PROGRAM DAERAH PEMBERDAYAAN MASYARAKAT - DESA MANDIRI

(PDPM-DM)
KABUPATEN TEGAL
PROPINSI JAWATENGAH

RENCANA ANGGARAN BIAYA

PEMASANGAN PAVING BLOK

KSM : SEJAHTERA
Dukuh : PENUJAH
Kelurahan/Desa : PENUJAH
Kecamatan : KEDUNGBANTENG
Kabupaten : TEGAL
Propinsi : JAWA TENGAH
TA : 2014
DAFTAR USULAN KEBUTUHAN PRASARANA

Lokasi Sumber Biaya ( Rp )


No Nama Pekerjaan Kegiatan Swadaya
BLM SLBM
( RT/RW ) In Cash
1 PEMASANGAN PAVING BLOK 02/14 Rp 19,236,450 Rp -
JUMLAH Rp 19,236,450 Rp -
PEMBULATAN Rp 19,236,000 Rp -
SA MANDIRI

LOK
Biaya ( Rp )
Swadaya
In Kind
Rp 596,900
Rp 596,900
Rp 600,000
Rencana Jalan Paving

A
Jalan Paving Existing
A
A

Paving 6 x 10 x 20 cm

Pasir Urug t = 5 cm

Kansteen Beton Cetak


10 x 20 x 50 cm
Spesi 1 : 3
t= 2 cm
Rencana Jalan Paving

A
Jalan Paving Existing
A
A

Paving 6 x 10 x 20 cm

Pasir Urug t = 5 cm

Kansteen Beton Cetak


10 x 20 x 50 cm
Spesi 1 : 3
t= 2 cm
PEMERINTAH KABUPATEN TEGAL
KECAMATAN …..
DESA ……
PROGRAM DAERAH PEMBERDAYAAN
MASYARAKAT - DESA MANDIRI
(PDPM-DM)
KEGIATAN

PERKERASAN JALAN

PEKERJAAN/LOKASI
Pavingisasi RT 03 RW II
DIBUAT
Ketua KSM “……….”

Tomahawk
DIAJUKAN
Kepala Desa

Jack ‘Oneil
DIVERIFIKASI
Kepala UPTD PU

James Bond
NIP. 007 0 007 007
DISETUJUI
Konsultan Manajemen Kabupaten

Sutiknyo
JUDUL GAMBAR

DENAH SITUASI

PEMERINTAH KABUPATEN TEGAL


KECAMATAN …..
DESA ……
PROGRAM DAERAH PEMBERDAYAAN
MASYARAKAT - DESA MANDIRI
(PDPM-DM)
KEGIATAN

PERKERASAN JALAN

PEKERJAAN/LOKASI
Pavingisasi RT 03 RW II
DIBUAT
Ketua KSM “……….”
(PDPM-DM)
KEGIATAN

PERKERASAN JALAN

PEKERJAAN/LOKASI
Pavingisasi RT 03 RW II
DIBUAT
Ketua KSM “……….”

Tomahawk
DIAJUKAN
Kepala Desa

Jack ‘Oneil
DIVERIFIKASI
Kepala UPTD PU

James Bond
NIP. 007 0 007 007
DISETUJUI
Konsultan Manajemen Kabupaten

Sutiknyo
JUDUL GAMBAR

TAMPAK

PEMERINTAH KABUPATEN TEGAL


KECAMATAN …..
DESA ……
PROGRAM DAERAH PEMBERDAYAAN
MASYARAKAT - DESA MANDIRI
(PDPM-DM)
KEGIATAN

PERKERASAN JALAN

PEKERJAAN/LOKASI
Pavingisasi RT 03 RW II
DIBUAT
Ketua KSM “……….”

Tomahawk
DIAJUKAN
Kepala Desa

Jack ‘Oneil
DIVERIFIKASI
Kepala UPTD PU

James Bond
NIP. 007 0 007 007
DISETUJUI
Konsultan Manajemen Kabupaten
Jack ‘Oneil
DIVERIFIKASI
Kepala UPTD PU

James Bond
NIP. 007 0 007 007
DISETUJUI
Konsultan Manajemen Kabupaten

Sutiknyo
JUDUL GAMBAR

POTONGAN

PEMERINTAH KABUPATEN TEGAL


KECAMATAN …..
DESA ……
PROGRAM DAERAH PEMBERDAYAAN
MASYARAKAT - DESA MANDIRI
(PDPM-DM)
KEGIATAN

PERKERASAN JALAN

PEKERJAAN/LOKASI
Pavingisasi RT 03 RW II
DIBUAT
Ketua KSM “……….”

Tomahawk
DIAJUKAN
Kepala Desa

Jack ‘Oneil
DIVERIFIKASI
Kepala UPTD PU

James Bond
NIP. 007 0 007 007
DISETUJUI
Konsultan Manajemen Kabupaten

Sutiknyo
JUDUL GAMBAR

DETAIL
DAFTAR ANALISA PEKERJAAN
DAFTAR ANALISA PEKERJAAN
KEGIATAN :
PEKERJAAN :
LOKASI :
TAHUN ANGGARAN :

KODE KOEF SAT. URAIAN PAKERJAAN

PEKERJAAN PERSIAPAN

A.6.2 1.000 m' Pagar Sementara dari Seng Gelombang Tinggi 2,00 m
6.2.1 Bahan
1.250 Btg Kayu Dolken diameter 8 - 10 / 400 cm
2.500 Kg Portland Semen
1.200 Lbr Seng Gelombang 3" - 5"
0.005 m3 Pasir
0.009 m3 Koral Beton
0.072 m3 Kayu 5/7X4m Kayu Kruing
0.060 Kg Paku Biasa 2" - 5"
0.450 Kg Meni Besi

6.2.2 Tenaga
0.200 OH Tukang Kayu
0.400 OH Pekerja
0.020 OH Kepala Tukang
0.020 OH Mandor

A.6.4 1 m' Pengukuran dan Pemasangan Bouwplank


6.4.1 Bahan
0.012 m3 Kayu 5/7x 4m Kayu Kruing
0.020 Kg Paku Biasa 2" - 5"
0.007 m3 Kayu Papan 3/20 Kruing

6.4.2 Tenaga
0.100 OH Tukang Kayu
0.100 OH Pekerja
0.010 OH Kepala Tukang
0.005 OH Mandor

6.5 1.000 m2 Pembuatan Kantor Sementara dg Lantai Plesteran


6.5.1 Bahan
1.250 Btg Kayu Dolken Ø 8 - 10 / 4 m
0.180 m3 Kayu
0.850 Kg Paku Biasa 2" - 5"
1.100 Kg Besi Strip
35.000 Kg Portland Sement
0.150 m3 Pasir
0.100 m3 Pasir
0.150 m3 Koral Beton
30.000 buah Batu bata Merah
0.250 Lbr Seng Plat
2.000 buah Jendela Naco
0.080 m2 Kaca Polos
0.150 buah Kunci Tanam
0.300 buah Engsel
0.060 Lbr Plywood 4 mm

6.5.2 Tenaga
2.000 OH Tukang Kayu
1.000 OH Tukang Batu
2.000 OH Pekerja
0.300 OH Kepala Tukang
0.050 OH Mandor

6.6 1.000 m2 Pembuatan Gudang Semen dan Alat-alat


6.6.1 Bahan
1.700 Btg Kayu Dolken diameter 8 - 10 / 400 cm
0.210 m3 Kayu
0.300 Kg Paku Biasa 2" - 5"
10.500 Kg Portland Semen
0.030 m3 Pasir
0.050 m3 Koral Beton
1.500 Lbr Seng Gelombang BJLS 32

6.6.2 Tenaga
2.000 OH Tukang Kayu
1.000 OH Pekerja
0.200 OH Kepala Tukang
0.050 OH Mandor

A.6.8 1 m2 Membersihkan Lapangan dan Perataan


6.8.2 Tenaga
0.100 OH Pekerja
0.050 OH Mandor

A.6.11 1 m2 Pembuatan Steger dari Bambu Uk. 40 x 50 x 20 cm


6.11.1 Bahan
1.000 Btg Bambu diameter 6 - 8 / 600 cm
0.250 Kg Tali Ijuk
6.11.2 Tenaga
0.170 OH Tukang Kayu
0.250 OH Pekerja
0.002 OH Kepala Tukang
0.001 OH Mandor

A.6.13 1 m3 Bongkaran Beton Bertulang


6.13.2 Tenaga
6.667 OH Pekerja
0.333 OH Mandor

A.6.14 1 m3 Bongkaran Dinding Tembok Bata Merah


6.14.2 Tenaga
6.667 OH Pekerja
0.033 OH Mandor

PEKERJAAN TANAH

B.6.1 1 m3 Galian Tanah Biasa Sedalam 1 m


6.1.2 Tenaga
0.750 OH Pekerja
0.025 OH Mandor

B.6.4 1 m3 Galian Tanah Keras Sedalam 1 m


6.4.2 Tenaga
1.000 OH Pekerja
0.032 OH Mandor

B.6.5 1 m3 Galian Tanah Cadas Sedalam 1 m


6.5.2 Tenaga
1.500 OH Pekerja
0.060 OH Mandor

B.6.6 1 m3 Galian Tanah Lumpur Sedalam 1 m


6.6.2 Tenaga
1.200 OH Pekerja
0.045 OH Mandor

B.6.7 1 m2 Pekerjaan Striping Tebing Setinggi 1 m


6.7.2 Tenaga
0.050 OH Pekerja
0.005 OH Mandor

B.6.8 1 m3 MembuangTanah sejauh 30 m'


6.8.2 Tenaga
0.330 OH Pekerja
0.010 OH Mandor

B.6.9 1 m3 Urugan Kembali (dihitung 1/3 kali indeks pekerjaan galian)


Tenaga
0.250 OH MembuangTanah sejauh 30 m'
0.011 OH Tenaga

B.6.10 1 m3 Pemadatan Tanah (per 20 cm)


6.10.2 Tenaga
0.500 OH Pekerja
0.050 OH Mandor

B.6.11 1 m3 Urugan Pasir


6.11.1 Bahan
1.200 m3 Pasir Urug

6.11.2 Tenaga
0.300 OH Pekerja
0.010 OH Mandor

B.6.12 1 m3 Lapisan Pudel Cmp. 1Kp : 3Ps : 7TL


6.12.1 Bahan
0.400 m3 Pasir
0.135 m3 Kapur Pasang
0.948 m3 Tanah Liat

6.12.2 Tenaga
0.800 OH Pekerja
0.400 OH Tukang Batu
0.040 OH Kepala Tukang
0.080 OH Mandor

B.6.14 1 m2 Pemasangan Lapisan Ijuk tebal 10 cm


6.14.1 Bahan
6.000 kg Ijuk

6.14.2 Tenaga
0.150 OH Pekerja
0.015 OH Mandor

B.6.15 1 m3 Urugan Sirtu


6.15.1 Bahan
1.200 m3 Sirtu

6.15.2 Tenaga
0.250 OH Pekerja
0.025 OH Mandor
PEKERJAAN PONDASI

C.6.1 1 m3 Pasang Pondasi Batu Kali 1Pc : 3 Psr


6.1.1 Bahan
1.200 m3 Batu Kali
202.000 Kg Portland Sement
0.485 m3 Pasir

6.1.2 Tenaga
1.500 OH Pekerja
0.750 OH Tukang Batu
0.075 OH Kepala Tukang
0.075 OH Mandor

C.6.2 1 m3 Pasang Pondasi Batu Kali 1Pc : 4 Psr


6.1.1 Bahan
1.200 m3 Batu Kali
163.000 Kg Portland Sement
0.520 m3 Pasir

6.1.2 Tenaga
1.500 OH Pekerja
0.750 OH Tukang Batu
0.075 OH Kepala Tukang
0.075 OH Mandor

C.6.2.a 1 m3 Pasang batu kali, 1 Pc : 4 Ps (Batu Kali 60%,blonos 40%)


Bahan
C.5.1 0.480 m3 Batu Blonos
0.720 m3 Batu Kali Pecah
163.000 Kg Portland Sement
0.520 m3 Pasir

C.5.2 Tenaga
1.500 OH Pekerja
0.600 OH Tukang Batu
0.060 OH Kepala Tukang
0.075 OH Mandor

C.6.3 1 m3 Pasang Pondasi Batu Kali 1Pc : 5 Psr


6.3.1 Bahan
1.200 m3 Batu Kali
136.000 Kg Portland Sement
0.544 m3 Pasir

6.3.2 Tenaga
1.500 OH Pekerja
0.750 OH Tukang Batu
0.075 OH Kepala Tukang
0.075 OH Mandor

C.6.4 1 m3 Pasang Pondasi Batu Kali 1Pc : 6 Psr


6.3.1 Bahan
1.200 m3 Batu Kali
117.000 Kg Portland Sement
0.561 m3 Pasir

6.3.2 Tenaga
1.500 OH Pekerja
0.750 OH Tukang Batu
0.075 OH Kepala Tukang
0.075 OH Mandor

C.6.9 1 m3 Pasang Pondasi Batu Kosong


6.9.1 Bahan
1.200 m3 Batu blonos
0.432 m3 Pasir Urug
6.9.2 Tenaga
. 0.780 OH Pekerja
0.390 OH Tukang Batu
0.039 OH Kepala Tukang
0.039 OH Mandor

C.6.10 1 m3 Pasang Pondasi Siklop, 60% Beton Camp. 1PC : 2PB : 3KR & 40% Batu Kali
6.10.1 Bahan
0.480 m3 Batu Kali cm
126.000 Kg Besi Beton
194.000 Kg Portland Semen
0.312 m3 Pasir Beton
0.468 m3 Koral Beton
1.800 Kg Kawat Beton
6.10.2 Tenaga
3.000 OH Pekerja
0.850 OH Tukang Batu
0.085 OH Kepala Tukang
0.150 OH Mandor

C.6.11 1 m3 Pasang Pondasi Sumuran diameter 100 cm


6.11.1 Bahan
0.450 m3 Batu Kali cm
194.000 Kg Portland Semen
0.312 m3 Pasir
0.468 m3 Koral Beton
6.11.2 Tenaga
2.380 OH Pekerja
0.300 OH Tukang Batu
0.030 OH Kepala Tukang
0.080 OH Mandor

PEKERJAAN DINDING
D.6.2 1 m2 Pasang Batu Merah Tebal 1 bata, 1 Pc : 3 Psr
6.7.1 Bahan
140.000 Buah Bata Merah 5 x 11 x 22
32.950 Kg Portland Semen
0.091 m3 Pasir
6.7.2 Tenaga
0.600 OH Pekerja
0.200 OH Tukang Batu
0.020 OH Kepala Tukang
0.030 OH Mandor

D.6.3 1 m2 Pasang Batu Merah Tebal 1 bata, 1 Pc : 4 Psr


6.7.1 Bahan
140.000 Buah Bata Merah 5 x 11 x 22
26.550 Kg Portland Semen
0.093 m3 Pasir
6.7.2 Tenaga
0.600 OH Pekerja
0.200 OH Tukang Batu
0.020 OH Kepala Tukang
0.030 OH Mandor

D.6.4 1 m2 Pasang Batu Merah Tebal 1 bata, 1 Pc : 5 Psr


6.7.1 Bahan
140.000 Buah Bata Merah 5 x 11 x 22
22.200 Kg Portland Semen
0.102 m3 Pasir
6.7.2 Tenaga
0.600 OH Pekerja
0.200 OH Tukang Batu
0.020 OH Kepala Tukang
0.030 OH Mandor

D.6.5 1 m2 Pasang Batu Merah Tebal 1 bata, 1 Pc : 6 Psr


6.7.1 Bahan
140.000 Buah Bata Merah 5 x 11 x 22
18.500 Kg Portland Semen
0.122 m3 Pasir
6.7.2 Tenaga
0.600 OH Pekerja
0.200 OH Tukang Batu
0.020 OH Kepala Tukang
0.030 OH Mandor

D.6.6 1 m2 Pasang Batu Merah Tebal 1 bata, 1 Pc : 3Kp : 10 Psr


6.7.1 Bahan
140.000 Buah Bata Merah 5 x 11 x 22
10.080 Kg Portland Semen
0.0925 m3 Pasir
6.7.2 Tenaga
0.600 OH Pekerja
0.200 OH Tukang Batu
0.020 OH Kepala Tukang
0.030 OH Mandor

D.6.7 1 m2 Pasang Batu Merah Tebal 1/2 bata, 1 Pc : 2 Psr


6.7.1 Bahan
70.000 Buah Bata Merah 5 x 11 x 22
18.950 Kg Portland Semen
0.038 m3 Pasir
6.7.2 Tenaga
0.300 OH Pekerja
0.100 OH Tukang Batu
0.010 OH Kepala Tukang
0.015 OH Mandor

D.6.8 1 m2 Pasang Batu Merah Tebal 1/2 bata, 1 Pc : 3 Psr


6.8.1 Bahan
70.000 Buah Bata Merah 5 x 11 x 22
14.370 Kg Portland Semen
0.040 m3 Pasir
6.8.2 Tenaga
0.300 OH Pekerja
0.100 OH Tukang Batu
0.010 OH Kepala Tukang
0.015 OH Mandor

D.6.9 1 m2 Pasang Batu Merah Tebal 1/2 bata, 1 Pc : 4 Psr


6.8.1 Bahan
70.000 Buah Bata Merah 5 x 11 x 22
11.500 Kg Portland Sement
0.043 m3 Pasir
6.8.2 Tenaga
0.300 OH Pekerja
0.100 OH Tukang Batu
0.010 OH Kepala Tukang
0.015 OH Mandor

D.6.10 1 m2 Pasang Batu Merah Tebal 1/2 bata, 1 Pc : 5 Psr


6.8.1 Bahan
70.000 Buah Bata Merah 5 x 11 x 22
9.680 Kg Portland Semen
0.045 m3 Pasir

6.8.2 Tenaga
0.300 OH Pekerja
0.100 OH Tukang Batu
0.010 OH Kepala Tukang
0.015 OH Mandor

D.6.11 1 m2 Pasang Batu Merah Tebal 1/2 bata, 1 Pc : 6 Psr


6.8.1 Bahan
70.000 Buah Bata Merah 5 x 11 x 22
8.320 Kg Portland Semen
0.049 m3 Pasir
6.8.2 Tenaga
0.300 OH Pekerja
0.100 OH Tukang Batu
0.010 OH Kepala Tukang
0.015 OH Mandor

PEKERJAAN PLESTERAN

E.6.1 1 m2 Plesteran 1 Pc : 1 Psr Tebal 15 mm


6.3.1 Bahan
15.504 Kg Portland Semen
0.016 m3 Pasir
6.3.2 Tenaga
0.200 OH Pekerja
0.150 OH Tukang batu
0.015 OH Kepala Tukang
0.010 OH Mandor

E.6.2 1 m2 Plesteran 1 Pc : 2 Psr Tebal 15 mm


6.3.1 Bahan
10.224 Kg Portland Semen
0.020 m3 Pasir

6.3.2 Tenaga
0.200 OH Pekerja
0.150 OH Tukang batu
0.015 OH Kepala Tukang
0.010 OH Mandor

E.6.3 1 m2 Plesteran 1 Pc : 3 Psr Tebal 15 mm


6.3.1 Bahan
7.776 Kg Portland Sement
0.023 m3 Pasir

6.3.2 Tenaga
0.200 OH Pekerja
0.150 OH Tukang batu
0.015 OH Kepala Tukang
0.010 OH Mandor

E.6.4 1 m2 Plesteran 1 Pc : 4 Psr Tebal 15 mm


6.3.1 Bahan
6.240 Kg Portland Semen
0.024 m3 Pasir
6.3.2 Tenaga
0.200 OH Pekerja
0.150 OH Tukang batu
0.015 OH Kepala Tukang
0.010 OH Mandor

E.6.5 1 m2 Plesteran 1 Pc : 5 Psr Tebal 15 mm


6.3.1 Bahan
5.184 Kg Portland Semen
0.026 m3 Pasir
6.3.2 Tenaga
0.200 OH Pekerja
0.150 OH Tukang batu
0.015 OH Kepala Tukang
0.010 OH Mandor

E.6.6 1 m2 Plesteran 1 Pc : 6 Psr Tebal 15 mm


6.3.1 Bahan
4.416 Kg Portland Semen
0.027 m3 Pasir
6.3.2 Tenaga
0.200 OH Pekerja
0.150 OH Tukang batu
0.015 OH Kepala Tukang
0.010 OH Mandor

E.6.10 1 m2 Plesteran 1 Pc : 2 Kp : 8 Psr Tebal 15 mm


6.10.1 Bahan
3.000 Kg Portland Semen
0.005 m3 Kapur Padam
0.020 m3 Pasir
6.10.2 Tenaga
0.220 OH Pekerja
0.120 OH Tukang batu
0.012 OH Kepala Tukang
0.011 OH Mandor

E.6.14 1 m2 Plesteran 1Pc : 3Psr Tebal 20 mm


6.14.1 Bahan
10.368 Kg Portland Semen
0.031 m3 Pasir
6.14.2 Tenaga
0.260 OH Pekerja
0.200 OH Tukang batu
0.020 OH Kepala Tukang
0.013 OH Mandor

E.6.17 1 m2 Plesteran 1Pc : 6Psr Tebal 20 mm


6.14.1 Bahan
5.888 Kg Portland Semen
0.036 m3 Pasir
6.14.2 Tenaga
0.260 OH Pekerja
0.200 OH Tukang batu
0.020 OH Kepala Tukang
0.013 OH Mandor

E.6.19 1 m2 Berapen 1 Pc : 5Psr Tebal 15 mm


6.19.1 Bahan
5.184 Kg Portland Semen
0.026 m3 Pasir
6.19.2 Tenaga
0.150 OH Pekerja
0.070 OH Tukang batu
0.007 OH Kepala Tukang
0.008 OH Mandor

E.6.20 1 m' Plesteran Skoning 1 Pc : 2Psr, lebar 10 mm


6.20.1 Bahan
0.500 Kg Portland Semen
0.013 m3 Pasir

6.20.2 Tenaga
0.150 OH Pekerja
0.070 OH Tukang batu
0.007 OH Kepala Tukang
0.008 OH Mandor

E.6.23 1 m2 Plesteran Ciprat 1 Pc : 2 Psr


6.23.1 Bahan
4.320 Kg Portland Semen
0.006 m3 Pasir

6.23.2 Tenaga
0.250 OH Pekerja
0.100 OH Tukang batu
0.010 OH Kepala Tukang
0.013 OH Mandor

E.6.26 1 m2 Finishing Siar Pas.Batu Kali Adukan 1Pc : 2Psr


6.26.1 Bahan
6.340 Kg Portland Sement
0.012 m3 Pasir

6.26.2 Tenaga
0.150 OH Pekerja
0.070 OH Tukang batu
0.007 OH Kepala Tukang
0.008 OH Mandor

E.6.27 1 m2 Acian
6.27.1 Bahan
3.250 Kg Portland Semen

6.27.2 Tenaga
0.150 OH Pekerja
0.100 OH Tukang batu
0.010 OH Kepala Tukang
0.008 OH Mandor

PEKERJAAN K A Y U
F.6.1 1 m3 Membuat Kosen Pintu & Jendela Kayu klas I
6.1.2 Bahan
1.100 m3 Kayu Klas I (Jati) , Balok
1.250 kg Paku Biasa 2" - 5 "
1.000 kg Lem Kayu
6.1.2 Tenaga
6.000 OH Pekerja
20.000 OH Tukang Kayu
2.000 OH Kepala Tukang
0.300 OH Mandor
F.6.2 1.000 m3 Membuat Kosen Pintu & Jendela Kayu klas II atau III
6.2.1 Bahan
1.200 m3 Kayu Klas II (bengkir) , Balok
1.250 kg Paku Biasa 2" - 5 "
1.000 kg Lem Kayu
6.2.2 Tenaga
6.000 OH Pekerja
20.000 OH Tukang Kayu
2.000 OH Kepala Tukang
0.300 OH Mandor

F.6.2a 1 m3 Membuat Kosen Pintu & Jendela Kayu klas II (Bengkir)


6.2.1 Bahan
1.200 m3 Kayu Klas II (bengkir) , Balok
1.250 kg Paku Biasa 2" - 5 "
1.000 kg Lem Kayu
6.2.2 Tenaga
6.000 OH Pekerja
20.000 OH Tukang Kayu
2.000 OH Kepala Tukang
0.300 OH Mandor

F.6.2b 1 m3 Membuat Kosen Pintu & Jendela Kayu klas III (Kruing)
6.2.1 Bahan
1.200 m3 Kayu Klas III (Kruing) , Balok
1.250 kg Paku Biasa 2" - 5 "
1.000 kg Lem Kayu
6.2.2 Tenaga
6.000 OH Pekerja
20.000 OH Tukang Kayu
2.000 OH Kepala Tukang
0.300 OH Mandor

F.6.3 1.000 m2 Membuat Pintu KlampStandard Kayu Klas II atau III


6.3.1 Bahan
0.040 m3 Kayu Klas II (Bengkir), papan
0.050 Kg Paku Biasa 2" - 5 "

6.3.2 Tenaga
0.350 OH Pekerja
1.050 OH Tukang Kayu
0.105 OH Kepala Tukang
0.018 OH Mandor

F.6.3a 1 m2 Membuat Pintu KlampStandard Kayu Klas II (Kayu Bengkir)


6.3.1 Bahan
0.040 m3 Kayu Klas II (Bengkir), papan
0.050 Kg Paku Biasa 2" - 5 "

6.3.2 Tenaga
0.350 OH Pekerja
1.050 OH Tukang Kayu
0.105 OH Kepala Tukang
0.018 OH Mandor

F.6.3b 1 m2 Membuat Pintu KlampStandard Kayu Klas III (Kayu Kruing)


6.3.1 Bahan
0.040 m3 Kayu Klas III (Kruing), papan
0.050 Kg Paku Biasa 2" - 5 "

6.3.2 Tenaga
0.350 OH Pekerja
1.050 OH Tukang Kayu
0.105 OH Kepala Tukang
0.018 OH Mandor

F.6.5 1.000 m2 Membuat Daun Pintu Panel Kayu Klas I, II, III
6.5.1 Bahan
0.040 m3 Kayu Klas II (Jati), papan
0.050 kg Lem Kayu
6.5.2 Tenaga
1.000 OH Pekerja
2.500 OH Tukang Kayu
0.250 OH Kepala Tukang
0.050 OH Mandor

F.6.5a 1 m2 Membuat Daun Pintu Panel Kayu Klas I (Jati)


6.5.1 Bahan
0.040 m3 Kayu Klas II (Jati), papan
0.050 kg Lem Kayu
6.5.2 Tenaga
1.000 OH Pekerja
2.500 OH Tukang Kayu
0.250 OH Kepala Tukang
0.050 OH Mandor

F.6.5b 1 m2 Membuat Daun Pintu Panel Kayu Klas II (Bengkir)


6.5.1 Bahan
0.040 m3 Kayu Klas II (Bengkir), papan
0.050 kg Lem Kayu
6.5.2 Tenaga
1.000 OH Pekerja
2.500 OH Tukang Kayu
0.250 OH Kepala Tukang
0.050 OH Mandor

F.6.5c 1 m2 Membuat Daun Pintu Panel Kayu Klas III (Kruing)


6.5.1 Bahan
0.040 m3 Kayu Klas III (Kruing), papan
0.050 kg Lem Kayu
6.5.2 Tenaga
1.000 OH Pekerja
2.500 OH Tukang Kayu
0.250 OH Kepala Tukang
0.050 OH Mandor

F.6.6 1.000 m2 Membuat Pintu & Jendela Kaca Kayu Klas I, II, III
6.6.1 Bahan
0.024 m3 Kayu Klas I (Jati), papan
0.300 kg Lem Kayu
6.6.2 Tenaga
0.800 OH Pekerja
2.000 OH Tukang Kayu
0.200 OH Kepala Tukang
0.040 OH Mandor

F.6.6a 1 m2 Membuat Pintu & Jendela Kaca Kayu Klas I (Jati)


6.6.1 Bahan
0.024 m3 Kayu Klas I (Jati), papan
0.300 kg Lem Kayu
6.6.2 Tenaga
0.800 OH Pekerja
2.000 OH Tukang Kayu
0.200 OH Kepala Tukang
0.040 OH Mandor

F.6.6b 1 m2 Membuat Pintu & Jendela Kaca Kayu Klas II (Bengkir)


6.6.1 Bahan
0.024 m3 Kayu Klas II (Bengkir), papan
0.300 kg Lem Kayu
6.6.2 Tenaga
0.800 OH Pekerja
2.000 OH Tukang Kayu
0.200 OH Kepala Tukang
0.040 OH Mandor

F.6.6c 1 m2 Membuat Pintu & Jendela Kaca Kayu Klas III (Kruing)
6.6.1 Bahan
0.024 m3 Kayu Klas III (Kruing), papan
0.300 kg Lem Kayu
6.6.2 Tenaga
0.800 OH Pekerja
2.000 OH Tukang Kayu
0.200 OH Kepala Tukang
0.040 OH Mandor

F.6.7 1.000 m2 Membuat Pintu & Jendela Jalusi Kayu Klas I atau II
6.7.1 Bahan
0.064 m3 Kayu Klas I (Jati), papan
0.500 kg Lem Kayu
6.7.2 Tenaga
1.000 OH Pekerja
3.000 OH Tukang Kayu
0.300 OH Kepala Tukang
0.050 OH Mandor

F.6.8 1.000 m2 Membuat Pintu kayu lapis (Plywood) Rangkap rangka Kayu Klas II atau III (l
6.8.1 Bahan
0.025 m3 Kayu Klas II (Bengkir), papan
0.030 Kg Paku Biasa 1/2" - 1"
0.500 Ltr Lem Kayu
1.000 Lbr Plywood tebal 4 mm uk.90x220cm

6.8.2 Tenaga
0.600 OH Pekerja
2.000 OH Tukang Kayu
0.200 OH Kepala Tukang
0.040 OH Mandor

F.6.8a 1 m2 Membuat Pintu kayu lapis (Plywood) Rangkap rangka Kayu Klas II (lbr s/d 9
6.8.1 Bahan
0.025 m3 Kayu Klas II (Bengkir), papan
0.030 Kg Paku Biasa 1/2" - 1"
0.500 Ltr Lem Kayu
1.000 Lbr Plywood tebal 4 mm uk.90x220cm

6.8.2 Tenaga
0.600 OH Pekerja
2.000 OH Tukang Kayu
0.200 OH Kepala Tukang
0.040 OH Mandor

F.6.8b 1 m2 Membuat Pintu kayu lapis (Plywood) Rangkap rangka Kayu Klas III (lbr s/d 9
6.8.1 Bahan
0.025 m3 Kayu Klas III (Kruing), papan
0.030 Kg Paku Biasa 1/2" - 1"
0.500 Ltr Lem Kayu
1.000 Lbr Plywood tebal 4 mm uk.90x220cm
6.8.2 Tenaga
0.600 OH Pekerja
2.000 OH Tukang Kayu
0.200 OH Kepala Tukang
0.040 OH Mandor

F.6.9 1.000 m2 Membuat Pintu Plywood rangkap, rangka expose kayu klas I atau III
6.9.1 Bahan
0.026 m3 Kayu Klas I (Jati), papan
0.030 Kg Paku Biasa 1/2" - 1"
0.500 Ltr Lem Kayu
1.000 Lbr Plywood tebal 4 mm uk.90x220cm
6.9.2 Tenaga
0.800 OH Pekerja
2.000 OH Tukang Kayu
0.200 OH Kepala Tukang
0.040 OH Mandor

F.6.9a 1 m2 Membuat Pintu Plywood rangkap, rangka expose kayu klas I


6.9.1 Bahan
0.026 m3 Kayu Klas I (Jati), papan
0.030 Kg Paku Biasa 1/2" - 1"
0.500 Ltr Lem Kayu
1.000 Lbr Plywood tebal 4 mm uk.90x220cm
6.9.2 Tenaga
0.800 OH Pekerja
2.000 OH Tukang Kayu
0.200 OH Kepala Tukang
0.040 OH Mandor

F.6.9b 1 m2 Membuat Pintu Plywood rangkap, rangka expose kayu klas II


6.9.1 Bahan
0.026 m3 Kayu Klas II (Bengkir), papan
0.030 Kg Paku Biasa 1/2" - 1"
0.500 Ltr Lem Kayu
1.000 Lbr Plywood tebal 4 mm uk.90x220cm
6.9.2 Tenaga
0.800 OH Pekerja
2.000 OH Tukang Kayu
0.200 OH Kepala Tukang
0.040 OH Mandor
F.6.10 1.000 m2 Membuat Jalusi mati Kosen Kayu Klas I atau II
6.10.1 Bahan
0.060 m3 Kayu Klas I (Jati), papan
0.150 Kg Paku Biasa 1/2" - 1"
6.10.2 Tenaga
0.500 OH Pekerja
2.000 OH Tukang Kayu
0.200 OH Kepala Tukang
0.025 OH Mandor

F.6.11 1 m2 Membuat Pintu Teakwood Rangkap, Rangka Expose Kayu Klas I


6.11.1 Bahan
0.025 m3 Kayu Klas I (Jati), papan
0.030 Kg Paku Biasa 1/2" - 1"
0.300 kg Lem Kayu
1.000 Lbr Teakwood (90 x 220) cm x 4 mm
6.11.2 Tenaga
0.800 OH Pekerja
2.000 OH Tukang Kayu
0.200 OH Kepala Tukang
0.040 OH Mandor

F.6.12 1 m2 Membuat Pintu Teakwood Rangkap Lapis Formika,Rangka expose Kayu Kla
6.12.1 Bahan
0.025 m3 Kayu Klas II (Bengkir), papan
0.030 Kg Paku Biasa 1/2" - 1"
0.080 kg Lem Kayu
1.000 Lbr Teakwood (90 x 220) cm x 4 mm
0.500 Lbr Formika
6.12.2 Tenaga
0.800 OH Pekerja
2.500 OH Tukang Kayu
0.250 OH Kepala Tukang
0.040 OH Mandor

F.6.13a 1 m3 Memasang Konstruksi Kuda-kuda Konvensional Kayu Kelas I Bentang 6 me


6.13.1 Bahan
1.100 m3 Kayu Jati, balok
15.000 Kg Besi Strip
5.600 Kg Paku Biasa 2" - 5"
6.13.2 Tenaga
4.000 OH Pekerja
12.000 OH Tukang Kayu
1.200 OH Kepala Tukang
0.200 OH Mandor

F.6.13b 1 m3 Memasang Konstruksi Kuda-kuda Konvensional Kayu Kelas II Bentang 6 m


6.13.1 Bahan
1.100 m3 Kayu Bengkir, balok
15.000 Kg Besi Strip
5.600 Kg Paku Biasa 2" - 5"
6.13.2 Tenaga
4.000 OH Pekerja
12.000 OH Tukang Kayu
1.200 OH Kepala Tukang
0.200 OH Mandor

F.6.13c 1 m3 Memasang Konstruksi Kuda-kuda Konvensional Kayu Kelas III Bentang 6 m


6.13.1 Bahan
1.100 m3 Kayu Kruing, balok
15.000 Kg Besi Strip
5.600 Kg Paku Biasa 2" - 5"
6.13.2 Tenaga
4.000 OH Pekerja
12.000 OH Tukang Kayu
1.200 OH Kepala Tukang
0.200 OH Mandor

F.6.14 1 m3 Memasang Konstruksi Kuda-kuda Expose, Kayu Klas I


6.14.1 Bahan
1.200 m3 Kayu Klas I (jati), balok
15.000 Kg Besi Strip
5.600 Kg Paku Biasa 2" - 5"
6.14.2 Tenaga
6.000 OH Pekerja
20.000 OH Tukang Kayu
2.000 OH Kepala Tukang
0.300 OH Mandor

F.6.15a 1 m3 Memasang konstruksi Gording, Kayu Klas I


6.15.1 Bahan
1.100 m3 Kayu Klas I (Jati), balok
15.000 Kg Besi Strip
3.000 Kg Paku Biasa 2" - 5"
6.15.2 Tenaga
2.400 OH Pekerja
7.200 OH Tukang Kayu
0.720 OH Kepala Tukang
0.120 OH Mandor

F.6.15b 1 m3 Memasang konstruksi Gording, Kayu Klas II


6.15.1 Bahan
1.100 m3 Kayu Klas II (Bengkir), balok
15.000 Kg Besi Strip
3.000 Kg Paku Biasa 2" - 5"
6.15.2 Tenaga
2.400 OH Pekerja
7.200 OH Tukang Kayu
0.720 OH Kepala Tukang
0.120 OH Mandor

F.6.15c 1 m3 Memasang konstruksi Gording, Kayu Klas III


6.15.1 Bahan
1.100 m3 Kayu Klas III (Kruing), balok
15.000 Kg Besi Strip
3.000 Kg Paku Biasa 2" - 5"
6.15.2 Tenaga
2.400 OH Pekerja
7.200 OH Tukang Kayu
0.720 OH Kepala Tukang
0.120 OH Mandor

F.6.16 1 m2 Memasang Rangka Atap Genteng Keramik, Kayu Klas III


6.16.1 Bahan
0.014 m3 Kayu Klas III (Kruing), Kaso-kaso (5x7) cm
0.036 m3 Reng (2x3) cm
0.250 Kg Paku Biasa 2" - 5"
6.16.2 Tenaga
0.100 OH Pekerja
0.100 OH Tukang Kayu
0.010 OH Kepala Tukang
0.005 OH Mandor

F.6.16a 1 m2 Memasang Rangka Atap Genteng Pres Kebumen/Jatiwangi, Kayu Klas III
6.16.1 Bahan
0.014 m3 Kayu Klas III (Kruing), Kaso-kaso (5x7) cm
0.003 m3 Reng (2x3) cm
0.250 Kg Paku Biasa 2" - 5"
6.16.2 Tenaga
0.100 OH Pekerja
0.100 OH Tukang Kayu
0.010 OH Kepala Tukang
0.005 OH Mandor

F.6.17 1 m2 Memasang Rangka Atap Genteng Beton, Kayu Klas III


6.17.1 Bahan
0.014 m3 Kayu Klas III (Kruing), Kaso-kaso (5x7) cm
0.008 m3 Reng (3x5) cm
0.250 Kg Paku Biasa 2" - 5"
6.17.2 Tenaga
0.100 OH Pekerja
0.100 OH Tukang Kayu
0.010 OH Kepala Tukang
0.005 OH Mandor

F.6.18 1 m2 Memasang Rangka Atap Sirap, Kayu Klas III


6.18.1 Bahan
0.165 m3 Kayu Klas III (Kruing), balok
0.200 Kg Paku Biasa 2" - 5"
6.18.2 Tenaga
0.120 OH Pekerja
0.120 OH Tukang Kayu
0.012 OH Kepala Tukang
0.006 OH Mandor

F.6.19 1.000 m2 Memasang Rangka Langit-langit (1,00x1,00) m, kayu Klas II atau III
6.19.1 Bahan
0.015 m3 Kayu Klas II atau III, balok
0.200 Kg Paku Biasa 2" - 5"
6.19.2 Tenaga
0.150 OH Pekerja
0.250 OH Tukang Kayu
0.025 OH Kepala Tukang
0.075 OH Mandor

F.6.19a 1 m2 Memasang Rangka Langit-langit (1,00x1,00) m, kayu Klas II


6.19.1 Bahan
0.015 m3 Kayu Klas II (Bengkir), balok
0.200 Kg Paku Biasa 2" - 5"
6.19.2 Tenaga
0.150 OH Pekerja
0.250 OH Tukang Kayu
0.025 OH Kepala Tukang
0.075 OH Mandor

F.6.19b 1 m2 Memasang Rangka Langit-langit (1,00x1,00) m, kayu Klas III


6.19.1 Bahan
0.015 m3 Kayu Klas III (Kruing), balok
0.200 Kg Paku Biasa 2" - 5"
6.19.2 Tenaga
0.150 OH Pekerja
0.250 OH Tukang Kayu
0.025 OH Kepala Tukang
0.075 OH Mandor

F.6.20 1.000 m2 Memasang Rangka Langit-langit (60x60) cm, kayu Klas II atau III
6.20.1 Bahan
0.016 m3 Kayu Klas II (Kruing), balok
0.250 Kg Paku Biasa 2" - 5"
6.20.2 Tenaga
0.200 OH Pekerja
0.300 OH Tukang Kayu
0.030 OH Kepala Tukang
0.010 OH Mandor

F.6.20a 1 m2 Memasang Rangka Langit-langit (60x60) cm, kayu Klas II


6.20.1 Bahan
0.016 m3 Kayu Klas II (Bengkir), balok
0.250 Kg Paku Biasa 2" - 5"
6.20.2 Tenaga
0.200 OH Pekerja
0.300 OH Tukang Kayu
0.030 OH Kepala Tukang
0.010 OH Mandor

F.6.20b 1 m2 Memasang Rangka Langit-langit (60x60) cm, kayu Klas III


6.20.1 Bahan
0.016 m3 Kayu Klas III (Kruing), balok
0.250 Kg Paku Biasa 2" - 5"
6.20.2 Tenaga
0.200 OH Pekerja
0.300 OH Tukang Kayu
0.030 OH Kepala Tukang
0.010 OH Mandor

F.6.21 1.000 m' Memasang Listplank Uk. (3x20)cm Kayu klas I atau II
6.21.1 Bahan
0.0108 m3 Kayu klas I (Jati), papan
0.100 Kg Paku Biasa 2" - 5"
6.21.2 Tenaga
0.100 OH Pekerja
0.200 OH Tukang Kayu
0.025 OH Kepala Tukang
0.005 OH Mandor

F.6.21a 1 m' Memasang Listplank Uk. (3x20)cm Kayu klas I


6.21.1 Bahan
0.0054 m3 Kayu klas I (Jati), papan
0.100 Kg Paku Biasa 2" - 5"
6.21.2 Tenaga
0.100 OH Pekerja
0.200 OH Tukang Kayu
0.025 OH Kepala Tukang
0.005 OH Mandor

F.6.21b 1 m' Memasang Listplank Uk. (3x20)cm Kayu klas II


6.21.1 Bahan
0.0054 m3 Kayu klas II (Bengkir), papan
0.100 Kg Paku Biasa 2" - 5"
6.21.2 Tenaga
0.100 OH Pekerja
0.200 OH Tukang Kayu
0.025 OH Kepala Tukang
0.005 OH Mandor

F.6.21c 1 m' Memasang Listplank Uk. (3x20)cm Kayu klas III


6.21.1 Bahan
0.0054 m3 Kayu klas III (Kruing), papan
0.100 Kg Paku Biasa 2" - 5"
6.21.2 Tenaga
0.100 OH Pekerja
0.200 OH Tukang Kayu
0.025 OH Kepala Tukang
0.005 OH Mandor

F.6.22 1.000 m' Memasang Listplank Uk. (3x30)cm klas III


6.22.1 Bahan
0.011 m3 Kayu klas III (Kruing), papan
0.050 Kg Paku Biasa 2" - 5"
6.22.2 Tenaga
0.100 OH Pekerja
0.200 OH Tukang Kayu
0.020 OH Kepala Tukang
0.005 OH Mandor
F.6.22a 1.000 m' Memasang Listplank Uk. (3x30)cm klas III
6.22.1 Bahan
0.006 m3 Kayu klas III (Kruing), papan
0.050 Kg Paku Biasa 2" - 5"
6.22.2 Tenaga
0.100 OH Pekerja
0.200 OH Tukang Kayu
0.020 OH Kepala Tukang
0.005 OH Mandor

F.6.23 1.000 m2 Memasang Rangka Dinding Pemisah (60x120) cm Kayu klas II atau III
6.23.1 Bahan
0.028 m3 Kayu klas II (Kruing), balok
0.150 Kg Paku Biasa 2" - 5"
6.23.2 Tenaga
0.150 OH Pekerja
0.450 OH Tukang Kayu
0.045 OH Kepala Tukang
0.008 OH Mandor

F.6.23a 1.000 m2 Memasang Rangka Dinding Pemisah (60x120) cm Kayu klas II


6.23.1 Bahan
0.028 m3 Kayu klas II (Bengkir), balok
0.150 Kg Paku Biasa 2" - 5"
6.23.2 Tenaga
0.150 OH Pekerja
0.450 OH Tukang Kayu
0.045 OH Kepala Tukang
0.008 OH Mandor

F.6.23b 1 m2 Memasang Rangka Dinding Pemisah (60x120) cm Kayu klas III


6.23.1 Bahan
0.028 m3 Kayu klas III (Kruing), balok
0.150 Kg Paku Biasa 2" - 5"
6.23.2 Tenaga
0.150 OH Pekerja
0.450 OH Tukang Kayu
0.045 OH Kepala Tukang
0.008 OH Mandor

F.6.24 1.000 m2 Memasang Dinding Pemisah Teakwood Rangkap Rangka Kayu Klas II
6.24.1 Bahan
0.028 m3 Kayu klas II (Kruing), balok
0.150 Kg Paku Biasa 2" - 5"
0.860 Lbr Teakwood 120 x 240 cm tebal 4mm
0.560 Ltr Lem
6.24.2 Tenaga
0.150 OH Pekerja
0.450 OH Tukang Kayu
0.045 OH Kepala Tukang
0.008 OH Mandor

F.6.24a 1 m2 Memasang Dinding Pemisah Teakwood Rangkap Rangka Kayu Klas II


6.24.1 Bahan
0.028 m3 Kayu klas II (Bengkir), balok
0.150 Kg Paku Biasa 2" - 5"
0.860 Lbr Teakwood 120 x 240 cm tebal 4mm
0.560 Ltr Lem
6.24.2 Tenaga
0.150 OH Pekerja
0.450 OH Tukang Kayu
0.045 OH Kepala Tukang
0.008 OH Mandor

F.6.24b 1 m2 Memasang Dinding Pemisah Teakwood Rangkap Rangka Kayu Klas III
6.24.1 Bahan
0.028 m3 Kayu klas III (Kruing), balok
0.150 Kg Paku Biasa 2" - 5"
0.860 Lbr Teakwood 120 x 240 cm tebal 4mm
0.560 Ltr Lem
6.24.2 Tenaga
0.150 OH Pekerja
0.450 OH Tukang Kayu
0.045 OH Kepala Tukang
0.008 OH Mandor

F.6.26 1 m2 Memasang Dinding Lambriziring dari Papan klas I


6.26.1 Bahan
0.007 m3 Kayu klas I (Jati), papan
0.100 Kg Paku Biasa 2" - 5"
0.150 Kg Paku Sekrup 3,5"
6.26.2 Tenaga
0.600 OH Pekerja
1.800 OH Tukang Kayu
0.180 OH Kepala Tukang
0.030 OH Mandor

F.6.28a 1 m2 Memasang Dinding Bilik, Rangka Kayu Klas III


6.28.1 Bahan
1.500 m2 Bilik Bambu
0.014 m3 Kayu Klas III (Kruing)
0.050 Kg Paku Biasa 1/2" - 1"
0.003 m' List Kayu 2/4
6.28.2 Tenaga
0.100 OH Pekerja
0.050 OH Tukang Kayu
0.005 OH Kepala Tukang
0.005 OH Mandor

PEKERJAAN B E T O N
G.6.1 1 m3 Membuat Beton mutu f'c=7,4 Mpa (K100), slum (12±2)cm, w/c = 0,87
6.1.1 Bahan
247.000 Kg Portland Semen
869.000 Kg Pasir
999.000 Kg Kerikil (maksimum 30 mm)
215.000 ltr Air
6.1.2 Tenaga
1.650 OH Pekerja
0.275 OH Tukang Batu
0.028 OH Kepala Tukang
0.083 OH Mandor

G.6.2 1 m3 Membuat Beton mutu f'c=9,8 Mpa (K125), slum (12±2)cm, w/c = 0,78
6.2.1 Bahan
276.000 Kg Portland Semen
828.000 kg Pasir
1,012.000 kg Kerikil (maksimum 30 mm)
215.000 ltr Air
6.2.2 Tenaga
1.650 OH Pekerja
0.275 OH Tukang Batu
0.028 OH Kepala Tukang
0.083 OH Mandor

G.6.3 1 m3 Membuat Beton mutu f'c=12,2 Mpa (K150), slum (12±2)cm, w/c = 0,72
6.3.1 Bahan
299.000 Kg Portland Semen
799.000 kg Pasir
1,017.000 kg Kerikil (maksimum 30 mm)
215.000 ltr Air
6.3.2 Tenaga
1.650 OH Pekerja
0.275 OH Tukang Batu
0.028 OH Kepala Tukang
0.083 OH Mandor

G.6.4 1 m3 Membuat Lantai Kerja Beton mutu f'c=7,4 MPa (K100), slum (3-6)cm, w/c =
6.4.1 Bahan
230.000 Kg Portland Semen
893.000 kg Pasir
1,027.000 kg Kerikil (maksimum 30 mm)
200.000 ltr Air
6.4.2 Tenaga
1.200 OH Pekerja
0.200 OH Tukang Batu
0.020 OH Kepala Tukang
0.006 OH Mandor

G.6.5 1 m3 Membuat Beton mutu f'c=14,5 MPa (K175), slum (12±2)cm, w/c = 0,66
6.5.1 Bahan
326.000 Kg Portland Sement
760.000 Kg Pasir (Harga pasir per kg)
1,029.000 Kg Batu pecah dg mesin (2/3 cm) per kg
215.000 ltr Air
6.5.2 Tenaga
1.650 OH Pekerja
0.275 OH Tukang Batu
0.028 OH Kepala Tukang
0.083 OH Mandor

G.6.6 1 m3 Membuat Beton mutu f'c=16,9 MPa (K200), slum (12±2)cm, w/c = 0,61
6.6.1 Bahan
352.000 Kg Portland Semen
731.000 Kg Pasir
1,031.000 Kg Batu pecah dg mesin (2/3 cm) per kg
215.000 ltr Air
6.6.2 Tenaga
1.650 OH Pekerja
0.275 OH Tukang batu
0.028 OH Kepala Tukang
0.083 OH Mandor

G.6.7 1 m3 Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58
6.7.1 Bahan
371.000 Kg Portland Semen
698.000 Kg Pasir
1,047.000 Kg Batu pecah dg mesin (2/3 cm) per kg
215.000 ltr Air
6.7.2 Tenaga
1.650 OH Pekerja
0.275 OH Tukang Batu
0.028 OH Kepala Tukang
0.083 OH Mandor

G.6.8 1 m3 Membuat Beton mutu f'c=21,7 MPa (K250), slum (12±2)cm, w/c = 0,56
6.8.1 Bahan
384.000 Kg Portland Semen
692.000 Kg Pasir
1,039.000 Kg Batu pecah dg mesin (2/3 cm) per kg
215.000 ltr Air
6.8.2 Tenaga
1.650 OH Pekerja
0.275 OH Tukang Batu
0.028 OH Kepala Tukang
0.083 OH Mandor

G.6.9 1 m3 Membuat Beton mutu f'c=24,0 MPa (K275), slum (12±2)cm, w/c = 0,53
6.9.1 Bahan
406.000 Kg Portland Semen
684.000 kg Pasir
1,026.000 kg Batu pecah dg mesin (2/3 cm) per kg
215.000 ltr Air
6.9.2 Tenaga
1.650 OH Pekerja
0.275 OH Tukang Batu
0.028 OH Kepala Tukang
0.083 OH Mandor

G.6.10 1 m3 Membuat Beton mutu f'c=26,4 MPa (K300), slum (12±2)cm, w/c = 0,52
6.10.1 Bahan
413.000 Kg Portland Semen
681.000 Kg Pasir
1,021.000 Kg Batu pecah dg mesin (2/3 cm) per kg
215.000 ltr Air
6.10.2 Tenaga
1.650 OH Pekerja
0.275 OH Tukang Batu
0.028 OH Kepala Tukang
0.083 OH Mandor

G.6.11 1 m3 Membuat Beton mutu f'c=28,8 MPa (K325), slum (12±2)cm, w/c = 0,49
6.11.1 Bahan
439.000 Kg Portland Semen
670.000 Kg Pasir
1,006.000 Kg Batu pecah dg mesin (2/3 cm) per kg
215.000 ltr Air
6.11.2 Tenaga
2.100 OH Pekerja
0.350 OH Tukang Batu
0.035 OH Kepala Tukang
0.105 OH Mandor

G.6.12 1 m3 Membuat Beton mutu f'c=31,2 MPa (K350), slum (12±2)cm, w/c = 0,48
6.12.1 Bahan
448.000 Kg Portland Semen
667.000 Kg Pasir
1,000.000 Kg Batu pecah dg mesin (2/3 cm) per kg
215.000 ltr Air
6.12.2 Tenaga
2.100 OH Pekerja
0.350 OH Tukang Batu
0.035 OH Kepala Tukang
0.105 OH Mandor

CATATAN : Bobot isi pasir = 1.400 kg/m3, bobot krikil = 1.350 kg/m3, Bukling factor pas

G.6.17 1 Kg Pembesian dg Besi Polos


6.17.1 Bahan
1.0500 Kg Besi Beton (polos)
0.0150 Kg Kawat Beton
6.17.2 Tenaga
0.0070 OH Pekerja
0.0070 OH Tukang Besi
0.0007 OH Kepala Tukang
0.0004 OH Mandor

G.6.17a 1 Kg Pembesian dg Besi Ulir


6.17.1 Bahan
1.0500 Kg Besi Beton (ulir)
0.0150 Kg Kawat Beton
6.17.2 Tenaga
0.0070 OH Pekerja
0.0070 OH Tukang Besi
0.0007 OH Kepala Tukang
0.0004 OH Mandor

G.6.20 1 m2 Memasang Bekisting untuk Pondasi


6.20.1 Bahan
0.040 m3 Kayu Klas III (Terentang)
0.300 Kg Paku Biasa 2" - 5"
0.100 Ltr Minyak Bekisting
6.20.2 Tenaga
0.520 OH Pekerja
0.260 OH Tukang Kayu
0.026 OH Kepala Tukang
0.026 OH Mandor

G.6.21 1 m2 Memasang Bekisting untuk Sloof


6.21.1 Bahan
0.045 m3 Kayu Klas III (Terentang)
0.300 Kg Paku Biasa 2" - 5"
0.100 Ltr Minyak Bekisting
6.21.2 Tenaga
0.520 OH Pekerja
0.260 OH Tukang Kayu
0.026 OH Kepala Tukang
0.026 OH Mandor

G.6.22 1 m2 Memasang Bekisting untuk Kolom


6.22.1 Bahan
0.040 m3 Kayu Klas III (Terentang)
0.400 Kg Paku Biasa 2" - 5"
0.200 Ltr Minyak Bekisting
0.015 m3 Balok Kayu Klas II
0.350 Lbr Plywood tebal 4mm
2.000 Btg Dolken Kayu Galam diameter 8 - 10 cm / 4 m
6.22.2 Tenaga
0.660 OH Pekerja
0.330 OH Tukang Kayu
0.033 OH Kepala Tukang
0.033 OH Mandor

G.6.22a 1 m2 Memasang Bekisting untuk Kolom


6.22.1 Bahan
0.040 m3 Papan cetak pinus
0.400 Kg Paku Biasa 2" - 5"
0.200 Ltr Minyak Bekisting
6.22.2 Tenaga
0.660 OH Pekerja
0.330 OH Tukang Kayu
0.033 OH Kepala Tukang
0.033 OH Mandor

G.6.23 1 m2 Memasang Bekisting untuk Balok


6.23.1 Bahan
0.040 m3 Kayu Klas III (Terentang)
0.400 Kg Paku Biasa 2" - 5"
0.200 Ltr Minyak Bekisting
0.018 m3 Balok Kayu Klas II
0.350 Lbr Plywood tebal 4mm
2.000 Btg Dolken Kayu Galam diameter 8 - 10 cm / 4 m
6.23.2 Tenaga
0.660 OH Pekerja
0.330 OH Tukang Kayu
0.033 OH Kepala Tukang
0.033 OH Mandor

G.6.23a 1 m2 Memasang Bekisting untuk Balok


6.23.1 Bahan
0.040 m3 Papan cetak pinus
0.400 Kg Paku Biasa 2" - 5"
0.200 Ltr Minyak Bekisting
6.23.2 Tenaga
0.660 OH Pekerja
0.330 OH Tukang Kayu
0.033 OH Kepala Tukang
0.033 OH Mandor
G.6.24 1 m2 Memasang Bekisting untuk Lantai
6.24.1 Bahan
0.040 m3 Kayu Klas III (Terentang)
0.400 Kg Paku Biasa 2" - 5"
0.200 Ltr Minyak Bekisting
0.015 m3 Balok Kayu Klas II (Borneo)
0.350 Lbr Plywood tebal 4mm
6.000 Btg Dolken Kayu Galam diameter 8 - 10 cm / 4 m
6.24.2 Tenaga
0.660 OH Pekerja
0.330 OH Tukang Kayu
0.033 OH Kepala Tukang
0.033 OH Mandor

G.6.24a 1 m2 Memasang Bekisting untuk Lantai


6.24.1 Bahan
0.040 m3 Papan cetak pinus
0.400 Kg Paku Biasa 2" - 5"
0.200 Ltr Minyak Bekisting
0.015 m3 Balok Kayu lokal
0.350 Lbr Triplek tebal 3mm
6.000 Btg Dolken Kayu Galam diameter 8 - 10 cm / 4 m
6.24.2 Tenaga
0.660 OH Pekerja
0.330 OH Tukang Kayu
0.033 OH Kepala Tukang
0.033 OH Mandor

G.6.25 1 m2 Memasang Bekisting untuk Dinding


6.25.1 Bahan
0.030 m3 Kayu Klas III (Terentang)
0.400 Kg Paku Biasa 2" - 5"
0.200 Ltr Minyak Bekisting
0.020 m3 Balok Kayu Klas II
0.350 Lbr Plywood tebal 4mm
3.000 Btg Dolken Kayu Galam diameter 8 - 10 cm / 4 m
4.000 Buah Formite/Penjaga jarak / Spacer (alat bantu)
6.25.2 Tenaga
0.660 OH Pekerja
0.330 OH Tukang Kayu
0.033 OH Kepala Tukang
0.033 OH Mandor

G.6.25a 1 m2 Memasang Bekisting untuk Dinding


6.25.1 Bahan
0.030 m3 Papan cetak pinus
0.400 Kg Paku Biasa 2" - 5"
0.200 Ltr Minyak Bekisting
0.020 m3 Balok Kayu lokal
0.350 Lbr Triplek tebal 3mm
3.000 Btg Dolken Kayu Galam diameter 8 - 10 cm / 4 m
4.000 Buah Formite/Penjaga jarak / Spacer (alat bantu)
6.25.2 Tenaga
0.660 OH Pekerja
0.330 OH Tukang Kayu
0.033 OH Kepala Tukang
0.033 OH Mandor

G.6.26 1 m2 Memasang Bekisting untuk Tangga


6.26.1 Bahan
0.030 m3 Kayu Klas III (Terentang)
0.400 Kg Paku Biasa 2" - 5"
0.150 Ltr Minyak Bekisting
0.015 m3 Balok Kayu Klas II
0.350 Lbr Plywood tebal 4mm
2.000 Btg Dolken Kayu Galam diameter 8 - 10 cm / 4 m
6.26.2 Tenaga
0.660 OH Pekerja
0.330 OH Tukang Kayu
0.033 OH Kepala Tukang
0.033 OH Mandor

G.6.26a 1 m2 Memasang Bekisting untuk Tangga


6.26.1 Bahan
0.030 m3 Papan cetak pinus
0.400 Kg Paku Biasa 2" - 5"
0.150 Ltr Minyak Bekisting
0.015 m3 Balok Kayu lokal
0.350 Lbr Triplek tebal 3mm
2.000 Btg Dolken Kayu Galam diameter 8 - 10 cm / 4 m
6.26.2 Tenaga
0.660 OH Pekerja
0.330 OH Tukang Kayu
0.033 OH Kepala Tukang
0.033 OH Mandor

G.6.27 1 m2 Memasang Jembatan Cor


6.27.1 Bahan
0.026 m3 Kayu Terentang
0.600 kg Paku Biasa 2" - 5"
0.500 m3 Dolken Kayu Galam diameter 8 - 10 / 4 m
6.27.2 Tenaga
0.150 OH Pekerja
0.050 OH Tukang Kayu
0.005 OH Kepala Tukang
0.008 OH Mandor
G.6.28 1 m3 Membuat Pondasi Beton Bertulang (150 kg Besi + Bekisting)
6.28.1 Bahan
0.200 m3 Kayu Klas III (Terentang)
1.500 Kg Paku Biasa 2" - 5"
0.400 Ltr Minyak Bekisting
157.500 Kg Besi Beton Polos
2.250 Kg Kawat Beton
336.000 Kg Portland Semen
0.540 m3 Pasir
0.810 m3 Kerikil Beton
6.28.2 Tenaga
5.300 OH Pekerja
0.275 OH Tukang batu
1.300 OH Tukang Kayu
1.050 OH Tukang Besi
0.262 OH Kepala Tukang
0.265 OH Mandor

G.6.29 1 m3 Membuat Sloof Beton Bertulang (200 kg Besi + Bekisting)


6.29.1 Bahan
0.270 m3 Kayu Klas III (Terentang)
2.000 Kg Paku Biasa 2" - 5"
0.600 Ltr Minyak Bekisting
210.000 Kg Besi Beton Polos
3.000 Kg Kawat Beton
336.000 Kg Portland Semen
0.540 m3 Pasir
0.810 m3 Kerikil Beton
6.29.2 Tenaga
5.650 OH Pekerja
0.275 OH Tukang batu
1.560 OH Tukang Kayu
1.400 OH Tukang Besi
0.323 OH Kepala Tukang
0.283 OH Mandor

G.6.30 1 m3 Membuat Kolom Beton Bertulang (300 kg Besi + Bekisting)


6.30.1 Bahan
0.400 m3 Kayu Klas III (Terentang)
4.000 Kg Paku Biasa 2" - 5"
2.000 Ltr Minyak Bekisting
315.000 kg Besi Beton Polos
4.500 kg Kawat Beton
336.000 Kg Portland Semen
0.540 m3 Pasir
0.810 m3 Kerikil Beton
0.150 m3 Kayu Klas II Balok
3.500 Lbr Plywood tebal 4mm
20.000 Btg Dolken diameter 8 / 4rm

6.30.2 Tenaga
7.050 OH Pekerja
0.275 OH Tukang batu
1.650 OH Tukang Kayu
2.100 OH Tukang Besi
0.403 OH Kepala Tukang
0.353 OH Mandor

G.6.31 1 m3 Membuat Balok Beton Bertulang (200 kg Besi + Bekisting)


6.31.1 Bahan
0.320 m3 Kayu Klas III (Terentang)
3.200 Kg Paku Biasa 2" - 5"
1.600 Ltr Minyak Bekisting
210.000 Kg Besi Beton Polos
3.000 Kg Kawat Beton
336.000 Kg Portland Semen
0.540 m3 Pasir
0.810 m3 Kerikil Beton
0.140 m3 Kayu Klas II Balok
2.800 Lbr Plywood tebal 4mm
16.000 Btg Dolken diameter 8 / 4rm

6.31.2 Tenaga
6.350 OH Pekerja
0.275 OH Tukang batu
1.650 OH Tukang Kayu
1.400 OH Tukang Besi
0.333 OH Kepala Tukang
0.318 OH Mandor

G.6.32 1 m3 Membuat Balok Beton Bertulang (150 kg Besi + Bekisting)


6.32.1 Bahan
0.320 m3 Kayu Klas III (Terentang)
3.200 Kg Paku Biasa 2" - 5"
1.600 Ltr Minyak Bekisting
157.500 Kg Besi Beton Polos
2.250 Kg Kawat Beton
336.000 Kg Portland Semen
0.540 m3 Pasir
0.810 m3 Kerikil Beton
0.120 m3 Kayu Klas II Balok
2.800 Lbr Plywood tebal 4mm
32.000 Btg Dolken diameter 8 / 4rm
6.32.2 Tenaga
5.300 OH Pekerja
0.275 OH Tukang batu
1.300 OH Tukang Kayu
1.050 OH Tukang Besi
0.265 OH Kepala Tukang
0.265 OH Mandor

G.6.33 1 m3 Membuat Dinding Beton Bertulang (150 kg Besi + Bekisting)


6.33.1 Bahan
0.240 m3 Kayu Klas III (Terentang)
3.200 Kg Paku Biasa 2" - 5"
1.600 Ltr Minyak Bekisting
157.500 Kg Besi Beton Polos
2.250 Kg Kawat Beton
336.000 Kg Portland Semen
0.540 m3 Pasir
0.810 m3 Kerikil Beton
0.160 m3 Kayu Klas II Balok
2.800 Lbr Plywood tebal 4mm
24.000 Btg Dolken diameter 8 / 4rm
6.33.2 Tenaga
5.300 OH Pekerja
0.275 OH Tukang batu
1.300 OH Tukang Kayu
1.050 OH Tukang Besi
0.262 OH Kepala Tukang
0.265 OH Mandor

G.6.34 1 m3 Membuat Tangga Beton Bertulang (200 kg Besi + Bekisting)


6.34.1 Bahan
0.250 m3 Kayu Klas III (Terentang)
3.000 Kg Paku Biasa 2" - 5"
1.200 Ltr Minyak Bekisting
210.000 Kg Besi Beton Polos
3.000 Kg Kawat Beton
336.000 Kg Portland Semen
0.540 m3 Pasir
0.810 m3 Kerikil Beton
0.105 m3 Kayu Klas II Balok
2.500 Lbr Plywood tebal 4mm
14.000 Btg Dolken diameter 8 / 4rm
6.34.2 Tenaga
5.650 OH Pekerja
0.275 OH Tukang batu
1.560 OH Tukang Kayu
1.400 OH Tukang Besi
0.323 OH Kepala Tukang
0.283 OH Mandor

G.6.35 1 m' Membuat Kolom Penguat Beton Bertulang (11 x 11) cm


6.35.1 Bahan
0.002 m3 Kayu Klas III (Terentang)
0.010 Kg Paku Biasa 2" - 5"
3.000 Kg Besi Beton Polos
0.450 Kg Kawat Beton
4.000 Kg Portland Semen
0.006 m3 Pasir
0.009 m3 Kerikil Beton
6.35.2 Tenaga
0.180 OH Pekerja
0.020 OH Tukang batu
0.020 OH Tukang Kayu
0.020 OH Tukang Besi
0.006 OH Kepala Tukang
0.009 OH Mandor

G.6.36 1 m' Membuat Ring Balok Beton Bertulang (10 x 15) cm


6.36.1 Bahan
0.003 m3 Kayu Klas III (Terentang)
0.020 Kg Paku Biasa 2" - 5"
3.600 Kg Besi Beton Polos
0.050 Kg Kawat Beton
5.500 Kg Portland Semen
0.009 m3 Pasir
0.015 m3 Kerikil Beton

6.36.2 Tenaga
0.297 OH Pekerja
0.033 OH Tukang batu
0.033 OH Tukang Kayu
0.033 OH Tukang Besi
0.010 OH Kepala Tukang
0.005 OH Mandor

SPL.1 SLOOF 15 / 20 Tulangan dia. 10mm


1.000 m3 Beton K.225 G.6.7
115.000 kg Pembesian G.6.17
18.000 m2 Papan Bekisting Sloof G.6.21

SPL.1a SLOOF 15 / 20 Tulangan dia. 12mm


1.000 m3 Beton K.225 G.6.7
155.000 kg Pembesian G.6.17
18.000 m2 Papan Bekisting Sloof G.6.21

SPL.2 SLOOF 15 / 25 Tulangan dia.10mm


1.000 m3 Beton K.275 G.6.9
92.000 kg Pembesian G.6.17
17.000 m2 Papan Bekisting Sloof G.6.21

SPL.2a SLOOF 15 / 25 Tulangan dia.12mm


1.000 m3 Beton K.275 G.6.9
124.000 kg Pembesian G.6.17
17.000 m2 Papan Bekisting Sloof G.6.21

SPL.3 RINGBALK 12 / 15 Tulangan dia.10mm


1.000 m3 Beton K.225 G.6.7
192.000 kg Pembesian G.6.17
23.000 m2 Papan Bekisting Balok G.6.23a

SPL.3a RINGBALK 12 / 15 Tulangan dia.12mm


1.000 m3 Beton K.225 G.6.7
258.000 kg Pembesian G.6.17
23.000 m2 Papan Bekisting Balok G.6.23a

SPL.4 RINGBALK 12/20 tulangan dia. 10mm


1.000 m3 Beton K.225 G.6.7
144.000 kg Pembesian G.6.17
22.000 m2 Papan Bekisting Balok G.6.23a

SPL.4a RINGBALK 12/20 tulangan dia. 12mm


1.000 m3 Beton K.225 G.6.7
193.000 kg Pembesian G.6.17
22.000 m2 Papan Bekisting Balok G.6.23a

SPL.5 KOLOM PRAKTIS 12/12 tulangan dia. 10mm


1.000 m3 Beton K.225 G.6.7
239.000 kg Pembesian G.6.17
25.000 m2 Papan Bekisting Kolom G.6.22a

SPL.5a KOLOM PRAKTIS 12/12 tulangan dia. 12mm


1.000 m3 Beton K.225 G.6.7
322.000 kg Pembesian G.6.17
25.000 m2 Papan Bekisting Kolom G.6.22a

SPL.6 KOLOM 25 / 20 Tulangan dia. 12mm


1.000 m3 Beton K.275 G.6.9
93.000 kg Pembesian G.6.17
14.000 m2 Papan Bekisting Kolom G.6.22a

SPL.7 KOLOM 25 / 25 tulangan dia. 12mm


1.000 m3 Beton K.275 G.6.9
75.000 kg Pembesian G.6.17
12.000 m2 Papan Bekisting Kolom G.6.22a

SPL.8 BALOK 20 / 40
1.000 m3 Beton K.275 G.6.9
100.000 kg Pembesian G.6.17
12.500 m2 Papan Bekisting Balok G.6.23a

SPL.9 BALOK 30 / 50
1.000 m3 Beton K.275 G.6.9
155.000 kg Pembesian G.6.17
9.000 m2 Papan Bekisting Balok G.6.23a
SPL.10 Plat beton tebal 12 cm
1.000 m3 Beton K.225 G.6.7
110.000 kg Pembesian G.6.17
8.000 m2 Papan Bekisting Lantai G.6.24a

PEKERJAAN PENUTUP ATAP

H.6.1 1 m2 Pasang Atap Genteng Plentong Kecil


6.1.1 Bahan
25.000 Buah Genteng Plentong
6.1.2 Tenaga
0.150 OH Pekerja
0.075 OH Tukang Kayu
0.008 OH Kepala Tukang
0.008 OH Mandor

H.6.2 1 m2 Pasang Atap Genteng Kodok / Glasur


6.2.1 Bahan
25.000 Buah Genteng Kodok / Glasur
6.2.2 Tenaga
0.150 OH Pekerja
0.075 OH Tukang Kayu
0.008 OH Kepala Tukang
0.008 OH Mandor

H.6.2a 1 m2 Pasang Atap Genteng Press (Kebumen)


6.3.1 Bahan
25.000 Buah Genteng Press (Kebumen)

6.3.2 Tenaga
0.150 OH Pekerja
0.075 OH Tukang Kayu
0.008 OH Kepala Tukang
0.008 OH Mandor

H.6.2b 1 m2 Pasang Atap Genteng Press (Jatiwangi)


6.3.1 Bahan
25.000 Buah Genteng Press (Jatiwangi)

6.3.2 Tenaga
0.150 OH Pekerja
0.075 OH Tukang Kayu
0.008 OH Kepala Tukang
0.008 OH Mandor

H.6.3 1 m2 Pasang Atap Genteng Plentong Super / Besar


6.3.1 Bahan
12.000 Buah Genteng Plentong Super / Besar
6.3.2 Tenaga
0.150 OH Pekerja
0.060 OH Tukang Kayu
0.006 OH Kepala Tukang
0.008 OH Mandor

H.6.5 1 m' Pasang Genteng Bubung Kodok / Glasur


6.5.1 Bahan
5.000 Buah Genteng Bubung Kodok / Glasur
8.000 Kg Portland Semen
0.032 m3 Pasir
6.5.2 Tenaga
0.400 OH Pekerja
0.200 OH Tukang Kayu
0.020 OH Kepala Tukang
0.002 OH Mandor

H.6.6a 1 m' Pasang Genteng Bubung Pres (Kebumen)


6.6.1 Bahan
4.000 Buah Genteng Bubung Press (Kebumen)
8.000 Kg Portland Semen
0.032 m3 Pasir
6.6.2 Tenaga
0.400 OH Pekerja
0.200 OH Tukang Kayu
0.020 OH Kepala Tukang
0.002 OH Mandor

H.6.6b 1 m' Pasang Genteng Bubung Pres (Jatiwangi)


6.6.1 Bahan
4.000 Buah Genteng Bubung Press (Jatiwangi)
8.000 Kg Portland Semen
0.032 m3 Pasir
6.6.2 Tenaga
0.400 OH Pekerja
0.200 OH Tukang Kayu
0.020 OH Kepala Tukang
0.002 OH Mandor

H.6.9 1 m2 Pasang Atap Asbes Gelombang (2,25x0,92 m) x 5 mm


6.9.1 Bahan
0.600 Lbr Asbes Gelombang
0.120 Kg Paku Pancing 60 x 230
6.9.2 Tenaga
0.140 OH Pekerja
0.075 OH Tukang Kayu
0.008 OH Kepala Tukang
0.008 OH Mandor

H.6.10 1 m2 Pasang Atap Asbes Gelombang (2,00x0,92 m) x 5 mm


6.10.1 Bahan
0.600 Lbr Asbes Gelombang
0.120 Kg Paku Pancing 60 x 230
6.10.2 Tenaga
0.140 OH Pekerja
0.070 OH Tukang Kayu
0.007 OH Kepala Tukang
0.007 OH Mandor

H.6.12 1 m2 Pasang Atap Asbes Gelombang (3,00x1,05 m) x 4 mm


6.12.1 Bahan
0.350 Lbr Asbes Gelombang
0.120 Kg Paku Pancing 60 x 230
6.12.2 Tenaga
0.140 OH Pekerja
0.070 OH Tukang Kayu
0.007 OH Kepala Tukang
0.007 OH Mandor

H.6.15 1 m2 Pasang Atap Asbes Gelombang (2,10x1,05 m) x 4 mm


6.15.1 Bahan
0.510 Lbr Asbes Gelombang
0.120 Kg Paku Pancing 60 x 230
6.15.2 Tenaga
0.140 OH Pekerja
0.067 OH Tukang Kayu
0.007 OH Kepala Tukang
0.007 OH Mandor

6.30 1.000 m2 Pasang Atap Genteng Beton


6.30.1 Bahan
11.000 Lbr Genteng Beton Standard
0.030 Kg Paku Biasa 2" - 5"

6.30.2 Tenaga
0.200 OH Pekerja
0.100 OH Tukang Kayu
0.010 OH Kepala Tukang
0.010 OH Mandor

6.33 1.000 m2 Pasang Atap Sirap


6.33.1 Bahan
60.000 Lbr Genteng Sirap
0.200 Kg Paku Biasa 1/2" - 1"

6.33.2 Tenaga
0.166 OH Pekerja
0.250 OH Tukang Kayu
0.025 OH Kepala Tukang
0.008 OH Mandor

6.34 1.000 m' Pasang Nok Genteng Beton


6.34.1 Bahan
3.500 Buah Nok Genteng Beton
0.050 Kg Paku Biasa 2" - 5"
10.800 Kg Portland Semen
0.032 m3 Pasir
1.000 Kg Semen Warna

6.34.2 Tenaga
0.400 OH Pekerja
0.200 OH Tukang Kayu
0.020 OH Kepala Tukang
0.020 OH Mandor

6.37 1.000 m' Pasang Nok Sirap


6.37.1 Bahan
0.400 Lbr Seng Plaat 3" x 6" BJLS 28
0.060 Kg Paku Biasa 1/2" - 1"
0.500 Kg Paku Biasa 2" - 5"
0.004 m3 Kayu Kruing Papan Tebal 3 cm

6.37.2 Tenaga
0.125 OH Pekerja
0.250 OH Tukang Kayu
0.025 OH Kepala Tukang
0.006 OH Mandor

H.6.38 1 m2 Pasang Atap Seng Gelombang


6.38.1 Bahan
0.700 Lbr Seng Gelombang 3" x 6" BJLS 28
0.020 Kg Paku Biasa 1/2" - 1"
6.38.2 Tenaga
0.120 OH Pekerja
0.060 OH Tukang Kayu
0.006 OH Kepala Tukang
0.006 OH Mandor

H.6.39 1 m' Pasang Atap Nok Seng


6.39.1 Bahan
0.300 Lbr Seng Plat 3" x 6" BJLS 28
0.040 Kg Paku Biasa 1/2" - 1"
6.39.2 Tenaga
0.150 OH Pekerja
0.070 OH Tukang Kayu
0.008 OH Kepala Tukang
0.006 OH Mandor

H.6.43 1 m2 Pasang Atap Asbes Motif Genteng


6.15.1 Bahan
1.200 lbr Genteng Asbes
0.120 Kg Paku Pancing 60 x 230
6.15.2 Tenaga
0.150 OH Pekerja
0.200 OH Tukang Kayu
0.010 OH Kepala Tukang
0.005 OH Mandor

PEKERJAAN LANGIT - LANGIT

I.6.1 1 m2 Memasang Langit-langit Asbes (1,00x1,00) m, tebal 4 mm, 5 mm & 6 mm


6.1.1 Bahan
1.100 Lbr Plat Asbes
0.010 Kg Paku eternit
6.1.2 Tenaga
0.030 OH Pekerja
0.070 OH Tukang Kayu
0.007 OH Kepala Tukang
0.002 OH Mandor

I.6.1a 1 m2 Memasang Langit-langit Harflex (1,00x1,00) m, tebal 4 mm


6.1.1 Bahan
1.100 Lbr Harflex tbl. 4 mm
0.010 Kg Paku eternit
6.1.2 Tenaga
0.030 OH Pekerja
0.070 OH Tukang Kayu
0.007 OH Kepala Tukang
0.002 OH Mandor

I.6.1b 1 m2 Memasang Langit-langit Saflex (1,00x1,00) m, tebal 5 mm


6.1.1 Bahan
1.100 Lbr Saflex tbl. 5 mm
0.010 Kg Paku eternit
6.1.2 Tenaga
0.030 OH Pekerja
0.070 OH Tukang Kayu
0.007 OH Kepala Tukang
0.002 OH Mandor

I.6.5 1.000 m2 Memasang Langit-langit Tripleks Uk (120x240) cm, Tebal 3 mm, 4 mm & 6 m
6.5.1 Bahan
0.375 Lbr Tripleks (3, 4 & 6 mm)
0.030 Kg Paku Tripleks

6.5.2 Tenaga
0.070 OH Pekerja
0.100 OH Tukang Kayu
0.010 OH Kepala Tukang
0.004 OH Mandor

I.6.5a 1 m2 Memasang Langit-langit Tripleks Uk (120x240) cm, Tebal 3 mm


6.5.1 Bahan
0.375 Lbr Tripleks (3 mm)
0.030 Kg Paku Tripleks
6.5.2 Tenaga
0.070 OH Pekerja
0.100 OH Tukang Kayu
0.010 OH Kepala Tukang
0.004 OH Mandor

I.6.5b 1 m2 Memasang Langit-langit Tripleks Uk (120x240) cm, 4 mm


6.5.1 Bahan
0.375 Lbr Tripleks (4 mm)
0.030 Kg Paku Tripleks
6.5.2 Tenaga
0.070 OH Pekerja
0.100 OH Tukang Kayu
0.010 OH Kepala Tukang
0.004 OH Mandor

I.6.5c 1 m2 Memasang Langit-langit Tripleks Uk (120x240) cm, 6 mm


6.5.1 Bahan
0.375 Lbr Tripleks (6 mm)
0.030 Kg Paku Tripleks
6.5.2 Tenaga
0.070 OH Pekerja
0.100 OH Tukang Kayu
0.010 OH Kepala Tukang
0.004 OH Mandor

I.6.6 1 m2 Memasang Langit-langit Lambriziring Kayu Jati, tebal 6 mm


6.6.1 Bahan
0.015 m3 Kayu Jati,Papan
0.010 Kg Paku
6.6.2 Tenaga
0.600 OH Pekerja
0.800 OH Tukang Kayu
0.080 OH Kepala Tukang
0.030 OH Mandor

I.6.7 1 m2 Memasang Langit-langit Gypsum Board, Uk (120x240) tebal 9 mm


6.7.1 Bahan
0.364 Lbr Gypsum Board
0.110 Kg Paku Sekrup
6.7.2 Tenaga
0.100 OH Pekerja
0.050 OH Tukang Kayu
0.005 OH Kepala Tukang
0.005 OH Mandor

6.8 1.000 m2 Memasang Langit-langit Akuatik Uk (60x120) cm & Rangka Allumunium


6.8.1 Bahan
3.600 m' Profil Allumunium "T"
0.150 kg Kawat Ø 4 mm
1.050 bh Ramset
1.500 lmb Akuatik 60 x 120 cm

6.8.2 Tenaga
0.150 OH Pekerja
0.500 OH Tukang Kayu
0.050 OH Kepala Tukang
0.008 OH Mandor

I.6.9 1 m1 List Langit-Langit Kayu Profil


6.9.1 Bahan
1.050 m1 List Kayu Profil
0.010 Kg Paku
6.9.2 Tenaga
0.050 OH Pekerja
0.050 OH Tukang Kayu
0.005 OH Kepala Tukang
0.003 OH Mandor

PEKERJAAN SANITASI
J.6.1 1 Unit Memasang Closet Duduk / Mono Blok
6.1.1 Bahan
1.000 Buah Kloset Duduk / Monoblok
0.060 Kelengkapan 6% dari harga Kloset
6.1.2 Tenaga
3.300 OH Pekerja
1.100 OH Tukang Batu
0.001 OH Kepala Tukang
0.160 OH Mandor

J.6.2 1 Unit Memasang Closet Jongkok Porselen


6.2.1 Bahan
1.000 Buah Kloset Jongkok
6.000 Kg Portland Semen
0.010 m3 Pasir
6.2.2 Tenaga
1.000 OH Pekerja
1.500 OH Tukang Batu
1.500 OH Kepala Tukang
0.160 OH Mandor

J.6.4 1 Unit Memasang Urinoir


6.4.1 Bahan
1.000 Buah Urinoir
0.300 - Perlengkapan 30% Harga Urinoir
6.000 Kg Portland Semen
0.010 m3 Pasir
6.4.1 Tenaga
1.000 OH Pekerja
1.000 OH Tukang Batu
0.100 OH Kepala Tukang
0.100 OH Mandor

J.6.5 1 Unit Memasang Wastafel


6.5.1 Bahan
1.000 Buah Wastafel Meja Oval
0.300 - Perlengkapan 30% Harga Wastafel
6.000 Kg Portland Semen
0.010 m3 Pasir
6.5.2 Tenaga
1.200 OH Pekerja
0.145 OH Tukang Batu
0.150 OH Kepala Tukang
0.100 OH Mandor

J.6.8 1 Unit Memasang Bak Mandi Batu Bata Vol. 0,30 m3


6.8.1 Bahan
0.400 m3 Batu Bata
120.000 Kg Portland Semen
0.300 m3 Pasir
360.000 buah Porselen 11 x 11 cm
6.000 Kg Semen Nat
6.8.2 Tenaga
6.000 OH Pekerja
3.000 OH Tukang Batu
0.300 OH Kepala Tukang
0.300 OH Mandor

J.6.14 1 m' Memasang Pipa Beton, Ø 15 cm - 20 cm


6.14.1 Bahan
1.100 Buah Pipa Beton
0.027 m3 Batu Bata
0.680 Kg Portland Semen
0.056 m3 Pasir
0.024 m3 Pasir Urug
6.14.2 Tenaga
0.140 OH Pekerja
0.070 OH Tukang Batu
0.007 OH Kepala Tukang
0.007 OH Mandor

J.6.15 1 m' Memasang Pipa Beton, Ø 30 cm - 100 cm


6.15.1 Bahan
1.100 Buah Pipa Beton
0.550 m3 Batu Bata
10.300 Kg Portland Semen
0.061 m3 Pasir
0.069 m3 Pasir Urug
6.15.2 Tenaga
0.380 OH Pekerja
0.190 OH Tukang Batu
0.019 OH Kepala Tukang
0.019 OH Mandor

J.6.15a 1 m' Memasang Pipa Beton, Ø 30 cm


6.15.1 Bahan
1.100 Buah Pipa Beton Ø 30 cm
0.550 m3 Batu Bata
10.300 Kg Portland Semen
0.061 m3 Pasir
0.069 m3 Pasir Urug
6.15.2 Tenaga
0.380 OH Pekerja
0.190 OH Tukang Batu
0.019 OH Kepala Tukang
0.019 OH Mandor

J.6.15b 1 m' Memasang Pipa Beton, Ø 40 cm


6.15.1 Bahan
1.100 Buah Pipa Beton Ø 40 cm
0.550 m3 Batu Bata
10.300 Kg Portland Semen
0.061 m3 Pasir
0.069 m3 Pasir Urug
6.15.2 Tenaga
0.380 OH Pekerja
0.190 OH Tukang Batu
0.019 OH Kepala Tukang
0.019 OH Mandor

J.6.15c 1 m' Memasang Pipa Beton, Ø 50 cm


6.15.1 Bahan
1.100 Buah Pipa Beton Ø 50 cm
0.550 m3 Batu Bata
10.300 Kg Portland Semen
0.061 m3 Pasir
0.069 m3 Pasir Urug
6.15.2 Tenaga
0.380 OH Pekerja
0.190 OH Tukang Batu
0.019 OH Kepala Tukang
0.019 OH Mandor

J.6.15d 1 m' Memasang Pipa Beton, Ø 60 cm


6.15.1 Bahan
1.100 Buah Pipa Beton Ø 60 cm
0.550 m3 Batu Bata
10.300 Kg Portland Semen
0.061 m3 Pasir
0.069 m3 Pasir Urug
6.15.2 Tenaga
0.380 OH Pekerja
0.190 OH Tukang Batu
0.019 OH Kepala Tukang
0.019 OH Mandor

J.6.15e 1 m' Memasang Pipa Beton, Ø 80 cm


6.15.1 Bahan
1.100 Buah Pipa Beton Ø 80 cm
0.550 m3 Batu Bata
10.300 Kg Portland Semen
0.061 m3 Pasir
0.069 m3 Pasir Urug
6.15.2 Tenaga
0.380 OH Pekerja
0.190 OH Tukang Batu
0.019 OH Kepala Tukang
0.019 OH Mandor

J.6.20 1 m' Memasang Pipa Galvanis Ø ¾"


6.20.1 Bahan
1.200 m' Pipa Galvanis
0.350 Perlengkapan 35% Harga Pipa
6.20.2 Tenaga
0.054 OH Pekerja
0.090 OH Tukang Ledeng
0.009 OH Kepala Tukang
0.027 OH Mandor

J.6.23 1 m' Memasang Pipa Galvanis Ø 3"


6.23.1 Bahan
1.200 m' Pipa Galvanis
0.350 Perlengkapan 35% Harga Pipa
6.23.2 Tenaga
0.108 OH Pekerja
0.180 OH Tukang Ledeng
0.018 OH Kepala Tukang
0.005 OH Mandor

J.6.24 1 m' Memasang Pipa Galvanis Ø 4"


6.24.1 Bahan
1.200 m' Pipa Galvanis
0.350 Perlengkapan 35% Harga Pipa
6.24.2 Tenaga
0.135 OH Pekerja
0.225 OH Tukang Ledeng
0.023 OH Kepala Tukang
0.007 OH Mandor

J.6.25 1 m' Memasang Pipa PVC type AW Ø ½"


6.25.1 Bahan
1.200 m' Pipa PVC
0.350 Perlengkapan 35% Harga Pipa
6.25.2 Tenaga
0.036 OH Pekerja
0.060 OH Tukang Ledeng
0.006 OH Kepala Tukang
0.002 OH Mandor

J.6.29 1 m' Memasang Pipa PVC type AW Ø 2"


6.29.1 Bahan
1.200 m' Pipa PVC
0.350 Perlengkapan 35% Harga Pipa
6.29.2 Tenaga
0.054 OH Pekerja
0.090 OH Tukang Ledeng
0.009 OH Kepala Tukang
0.003 OH Mandor

J.6.31 1 m' Memasang Pipa PVC type AW Ø 3"


6.31.1 Bahan
1.200 m' Pipa PVC
0.350 Perlengkapan 35% Harga Pipa
6.31.2 Tenaga
0.081 OH Pekerja
0.135 OH Tukang Ledeng
0.014 OH Kepala Tukang
0.004 OH Mandor

J.6.33 1 Buah Memasang Bak Cuci Piring Stainles Steel


6.33.1 Bahan
1.000 Buah Bak Cuci Stainles Steel
1.000 Set Water Drain & assesories
6.33.2 Tenaga
0.030 OH Pekerja
0.300 OH Tukang Ledeng
0.030 OH Kepala Tukang
0.002 OH Mandor

J.6.35 1 Buah Memasang Kran Ø ¾" atau ½"


6.35.1 Bahan
1.000 Buah Kran Air
0.025 Set Seal Tape
6.35.2 Tenaga
0.010 OH Pekerja
0.100 OH Tukang Ledeng
0.010 OH Kepala Tukang
0.005 OH Mandor

J.6.35a 1 Buah Memasang Kran Ø 1/2"


6.35.1 Bahan
1.000 Buah Kran Air
0.025 Set Seal Tape
6.35.2 Tenaga
0.010 OH Pekerja
0.100 OH Tukang Ledeng
0.010 OH Kepala Tukang
0.005 OH Mandor

J.6.35b 1 Buah Memasang Kran Ø 3/4"


6.35.1 Bahan
1.000 Buah Kran Air
0.025 Set Seal Tape
6.35.2 Tenaga
0.010 OH Pekerja
0.100 OH Tukang Ledeng
0.010 OH Kepala Tukang
0.005 OH Mandor

J.6.36 1 Buah Memasang Floor Drain


6.36.1 Bahan
1.000 Buah Floor Drain
6.36.2 Tenaga
0.010 OH Pekerja
0.100 OH Tukang Batu
0.010 OH Kepala Tukang
0.005 OH Mandor

PEKERJAAN BESI & ALLUMUNIUM


K.6.1 1 Kg Memasang Besi Profil
6.1.1 Bahan
1.150 Kg Besi Profil
0.060 Kg Meni Besi
6.1.2 Tenaga
0.060 OH Pekerja
0.060 OH Tukang Besi
0.006 OH Kepala Tukang
0.003 OH Mandor

K.6.2 1 kg Memasang Rangka Kuda-kuda Baja IWF


6.2.1 Bahan
1.150 kg Besi Baja IWF
6.2.2 Tenaga
0.060 OH Pekerja
0.060 OH Tukang Besi
0.006 OH Kepala Tukang
0.003 OH Mandor

K.6.3 100 kg Mengerjakan Pekerjaan Perakitan (Kuda-kuda Baja)


6.3.1 Bahan
1.000 ltr Solar
0.100 ltr Minyak Pelumas
6.3.2 Tenaga
1.050 OH Pekerja
1.050 OH Tukang Besi
0.105 OH Kepala Tukang
0.005 OH Mandor
0.008 Jam Sewa Alat

K.6.4 1 m2 Membuat Pintu Besi Plat Baja tebal 2 mm rangkap, rangka baja Siku
6.4.1 Bahan
15.000 Kg Besi Siku L.30.30.3
32.800 Kg Besi Plat Baja
0.050 Kg Kawat Las
6.4.2 Tenaga
1.050 OH Pekerja
1.050 OH Tukang Besi
0.105 OH Kepala Tukang
0.052 OH Mandor

K.6.5 1 cm Mengerjakan Pengelasan dengan Las Listrik


6.5.1 Bahan
0.040 kg Kawat Las
0.030 ltr Solar
0.004 ltr Minyak Pelumas
6.5.2 Tenaga
0.004 OH Pekerja
0.002 OH Tukang Besi
0.000 OH Kepala Tukang
0.000 OH Mandor
0.017 Jam Sewa Alat

K.6.7 1 m2 Memasang Pintu Rolling Door Besi


Bahan
6.7.1 1.000 m2 Pintu Gulung Besi
6.7.2 Tenaga
1.200 OH Pekerja
1.200 OH Tukang Besi
0.120 OH Kepala Tukang
0.006 OH Mandor

K.6.8 1 m2 Memasang Pintu Lipat (Folding Door)


6.8.1 Bahan
1.000 m2 Pintu Lipat
6.8.2 Tenaga
0.440 OH Pekerja
0.440 OH Tukang Besi
0.044 OH Kepala Tukang
0.022 OH Mandor

6.9 1.000 m2 Sunscreen Allumunium


6.9.1 Bahan
1.000 m2 Sunscreen Alluminium
6.9.2 Tenaga
0.080 OH Pekerja
0.800 OH Tukang Besi
0.080 OH Kepala Tukang
0.004 OH Mandor

K.6.10 1 m2 Memasang Rolling Door Allumunium


6.10.1 Bahan
1.000 m2 Rolling Allumunium
6.10.2 Tenaga
1.000 OH Pekerja
1.000 OH Tukang Besi
0.100 OH Kepala Tukang
0.050 OH Mandor

K.6.11 1.000 m' Memasang Kusen Pintu Allumunium


6.11.1 Bahan
1.100 m' Profil Allumunium
2.000 buah Skrup Fixer
0.060 Tube Sealant
6.11.2 Tenaga
0.430 OH Pekerja
0.430 OH Tukang Besi
0.004 OH Kepala Tukang
0.002 OH Mandor

K.6.12 1.000 m2 Memasang Pintu Allumunium Strip Lebar 8 cm


6.12.1 Bahan
4.400 m' Profil Allumunium
14.600 m' Allumunium Strip

6.12.2 Tenaga
0.085 OH Pekerja
0.085 OH Tukang Besi
0.009 OH Kepala Tukang
0.004 OH Mandor

K.6.13 1.000 m2 Memasang Pintu Kaca Rangka Allumunium


6.13.1 Bahan
4.400 m' Pintu Allumunium
4.500 m' Profil Kaca
0.270 tube Sealant

6.13.2 Tenaga
0.085 OH Pekerja
0.085 OH Tukang Besi
0.008 OH Kepala Tukang
0.004 OH Mandor

6.14 1.000 m2 Memasang Venetions Blinds & Vertical Blinds


6.14.1 Bahan
1.000 m2 Venetions Blinds atau Vertical Blinds (tirai)

6.14.2 Tenaga
0.350 OH Pekerja
0.350 OH Tukang Besi
0.035 OH Kepala Tukang
0.018 OH Mandor

K.6.15 1 m2 Memasang Terali Besi Strip (2x3) cm


6.15.1 Bahan
6.177 m' Besi Strip 2x3
27.080 cm Pengelasan
6.15.2 Tenaga
1.670 OH Pekerja
1.670 OH Tukang Las
0.167 OH Kepala Tukang
0.083 OH Mandor

K.6.16 1 m2 Memasang Kawat Nyamuk


6.16.1 Bahan
1.100 m2 Kawat Nyamuk nylon
11.110 cm Pengelasan
1.716 kg Baja Strip (0,2x2) cm
6.16.2 Tenaga
0.100 OH Pekerja
0.100 OH Tukang Kayu
0.010 OH Kepala Tukang
0.005 OH Mandor

K.6.17 1 m2 Memasang Jendela Nako & Tralis


6.17.1 Bahan
1.100 m2 Jendela Nako
10.000 buah Paku Skrup 1 - 2,5 cm
7.000 m' Besi Strip
6.17.2 Tenaga
0.200 OH Pekerja
0.200 OH Tukang Kayu
0.020 OH Kepala Tukang
0.001 OH Mandor

K.6.18 1 m' Memasang Talang Datar/Jurai , Seng BJLS 28 Lebar 90 cm


6.18.1 Bahan
1.050 Lbr Seng Plaat
0.015 Kg Paku Biasa 1 - 2,5 cm
0.019 m3 Kayu Papan Klas II atau III
6.18.2 Tenaga
0.200 OH Pekerja
0.400 OH Tukang Kayu
0.025 OH Kepala Tukang
0.010 OH Mandor

K.6.19 1 m' Memasang Talang 1/2 Lingkaran Ø 15 cm, Seng Plaat BJLS 30 Lebar 45 cm
6.19.1 Bahan
1.050 Lbr Seng Plaat
0.010 Kg Paku Biasa 1 - 2,5 cm
0.500 Kg Besi strip
6.19.2 Tenaga
0.150 OH Pekerja
0.300 OH Tukang Kayu
0.030 OH Kepala Tukang
0.007 OH Mandor

PEKERJAAN KUNCI dan KACA

L.6.2 1 Buah Memasang Kunci Tanam Biasa


6.2..1 Bahan
1.000 Buah Kunci Tanam Biasa
6.2.2 Tenaga
0.010 OH Pekerja
0.500 OH Tukang Kayu
0.010 OH Kepala Tukang
0.005 OH Mandor

L.6.3 1 Buah Memasang Kunci Kamar Mandi


6.3.1 Bahan
1.000 Buah Kunci Tanam Kamar Mandi

6.3..2 Tenaga
0.005 OH Pekerja
0.500 OH Tukang Kayu
0.005 OH Kepala Tukang
0.003 OH Mandor

L.6.4 1 Buah Memasang Kunci Selinder


6.4.1 Bahan
1.000 Buah Kunci Selinder
6.4.2 Tenaga
0.005 OH Pekerja
0.500 OH Tukang Kayu
0.005 OH Kepala Tukang
0.003 OH Mandor

L.6.5 1 Buah Memasang Engsel Pintu


6.5.1 Bahan
1.000 Buah Engsel pintu
6.5.2 Tenaga
0.015 OH Pekerja
0.150 OH Tukang Kayu
0.015 OH Kepala Tukang
0.008 OH Mandor

L.6.6 1 Buah Pasang Engsel Jendela Kupu-kupu


6..6.1 Bahan
1.000 Buah Engsel Jendela
6.6.2 Tenaga
0.010 OH Pekerja
0.100 OH Tukang Kayu
0.010 OH Kepala Tukang
0.005 OH Mandor

L.6.7 1 Buah Pasang Engsel Angin


6.7.1 Bahan
1.000 Buah Engsel Angin
6.7.2 Tenaga
0.020 OH Pekerja
0.200 OH Tukang Kayu
0.020 OH Kepala Tukang
0.010 OH Mandor

L.6.9 1 Buah Pasang Kait Angin


6.9.1 Bahan
1.000 Buah Kait Angin
6.9.2 Tenaga
0.015 OH Pekerja
0.150 OH Tukang Kayu
0.015 OH Kepala Tukang
0.001 OH Mandor

L.6.10 1 Buah Pasang Door Closer


6.10.1 Bahan
1.000 Buah Door Closer

6.10.2 Tenaga
0.050 OH Pekerja
0.500 OH Tukang Kayu
0.050 OH Kepala Tukang
0.003 OH Mandor
L.6.11 1 Buah Pasang Kunci Selot
6.11.1 Bahan
1.000 Buah Kunci Selot
6.11.2 Tenaga
0.020 OH Pekerja
0.200 OH Tukang Kayu
0.020 OH Kepala Tukang
0.001 OH Mandor

L.6.13 1 Buah Pasang Door Stop


6.12.1 Bahan
1.000 Buah Door Stop
6.12.2 Tenaga
0.010 OH Pekerja
0.100 OH Tukang Kayu
0.010 OH Kepala Tukang
0.001 OH Mandor

L.6.14 1 Buah Pasang Rel Pintu Dorong


6.14.1 Bahan
1.000 Buah Rel Pintu Dorong
6.14.2 Tenaga
0.060 OH Pekerja
0.600 OH Tukang Kayu
0.060 OH Kepala Tukang
0.003 OH Mandor

L.6.15 1 Buah Pasang Kunci Lemari


6.15.1 Bahan
1.000 Buah Kunci Lemari
6.15.2 Tenaga
0.025 OH Pekerja
0.250 OH Tukang Kayu
0.025 OH Kepala Tukang
0.001 OH Mandor

L.6.16 1 m2 Pasang Kaca tebal 3 mm


6.16.1 Bahan
1.100 m2 Kaca tebal 3mm
6.16.2 Tenaga
0.015 OH Pekerja
0.150 OH Tukang Kayu
0.015 OH Kepala Tukang
0.001 OH Mandor

L.6.17 1 m2 Pasang Kaca tebal 5 mm


6.17.1 Bahan
1.100 m2 Kaca tebal 5mm
6.17.2 Tenaga
0.015 OH Pekerja
0.150 OH Tukang Kayu
0.015 OH Kepala Tukang
0.001 OH Mandor

L.6.20 1 m2 Pasang Kaca Cermin tebal 5 mm


6.20.1 Bahan
1.100 m2 Kaca Cermin
6.20.2 Tenaga
0.015 OH Pekerja
0.150 OH Tukang Kayu
0.015 OH Kepala Tukang
0.001 OH Mandor

PEKERJAAN PENUTUP LANTAI dan DINDING

M.6.9 1 m2 Memasang lantai Ubin Granito Uk. 60 x 60 cm


6.9.1 Bahan
3.100 Buah Ubin Granito 60x60 cm
14.700 Kg Portland Semen
0.068 m3 Pasir
1.950 Kg Semen Warna
6.9.2 Tenaga
0.375 OH Pekerja
0.180 OH Tukang Batu
0.018 OH Kepala Tukang
0.020 OH Mandor

M.6.34 1.000 m2 Memasang Lantai Keramik motif / warna/ 30 x 30 cm


6.34.1 Bahan
1.000 Buah Ubin Keramik motif / warna 30 x 30 cm
10.000 Kg Portland Semen
0.045 m3 Pasir
1.500 Kg Semen Warna
6.34.2 Tenaga
0.620 OH Pekerja
0.350 OH Tukang Batu
0.035 OH Kepala Tukang
0.030 OH Mandor

M.6.34a 1.000 m2 Memasang Lantai Keramik motif / warna 40 x 40 cm


6.34.1 Bahan
1.000 Buah Ubin Keramik motif / warna 40 x 40 cm
10.000 Kg Portland Semen
0.045 m3 Pasir
1.500 Kg Semen Warna
6.34.2 Tenaga
0.620 OH Pekerja
0.350 OH Tukang Batu
0.035 OH Kepala Tukang
0.030 OH Mandor

M.6.35 1 m2 Memasang Lantai Keramik 30 x 30 cm


6.35.1 Bahan
1.000 m2 Ubin Keramik 30 x 30 cm
10.000 Kg Portland Semen
0.045 m3 Pasir
1.500 Kg Semen Warna
6.35.2 Tenaga
0.620 OH Pekerja
0.350 OH Tukang Batu
0.035 OH Kepala Tukang
0.030 OH Mandor

M.6.35a 1 m2 Memasang Lantai Keramik 40 x 40 cm


6.35.1 Bahan
1.000 m2 Ubin Keramik 40 x 40 cm
10.000 Kg Portland Semen
0.045 m3 Pasir
1.500 Kg Semen Warna
6.35.2 Tenaga
0.620 OH Pekerja
0.350 OH Tukang Batu
0.035 OH Kepala Tukang
0.030 OH Mandor

M.6.36 1 m2 Pasang Lantai Keramik 20 x 20 cm


6.36.1 Bahan
1.000 m2 Ubin Keramik 20 x 20 cm
10.400 Kg Portland Semen
0.045 m3 Pasir
1.620 Kg Semen Warna
6.36.2 Tenaga
0.620 OH Pekerja
0.350 OH Tukang Batu
0.035 OH Kepala Tukang
0.030 OH Mandor

M.6.39 1 m' Memasang Plint Keramik Ukuran 10x20 cm


6.39.1 Bahan
5.300 Buah Ubin Keramik 10 x 20 cm
1.140 Kg Portland Semen
0.003 m3 Pasir
0.025 Kg Semen Warna
6.39.2 Tenaga
0.090 OH Pekerja
0.090 OH Tukang Batu
0.009 OH Kepala Tukang
0.005 OH Mandor

M.6.40 1 m' Memasang Plint Keramik Ukuran 10x10 cm


6.40.1 Bahan
10.600 Buah Ubin Keramik 10 x 10 cm
1.140 Kg Portland Semen
0.003 m3 Pasir
0.050 Kg Semen Warna
Tenaga
0.090 OH Pekerja
0.090 OH Tukang Batu
0.009 OH Kepala Tukang
0.005 OH Mandor

M.6.43 1 m2 Memasang Lantai Marmer Ukuran 1.00x1.00 cm


6.43.1 Bahan
1.060 buah Marmer 100 x 100 cm
8.190 kg Portland Semen
0.045 m3 Pasir
0.650 kg Semen Warna
Tenaga
0.620 OH Pekerja
0.350 OH Tukang Batu
0.035 OH Kepala Tukang
0.030 OH Mandor

M.6.44 1 m2 Memasang Lantai Karpet


6.44.1 Bahan
1.050 m2 Karpet
0.350 kg Lem
6.44.2 Tenaga
0.170 OH Pekerja
0.170 OH Tukang Batu
0.017 OH Kepala Tukang
0.009 OH Mandor

M.6.46a 1 m2 Memasang Lantai Parquet Merbau uk. 14x90x300/400/500 mm


6.46.1 Bahan
1.050 m2 Parquet Jati Parquet ky merbau 14x90x300/400/500mm
0.600 Kg Lem Vynil
6.46.2 Tenaga
0.650 OH Pekerja
0.350 OH Tukang Batu
0.035 OH Kepala Tukang
0.033 OH Mandor

M.6.46b 1 m2 Memasang Lantai Parquet Merbau uk. 14x90x900 mm


6.46.1 Bahan
1.050 m2 Parquet Jati Parquet ky merbau 14x90x900mm
0.600 Kg Lem Vynil
6.46.2 Tenaga
0.650 OH Pekerja
0.350 OH Tukang Batu
0.035 OH Kepala Tukang
0.033 OH Mandor

M.6.46c 1 m2 Memasang Lantai Parquet Merbau uk. 10x120x1.200 mm


6.46.1 Bahan
1.050 m2 Parquet Jati Parquet ky merbau 10 x 120 x 1.200 mm
0.600 Kg Lem Vynil
6.46.2 Tenaga
0.650 OH Pekerja
0.350 OH Tukang Batu
0.035 OH Kepala Tukang
0.033 OH Mandor

M.6.46d 1 m2 Memasang Lantai Parquet Merbau uk. 12x120x1.200 mm


6.46.1 Bahan
1.050 m2 Parquet Jati Parquet ky merbau 12 x 120 x 1.200 mm
0.600 Kg Lem Vynil
6.46.2 Tenaga
0.650 OH Pekerja
0.350 OH Tukang Batu
0.035 OH Kepala Tukang
0.033 OH Mandor

M.6.46e 1 m2 Memasang Lantai Parquet Merbau uk. 14x140x1.200 mm


6.46.1 Bahan
1.050 m2 Parquet Jati Parquet ky merbau 14 x 140 x 1.200 mm
0.600 Kg Lem Vynil
6.46.2 Tenaga
0.650 OH Pekerja
0.350 OH Tukang Batu
0.035 OH Kepala Tukang
0.033 OH Mandor

M.6.46f 1 m2 Memasang Lantai Parquet Jati uk. 12x120x1.200 mm


6.46.1 Bahan
1.050 m2 Parquet Jati Parquet ky Jati 12x120x1.200 mm
0.600 Kg Lem Vynil
6.46.2 Tenaga
0.650 OH Pekerja
0.350 OH Tukang Batu
0.035 OH Kepala Tukang
0.033 OH Mandor

M.6.46g 1 m2 Memasang Lantai Parquet Jati uk. 14x140x1.200 mm


6.46.1 Bahan
1.050 m2 Parquet Jati Parquet ky Jati 14x140x1.200 mm
0.600 Kg Lem Vynil
6.46.2 Tenaga
0.650 OH Pekerja
0.350 OH Tukang Batu
0.035 OH Kepala Tukang
0.033 OH Mandor

M.6.53 1 m2 Memasang Dinding Keramik 10x20 cm,


6.53.1 Bahan
1.000 m2 Keramik 10 x 20 cm
9.300 Kg Portland Semen
0.018 m3 Pasir
2.750 Kg Semen Warna
6.53.2 Tenaga
0.600 OH Pekerja
0.450 OH Tukang Batu
0.045 OH Kepala Tukang
0.030 OH Mandor

M.6.54 1 m2 Memasang Dinding Keramik 20x25 cm,


6.54.1 Bahan
1.000 m2 Keramik 20 x 25 cm
9.300 Kg Portland Semen
0.018 m3 Pasir
1.940 Kg Semen Warna
6.54.2 Tenaga
0.600 OH Pekerja
0.450 OH Tukang Batu
0.045 OH Kepala Tukang
0.030 OH Mandor

M.6.55 1 m2 Memasang Dinding Marmer Ukuran 1.00x1.00 cm


6.55.1 Bahan
1.020 buah Marmer
2.000 buah Paku 12 cm
12.440 kg Portlan Semen
0.025 m3 Pasir
0.650 kg Semen Warna
6.55.2 Tenaga
0.720 OH Pekerja
0.650 OH Tukang Batu
0.065 OH Kepala Tukang
0.035 OH Mandor

M.6.57 1 m2 Memasang Dinding Batu Paros / Batu Tempel Hitam


6.57.1 Bahan
1.100 m2 Batu Tempel Hitam
11.750 Kg Portland Semen
0.035 m3 Pasir
6.57.2 Tenaga
0.620 OH Pekerja
0.350 OH Tukang Batu
0.035 OH Kepala Tukang
0.030 OH Mandor

M.6.60 1 m2 Memasang Wall Paper Lebar 50 cm


6.60.1 Bahan
2.200 m' Wall Paper
0.250 kg Lem
6.60.2 Tenaga
0.750 OH Pekerja
0.170 OH Tukang Batu
0.017 OH Kepala Tukang
0.004 OH Mandor

M.6.63 1 m' Memasang Plint Kayu Klas II Ukuran 2x10 cm


6.63.1 Bahan
0.003 m3 Papan Kayu Klas II
0.050 kg Paku Sekrup 5 cm
6.61.2 Tenaga
0.120 OH Pekerja
0.120 OH Tukang Batu
0.012 OH Kepala Tukang
0.006 OH Mandor

PEKERJAAN PENGECATAN

N.6.1 1 m2 Mengikis / Mengerok Permukaan Cat Tembok Lama


6.1.1 Bahan
0.050 Kg Soda Api
6.1.2 Tenaga
0.150 OH Pekerja
0.003 OH Mandor

N.6.2 1 m2 Mencuci Bidang Permukaan Tembok yang Pernah dicat


6.2.1 Bahan
0.050 Kg Sabun
6.2.2 Tenaga
0.150 OH Pekerja
0.003 OH Mandor

N.6.3 1 m2 Mengerok Karat Cat Lama permukaan Baja dg cara manual


6.3.1 Bahan
0.050 Kg Sabun
6.3.2 Tenaga
0.150 OH Pekerja
0.003 OH Mandor

N.6.4 1 m2 Penyabun Permukaan Tembok Lama


6.4.1 Bahan
0.050 Kg Sabun
6.4.2 Tenaga
0.150 OH Pekerja
0.003 OH Mandor

N.6.6 1 m2 Mendempul dan Menggosok Kayu


6.6.1 Bahan
0.080 Kg Dempul Jadi
0.020 Kg Minyak Cat
0.100 lbr Amplas
6.6.2 Tenaga
0.040 OH Pekerja
0.040 OH Tukang Cat
0.004 OH Kepala Tukang
0.003 OH Mandor

N.6.7 1 m2 Pengecatan Kayu Bidang Lama


6.7.1 Bahan
0.150 Kg Plamir
0.170 Kg Cat Dasar
0.170 Kg Cat Penutup

6.7.2 Tenaga
0.070 OH Pekerja
0.075 OH Tukang Cat
0.008 OH Kepala Tukang
0.003 OH Mandor

N.6.8 1 m2 Pengecatan Kayu Bidang Baru (1 lap.Plamir)1 lap.Cat Dasar & 2 lap.Cat Pen
6.8.1 Bahan
0.200 Kg Cat Meni
0.150 Kg Plamir
0.170 Kg Cat Dasar
0.260 Kg Cat Penutup 2 kali

6.8.2 Tenaga
0.070 OH Pekerja
0.009 OH Tukang Cat
0.006 OH Kepala Tukang
0.003 OH Mandor

N.6.9 1 m2 Pengecatan Bidang Kayu Baru (1 lap.Plamir)1 lap.Cat Dasar & 3 lap.Cat Pen
6.9.1 Bahan
0.200 Kg Cat Meni
0.150 Kg Plamir
0.170 Kg Cat Dasar
0.350 Kg Cat Penutup 2 kali
6.9.2 Tenaga
0.070 OH Pekerja
0.105 OH Tukang Cat
0.004 OH Kepala Tukang
0.003 OH Mandor

N.6.10 1 m2 Pelaburan Bidang Kayu dg Teak Oil


6.10.1 Bahan
0.360 Ltr Teak Oil

6.10.2 Tenaga
0.040 OH Pekerja
0.063 OH Tukang Cat
0.063 OH Kepala Tukang
0.003 OH Mandor

N.6.11 1 m2 Pelaburan Bidang Kayu dg Politur


6.11.1 Bahan
0.150 Ltr Politur
0.372 Ltr Politur Jadi
2.000 Lbr Ampelas
6.11.2 Tenaga
0.060 OH Tukang Cat
0.016 OH Kepala Tukang
0.003 OH Mandor

N.6.12 1 m2 Pelaburan Bidang Kayu dg Cat Residu & Ter


6.12.1 Bahan
0.350 Ltr Residu atau Ter
6.12.2 Tenaga
0.100 OH Pekerja
0.006 OH Mandor

N.6.13 1 m2 Pelaburan Bidang Kayu dg Vernis


6.13.1 Bahan
0.150 Ltr Vernis
0.050 Ltr Dempul
0.100 Lbr Ampelas
0.010 Buah Kuas
6.13.2 Tenaga
0.160 OH Pekerja
0.160 OH Tukang Cat
0.016 OH Kepala Tukang
0.003 OH Mandor

N.6.14 1 m2 Pengecat Tembok Baru (1lap.Plamir, 1lap Cat Dasar 2 lap. Cat Penutup)
6.14.1 Bahan
0.100 Kg Plamir
0.100 Kg Cat Dasar
0.260 Kg Cat Penutup 2 kali
6.14.2 Tenaga
0.020 OH Pekerja
0.063 OH Tukang Cat
0.006 OH Kepala Tukang
0.003 OH Mandor

N.6.14a 1 m2 Pengecat Tembok Baru - Exterior (1lap.Plamir, 1lap Cat Dasar


2 lap. Cat Penutup)
6.14.1 Bahan
- Kg Plamir
0.100 Kg Cat Dasar
0.260 Kg Cat Penutup 2 kali
6.14.2 Tenaga
0.020 OH Pekerja
0.063 OH Tukang Cat
0.006 OH Kepala Tukang
0.003 OH Mandor

N.6.15 1 m2 Pengecat Tembok Lama (1lap.Plamir, 2lap Cat Penutup)


6.15.1 Bahan
0.100 Kg Cat Dasar
0.180 Kg Cat Penutup 2 kali
6.15.2 Tenaga
0.028 OH Pekerja
0.042 OH Tukang Cat
0.004 OH Kepala Tukang
0.003 OH Mandor

N.6.20 1 m2 Pengecatan Permukaan Baja dg Meni Besi


6.20.1 Bahan
0.100 Kg Meni Besi
0.010 Kg Perekat / Lem
6.20.2 Tenaga
0.020 OH Pekerja
0.200 OH Tukang Cat
0.002 OH Kepala Tukang
0.010 OH Mandor

N.6.21 1 m2 Pengecatan Permukaan Baja dg Meni Besi & Perancah


6.21.1 Bahan
0.100 Kg Meni Besi
0.010 Kg Perekat / Lem
0.002 m3 Perancah Kayu
6.21.2 Tenaga
0.250 OH Pekerja
0.225 OH Tukang Cat
0.023 OH Kepala Tukang
0.008 OH Mandor

N.6.24 1 m2 Pengecatan Permukaan Baja lapis Seng (Galvanis) secara


Manual sistem 3 lap. Cat Konvensional dg Tebal 200 μm
6.24.1 Bahan
0.110 Kg Cat dasar
0.170 Kg Cat Antara
0.080 Kg Cat Penutup
6.24.2 Tenaga
0.500 OH Pekerja
0.800 OH Tukang Cat
0.300 OH Kepala Tukang
0.200 OH Mandor

BOW.M.15 1 m2 Pasang Paving Blok Abu-abu Tebal 6 cm (K.175)


Bahan
1.000 m2 Paving blok abu-abu tebal 6 cm
0.105 m3 Pasir urug
Tenaga
0.400 OH Pekerja
0.200 OH Tukang Batu
0.020 OH Kepala Tukang
0.020 OH Mandor

BOW.M.15a 1 m2 Pasang Paving Blok Warna Tebal 6 cm (K.175)


Bahan
1.000 m2 Paving blok warna tebal 6 cm
0.105 m3 Pasir urug
Tenaga
0.400 OH Pekerja
0.200 OH Tukang Batu
0.020 OH Kepala Tukang
0.020 OH Mandor

BOW.M.15b 1 m2 Pasang Paving Blok Abu-abu Tebal 8 cm (K.175)


Bahan
1.000 m2 Paving blok abu-abu tebal 8 cm
0.105 m3 Pasir urug
Tenaga
0.400 OH Pekerja
0.200 OH Tukang Batu
0.020 OH Kepala Tukang
0.020 OH Mandor

BOW.M.15c 1 m2 Pasang Paving Blok Warna Tebal 8 cm (K.175)


Bahan
1.000 m2 Paving blok warna tebal 8 cm
0.105 m3 Pasir urug
Tenaga
0.400 OH Pekerja
0.200 OH Tukang Batu
0.020 OH Kepala Tukang
0.020 OH Mandor

BOW.M.15d 1 m2 Pasang Paving Blok Abu-abu (Lokal)


Bahan
1.000 m2 Paving blok abu-abu (lokal)
0.105 m3 Pasir urug
Tenaga
0.400 OH Pekerja
0.200 OH Tukang Batu
0.020 OH Kepala Tukang
0.020 OH Mandor

BOW.M.15e 1 m2 Pasang Paving Blok Warna (Lokal)


Bahan
1.000 m2 Paving blok warna (lokal)
0.105 m3 Pasir urug
Tenaga
0.400 OH Pekerja
0.200 OH Tukang Batu
0.020 OH Kepala Tukang
0.020 OH Mandor

BOW.A.6 1 m3 Pembuangan tanah sejauh 30 m'


Tenaga
0.330 OH Pekerja
0.010 OH Mandor

BOW.A.7 1 m3 Pembuangan tanah sejauh 100 m'


Dipakai rumus K = a/275 x (L+75)
K = (30.000 / 275) x (100 + 75) 163.636 x

BOW.A.7a 1 m3 Pembuangan tanah sejauh 200 m'


Dipakai rumus K = a/275 x (L+75)
K = (30.000 / 275) x (200 + 75) 163.636 x

BOW.A.9 1 m3 Mengangkat tanah sedalam lebih dari 1 m'


Tenaga
0.150 OH Pekerja
0.008 OH Mandor

BOW F.1 1 m3 Stootwerk beton bertulang


Bahan
0.700 m3 Dolken kayu lokal
Tenaga
3.500 OH Pekerja
10.500 OH Tukang kayu
1.050 OH Kepala tukang
0.175 OH Mandor

7.10.(3) 1 m3 Bronjong
Bahan
- Kawat bronjong (galv 15.00 kg 20,000.00
- Batu blonos 1.10 m3 111,000.00
Jumlah 1
Tenaga
- Pekerja 5.2500 jam #NAME?
- Tukang batu 2.6250 jam #NAME?
- Mandor 0.8750 jam #NAME?
Jumlah 2
Peralatan
- Alat bantu 1.0000 Ls 50,000.00
Jumlah 3
Jumlah ( 1+2+3 )
Jumlah Dibulatkan

BOW.G.5b. 1.000 m3 Bronjong penahan kawat Ø 4 mm


6.26.1 Bahan
1.000 m3 Batu kali blonos
15.000 kg Kawat pengikat Ø 4mm
6.26.2 Tenaga
2.100 OH Pekerja
0.730 OH Tukang besi
0.052 OH Mandor
EKERJAAN
PEKERJAAN

HARGA BAHAN JUMLAH


/ UPAH HARGA
Rp Rp

551,957.65
518,357.65
18,300.00 22,875.00
1,700.00 4,250.00
29,500.00 35,400.00
115,000.00 575.00
237,250.00 2,135.25
6,126,700.00 441,122.40
20,750.00 1,245.00
23,900.00 10,755.00

33,600.00
65,000.00 13,000.00
45,000.00 18,000.00
65,000.00 1,300.00
65,000.00 1,300.00

137,101.40
125,126.40
6,126,700.00 73,520.40
20,750.00 415.00
7,313,000.00 51,191.00

11,975.00
65,000.00 6,500.00
45,000.00 4,500.00
65,000.00 650.00
65,000.00 325.00

806,400.00
664,400.00
18,300.00 22,875.00
2,560,000.00 460,800.00
20,750.00 17,637.50
10,000.00 11,000.00
1,700.00 59,500.00
115,000.00 17,250.00
110,000.00 11,000.00
237,250.00 35,587.50
270.00 8,100.00
17,000.00 4,250.00
2,750.00 5,500.00
35,000.00 2,800.00
25,000.00 3,750.00
1,500.00 450.00
65,000.00 3,900.00

142,000.00
30,000.00 60,000.00
30,000.00 30,000.00
20,000.00 40,000.00
35,000.00 10,500.00
30,000.00 1,500.00

812,972.50
724,472.50
13,000.00 22,100.00
2,900,000.00 609,000.00
9,000.00 2,700.00
820.00 8,610.00
90,000.00 2,700.00
237,250.00 11,862.50
45,000.00 67,500.00

88,500.00
30,000.00 60,000.00
20,000.00 20,000.00
35,000.00 7,000.00
30,000.00 1,500.00

7,750.00
7,750.00
45,000.00 4,500.00
65,000.00 3,250.00

46,014.50
23,500.00
12,800.00 12,800.00
42,800.00 10,700.00
22,514.50
65,000.00 11,050.00
45,000.00 11,250.00
65,000.00 130.00
65,000.00 84.50

321,660.00
321,660.00
45,000.00 300,015.00
65,000.00 21,645.00

302,160.00
302,160.00
45,000.00 300,015.00
65,000.00 2,145.00

35,375.00
35,375.00
45,000.00 33,750.00
65,000.00 1,625.00

47,080.00
47,080.00
45,000.00 45,000.00
65,000.00 2,080.00

71,400.00
71,400.00
45,000.00 67,500.00
65,000.00 3,900.00

56,925.00
56,925.00
45,000.00 54,000.00
65,000.00 2,925.00

2,575.00
2,575.00
45,000.00 2,250.00
65,000.00 325.00

15,500.00
15,500.00
45,000.00 14,850.00
65,000.00 650.00

rjaan galian) 11,943.33


11,943.33
45,000.00 11,250.00
65,000.00 693.33

25,750.00
25,750.00
45,000.00 22,500.00
65,000.00 3,250.00

123,350.00
109,200.00
91,000.00 109,200.00

14,150.00
45,000.00 13,500.00
65,000.00 650.00

Err:508
Err:508
115,000.00 46,000.00
Err:508 Err:508
Err:508 Err:508

69,800.00
45,000.00 36,000.00
65,000.00 26,000.00
65,000.00 2,600.00
65,000.00 5,200.00

264,525.00
42,800.00 256,800.00
42,800.00 256,800.00

7,725.00
45,000.00 6,750.00
65,000.00 975.00

108,755.00
95,880.00
79,900.00 95,880.00

12,875.00
45,000.00 11,250.00
65,000.00 1,625.00
685,375.00
559,375.00
133,500.00 160,200.00
1,700.00 343,400.00
115,000.00 55,775.00

126,000.00
45,000.00 67,500.00
65,000.00 48,750.00
65,000.00 4,875.00
65,000.00 4,875.00

623,100.00
497,100.00
133,500.00 160,200.00
1,700.00 277,100.00
115,000.00 59,800.00

126,000.00
45,000.00 67,500.00
65,000.00 48,750.00
65,000.00 4,875.00
65,000.00 4,875.00

onos 40%) 601,575.000


486,300.000
111,000.00 53,280.000
133,500.00 96,120.000
1,700.00 277,100.000
115,000.00 59,800.000

115,275.000
45,000.00 67,500.000
65,000.00 39,000.000
65,000.00 3,900.000
65,000.00 4,875.000

579,960.00
453,960.00
133,500.00 160,200.00
1,700.00 231,200.00
115,000.00 62,560.00

126,000.00
45,000.00 67,500.00
65,000.00 48,750.00
65,000.00 4,875.00
65,000.00 4,875.00

549,615.00
423,615.00
133,500.00 160,200.00
1,700.00 198,900.00
115,000.00 64,515.00

126,000.00
45,000.00 67,500.00
65,000.00 48,750.00
65,000.00 4,875.00
65,000.00 4,875.00

238,032.00
172,512.00
111,000.00 133,200.00
91,000.00 39,312.00
65,520.00
45,000.00 35,100.00
65,000.00 25,350.00
65,000.00 2,535.00
65,000.00 2,535.00

C : 2PB : 3KR & 40% Batu Kali 2,140,940.00


1,935,415.00
133,500.00 64,080.00
10,500.00 1,323,000.00
1,700.00 329,800.00
237,250.00 74,022.00
237,250.00 111,033.00
18,600.00 33,480.00
205,525.00
45,000.00 135,000.00
65,000.00 55,250.00
65,000.00 5,525.00
65,000.00 9,750.00

670,538.00
536,788.00
133,500.00 60,075.00
1,700.00 329,800.00
115,000.00 35,880.00
237,250.00 111,033.00
133,750.00
45,000.00 107,100.00
65,000.00 19,500.00
65,000.00 1,950.00
65,000.00 5,200.00

249,730.00
206,480.00
1,000.00 140,000.00
1,700.00 56,015.00
115,000.00 10,465.00
43,250.00
45,000.00 27,000.00
65,000.00 13,000.00
65,000.00 1,300.00
65,000.00 1,950.00

239,080.00
195,830.00
1,000.00 140,000.00
1,700.00 45,135.00
115,000.00 10,695.00
43,250.00
45,000.00 27,000.00
65,000.00 13,000.00
65,000.00 1,300.00
65,000.00 1,950.00

232,720.00
189,470.00
1,000.00 140,000.00
1,700.00 37,740.00
115,000.00 11,730.00
43,250.00
45,000.00 27,000.00
65,000.00 13,000.00
65,000.00 1,300.00
65,000.00 1,950.00

228,730.00
185,480.00
1,000.00 140,000.00
1,700.00 31,450.00
115,000.00 14,030.00
43,250.00
45,000.00 27,000.00
65,000.00 13,000.00
65,000.00 1,300.00
65,000.00 1,950.00

211,023.50
167,773.50
1,000.00 140,000.00
1,700.00 17,136.00
115,000.00 10,637.50
43,250.00
45,000.00 27,000.00
65,000.00 13,000.00
65,000.00 1,300.00
65,000.00 1,950.00

128,210.00
106,585.00
1,000.00 70,000.00
1,700.00 32,215.00
115,000.00 4,370.00
21,625.00
45,000.00 13,500.00
65,000.00 6,500.00
65,000.00 650.00
65,000.00 975.00

120,654.00
99,029.00
1,000.00 70,000.00
1,700.00 24,429.00
115,000.00 4,600.00
21,625.00
45,000.00 13,500.00
65,000.00 6,500.00 0.011
65,000.00 650.00 90.90909
65,000.00 975.00

116,120.00
94,495.00
1,000.00 70,000.00
1,700.00 19,550.00
115,000.00 4,945.00
21,625.00
45,000.00 13,500.00
65,000.00 6,500.00
65,000.00 650.00
65,000.00 975.00

113,256.00
91,631.00
1,000.00 70,000.00
1,700.00 16,456.00
115,000.00 5,175.00

21,625.00
45,000.00 13,500.00
65,000.00 6,500.00
65,000.00 650.00
65,000.00 975.00

111,404.00
89,779.00
1,000.00 70,000.00
1,700.00 14,144.00
115,000.00 5,635.00
21,625.00
45,000.00 13,500.00
65,000.00 6,500.00
65,000.00 650.00
65,000.00 975.00

48,571.80
28,196.80
1,700.00 26,356.80
115,000.00 1,840.00
20,375.00
45,000.00 9,000.00
65,000.00 9,750.00
65,000.00 975.00
65,000.00 650.00

40,055.80
19,680.80
1,700.00 17,380.80
115,000.00 2,300.00

20,375.00
45,000.00 9,000.00
65,000.00 9,750.00
65,000.00 975.00
65,000.00 650.00

36,239.20
15,864.20
1,700.00 13,219.20
115,000.00 2,645.00

20,375.00
45,000.00 9,000.00
65,000.00 9,750.00
65,000.00 975.00
65,000.00 650.00

33,743.00
13,368.00
1,700.00 10,608.00
115,000.00 2,760.00
20,375.00
45,000.00 9,000.00
65,000.00 9,750.00
65,000.00 975.00
65,000.00 650.00

32,177.80
11,802.80
1,700.00 8,812.80
115,000.00 2,990.00
20,375.00
45,000.00 9,000.00
65,000.00 9,750.00
65,000.00 975.00
65,000.00 650.00

30,987.20
10,612.20
1,700.00 7,507.20
115,000.00 3,105.00
20,375.00
45,000.00 9,000.00
65,000.00 9,750.00
65,000.00 975.00
65,000.00 650.00

Err:508
Err:508
1,700.00 5,100.00
Err:508 Err:508
115,000.00 2,300.00
19,195.00
45,000.00 9,900.00
65,000.00 7,800.00
65,000.00 780.00
65,000.00 715.00

48,035.60
21,190.60
1,700.00 17,625.60
115,000.00 3,565.00
26,845.00
45,000.00 11,700.00
65,000.00 13,000.00
65,000.00 1,300.00
65,000.00 845.00

40,994.60
14,149.60
1,700.00 10,009.60
115,000.00 4,140.00
26,845.00
45,000.00 11,700.00
65,000.00 13,000.00
65,000.00 1,300.00
65,000.00 845.00

24,077.80
11,802.80
1,700.00 8,812.80
115,000.00 2,990.00
12,275.00
45,000.00 6,750.00
65,000.00 4,550.00
65,000.00 455.00
65,000.00 520.00

14,620.00
2,345.00
1,700.00 850.00
115,000.00 1,495.00

12,275.00
45,000.00 6,750.00
65,000.00 4,550.00
65,000.00 455.00
65,000.00 520.00

27,279.00
8,034.00
1,700.00 7,344.00
115,000.00 690.00

19,245.00
45,000.00 11,250.00 6.29 1
65,000.00 6,500.00 6.29.1
65,000.00 650.00 9.3
65,000.00 845.00 0.018

24,433.00 6.29.2
12,158.00 0.26
1,700.00 10,778.00 0.2
115,000.00 1,380.00 0.02
0.013
12,275.00
45,000.00 6,750.00
65,000.00 4,550.00
65,000.00 455.00
65,000.00 520.00

19,945.00
5,525.00
1,700.00 5,525.00

14,420.00
45,000.00 6,750.00
65,000.00 6,500.00
65,000.00 650.00
65,000.00 520.00

13,821,677.50
12,102,177.50
10,951,400.00 12,046,540.00
20,750.00 25,937.50
29,700.00 29,700.00
1,719,500.00
45,000.00 270,000.00
65,000.00 1,300,000.00
65,000.00 130,000.00
65,000.00 19,500.00
14,420,437.50
12,600,437.50
10,454,000.00 12,544,800.00
20,750.00 25,937.50
29,700.00 29,700.00
1,820,000.00
65,000.00 390,000.00
65,000.00 1,300,000.00
65,000.00 130,000.00
- -

14,319,937.50
12,600,437.50
10,454,000.00 12,544,800.00
20,750.00 25,937.50
29,700.00 29,700.00
1,719,500.00
45,000.00 270,000.00
65,000.00 1,300,000.00
65,000.00 130,000.00
65,000.00 19,500.00

9,862,297.50
8,142,797.50
6,739,300.00 8,087,160.00
20,750.00 25,937.50
29,700.00 29,700.00
1,719,500.00
45,000.00 270,000.00
65,000.00 1,300,000.00
65,000.00 130,000.00
65,000.00 19,500.00

541,644.00
449,649.00
11,204,100.00 448,164.00
29,700.00 1,485.00

91,995.00
45,000.00 15,750.00
65,000.00 68,250.00
65,000.00 6,825.00
65,000.00 1,170.00

ayu Bengkir) 541,644.00


449,649.00
11,204,100.00 448,164.00
29,700.00 1,485.00

91,995.00
45,000.00 15,750.00
65,000.00 68,250.00
65,000.00 6,825.00
65,000.00 1,170.00

Kayu Kruing) 386,000.00


294,005.00
7,313,000.00 292,520.00
29,700.00 1,485.00

91,995.00
45,000.00 15,750.00
65,000.00 68,250.00
65,000.00 6,825.00
65,000.00 1,170.00

676,345.00
449,345.00
11,196,500.00 447,860.00
29,700.00 1,485.00
227,000.00
45,000.00 45,000.00
65,000.00 162,500.00
65,000.00 16,250.00
65,000.00 3,250.00

676,345.00
449,345.00
11,196,500.00 447,860.00
29,700.00 1,485.00
227,000.00
45,000.00 45,000.00
65,000.00 162,500.00
65,000.00 16,250.00
65,000.00 3,250.00

676,649.00
449,649.00
11,204,100.00 448,164.00
29,700.00 1,485.00
227,000.00
45,000.00 45,000.00
65,000.00 162,500.00
65,000.00 16,250.00
65,000.00 3,250.00

521,005.00
294,005.00
7,313,000.00 292,520.00
29,700.00 1,485.00
227,000.00
45,000.00 45,000.00
65,000.00 162,500.00
65,000.00 16,250.00
65,000.00 3,250.00

459,226.00
277,626.00
11,196,500.00 268,716.00
29,700.00 8,910.00
181,600.00
45,000.00 36,000.00
65,000.00 130,000.00
65,000.00 13,000.00
65,000.00 2,600.00

459,226.00
277,626.00
11,196,500.00 268,716.00
29,700.00 8,910.00
181,600.00
45,000.00 36,000.00
65,000.00 130,000.00
65,000.00 13,000.00
65,000.00 2,600.00

459,408.40
277,808.40
11,204,100.00 268,898.40
29,700.00 8,910.00
181,600.00
45,000.00 36,000.00
65,000.00 130,000.00
65,000.00 13,000.00
65,000.00 2,600.00

366,022.00
184,422.00
7,313,000.00 175,512.00
29,700.00 8,910.00
181,600.00
45,000.00 36,000.00
65,000.00 130,000.00
65,000.00 13,000.00
65,000.00 2,600.00

994,176.00
731,426.00
11,196,500.00 716,576.00
29,700.00 14,850.00
262,750.00
45,000.00 45,000.00
65,000.00 195,000.00
65,000.00 19,500.00
65,000.00 3,250.00

rangka Kayu Klas II atau III (lbr s/d 90 cm) Err:508


Err:508
11,204,100.00 280,102.50
20,750.00 622.50
29,700.00 14,850.00
Err:508 Err:508

172,600.00
45,000.00 27,000.00
65,000.00 130,000.00
65,000.00 13,000.00
65,000.00 2,600.00

rangka Kayu Klas II (lbr s/d 90 cm) Err:508


Err:508
11,204,100.00 280,102.50
20,750.00 622.50
29,700.00 14,850.00
Err:508 Err:508

172,600.00
45,000.00 27,000.00
65,000.00 130,000.00
65,000.00 13,000.00
65,000.00 2,600.00

rangka Kayu Klas III (lbr s/d 90 cm) Err:508


Err:508
7,313,000.00 182,825.00
20,750.00 622.50
29,700.00 14,850.00
Err:508 Err:508
172,600.00
45,000.00 27,000.00
65,000.00 130,000.00
65,000.00 13,000.00
65,000.00 2,600.00

ose kayu klas I atau III Err:508


Err:508
11,196,500.00 286,630.40
20,750.00 622.50
29,700.00 14,850.00
Err:508 Err:508
181,600.00
45,000.00 36,000.00
65,000.00 130,000.00
65,000.00 13,000.00
65,000.00 2,600.00

ose kayu klas I Err:508


Err:508
11,196,500.00 286,630.40
20,750.00 622.50
29,700.00 14,850.00
Err:508 Err:508
181,600.00
45,000.00 36,000.00
65,000.00 130,000.00
65,000.00 13,000.00
65,000.00 2,600.00

ose kayu klas II Err:508


Err:508
11,204,100.00 286,824.96
20,750.00 622.50
29,700.00 14,850.00
Err:508 Err:508
181,600.00
45,000.00 36,000.00
65,000.00 130,000.00
65,000.00 13,000.00
65,000.00 2,600.00
842,027.50
674,902.50
11,196,500.00 671,790.00
20,750.00 3,112.50
167,125.00
45,000.00 22,500.00
65,000.00 130,000.00
65,000.00 13,000.00
65,000.00 1,625.00

xpose Kayu Klas I 599,445.00


417,845.00
11,196,500.00 279,912.50
20,750.00 622.50
29,700.00 8,910.00
128,400.00 128,400.00
181,600.00
45,000.00 36,000.00
65,000.00 130,000.00
65,000.00 13,000.00
65,000.00 2,600.00

mika,Rangka expose Kayu Klas II Err:508


Err:508
11,204,100.00 280,102.50
20,750.00 622.50
29,700.00 2,376.00
128,400.00 128,400.00
Err:508 Err:508
217,350.00
45,000.00 36,000.00
65,000.00 162,500.00
65,000.00 16,250.00
65,000.00 2,600.00

al Kayu Kelas I Bentang 6 meter 13,363,740.00


12,312,740.00
10,951,400.00 12,046,540.00
10,000.00 150,000.00
20,750.00 116,200.00
1,051,000.00
45,000.00 180,000.00
65,000.00 780,000.00
65,000.00 78,000.00
65,000.00 13,000.00

al Kayu Kelas II Bentang 6 meter 12,816,600.00


11,765,600.00
10,454,000.00 11,499,400.00
10,000.00 150,000.00
20,750.00 116,200.00
1,051,000.00
45,000.00 180,000.00
65,000.00 780,000.00
65,000.00 78,000.00
65,000.00 13,000.00

al Kayu Kelas III Bentang 6 meter 8,730,430.00


7,679,430.00
6,739,300.00 7,413,230.00
10,000.00 150,000.00
20,750.00 116,200.00
1,051,000.00
45,000.00 180,000.00
65,000.00 780,000.00
65,000.00 78,000.00
65,000.00 13,000.00

15,127,380.00
13,407,880.00
10,951,400.00 13,141,680.00
10,000.00 150,000.00
20,750.00 116,200.00
1,719,500.00
45,000.00 270,000.00
65,000.00 1,300,000.00
65,000.00 130,000.00
65,000.00 19,500.00

12,889,390.00
12,258,790.00
10,951,400.00 12,046,540.00
10,000.00 150,000.00
20,750.00 62,250.00
630,600.00
45,000.00 108,000.00
65,000.00 468,000.00
65,000.00 46,800.00
65,000.00 7,800.00

12,342,250.00
11,711,650.00
10,454,000.00 11,499,400.00
10,000.00 150,000.00
20,750.00 62,250.00
630,600.00
45,000.00 108,000.00
65,000.00 468,000.00
65,000.00 46,800.00
65,000.00 7,800.00

8,256,080.00
7,625,480.00
6,739,300.00 7,413,230.00
10,000.00 150,000.00
20,750.00 62,250.00
630,600.00
45,000.00 108,000.00
65,000.00 468,000.00
65,000.00 46,800.00
65,000.00 7,800.00

263,496.30
251,521.30
6,126,700.00 85,773.80
4,460,000.00 160,560.00
20,750.00 5,187.50
11,975.00
45,000.00 4,500.00
65,000.00 6,500.00
65,000.00 650.00
65,000.00 325.00

en/Jatiwangi, Kayu Klas III 116,316.30


104,341.30
6,126,700.00 85,773.80
4,460,000.00 13,380.00
20,750.00 5,187.50
11,975.00
45,000.00 4,500.00
65,000.00 6,500.00
65,000.00 650.00
65,000.00 325.00

136,386.30
124,411.30
6,126,700.00 85,773.80
4,460,000.00 33,450.00 0.0075
20,750.00 5,187.50
11,975.00
45,000.00 4,500.00
65,000.00 6,500.00
65,000.00 650.00
65,000.00 325.00

1,029,425.50
1,015,055.50
6,126,700.00 1,010,905.50
20,750.00 4,150.00
14,370.00
45,000.00 5,400.00
65,000.00 7,800.00
65,000.00 780.00
65,000.00 390.00

m, kayu Klas II atau III 187,650.00


158,150.00
10,000,000.00 154,000.00
20,750.00 4,150.00
29,500.00
45,000.00 6,750.00
65,000.00 16,250.00
65,000.00 1,625.00
65,000.00 4,875.00

m, kayu Klas II 187,650.00


158,150.00
10,000,000.00 154,000.00
20,750.00 4,150.00
29,500.00
45,000.00 6,750.00
65,000.00 16,250.00
65,000.00 1,625.00
65,000.00 4,875.00

m, kayu Klas III 128,001.18


98,501.18
6,126,700.00 94,351.18
20,750.00 4,150.00
29,500.00
45,000.00 6,750.00
65,000.00 16,250.00
65,000.00 1,625.00
65,000.00 4,875.00

ayu Klas II atau III 146,138.09


115,038.09
6,739,300.00 109,850.59
20,750.00 5,187.50
31,100.00
45,000.00 9,000.00
65,000.00 19,500.00
65,000.00 1,950.00
65,000.00 650.00

ayu Klas II 199,287.50


168,187.50
10,000,000.00 163,000.00
20,750.00 5,187.50
31,100.00
45,000.00 9,000.00
65,000.00 19,500.00
65,000.00 1,950.00
65,000.00 650.00

ayu Klas III 136,152.71


105,052.71
6,126,700.00 99,865.21
20,750.00 5,187.50
31,100.00
45,000.00 9,000.00
65,000.00 19,500.00
65,000.00 1,950.00
65,000.00 650.00

142,447.20
122,997.20
11,196,500.00 120,922.20
20,750.00 2,075.00
19,450.00
45,000.00 4,500.00
65,000.00 13,000.00
65,000.00 1,625.00
65,000.00 325.00

81,986.10
62,536.10
11,196,500.00 60,461.10
20,750.00 2,075.00
19,450.00
45,000.00 4,500.00
65,000.00 13,000.00
65,000.00 1,625.00
65,000.00 325.00

82,027.14
62,577.14
11,204,100.00 60,502.14
20,750.00 2,075.00
19,450.00
45,000.00 4,500.00
65,000.00 13,000.00
65,000.00 1,625.00
65,000.00 325.00

61,015.20
41,565.20
7,313,000.00 39,490.20
20,750.00 2,075.00
19,450.00
45,000.00 4,500.00
65,000.00 13,000.00
65,000.00 1,625.00
65,000.00 325.00

100,605.50
81,480.50
7,313,000.00 80,443.00
20,750.00 1,037.50
19,125.00
45,000.00 4,500.00
65,000.00 13,000.00
65,000.00 1,300.00
65,000.00 325.00
60,384.00
41,259.00
7,313,000.00 40,221.50
20,750.00 1,037.50
19,125.00
45,000.00 4,500.00
65,000.00 13,000.00
65,000.00 1,300.00
65,000.00 325.00

cm Kayu klas II atau III 231,257.90


191,812.90
6,739,300.00 188,700.40
20,750.00 3,112.50
39,445.00
45,000.00 6,750.00
65,000.00 29,250.00
65,000.00 2,925.00
65,000.00 520.00

cm Kayu klas II 335,269.50


295,824.50
10,454,000.00 292,712.00
20,750.00 3,112.50
39,445.00
45,000.00 6,750.00
65,000.00 29,250.00
65,000.00 2,925.00
65,000.00 520.00

cm Kayu klas III 231,257.90


191,812.90
6,739,300.00 188,700.40
20,750.00 3,112.50
39,445.00
45,000.00 6,750.00
65,000.00 29,250.00
65,000.00 2,925.00
65,000.00 520.00

ap Rangka Kayu Klas II 353,712.90


314,267.90
6,739,300.00 188,700.40
20,750.00 3,112.50
123,050.00 105,823.00
29,700.00 16,632.00
39,445.00
45,000.00 6,750.00
65,000.00 29,250.00
65,000.00 2,925.00
65,000.00 520.00

ap Rangka Kayu Klas II 457,724.50


418,279.50
10,454,000.00 292,712.00
20,750.00 3,112.50
123,050.00 105,823.00
29,700.00 16,632.00
39,445.00
45,000.00 6,750.00
65,000.00 29,250.00
65,000.00 2,925.00
65,000.00 520.00

ap Rangka Kayu Klas III 353,712.90


314,267.90
6,739,300.00 188,700.40
20,750.00 3,112.50
123,050.00 105,823.00
29,700.00 16,632.00
39,445.00
45,000.00 6,750.00
65,000.00 29,250.00
65,000.00 2,925.00
65,000.00 520.00

238,325.50
80,675.50
11,196,500.00 78,375.50
20,750.00 2,075.00
1,500.00 225.00
157,650.00
45,000.00 27,000.00
65,000.00 117,000.00
65,000.00 11,700.00
65,000.00 1,950.00

78,000.00
78,000.00
52,000.00 78,000.00
-
-
-
-
-
-
-
-

(12±2)cm, w/c = 0,87 874,345.00


775,005.00
1,700.00 419,900.00
85.00 73,865.00
260.00 259,740.00
100.00 21,500.00
99,340.00
45,000.00 74,250.00
65,000.00 17,875.00
65,000.00 1,820.00
65,000.00 5,395.00

(12±2)cm, w/c = 0,78 923,540.00


824,200.00
1,700.00 469,200.00
85.00 70,380.00
260.00 263,120.00
100.00 21,500.00
99,340.00
45,000.00 74,250.00
65,000.00 17,875.00
65,000.00 1,820.00
65,000.00 5,395.00

m (12±2)cm, w/c = 0,72 961,475.00


862,135.00
1,700.00 508,300.00
85.00 67,915.00
260.00 264,420.00
100.00 21,500.00
99,340.00
45,000.00 74,250.00
65,000.00 17,875.00
65,000.00 1,820.00
65,000.00 5,395.00

a (K100), slum (3-6)cm, w/c = 0,87 822,615.00


753,925.00
1,700.00 391,000.00
85.00 75,905.00
260.00 267,020.00
100.00 20,000.00
68,690.00
45,000.00 54,000.00
65,000.00 13,000.00
65,000.00 1,300.00
65,000.00 390.00

m (12±2)cm, w/c = 0,66 1,007,180.00


907,840.00
1,700.00 554,200.00
85.00 64,600.00
260.00 267,540.00
100.00 21,500.00
99,340.00
45,000.00 74,250.00
65,000.00 17,875.00
65,000.00 1,820.00
65,000.00 5,395.00

m (12±2)cm, w/c = 0,61 1,049,435.00


950,095.00
1,700.00 598,400.00
85.00 62,135.00
260.00 268,060.00
100.00 21,500.00
99,340.00
45,000.00 74,250.00
65,000.00 17,875.00
65,000.00 1,820.00
65,000.00 5,395.00

m (12±2)cm, w/c = 0,58 1,083,090.00


983,750.00
1,700.00 630,700.00
85.00 59,330.00
260.00 272,220.00
100.00 21,500.00
99,340.00
45,000.00 74,250.00
65,000.00 17,875.00
65,000.00 1,820.00
65,000.00 5,395.00

m (12±2)cm, w/c = 0,56 1,102,600.00


1,003,260.00
1,700.00 652,800.00
85.00 58,820.00
260.00 270,140.00
100.00 21,500.00
99,340.00
45,000.00 74,250.00
65,000.00 17,875.00
65,000.00 1,820.00
65,000.00 5,395.00

m (12±2)cm, w/c = 0,53 1,135,940.00


1,036,600.00
1,700.00 690,200.00
85.00 58,140.00
260.00 266,760.00
100.00 21,500.00
99,340.00
45,000.00 74,250.00
65,000.00 17,875.00
65,000.00 1,820.00
65,000.00 5,395.00

m (12±2)cm, w/c = 0,52 1,146,285.00


1,046,945.00
1,700.00 702,100.00
85.00 57,885.00
260.00 265,460.00
100.00 21,500.00
99,340.00
45,000.00 74,250.00
65,000.00 17,875.00
65,000.00 1,820.00
65,000.00 5,395.00

m (12±2)cm, w/c = 0,49 1,212,660.00


1,086,310.00
1,700.00 746,300.00
85.00 56,950.00
260.00 261,560.00
100.00 21,500.00
126,350.00
45,000.00 94,500.00
65,000.00 22,750.00
65,000.00 2,275.00
65,000.00 6,825.00

m (12±2)cm, w/c = 0,48 1,226,145.00


1,099,795.00
1,700.00 761,600.00
85.00 56,695.00
260.00 260,000.00
100.00 21,500.00
126,350.00
45,000.00 94,500.00
65,000.00 22,750.00
65,000.00 2,275.00
65,000.00 6,825.00

350 kg/m3, Bukling factor pasir 20%

12,145.50
11,304.00
10,500.00 11,025.00
18,600.00 279.00
841.50
45,000.00 315.00
65,000.00 455.00
65,000.00 45.50
65,000.00 26.00

12,670.50
11,829.00
11,000.00 11,550.00
18,600.00 279.00
841.50
45,000.00 315.00
65,000.00 455.00
65,000.00 45.50
65,000.00 26.00

143,815.00
100,135.00
2,302,000.00 92,080.00
20,750.00 6,225.00 6.35
18,300.00 1,830.00 6.35.1
43,680.00
45,000.00 23,400.00
65,000.00 16,900.00
65,000.00 1,690.00 6.35.2
65,000.00 1,690.00

155,325.00
111,645.00
2,302,000.00 103,590.00
20,750.00 6,225.00 6.36
18,300.00 1,830.00 6.36.1
43,680.00
45,000.00 23,400.00
65,000.00 16,900.00
65,000.00 1,690.00 6.36.2
65,000.00 1,690.00

Err:508
Err:508
2,302,000.00 92,080.00
20,750.00 8,300.00
18,300.00 3,660.00
6,126,700.00 91,900.50
Err:508 Err:508
18,300.00 36,600.00
55,440.00
45,000.00 29,700.00
65,000.00 21,450.00
65,000.00 2,145.00
65,000.00 2,145.00

159,480.00
104,040.00
2,302,000.00 92,080.00
20,750.00 8,300.00
18,300.00 3,660.00
55,440.00
45,000.00 29,700.00
65,000.00 21,450.00
65,000.00 2,145.00
65,000.00 2,145.00

Err:508
Err:508
2,302,000.00 92,080.00
20,750.00 8,300.00
18,300.00 3,660.00
6,126,700.00 110,280.60
Err:508 Err:508
18,300.00 36,600.00
55,440.00
45,000.00 29,700.00
65,000.00 21,450.00
65,000.00 2,145.00
65,000.00 2,145.00

159,480.00
104,040.00
2,302,000.00 92,080.00
20,750.00 8,300.00
18,300.00 3,660.00
55,440.00
45,000.00 29,700.00
65,000.00 21,450.00
65,000.00 2,145.00
65,000.00 2,145.00
Err:508
Err:508
2,302,000.00 92,080.00
20,750.00 8,300.00
18,300.00 3,660.00
6,126,700.00 91,900.50
Err:508 Err:508
18,300.00 109,800.00
55,440.00
45,000.00 29,700.00
65,000.00 21,450.00
65,000.00 2,145.00
65,000.00 2,145.00

326,755.00
271,315.00
2,302,000.00 92,080.00
20,750.00 8,300.00
18,300.00 3,660.00
2,560,000.00 38,400.00
54,500.00 19,075.00
18,300.00 109,800.00
55,440.00
45,000.00 29,700.00
65,000.00 21,450.00
65,000.00 2,145.00
65,000.00 2,145.00

Err:508
Err:508
2,302,000.00 69,060.00
20,750.00 8,300.00
18,300.00 3,660.00
6,126,700.00 122,534.00
Err:508 Err:508
18,300.00 54,900.00
5,000.00 20,000.00
55,440.00
45,000.00 29,700.00
65,000.00 21,450.00
65,000.00 2,145.00
65,000.00 2,145.00

281,635.00
226,195.00
2,302,000.00 69,060.00
20,750.00 8,300.00
18,300.00 3,660.00
2,560,000.00 51,200.00
54,500.00 19,075.00
18,300.00 54,900.00
5,000.00 20,000.00
55,440.00
45,000.00 29,700.00
65,000.00 21,450.00
65,000.00 2,145.00
65,000.00 2,145.00

Err:508
Err:508
2,302,000.00 69,060.00
20,750.00 8,300.00
18,300.00 2,745.00
6,126,700.00 91,900.50
Err:508 Err:508
18,300.00 36,600.00
55,440.00
45,000.00 29,700.00
65,000.00 21,450.00
65,000.00 2,145.00
65,000.00 2,145.00

229,620.00
174,180.00
2,302,000.00 69,060.00
20,750.00 8,300.00
18,300.00 2,745.00
2,560,000.00 38,400.00
54,500.00 19,075.00
18,300.00 36,600.00
55,440.00
45,000.00 29,700.00
65,000.00 21,450.00
65,000.00 2,145.00
65,000.00 2,145.00

93,217.80
82,372.80
2,302,000.00 60,772.80
20,750.00 12,450.00
18,300.00 9,150.00
10,845.00
45,000.00 6,750.00
65,000.00 3,250.00
65,000.00 325.00
65,000.00 520.00
si + Bekisting) -
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-

+ Bekisting) -
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-

+ Bekisting) -
-
-
-
-
-
-
-
-
-
-
-
-

-
-
-
-
-
-
-

+ Bekisting) -
-
-
-
-
-
-
-
-
-
-
-
-

-
-
-
-
-
-
-

+ Bekisting) -
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-

si + Bekisting) -
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-

i + Bekisting) -
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-

-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-

-
-
-
-
-
-
-
-
-

-
-
-
-
-
-
-

-
-
-
-

-
-
-
-

-
-
-
-

-
-
-
-

-
-
-
-

-
-
-
-

-
-
-
-

-
-
-
-

-
-
-
-

-
-
-
-

-
-
-
-

-
-
-
-

-
-
-
-

-
-
-
-
-
-
-
-

63,915.00
51,250.00
2,050.00 51,250.00
12,665.00
45,000.00 6,750.00
65,000.00 4,875.00
65,000.00 520.00
65,000.00 520.00

82,665.00
70,000.00
2,800.00 70,000.00
12,665.00
45,000.00 6,750.00
65,000.00 4,875.00
65,000.00 520.00
65,000.00 520.00

75,165.00
62,500.00
2,500.00 62,500.00

12,665.00
45,000.00 6,750.00
65,000.00 4,875.00
65,000.00 520.00
65,000.00 520.00

62,040.00
49,375.00
1,975.00 49,375.00

12,665.00
45,000.00 6,750.00
65,000.00 4,875.00
65,000.00 520.00
65,000.00 520.00

41,560.00
30,000.00
2,500.00 30,000.00
11,560.00
45,000.00 6,750.00
65,000.00 3,900.00
65,000.00 390.00
65,000.00 520.00

71,710.00
39,280.00
4,400.00 22,000.00
1,700.00 13,600.00
115,000.00 3,680.00
32,430.00
45,000.00 18,000.00
65,000.00 13,000.00
65,000.00 1,300.00
65,000.00 130.00

67,710.00
35,280.00
4,500.00 18,000.00
1,700.00 13,600.00
115,000.00 3,680.00
32,430.00
45,000.00 18,000.00
65,000.00 13,000.00
65,000.00 1,300.00
65,000.00 130.00

64,910.00
32,480.00
3,800.00 15,200.00
1,700.00 13,600.00
115,000.00 3,680.00
32,430.00
45,000.00 18,000.00
65,000.00 13,000.00
65,000.00 1,300.00
65,000.00 130.00

Err:508
Err:508
Err:508 Err:508
45,300.00 5,436.00
12,215.00
45,000.00 6,300.00
65,000.00 4,875.00
65,000.00 520.00
65,000.00 520.00

Err:508
Err:508
Err:508 Err:508
45,300.00 5,436.00
11,760.00
45,000.00 6,300.00
65,000.00 4,550.00
65,000.00 455.00
65,000.00 455.00

42,046.00
30,286.00
71,000.00 24,850.00
45,300.00 5,436.00
11,760.00
45,000.00 6,300.00
65,000.00 4,550.00
65,000.00 455.00
65,000.00 455.00

46,071.00
34,506.00
57,000.00 29,070.00
45,300.00 5,436.00
11,565.00
45,000.00 6,300.00
65,000.00 4,355.00
65,000.00 455.00
65,000.00 455.00

35,420.00
27,770.00
2,500.00 27,500.00
9,000.00 270.00

7,650.00
20,000.00 4,000.00
30,000.00 3,000.00
35,000.00 350.00
30,000.00 300.00

88,735.00
76,800.00
1,250.00 75,000.00
9,000.00 1,800.00

11,935.00
20,000.00 3,320.00
30,000.00 7,500.00
35,000.00 875.00
30,000.00 240.00

25,486.00
25,486.00
3,800.00 13,300.00
9,000.00 450.00
820.00 8,856.00
90,000.00 2,880.00
4,500.00 4,500.00

15,300.00
20,000.00 8,000.00
30,000.00 6,000.00
35,000.00 700.00
30,000.00 600.00

25,071.00
14,016.00
21,000.00 8,400.00
9,000.00 540.00
9,000.00 4,500.00
144,000.00 576.00

11,055.00
20,000.00 2,500.00
30,000.00 7,500.00
35,000.00 875.00
30,000.00 180.00

39,720.00
29,640.00
41,750.00 29,225.00
20,750.00 415.00
10,080.00
45,000.00 5,400.00
65,000.00 3,900.00
65,000.00 390.00
65,000.00 390.00

25,565.00
13,355.00
41,750.00 12,525.00
20,750.00 830.00
12,210.00
45,000.00 6,750.00
65,000.00 4,550.00
65,000.00 520.00
65,000.00 390.00

68,461.00
47,736.00
35,250.00 42,300.00
45,300.00 5,436.00
20,725.00
45,000.00 6,750.00
65,000.00 13,000.00
65,000.00 650.00
65,000.00 325.00

tebal 4 mm, 5 mm & 6 mm 32,505.00


26,020.00
23,500.00 25,850.00
17,000.00 170.00
6,485.00
45,000.00 1,350.00
65,000.00 4,550.00
65,000.00 455.00
65,000.00 130.00 6.20 1

tebal 4 mm 26,455.00
19,970.00
18,000.00 19,800.00
17,000.00 170.00
6,485.00
45,000.00 1,350.00
65,000.00 4,550.00
65,000.00 455.00
65,000.00 130.00

ebal 5 mm 25,575.00
19,090.00
17,200.00 18,920.00
17,000.00 170.00
6,485.00
45,000.00 1,350.00
65,000.00 4,550.00
65,000.00 455.00
65,000.00 130.00

) cm, Tebal 3 mm, 4 mm & 6 mm 31,620.00


21,060.00
54,500.00 20,437.50
20,750.00 622.50

10,560.00
45,000.00 3,150.00
65,000.00 6,500.00
65,000.00 650.00
65,000.00 260.00

) cm, Tebal 3 mm 31,620.00


21,060.00
54,500.00 20,437.50
20,750.00 622.50
10,560.00
45,000.00 3,150.00
65,000.00 6,500.00
65,000.00 650.00
65,000.00 260.00

) cm, 4 mm 36,757.50
26,197.50
68,200.00 25,575.00
20,750.00 622.50
10,560.00
45,000.00 3,150.00
65,000.00 6,500.00
65,000.00 650.00
65,000.00 260.00

) cm, 6 mm 42,570.00
32,010.00
83,700.00 31,387.50
20,750.00 622.50
10,560.00
45,000.00 3,150.00
65,000.00 6,500.00
65,000.00 650.00
65,000.00 260.00

ti, tebal 6 mm 254,305.00


168,155.00
11,196,500.00 167,947.50
20,750.00 207.50
86,150.00
45,000.00 27,000.00
65,000.00 52,000.00
65,000.00 5,200.00
65,000.00 1,950.00

20x240) tebal 9 mm 32,661.80


24,261.80
66,200.00 24,096.80
1,500.00 165.00
8,400.00
45,000.00 4,500.00
65,000.00 3,250.00
65,000.00 325.00
65,000.00 325.00

m & Rangka Allumunium 131,670.00


88,650.00
3,500.00 12,600.00
6,500.00 975.00
21,500.00 22,575.00
35,000.00 52,500.00

43,020.00
45,000.00 6,750.00
65,000.00 32,500.00
65,000.00 3,250.00
65,000.00 520.00

11,582.50
5,562.50
5,100.00 5,355.00
20,750.00 207.50
6,020.00
45,000.00 2,250.00
65,000.00 3,250.00
65,000.00 325.00
65,000.00 195.00

1,336,310.00
1,105,845.00
1,043,250.00 1,043,250.00
1,043,250.00 62,595.00
230,465.00
45,000.00 148,500.00
65,000.00 71,500.00
65,000.00 65.00
65,000.00 10,400.00

445,850.00
195,450.00
184,100.00 184,100.00
1,700.00 10,200.00
115,000.00 1,150.00
250,400.00
45,000.00 45,000.00
65,000.00 97,500.00
65,000.00 97,500.00
65,000.00 10,400.00

472,940.00
472,940.00
363,800.00 363,800.00
363,800.00 109,140.00
-
-
-
-
-
-
-

-
-
-
-
-
-
-
-
-
-
-

Err:508
Err:508
750,000.00 300,000.00
1,700.00 204,000.00
115,000.00 34,500.00
Err:508 Err:508
1,800.00 10,800.00
504,000.00
45,000.00 270,000.00
65,000.00 195,000.00
65,000.00 19,500.00
65,000.00 19,500.00

113,455.00
101,695.00
65,150.00 71,665.00
750,000.00 20,250.00
1,700.00 1,156.00
115,000.00 6,440.00
91,000.00 2,184.00
11,760.00
45,000.00 6,300.00
65,000.00 4,550.00
65,000.00 455.00
65,000.00 455.00

654,523.45
622,603.45
162,999.50 179,299.45
750,000.00 412,500.00
1,700.00 17,510.00
115,000.00 7,015.00
91,000.00 6,279.00
31,920.00
45,000.00 17,100.00
65,000.00 12,350.00
65,000.00 1,235.00
65,000.00 1,235.00

564,873.73
532,953.73
81,499.75 89,649.73
750,000.00 412,500.00
1,700.00 17,510.00
115,000.00 7,015.00
91,000.00 6,279.00
31,920.00
45,000.00 17,100.00
65,000.00 12,350.00
65,000.00 1,235.00
65,000.00 1,235.00

594,794.00
562,874.00
108,700.00 119,570.00
750,000.00 412,500.00
1,700.00 17,510.00
115,000.00 7,015.00
91,000.00 6,279.00
31,920.00
45,000.00 17,100.00
65,000.00 12,350.00
65,000.00 1,235.00
65,000.00 1,235.00

618,664.00
586,744.00
130,400.00 143,440.00
750,000.00 412,500.00
1,700.00 17,510.00
115,000.00 7,015.00
91,000.00 6,279.00
31,920.00
45,000.00 17,100.00
65,000.00 12,350.00
65,000.00 1,235.00
65,000.00 1,235.00

654,523.45
622,603.45
162,999.50 179,299.45
750,000.00 412,500.00
1,700.00 17,510.00
115,000.00 7,015.00
91,000.00 6,279.00
31,920.00
45,000.00 17,100.00
65,000.00 12,350.00
65,000.00 1,235.00
65,000.00 1,235.00

654,523.45
622,603.45
162,999.50 179,299.45
750,000.00 412,500.00
1,700.00 17,510.00
115,000.00 7,015.00
91,000.00 6,279.00
31,920.00
45,000.00 17,100.00
65,000.00 12,350.00
65,000.00 1,235.00
65,000.00 1,235.00

96,025.00
85,405.00
55,100.00 66,120.00
55,100.00 19,285.00
10,620.00
45,000.00 2,430.00
65,000.00 5,850.00
65,000.00 585.00
65,000.00 1,755.00

333,041.00
314,960.00
203,200.00 243,840.00
203,200.00 71,120.00
18,081.00
45,000.00 4,860.00
65,000.00 11,700.00
65,000.00 1,170.00
65,000.00 351.00

461,952.00
439,347.50
283,450.00 340,140.00
283,450.00 99,207.50
22,604.50
45,000.00 6,075.00
65,000.00 14,625.00
65,000.00 1,462.50
65,000.00 442.00

28,502.00
22,475.00
14,500.00 17,400.00
14,500.00 5,075.00
6,027.00
45,000.00 1,620.00
65,000.00 3,900.00
65,000.00 390.00
65,000.00 117.00

65,848.00
56,807.50
36,650.00 43,980.00
36,650.00 12,827.50
9,040.50
45,000.00 2,430.00
65,000.00 5,850.00
65,000.00 585.00
65,000.00 175.50

76,649.00
63,085.00
40,700.00 48,840.00
40,700.00 14,245.00
13,564.00
45,000.00 3,645.00
65,000.00 8,775.00
65,000.00 877.50
65,000.00 266.50

-
-
-
-
-
-
-
-
-

19,500.00
11,575.00
11,500.00 11,500.00
3,000.00 75.00
7,925.00
45,000.00 450.00
65,000.00 6,500.00
65,000.00 650.00
65,000.00 325.00

19,500.00
11,575.00
11,500.00 11,500.00
3,000.00 75.00
7,925.00
45,000.00 450.00
65,000.00 6,500.00
65,000.00 650.00
65,000.00 325.00

23,000.00
15,075.00
15,000.00 15,000.00
3,000.00 75.00
7,925.00
45,000.00 450.00
65,000.00 6,500.00
65,000.00 650.00
65,000.00 325.00

21,725.00
13,800.00
13,800.00 13,800.00
7,925.00
45,000.00 450.00
65,000.00 6,500.00
65,000.00 650.00
65,000.00 325.00

20,119.00
12,934.00
10,000.00 11,500.00
23,900.00 1,434.00
7,185.00
45,000.00 2,700.00
65,000.00 3,900.00
65,000.00 390.00
65,000.00 195.00

20,985.00
13,800.00
12,000.00 13,800.00
7,185.00
45,000.00 2,700.00
65,000.00 3,900.00
65,000.00 390.00
65,000.00 195.00

132,343.00
9,000.00
5,500.00 5,500.00
35,000.00 3,500.00
123,343.00
45,000.00 47,250.00
65,000.00 68,250.00
65,000.00 6,825.00
65,000.00 338.00
85,000.00 680

kap, rangka baja Siku Err:508


Err:508
10,000.00 150,000.00
10,000.00 328,000.00
Err:508 Err:508
125,705.00
45,000.00 47,250.00
65,000.00 68,250.00
65,000.00 6,825.00
65,000.00 3,380.00

Err:508
Err:508
Err:508 Err:508
5,500.00 165.00
35,000.00 140.00
1,781.00
45,000.00 180.00
65,000.00 130.00
65,000.00 13.00
65,000.00 13.00
85,000.00 1,445.00 6.13 1 m2
6.13.1
Err:508 1.1 m2
Err:508 0.02 Kg
Err:508 Err:508 0.0018 m3
140,190.00 6.13.2
45,000.00 54,000.00 0.1 OH
65,000.00 78,000.00 0.1 OH
65,000.00 7,800.00 0.01 OH
65,000.00 390.00 0.0005 OH

Err:508
Err:508
Err:508 Err:508
52,690.00
45,000.00 19,800.00
65,000.00 28,600.00
65,000.00 2,860.00
65,000.00 1,430.00

286,060.00
225,000.00
225,000.00 225,000.00
61,060.00
45,000.00 3,600.00
65,000.00 52,000.00
65,000.00 5,200.00
65,000.00 260.00

Err:508
Err:508
Err:508 Err:508
119,750.00
45,000.00 45,000.00
65,000.00 65,000.00
65,000.00 6,500.00
65,000.00 3,250.00

Err:508
Err:508
Err:508 Err:508
1,500.00 3,000.00
24,000.00 1,440.00
47,716.00
45,000.00 19,350.00
65,000.00 27,950.00
65,000.00 279.50
65,000.00 136.50

Err:508
Err:508
Err:508 Err:508
#REF! #REF!

10,175.50
45,000.00 3,825.00
65,000.00 5,525.00
65,000.00 552.50
65,000.00 273.00

#REF!
#REF!
#REF! #REF!
5,600.00 25,200.00
24,000.00 6,480.00

10,130.00
45,000.00 3,825.00
65,000.00 5,525.00
65,000.00 520.00
65,000.00 260.00

136,945.00
95,000.00
95,000.00 95,000.00

41,945.00
45,000.00 15,750.00
65,000.00 22,750.00
65,000.00 2,275.00
65,000.00 1,170.00

Err:508
Err:508
Err:508 Err:508
Err:508 Err:508
199,950.00
45,000.00 75,150.00
65,000.00 108,550.00
65,000.00 10,855.00
65,000.00 5,395.00

Err:508
Err:508
Err:508 Err:508
Err:508 Err:508
10,000.00 17,160.00
11,975.00
45,000.00 4,500.00
65,000.00 6,500.00
65,000.00 650.00
65,000.00 325.00

Err:508
Err:508
- -
1,500.00 15,000.00
Err:508 Err:508
23,365.00
45,000.00 9,000.00
65,000.00 13,000.00
65,000.00 1,300.00
65,000.00 65.00

Lebar 90 cm 220,370.75
183,095.75
41,750.00 43,837.50
20,750.00 311.25
7,313,000.00 138,947.00
37,275.00
45,000.00 9,000.00
65,000.00 26,000.00
65,000.00 1,625.00
65,000.00 650.00

g Plaat BJLS 30 Lebar 45 cm 77,700.00


49,045.00
41,750.00 43,837.50
20,750.00 207.50
10,000.00 5,000.00
28,655.00
45,000.00 6,750.00
65,000.00 19,500.00
65,000.00 1,950.00
65,000.00 455.00

118,925.00
85,000.00
85,000.00 85,000.00
33,925.00
45,000.00 450.00
65,000.00 32,500.00
65,000.00 650.00
65,000.00 325.00

55,000.00
55,000.00
55,000.00 55,000.00

-
-
-
-
-

103,212.50
70,000.00
70,000.00 70,000.00
33,212.50
45,000.00 225.00
65,000.00 32,500.00
65,000.00 325.00
65,000.00 162.50

28,937.50
17,050.00
17,050.00 17,050.00
11,887.50
45,000.00 675.00
65,000.00 9,750.00
65,000.00 975.00
65,000.00 487.50

21,025.00
13,100.00
13,100.00 13,100.00
7,925.00
45,000.00 450.00
65,000.00 6,500.00
65,000.00 650.00
65,000.00 325.00

22,850.00
7,000.00
7,000.00 7,000.00
15,850.00
45,000.00 900.00
65,000.00 13,000.00
65,000.00 1,300.00
65,000.00 650.00

16,548.75
5,100.00
5,100.00 5,100.00
11,448.75
45,000.00 675.00
65,000.00 9,750.00
65,000.00 975.00
65,000.00 48.75

183,750.00
183,750.00
183,750.00 183,750.00

-
-
-
-
-
105,265.00
90,000.00
90,000.00 90,000.00
15,265.00
45,000.00 900.00
65,000.00 13,000.00
65,000.00 1,300.00
65,000.00 65.00

306,300.00
306,300.00
306,300.00 306,300.00
-
-
-
-
-

Err:508
Err:508
Err:508 Err:508
45,795.00
45,000.00 2,700.00
65,000.00 39,000.00
65,000.00 3,900.00
65,000.00 195.00

31,381.25
12,300.00
12,300.00 12,300.00
19,081.25
45,000.00 1,125.00
65,000.00 16,250.00
65,000.00 1,625.00
65,000.00 81.25

77,448.75
66,000.00
60,000.00 66,000.00
11,448.75
45,000.00 675.00
65,000.00 9,750.00
65,000.00 975.00
65,000.00 48.75

115,728.75
104,280.00
94,800.00 104,280.00
11,448.75
45,000.00 675.00
65,000.00 9,750.00
65,000.00 975.00
65,000.00 48.75

170,948.75
159,500.00
145,000.00 159,500.00
11,448.75
45,000.00 675.00
65,000.00 9,750.00
65,000.00 975.00
65,000.00 48.75

447,025.00
416,012.50
122,500.00 379,750.00
1,700.00 24,990.00
115,000.00 7,762.50
1,800.00 3,510.00
31,012.50
45,000.00 16,875.00
65,000.00 11,700.00
65,000.00 1,170.00
65,000.00 1,267.50

131,850.00
76,975.00
52,100.00 52,100.00
1,700.00 17,000.00
115,000.00 5,175.00
1,800.00 2,700.00
54,875.00
45,000.00 27,900.00
65,000.00 22,750.00
65,000.00 2,275.00
65,000.00 1,950.00

137,850.00
82,975.00
58,100.00 58,100.00
1,700.00 17,000.00
115,000.00 5,175.00
1,800.00 2,700.00
54,875.00
45,000.00 27,900.00
65,000.00 22,750.00
65,000.00 2,275.00
65,000.00 1,950.00

129,750.00
74,875.00
50,000.00 50,000.00
1,700.00 17,000.00
115,000.00 5,175.00
1,800.00 2,700.00
54,875.00
45,000.00 27,900.00
65,000.00 22,750.00
65,000.00 2,275.00
65,000.00 1,950.00

132,950.00
78,075.00
53,200.00 53,200.00
1,700.00 17,000.00
115,000.00 5,175.00
1,800.00 2,700.00
54,875.00
45,000.00 27,900.00
65,000.00 22,750.00
65,000.00 2,275.00
65,000.00 1,950.00

136,321.00
81,446.00
55,675.00 55,675.00
1,700.00 17,680.00
115,000.00 5,175.00
1,800.00 2,916.00
54,875.00
45,000.00 27,900.00
65,000.00 22,750.00
65,000.00 2,275.00
65,000.00 1,950.00

Err:508
Err:508
Err:508 Err:508
1,700.00 1,938.00
115,000.00 345.00
1,800.00 45.00
10,810.00
45,000.00 4,050.00
65,000.00 5,850.00
65,000.00 585.00
65,000.00 325.00

Err:508
Err:508
Err:508 Err:508 0.03
1,700.00 1,938.00 33.333333
115,000.00 345.00
1,800.00 90.00
10,810.00
45,000.00 4,050.00
65,000.00 5,850.00
65,000.00 585.00
65,000.00 325.00

Err:508
Err:508
Err:508 Err:508
1,700.00 13,923.00
115,000.00 5,175.00
1,800.00 1,170.00
54,875.00
45,000.00 27,900.00
65,000.00 22,750.00
65,000.00 2,275.00
65,000.00 1,950.00

46,500.00
26,110.00
13,200.00 13,860.00
35,000.00 12,250.00
20,390.00
45,000.00 7,650.00
65,000.00 11,050.00
65,000.00 1,105.00
65,000.00 585.00

00/400/500 mm Err:508
Err:508
Err:508 Err:508
7,600.00 4,560.00
56,420.00
45,000.00 29,250.00
65,000.00 22,750.00
65,000.00 2,275.00
65,000.00 2,145.00

Err:508
Err:508
Err:508 Err:508
7,600.00 4,560.00
56,420.00
45,000.00 29,250.00
65,000.00 22,750.00
65,000.00 2,275.00
65,000.00 2,145.00

1.200 mm Err:508
Err:508
Err:508 Err:508
7,600.00 4,560.00
56,420.00
45,000.00 29,250.00
65,000.00 22,750.00
65,000.00 2,275.00
65,000.00 2,145.00

1.200 mm Err:508
Err:508
Err:508 Err:508
7,600.00 4,560.00
56,420.00
45,000.00 29,250.00
65,000.00 22,750.00
65,000.00 2,275.00
65,000.00 2,145.00

1.200 mm Err:508
Err:508
Err:508 Err:508
7,600.00 4,560.00
56,420.00
45,000.00 29,250.00
65,000.00 22,750.00
65,000.00 2,275.00
65,000.00 2,145.00

Err:508
Err:508
Err:508 Err:508
7,600.00 4,560.00
56,420.00
45,000.00 29,250.00
65,000.00 22,750.00
65,000.00 2,275.00
65,000.00 2,145.00

Err:508
Err:508
Err:508 Err:508
7,600.00 4,560.00
56,420.00
45,000.00 29,250.00
65,000.00 22,750.00
65,000.00 2,275.00
65,000.00 2,145.00

134,955.00
73,830.00
51,000.00 51,000.00
1,700.00 15,810.00
115,000.00 2,070.00
1,800.00 4,950.00
61,125.00
45,000.00 27,000.00
65,000.00 29,250.00
65,000.00 2,925.00
65,000.00 1,950.00

138,797.00
77,672.00
56,300.00 56,300.00
1,700.00 15,810.00
115,000.00 2,070.00
1,800.00 3,492.00
61,125.00
45,000.00 27,000.00
65,000.00 29,250.00
65,000.00 2,925.00
65,000.00 1,950.00

Err:508
Err:508
Err:508 Err:508
300.00 600.00
1,700.00 21,148.00
115,000.00 2,875.00
1,800.00 1,170.00
81,150.00
45,000.00 32,400.00
65,000.00 42,250.00
65,000.00 4,225.00
65,000.00 2,275.00

Err:508
Err:508
Err:508 Err:508
1,700.00 19,975.00
115,000.00 4,025.00
54,875.00
45,000.00 27,900.00
65,000.00 22,750.00
65,000.00 2,275.00
65,000.00 1,950.00

Err:508
Err:508
Err:508 Err:508
15,200.00 3,800.00
46,165.00
45,000.00 33,750.00
65,000.00 11,050.00
65,000.00 1,105.00
65,000.00 260.00

37,384.00
23,014.00
7,313,000.00 21,939.00
21,500.00 1,075.00
14,370.00
45,000.00 5,400.00
65,000.00 7,800.00
65,000.00 780.00
65,000.00 390.00

7,925.00
1,012.50
20,250.00 1,012.50
6,912.50
45,000.00 6,750.00
65,000.00 162.50

7,457.50
545.00
10,900.00 545.00
6,912.50
45,000.00 6,750.00
65,000.00 162.50

cara manual 7,457.50


545.00
10,900.00 545.00
6,912.50
45,000.00 6,750.00
65,000.00 162.50

7,457.50
545.00
10,900.00 545.00
6,912.50
45,000.00 6,750.00
65,000.00 162.50

7,761.50
2,939.00
28,900.00 2,312.00
16,350.00 327.00
3,000.00 300.00
4,822.50
45,000.00 1,800.00
65,000.00 2,600.00
65,000.00 260.00
65,000.00 162.50

29,827.00
21,152.00
23,600.00 3,540.00
51,800.00 8,806.00
51,800.00 8,806.00

8,675.00
45,000.00 3,150.00
65,000.00 4,875.00
65,000.00 487.50
65,000.00 162.50

lap.Cat Dasar & 2 lap.Cat Penutup 34,541.50


30,254.00
22,200.00 4,440.00
23,600.00 3,540.00
51,800.00 8,806.00
51,800.00 13,468.00

4,287.50
45,000.00 3,150.00
65,000.00 585.00
65,000.00 390.00
65,000.00 162.50

lap.Cat Dasar & 3 lap.Cat Penutup 45,313.50


34,916.00
22,200.00 4,440.00
23,600.00 3,540.00
51,800.00 8,806.00
51,800.00 18,130.00
10,397.50
45,000.00 3,150.00
65,000.00 6,825.00
65,000.00 260.00
65,000.00 162.50

-
-
-

-
-
-
-
-

34,593.70
29,491.20
46,000.00 6,900.00
44,600.00 16,591.20
3,000.00 6,000.00
5,102.50
65,000.00 3,900.00
65,000.00 1,040.00
65,000.00 162.50

7,270.00
2,380.00
6,800.00 2,380.00
4,890.00
45,000.00 4,500.00
65,000.00 390.00

25,432.50
6,630.00
32,100.00 4,815.00
28,900.00 1,445.00
3,000.00 300.00
7,000.00 70.00
18,802.50
45,000.00 7,200.00
65,000.00 10,400.00
65,000.00 1,040.00
65,000.00 162.50

Dasar 2 lap. Cat Penutup) 16,227.00


10,660.00
25,600.00 2,560.00
22,500.00 2,250.00
22,500.00 5,850.00
5,567.00
45,000.00 900.00
65,000.00 4,095.00
65,000.00 409.50
65,000.00 162.50

1lap Cat Dasar 39,443.00

33,876.00
25,600.00 -
94,100.00 9,410.00
94,100.00 24,466.00
5,567.00
45,000.00 900.00
65,000.00 4,095.00
65,000.00 409.50
65,000.00 162.50

10,725.50
6,300.00
22,500.00 2,250.00
22,500.00 4,050.00
4,425.50
45,000.00 1,260.00
65,000.00 2,730.00
65,000.00 273.00
65,000.00 162.50

17,420.00
2,740.00
23,900.00 2,390.00
35,000.00 350.00
14,680.00
45,000.00 900.00
65,000.00 13,000.00
65,000.00 130.00
65,000.00 650.00

33,970.20
6,145.20
23,900.00 2,390.00
35,000.00 350.00
1,702,600.00 3,405.20
27,825.00
45,000.00 11,250.00
65,000.00 14,625.00
65,000.00 1,462.50
65,000.00 487.50

anis) secara 125,684.00

18,684.00
51,900.00 5,709.00
51,900.00 8,823.00
51,900.00 4,152.00
107,000.00
45,000.00 22,500.00
65,000.00 52,000.00
65,000.00 19,500.00
65,000.00 13,000.00

121,755.00
88,155.00
78,600.00 78,600.00
91,000.00 9,555.00
33,600.00
45,000.00 18,000.00
65,000.00 13,000.00
65,000.00 1,300.00
65,000.00 1,300.00

131,755.00
98,155.00
88,600.00 88,600.00
91,000.00 9,555.00
33,600.00
45,000.00 18,000.00
65,000.00 13,000.00
65,000.00 1,300.00
65,000.00 1,300.00

143,205.00
109,605.00
100,050.00 100,050.00
91,000.00 9,555.00
33,600.00
45,000.00 18,000.00
65,000.00 13,000.00
65,000.00 1,300.00
65,000.00 1,300.00

153,205.00
119,605.00
110,050.00 110,050.00
91,000.00 9,555.00
33,600.00
45,000.00 18,000.00
65,000.00 13,000.00
65,000.00 1,300.00
65,000.00 1,300.00

101,405.00
67,805.00
58,250.00 58,250.00
91,000.00 9,555.00
33,600.00
45,000.00 18,000.00
65,000.00 13,000.00
65,000.00 1,300.00
65,000.00 1,300.00

103,055.00
69,455.00
59,900.00 59,900.00
91,000.00 9,555.00
33,600.00
45,000.00 18,000.00
65,000.00 13,000.00
65,000.00 1,300.00
65,000.00 1,300.00

15,500.00
15,500.00
45,000.00 14,850.00
65,000.00 650.00

28,636.00

175.00 28,636.36

45,000.00

275.00 45,000.00

7,237.50
7,237.50
45,000.00 6,750.00
65,000.00 487.50

2,111,445.00
1,191,820.00
1,702,600.00 1,191,820.00
919,625.00
45,000.00 157,500.00
65,000.00 682,500.00
65,000.00 68,250.00
65,000.00 11,375.00

300,000.00
122,100.00
422,100.00

#NAME?
#NAME?
#NAME?
#NAME?

50,000.00
50,000.00
#NAME?
#NAME?

556,330.00
411,000.00
111,000.00 111,000.00
20,000.00 300,000.00
145,330.00
45,000.00 94,500.00
65,000.00 47,450.00 1.9666667
65,000.00 3,380.00

Slawi, Agustus 2014

Plt. KEPALA DINAS PEKERJAAN UMUM


KABUPATEN TEGAL

Ir. SUHARMANTO
Pembina Utama Muda
NIP. 19610416 198810 1 001
m2 Langit-langit Asbes (1,00x1,00)m, Tebal 3,2 mm, Rangka Kruing #REF!
Pasang Kawat Harmonika 37,795.00 39,422.50
Bahan 32,430.00 33,530.00
Kawat Harmonika 19,500.00 20,000.00 21,450.00 22,000.00
Paku Biasa 1/2" - 1" 9,000.00 9,500.00 180.00 190.00
Kayu Kruing, papan 6,000,000.00 6,300,000.00 10,800.00 11,340.00
Tenaga 5,365.00 5,892.50
Pekerja 20,000.00 25,000.00 2,000.00 2,500.00
Tukang Kayu 30,000.00 30,000.00 3,000.00 3,000.00
Kepala Tukang 35,000.00 37,500.00 350.00 375.00
Mandor 30,000.00 35,000.00 15.00 17.50
#REF!
DAFTAR HARGA SATUAN
BAHAN DAN UPAH UNTUK WILAYAH A
KABUPATEN TEGAL
TAHUN 2014

BERLAKU UNTUK LOKASI : KEC. LEBAKSIU, KEC. DUKUHWARU, KEC. SLAWI


KEC. TALANG, KEC. ADIWERNA
KEC. PANGKAH (KECUALI DESA DERMASUCI)

HERMAWAN
No Nama Bahan/ Jenis Tenaga Harga Harga Pokok Satuan
1 Abu Batu 237,250 213,525 M3
2 Bata Merah 5 x 11 x 22 1,000 900 Bh
3 Batu kali pecah 133,500 120,150 M3
4 Batu Blonos 111,000 99,900 M3
5 Batu pecah dg mesin (0,5-<1 cm) (Screening) 237,250 213,525 M3
6 Batu pecah dg mesin (1-2cm) 237,250 213,525 M3
7 Batu pecah dg mesin (2-3 cm) 237,250 213,525 M3
8 Batu pecah dg mesin (3-5 cm) 239,750 215,775 M3
9 Batu pecah dg tangan (5-7 cm) 128,000 115,200 M3
10 Batu pecah dg mesin (2/3 cm) per kg 260 234 Kg
11 Filler 1,500 1,350 Kg
12 Kerikil Sungai 59,000 53,100 M3
13 Pasir 115,000 103,500 M3
14 Pasir (Harga pasir per kg) 85 77 Kg
15 Pasir Urug 91,000 81,900 M3
16 Portland Sement 1,700 1,530 Kg
17 PC Semen Warna ( 40 Kg ) 1,800 1,620 Kg
18 Sirtu 79,900 71,910 M3
19 Tanah Urug 77,500 69,750 M3
20 Asbes Gelombang (3,00x1,05)x4 mm (gelombang kecil) 71,000 63,900 Lbr
21 Asbes Gelombang (2,70x1,05)x4 mm (gelombang kecil) 70,000 63,000 Lbr
22 Asbes Gelombang (2,40x1,05)x4 mm (gelombang kecil) 54,500 49,050 Lbr
23 Asbes Gelombang (2,10x1,05)x4 mm (gelombang kecil) 57,000 51,300 Lbr
24 Asbes Gelombang (1,50x1,05)x4 mm (gelombang kecil) 38,000 34,200 Lbr
25 Asbes Gelombang (2,40x1,08)x6 mm (gelombang kecil) 44,000 39,600 Lbr
26 Asbes Gelombang (2,10x1,08)x6 mm (gelombang kecil) 39,000 35,100 Lbr
27 Asbes Gelombang (1,80x1,08)x6 mm (gelombang kecil) 43,500 39,150 Lbr
28 Asbes Gelombang (2,40x0,8)x3,5 mm (gelombang kecil) 52,500 47,250 Lbr
29 Asbes Gelombang (2,10x0,8)x3,5 mm (gelombang kecil) 47,150 42,435 Lbr
30 Asbes Gelombang (1,80x0,8)x3,5 mm (gelombang kecil) 41,750 37,575 Lbr
31 Bubungan Asbes gelombang besar 35,700 32,130 m'
32 Bubungan Asbes gelombang kecil 29,650 26,685 m'
33 Bubungan Genteng keramik "KIA" 9,300 8,370 Bh
34 Bubungan Genteng Morando 5,450 4,905 Bh
35 Bubungan genteng pres jtw isi 4/m2 3,800 3,420 Bh
36 Bubungan genteng pres kebumen 4,500 4,050 Bh
37 Bubungan genteng kodok 4,400 3,960 Bh
38 Genteng Keramik Glazur KIA isi 15/m2 warna muda 8,000 7,200 Bh
39 Genteng Keramik Glazur KIA isi 14/m2 warna tua 8,500 7,650 Bh
40 Genteng Morando Glazur isi 20/m2 1550x20 3,800 3,420 Bh
41 Genteng Pres Jatiwangi isi 25/m2 750x25 1,975 1,778 Bh
42 Genteng Pres Kebumen 2,500 2,250 Bh
43 Genteng Morando Natural isi 20/m2 oven 950x20 3,075 2,768 Bh
44 Genteng plentong 2,050 1,845 Bh
45 Genteng plentong super 2,500 2,250 Bh
46 Genteng kodok 2,800 2,520 Bh
47 Genteng asbes 35,250 31,725 Lbr
48 Glass Block 20,800 18,720 Bh
49 Seng BJLS 20, uk 90 cm 29,500 26,550 M'
50 Seng BJLS 30, Uk. 180 cm 57,300 51,570 M'
51 Seng BJLS 20, Uk. 180 cm 44,500 40,050 Lbr
52 Seng plat 3' x 6' ( 90 cm x 180 cm ) bjls 24 41,750 37,575 M'
53 Seng plat 3' x 6' ( 90 cm x 180 cm ) bjls 28 41,500 37,350 Lbr
54 Seng Plat BJLS 20 35,750 32,175 M2
55 Seng Plat BJLS 30 42,600 38,340 M3
56 Bambu 12,800 11,520 Btg
57 Kayu Bakar 136,000 122,400 M3
58 Kayu bengkirai 6/14 cm 10,597,000 9,537,300 M3
59 Kayu Bengkir 5/7 cm 10,000,000 9,000,000 M3
60 Kayu Bengkir 8/12 cm 10,454,000 9,408,600 M3
61 Kayu Bengkir 4/6 cm 10,494,100 9,444,690 M3
62 Kayu Bengkir 3/20 cm 10,926,000 9,833,400 M3
63 Kayu Bengkir 10/20 cm 11,000,000 9,900,000 M3
64 Kayu Papan bengkirai 2x20x400 11,204,100 10,083,690 M3
65 Kayu Papan jati 11,196,500 10,076,850 M3
66 Kayu Jati 8/20 cm (perum) 10,951,400 9,856,260 M3
67 Kayu Jati 3/20 cm (perum) 10,951,400 9,856,260 M3
68 Kayu Jati 6/14 cm (perum) 10,951,400 9,856,260 M3
69 Kayu Jati 5/7 cm (perum) 10,951,400 9,856,260 M3
70 Kayu Jati 2/3 cm (perum) 10,951,400 9,856,260 M3
71 Kayu Jati 8/20 cm (rakyat) 7,000,000 6,300,000 M3
72 Kayu Jati 3/20 cm (rakyat) 7,000,000 6,300,000 M3
73 Kayu Jati 6/14 cm (rakyat) 6,125,000 5,512,500 M3
74 Kayu Jati 5/7 cm (rakyat) 6,500,000 5,850,000 M3
75 Kayu Jati 2/3 cm (rakyat) 6,000,000 5,400,000 M3
76 Kayu Papan kempas 6,653,000 5,987,700 M3
77 Kayu Kempas 8/12 6,492,350 5,843,115 M3
78 Kayu Kempas 3/20 6,088,900 5,480,010 M3
79 Kayu Kempas 5/7 4,847,725 4,362,953 M3
80 Kayu Kempas 4/6 4,847,725 4,362,953 M3
81 Kayu Kempas 3/5 5,335,000 4,801,500 M3
82 Kayu Kempas 2/3 4,847,725 4,362,953 M3
83 Kayu Meranti 5/7 3,878,200 3,490,380 M3
84 Kayu Meranti 4/6 3,878,200 3,490,380 M3
85 Kayu Meranti 3/5 3,878,200 3,490,380 M3
86 Kayu Meranti 2/3 3,878,200 3,490,380 M3
87 Kayu Papan kruing 7,313,000 6,581,700 M3
88 Kayu Kruing 8/12 6,739,300 6,065,370 M3
89 Kayu Kruing 3/20 7,045,700 6,341,130 M3
90 Kayu Kruing 5/7 6,126,700 5,514,030 M3
91 Kayu Kruing 4/6 4,639,000 4,175,100 M3
92 Kayu Kruing 3/5 5,335,000 4,801,500 M3
93 Kayu Kruing 2/3 4,460,000 4,014,000 M3
94 Kayu Papan Cetak Pinus 2,302,000 2,071,800 M3
95 Kayu Stoot ( bambu ) 5 mtr 12,800 11,520 Btg
96 Kayu Lokal 5/7 2,560,000 2,304,000 M3
97 Kayu Lokal 4/6 3,185,000 2,866,500 M3
98 Kayu Lokal 2/3 2,060,000 1,854,000 M3
99 Kayu Lokal Papan 903,750 813,375 M3
100 Dolken kayu lokal 1,702,600 1,532,340 M3
101 Dolken Kayu 8-10/400 cm 18,300 16,470 Btg
102 Batu segi 6 tebal 10 cm abu - abu kecil 47,475 42,728 M2
103 Batu segi 6 tebal 10 cm abu - abu sedang 52,750 47,475 M2
104 Batu segi 6 tebal 10 cm abu - abu besar 79,125 71,213 M2
105 Batu Tempel Sukabumi hijau 100,225 90,203 M2
106 Batu Tempel Palimanan kuning 89,675 80,708 M2
107 Batu Tempel ( Tidak Beraturan ) kecil 263,750 237,375 M2
108 Batu Tempel ( Tidak Beraturan ) besar 126,600 113,940 M2
109 Batu Candi 20/20, 5/20 79,125 71,213 M2
110 Batu Susun sirih Andesit (Jabar) 3x30x1,3 cm 100,225 90,203 M2
111 Batu Susun sirih Templek 263,750 237,375 M2
112 Batu Andesit (Candi Jawa Barat) 15x30cm Bakar 116,050 104,445 M2
113 Batu Andesit (Candi Jawa Barat) 15x30cm Mesin 116,050 104,445 M2
114 Batu Candi 20/40 84,400 75,960 M2
115 Batu Candi 15/30 79,125 71,213 M2
116 Granito Uk. 60 x 60 cm 122,500 110,250 M2
117 Keramik 20/25, putih 51,550 46,395 M2
118 Keramik 20/25, warna 56,300 50,670 M2
119 Keramik 20/20, anti slip ( u/.lantai Km/wc) 55,675 50,108 M2
120 Keramik 20/20, warna 56,500 50,850 M2
121 Keramik 10/20, warna 51,000 45,900 M2
122 Keramik 30/30 (putih polos) 50,000 45,000 M2
123 Keramik 30/30, warna 52,100 46,890 M2
124 Keramik 40/40, (putih polos) 53,200 47,880 M2
125 Keramik 40/40, warna 58,100 52,290 M2
126 Keramik 40/40, Anti Slip 62,000 55,800 M3
127 Keramik Uk. 10 x 30 cm Plint 10,300 9,270 Bh
128 Keramik Uk. 10 x 40 cm Plint 15,200 13,680 Bh
129 Keramik Anti Slip 30x30 53,300 47,970 M2
130 Keramik lis Uk. 7 x 20 5,775 5,198 Bh
131 Keramik lis Uk. 13 x 40 5,500 4,950 Bh
132 Keramik kuku macan 5,500 4,950 M'
133 Buis Beton 1/2 dia 20 cm 59,800 53,820 m'
134 Buis Beton Ø 20 cm 65,150 58,635 m'
135 Buis Beton Ø 30 cm 81,500 73,350 m'
136 Buis Beton Ø 40 cm 108,700 97,830 m'
137 Buis Beton Ø 50 cm 130,400 117,360 m'
138 Buis Beton Ø 60 cm 163,000 146,700 m'
139 Buis Beton Ø 80 cm 163,000 146,700 m'
140 Paving Block tebal 6 cm abu - abu K175 78,600 70,740 M2
141 Paving Block tebal 6 cm warna K175 88,600 79,740 M2
142 Paving Block tebal 8 cm abu - abu K175 100,050 90,045 M2
143 Paving Block tebal 8 cm warna K175 110,050 99,045 M2
144 Paving Block tebal 6 cm abu - abu lokal 58,250 52,425 M2
145 Paving Block tebal 6 cm warna lokal 59,900 53,910 M2
146 Rooster bata 17,250 15,525 Bh
147 Kansteen beton 10.20.50 15,075 13,568 Bh
148 Kansteen beton 8.10.25.50 25,800 23,220 Bh
149 Kansteen beton 8.15.30.50 28,000 25,200 Bh
150 Kansteen beton 8.15.30.50 33,500 30,150 Bh
151 Kansteen beton taman 28,200 25,380 Bh
152 Besi Beton polos 10,500 9,450 Kg
153 Besi Beton ulir 11,000 9,900 Kg
154 Besi Profil IWF 12,000 10,800 Kg
155 Besi Profil Siku / U 10,000 9,000 Kg
156 Besi Profil kanal CNP 12,000 10,800 Kg
157 Besi Strip ( tebal 5mm, lebar 5 cm ) 10,000 9,000 Kg
158 Besi plat bordes T = 2,3 mm (1,2 m' x 2,4 m') 1,066,800 960,120 lbr
159 Besi plat bordes T = 3 mm (1,2 m' x 2,4 m') 1,506,100 1,355,490 lbr
160 Besi plat bordes T = 5 mm (1,2 m' x 2,4 m') 1,945,400 1,750,860 lbr
161 Besi plat bordes T = 6 mm (1,2 m' x 2,4 m') 2,384,600 2,146,140 lbr
162 Besi Hollow 2x 4 cm, tbl. 2mm Pjg 6 m 9,500 8,550 m'
163 Besi Hollow 2x 4 cm, tbl. 2mm Pjg 6 m 12,500 11,250 Kg
164 Besi Hollow 3 x 3 cm, tbl. 2mm Pjg 6 m 9,500 8,550 m'
165 Besi Hollow 3 x 3 cm, tbl. 2mm Pjg 6 m 13,500 12,150 Kg
166 Kawat Beton 18,600 16,740 Kg
167 Kawat Bronjong d4mm galvanis 20,000 18,000 Kg
168 Kusen Aluminium uk. 4" 95,000 85,500 M'
169 Plat alumunium 0,6 mm 80,960 72,864 M2
170 Plat alumunium ( Aluminium Sheet ) 0,3 mm 6,300 5,670 M2
171 Knee Galvanis 1/2" 5,000 4,500 Bh
172 Knee Galvanis 3/4" 7,700 6,930 Bh
173 Knee Galvanis 1" 12,200 10,980 Bh
174 Knee Galvanis 11/2" 23,300 20,970 Bh
175 Knee Galvanis 2" 41,100 36,990 Bh
176 Knee Galvanis 2 1/2" 62,700 56,430 Bh
177 Knee Galvanis 3" 90,700 81,630 Bh
178 Knee Galvanis 4" 166,800 150,120 Bh
179 Overstock Galvanis 1" x 3/4" 10,200 9,180 Bh
180 Knee PVC ø 1/2" 2,500 2,250 Bh
181 Knee PVC ø 3/4" 3,000 2,700 Bh
182 Knee PVC ø 1" 4,000 3,600 Bh
183 Knee PVC ø 1 1/2" 4,400 3,960 Bh
184 Knee PVC ø 2" 5,425 4,883 Bh
185 Knee PVC ø 2 1/2" 6,800 6,120 Bh
186 Knee PVC ø 3" ( AW ) 11,000 9,900 Bh
187 Knee PVC ø 4" ( AW ) 16,500 14,850 Bh
188 Knee pipa pVC (hitam) Ø 4" 8,175 7,358 Bh
189 Pipa PVC ø 1/2" 14,500 13,050 M'
190 Pipa PVC ø 3/4" 19,400 17,460 M'
191 Pipa PVC ø 1" 29,000 26,100 M'
192 Pipa PVC ø 1 1/2" 35,200 31,680 M'
193 Pipa PVC ø 2" 36,650 32,985 M'
194 Pipa PVC ø 2 1/2" 45,800 41,220 M'
195 Pipa PVC ø 3" ( AW ) 40,700 36,630 M'
196 Pipa PVC ø 4" ( AW ) 64,300 57,870 M'
197 Pipa PVC ( hitam ) 4" 16,900 15,210 M'
198 Klem PVC Ø 3/4" AW 3,600 3,240 Bh
199 Pipa Galvanis 1/2" 30,600 27,540 M'
200 Pipa Galvanis 3/4" 42,800 38,520 M'
201 Pipa Galvanis 1" 55,100 49,590 M'
202 Pipa Galvanis 11/2" 67,400 60,660 M'
203 Pipa Galvanis 2" 79,600 71,640 M'
204 Pipa Galvanis 2 1/2" 120,200 108,180 M'
205 Pipa Galvanis 3" 203,200 182,880 M'
206 Pipa Galvanis 4" 283,450 255,105 M'
207 Pipa : Runcing dia 3/4" 226,000 203,400 Bh
208 Pipa : BC dia 50 mm2 73,000 65,700 Bh
209 Pipa : Klem BC dia 50 mm2 9,800 8,820 Bh
210 Pipa : Sepatu Kabel dia 50 mm2 10,350 9,315 Bh
211 Seal tape 3,000 2,700 Bh
212 PIPA AIR BERSIH -
213 PIPA PVC ( S - 12,5 ) -
214 Pipa uPVC Ø 1" ( S - 12,5 ) 10,900 9,810 M'
215 Pipa uPVC Ø 1 1/2" ( S - 12,5 ) 17,900 16,110 M'
216 Pipa uPVC Ø 2" ( S - 12,5 ) 26,550 23,895 M'
217 Pipa uPVC Ø 3" ( S - 12,5 ) 54,900 49,410 M'
218 Pipa uPVC Ø 4" ( S - 12,5 ) 79,600 71,640 M'
219 Pipa uPVC Ø 6" ( S - 12,5 ) 173,800 156,420 M'
220 Pipa uPVC Ø 8" ( S - 12,5 ) 296,800 267,120 M'
221 Pipa uPVC Ø 10" ( S - 12,5 ) 468,200 421,380 M'
222 PIPA POLYETYLINE ( PE - PN. 10 - SDR 17 ) - -
223 Pipa PE Ø 1" 9,300 8,370 M'
224 Pipa PE Ø 1 1/4" 13,950 12,555 M'
225 Pipa PE Ø 1 1/2" 22,100 19,890 M'
226 Pipa PE Ø 2" 33,850 30,465 M'
227 Pipa PE Ø 2 1/2" 53,900 48,510 M'
228 Pipa PE Ø 3" 75,600 68,040 M'
229 Pipa PE Ø 4" 161,500 145,350 M'
230 Pipa PE Ø 5" 207,600 186,840 M'
231 Pipa PE Ø 6" 207,600 186,840 M'
232 Pipa PE Ø 8" 299,000 269,100 M'
233 Pipa PE Ø 9" 531,300 478,170 M'
234 Pipa PE Ø 10" 822,950 740,655 M'
235 PIPA MEDIUM GALVANIZED - -
236 Pipa Medium Galvanized Ø 1/2 " 44,700 40,230 M'
237 Pipa Medium Galvanized Ø 3/4 " 56,350 50,715 M'
238 Pipa Medium Galvanized Ø 1 " 93,200 83,880 M'
239 Pipa Medium Galvanized Ø 1 1/2 " 132,000 118,800 M'
240 Pipa Medium Galvanized Ø 2 " 183,000 164,700 M'
241 Pipa Medium Galvanized Ø 3 " 307,900 277,110 M'
242 Pipa Medium Galvanized Ø 4 " 467,700 420,930 M'
243 Pipa Medium Galvanized Ø 6 " 678,000 610,200 M'
244 Pipa Medium Galvanized Ø 8 " 1,032,000 928,800 M'
245 ACCESSORIES PIPA - -
246 Fitting PVC DN 63 x 63 mm 159,300 143,370 Bh
247 Fitting PVC DN 90 x 90 mm 251,000 225,900 Bh
248 Fitting PVC DN 90 x 63 mm 223,100 200,790 Bh
249 Fitting PVC DN 110 x 110 mm 418,350 376,515 Bh
250 Fitting PVC DN 110 x 90 mm 378,200 340,380 Bh
251 Fitting PVC DN 110 x 63 mm 339,100 305,190 Bh
252 Fitting PVC DN 160 x 160 mm 772,700 695,430 Bh
253 Fitting PVC DN 160 x 110 mm 670,450 603,405 Bh
254 Fitting PVC DN 160 x 90 mm 605,000 544,500 Bh
255 Fitting PVC DN 160 x 63 mm 520,600 468,540 Bh
256 Fitting PVC DN 200 x 200 mm 1,783,000 1,604,700 Bh
257 Fitting PVC DN 200 x 160 mm 1,601,200 1,441,080 Bh
258 Fitting PVC DN 200 x 110 mm 1,326,600 1,193,940 Bh
259 Fitting PVC DN 200 x 90 mm 1,377,100 1,239,390 Bh
260 Fitting PVC DN 250 x 250 mm 1,245,200 1,120,680 Bh
261 PVC Reducer Socket RR Joint uk. DN 90 x 63 mm 61,100 54,990 Bh
262 PVC Reducer Socket RR Joint uk. DN 110 x 90 mm 86,000 77,400 Bh
263 PVC Reducer Socket RR Joint uk. DN 110 x 63 mm 87,200 78,480 Bh
264 PVC Reducer Socket RR Joint uk. DN 160 x 110 mm 167,300 150,570 Bh
265 PVC Reducer Socket RR Joint uk. DN 200 x 160 mm 268,900 242,010 Bh
266 PVC Reducer Socket RR Joint uk. DN 250 x 200 mm 527,900 475,110 Bh
267 Long Bend All Socket RR Joint 90º DN. 63 mm 37,300 33,570 Bh
268 Long Bend All Socket RR Joint 90º DN. 75 mm 50,200 45,180 Bh
269 Long Bend All Socket RR Joint 90º DN. 90 mm 73,500 66,150 Bh
270 Long Bend All Socket RR Joint 90º DN. 110 mm 138,200 124,380 Bh
271 Long Bend All Socket RR Joint 90º DN. 140 mm 213,800 192,420 Bh
272 Long Bend All Socket RR Joint 90º DN. 160 mm 320,200 288,180 Bh
273 Long Bend All Socket RR Joint 90º DN. 200 mm 650,900 585,810 Bh
274 Long Bend All Socket RR Joint 90º DN. 250 mm 1,182,400 1,064,160 Bh
275 Long Bend All Socket RR Joint 45º DN. 63 mm 38,200 34,380 Bh
276 Long Bend All Socket RR Joint 45º DN. 75 mm 42,500 38,250 Bh
277 Long Bend All Socket RR Joint 45º DN. 90 mm 64,200 57,780 Bh
278 Long Bend All Socket RR Joint 45º DN. 110 mm 102,900 92,610 Bh
279 Long Bend All Socket RR Joint 45º DN. 140 mm 169,750 152,775 Bh
280 Long Bend All Socket RR Joint 45º DN. 160 mm 276,900 249,210 Bh
281 Long Bend All Socket RR Joint 45º DN. 200 mm 459,100 413,190 Bh
282 Long Bend All Socket RR Joint 45º DN. 250 mm 851,500 766,350 Bh
283 Long Bend All Socket RR Joint 22,5º DN. 63 mm 28,600 25,740 Bh
284 Long Bend All Socket RR Joint 22,5º DN. 75 mm 37,300 33,570 Bh
285 Long Bend All Socket RR Joint 22,5º DN. 90 mm 55,500 49,950 Bh
286 Long Bend All Socket RR Joint 22,5º DN. 110 mm 87,500 78,750 Bh
287 Long Bend All Socket RR Joint 22,5º DN. 140 mm 140,500 126,450 Bh
288 Long Bend All Socket RR Joint 22,5º DN. 160 mm 235,600 212,040 Bh
289 Long Bend All Socket RR Joint 22,5º DN. 200 mm 391,500 352,350 Bh
290 Long Bend All Socket RR Joint 22,5º DN. 250 mm 686,000 617,400 Bh
291 Flanges Socket RR Joint DN. 63 mm 113,100 101,790 Bh
292 Flanges Socket RR Joint DN. 90 mm 156,100 140,490 Bh
293 Flanges Socket RR Joint DN. 110 mm 195,200 175,680 Bh
294 Flanges Socket RR Joint DN. 160 mm 329,100 296,190 Bh
295 Flanges Socket RR Joint DN. 200 mm 516,100 464,490 Bh
296 Flanges Socket RR Joint DN. 250 mm 803,100 722,790 Bh
297 CI Gte Valve Flanged Flat Body "AFT" Ø 40 mm 989,500 890,550 Bh
298 CI Gte Valve Flanged Flat Body "AFT" Ø 50 mm 1,095,800 986,220 Bh
299 CI Gte Valve Flanged Flat Body "AFT" Ø 80 mm 1,593,900 1,434,510 Bh
300 CI Gte Valve Flanged Flat Body "AFT" Ø 100 mm 2,125,200 1,912,680 Bh
301 CI Gte Valve Flanged Flat Body "AFT" Ø 150 mm 3,453,450 3,108,105 Bh
302 CI Gte Valve Flanged Flat Body "AFT" Ø 200 mm 5,512,200 4,960,980 Bh
303 CI Gte Valve Flanged Flat Body "AFT" Ø 250 mm 8,301,500 7,471,350 Bh
304 Giboult Joint Cast Iron PN. 10 uk. 50 mm 237,000 213,300 Bh
305 Giboult Joint Cast Iron PN. 10 uk. 80 mm 285,500 256,950 Bh
306 Giboult Joint Cast Iron PN. 10 uk. 100 mm 342,600 308,340 Bh
307 Giboult Joint Cast Iron PN. 10 uk. 150 mm 541,900 487,710 Bh
308 Giboult Joint Cast Iron PN. 10 uk. 200 mm 670,700 603,630 Bh
309 Giboult Joint Cast Iron PN. 10 uk. 250 mm 890,900 801,810 Bh
310 Tangki air (Hidran Umum) uk. 1000 ltr 3,187,800 2,869,020 Bh
311 Tangki air (Hidran Umum) uk. 2000 ltr 6,508,425 5,857,583 Bh
312 Tangki air (Hidran Umum) uk. 3000 ltr 7,438,200 6,694,380 Bh
313 All Flange Tee uk. 50 x 50 mm Cast Iron ( CI ) 317,500 285,750 Bh
314 All Flange Tee uk. 75 x 75 mm Cast Iron ( CI ) 454,700 409,230 Bh
315 All Flange Tee uk. 100 x 50 mm Cast Iron ( CI ) 526,900 474,210 Bh
316 All Flange Tee uk. 100 x 75 mm Cast Iron ( CI ) 541,300 487,170 Bh
317 All Flange Tee uk. 100 x 100 mm Cast Iron ( CI ) 577,500 519,750 Bh
318 All Flange Tee uk. 150 x 50 mm Cast Iron ( CI ) 815,600 734,040 Bh
319 All Flange Tee uk. 150 x 75 mm Cast Iron ( CI ) 830,100 747,090 Bh
320 All Flange Tee uk. 150 x 100 mm Cast Iron ( CI ) 858,900 773,010 Bh
321 All Flange Tee uk. 150 x 150 mm Cast Iron ( CI ) 945,700 851,130 Bh
322 All Flange Tee uk. 200 x 75 mm Cast Iron ( CI ) 1,219,900 1,097,910 Bh
323 All Flange Tee uk. 200 x 100 mm Cast Iron ( CI ) 1,248,800 1,123,920 Bh
324 All Flange Tee uk. 200 x 150 mm Cast Iron ( CI ) 1,321,000 1,188,900 Bh
325 All Flange Tee uk. 200 x 200 mm Cast Iron ( CI ) 1,443,800 1,299,420 Bh
326 All Flange Bend 90º uk. 50 mm Cast Iron ( CI ) 216,500 194,850 Bh
327 All Flange Bend 90º uk. 75 mm Cast Iron ( CI ) 317,500 285,750 Bh
328 All Flange Bend 90º uk. 100 mm Cast Iron ( CI ) 404,000 363,600 Bh
329 All Flange Bend 90º uk. 150 mm Cast Iron ( CI ) 721,900 649,710 Bh
330 All Flange Bend 90º uk. 200 mm Cast Iron ( CI ) 996,100 896,490 Bh
331 All Flange Bend 90º uk. 250 mm Cast Iron ( CI ) 1,443,800 1,299,420 Bh
332 All Flange Bend 45º uk. 50 mm Cast Iron ( CI ) 223,800 201,420 Bh
333 All Flange Bend 45º uk. 75 mm Cast Iron ( CI ) 332,000 298,800 Bh
334 All Flange Bend 45º uk. 100 mm Cast Iron ( CI ) 404,100 363,690 Bh
335 All Flange Bend 45º uk. 150 mm Cast Iron ( CI ) 692,900 623,610 Bh
336 All Flange Bend 45º uk. 200 mm Cast Iron ( CI ) 1,025,000 922,500 Bh
337 All Flange Bend 45º uk. 250 mm Cast Iron ( CI ) 1,530,100 1,377,090 Bh
338 All Flange Reducer uk. 80 x 50 mm 252,650 227,385 Bh
339 All Flange Reducer uk. 100 x 50 mm 274,200 246,780 Bh
340 All Flange Reducer uk. 100 x 80 mm 288,750 259,875 Bh
341 All Flange Reducer uk. 150 x 80 mm 498,000 448,200 Bh
342 All Flange Reducer uk. 150 x 100 mm 526,900 474,210 Bh
343 All Flange Reducer uk. 200 x 75 mm 613,600 552,240 Bh
344 All Flange Reducer uk. 200 x 100 mm 649,600 584,640 Bh
345 All Flange Reducer uk. 200 x 150 mm 685,700 617,130 Bh
346 All Flange Reducer uk. 250 x 75 mm 887,900 799,110 Bh
347 All Flange Reducer uk. 250 x 100 mm 901,800 811,620 Bh
348 All Flange Reducer uk. 250 x 150 mm 938,400 844,560 Bh
349 All Flange Reducer uk. 250 x 200 mm 1,032,300 929,070 Bh
350 Wall Pipe uk. 100 x 0.50 mm 822,900 740,610 Bh
351 Wall Pipe uk. 150 x 0.50 mm 1,155,000 1,039,500 Bh
352 Wall Pipe uk. 200 x 0.50 mm 1,790,200 1,611,180 Bh
353 Wall Pipe uk. 250 x 0.50 mm 2,324,400 2,091,960 Bh
354 Giboult Joint uk. 50 mm 180,500 162,450 Bh
355 Giboult Joint uk. 75 mm 274,200 246,780 Bh
356 Giboult Joint uk. 100 mm 345,200 310,680 Bh
357 Giboult Joint uk. 150 mm 541,300 487,170 Bh
358 Giboult Joint uk. 200 mm 810,800 729,720 Bh
359 Giboult Joint uk. 250 mm 1,176,600 1,058,940 Bh
360 Bend All Socket 90º uk. 50 mm 454,700 409,230 Bh
361 Bend All Socket 90º uk. 100 mm 456,600 410,940 Bh
362 Bend All Socket 90º uk. 150 mm 721,900 649,710 Bh
363 Bend All Socket 90º uk. 200 mm 1,624,100 1,461,690 Bh
364 Bend All Socket 90º uk. 250 mm 2,526,500 2,273,850 Bh
365 Air Relief Valve ( CI ) DN 50 mm 1,713,400 1,542,060 Bh
366 Air Relief Valve ( CI ) DN 80 mm 1,177,900 1,060,110 Bh
367 Air Relief Valve ( CI ) DN 100 mm 4,316,800 3,885,120 Bh
368 Air Relief Valve ( CI ) DN 150 mm 8,633,600 7,770,240 Bh
369 Air Relief Valve ( CI ) DN 200 mm 13,402,000 12,061,800 Bh
370 Asbes Plat tebal 6 mm (1,00 x 1,00) 23,500 21,150 Lbr
371 Bilik bambu 52,000 46,800 M2
372 Eternit 1 x 1 m2 t = 4 mm Djabesmen / harflex 18,000 16,200 m2
373 Eternit (saflex) 1 x 1 m2, t = 5 mm 17,200 15,480 m2
374 Gypsum uk. 1,2 x 2,4 tebal 9mm 66,200 59,580 Lbr
375 Lis gypsum 13,700 12,330 m'
376 Lis kayu profil 5,100 4,590 M'
377 Lis kayu 2/4 5,100 4,590 M'
378 Teakwood 0,9 x 2,1 t = 3 mm 85,600 77,040 Lbr
379 Teakwood 0,9 x 2,1 t = 4 mm 128,400 115,560 Lbr
380 Teakwood 1,2 x 2,4 t = 3 mm 123,050 110,745 Lbr
381 Teakwood 1,2 x 2,4 t = 6 mm 133,750 120,375 Lbr
382 Triplek 1.2 x 2.4 tbl = 3 mm 54,500 49,050 Lbr
383 Triplek 1.2 x 2.4 tbl = 4 mm 68,200 61,380 Lbr
384 Triplek 1.2 x 2.4 tbl = 6 mm 83,700 75,330 Lbr
385 Triplek 0.9 x 2.1 uk pintu tbl 4 mm 59,800 53,820 Lbr
386 Triplek 0.9 x 2.1 uk pintu tbl 3 mm 48,300 43,470 Lbr
387 Amplas 3,000 2,700 Lbr
388 Coating Heritage alami 62,200 55,980 Ltr
389 Dempul kayu 28,900 26,010 Kg
390 Plamur Kayu 23,600 21,240 Kg
391 Plamur tembok 25,600 23,040 Kg
392 Cat Besi 51,900 46,710 Kg
393 Cat Kayu 51,800 46,620 Kg
394 Cat Tembok 22,500 20,250 Kg
395 Cat Tembok exterior 94,100 84,690 Kg
396 Flinkote 24,600 22,140 Kg
397 Kuas 3" 7,000 6,300 Bh
398 Kuas 2" 5,200 4,680 Bh
399 Lem kayu 29,700 26,730 Kg
400 Lem Kuning 35,000 31,500 Kg
401 Lem Putih 18,500 16,650 Kg
402 Lem Vinyl 7,600 6,840 Kg
403 Lem Perekat Wallpaper 15,200 13,680 Kg
404 Oker Putih 7,800 7,020 Kg
405 Oker Warna 8,800 7,920 Kg
406 Melamik 28,800 25,920 Kg
407 Menie Besi 23,900 21,510 Kg
408 Menie kayu 22,200 19,980 Kg
409 Minyak Cat 16,350 14,715 Ltr
410 Politur 46,000 41,400 Kg
411 Politur Jadi 44,600 40,140 Kg
412 Residu 41,100 36,990 Ltr
413 Rol Cat 16,000 14,400 Bh
414 Sirlak 91,900 82,710 Kg
415 Spiritus 12,800 11,520 Ltr
416 Teer 6,800 6,120 Ltr
417 Teak oil 12,000 10,800 Kg
418 Vernis 32,100 28,890 Ltr
419 Vernis Batu alam 60,600 54,540 Ltr
420 Kaca patri - M2
421 Kaca bening 5 mm 94,800 85,320 M2
422 Kaca ryban 5 mm 103,000 92,700 M2
423 Kaca Es 112,000 100,800 M2
424 Kaca Bening 12 mm - - M2
425 Kaca Cermin tebal 5mm 145,000 130,500 M2
426 Kaca nako - - M2
427 Kaca one way - - M2
428 Kaca tebal 3 mm 60,000 54,000 M2
429 Kaca tebal 8 mm - - M2
430 Kaca, cermin tebal 8 mm - - M2
431 Kaca cermin, tebal 6 mm - - M2
432 Kaca Wireglass - - M2
433 Profil Kaca 5,600 5,040 M'
434 HARDWARE JARINGAN 20 KV -
435 Armour Rod # for 35 mm2 30,200 27,180 Set
436 Armour Rod # for 50 mm2 45,400 40,860 Set
437 Armour Rod # for 70 mm2 60,500 54,450 Set
438 Armour Rod # for 150 mm2 80,800 72,720 Set
439 Armour Rod # for 240 mm2 121,250 109,125 Set
440 Armour Tape 1/4" wide 5,900 5,310 Mtr
441 Aluminium connector 26,400 23,760 Bh
442 Armour rod # for AAAC 70 mm2 55,050 49,545 Set
443 Amor rod tapping 16,900 15,210 Set
444 Amor tape 3,700 3,330 m
445 Anchor rod 5/8 x 7" 87,550 78,795 Bh
446 Anchor rod 3/4 x 8" 88,200 79,380 Bh
447 Anchor rod 3/4 x 7" 88,200 79,380 Bh
448 Anchor Expanding 8.000 lbs 102,050 91,845 Bh
449 Anchor Expanding 10.000 lbs 103,300 92,970 Bh
450 Angle clamp primer 2,100 1,890 Bh
451 Bolt eye 5/8 x 10" 16,650 14,985 Bh
452 Bolt eye 5/8 x 12" 16,650 14,985 Bh
453 Bolt eye 5/8 x ridg length" 16,000 14,400 Bh
454 Bolt Machine 5/8" x ( 14" s/d 22" ) 21,100 18,990 Bh
455 Bolt Machine 5/8 x 8" 16,900 15,210 Bh
456 Bolt Machine 5/8 x 9" 14,420 12,978 Bh
457 Bolt Machine 5/8 x 10" 19,050 17,145 Bh
458 Bolt Machine 5/8 x 12" 17,600 15,840 Bh
459 Bolt cariage 1/2" x 3/4" 4,000 3,600 Bh
460 Bolt Single Up Side 5/8" x 8" 26,900 24,210 Bh
461 Bolt Single Up Side 5/8" x 9" 27,800 25,020 Bh
462 Bolt Single Up Side 5/8" x 10" 30,200 27,180 Bh
463 Bolt Single Up Side 5/8" x 12" 26,500 23,850 Bh
464 Bolt Double Up Side 5/8" x (14" s/d 22" ) 36,900 33,210 Bh
465 Bolt Double Up Side 5/8" x 10" 27,600 24,840 Bh
466 Bolt Double Up Side 5/8" x 12" 28,700 25,830 Bh
467 Bolt Double Up Side 5/8" x 9" 26,600 23,940 Bh
468 Bolt Double Up Side 5/8" x 8" 25,600 23,040 Bh
469 Bolt Double Arming 5/8" x (16" s/d 24" ) 22,500 20,250 Bh
470 Bolt Double Arming 5/8" x 10" 27,150 24,435 Bh
471 Bolt Double Arming 5/8" x 12" 29,200 26,280 Bh
472 Bolt Double Arming 5/8" x 14" 31,200 28,080 Bh
473 Bimetalic Connector ( 35 s/d 240 ) mm2 40,400 36,360 Bh
474 Brace steel 550 mm 21,950 19,755 Bh
475 Brace steel 770 mm 26,400 23,760 Bh
476 Brace steel 1,262 mm 82,430 74,187 Bh
477 Bracket center 42,850 38,565 Bh
478 Bracket Secondary / Bracket Insulated 18,540 16,686 Bh
479 Brecket transformer 334,750 301,275 Bh
480 Bracket Extension For cut out 60,500 54,450 Bh
481 Bracket band segment vertical plat(Hot dip galvanis 368,760 331,884 Bh
482 Center Bracket 6 KN 67,300 60,570 Bh
483 Center Bracket 12,5 KN 79,900 71,910 Bh
484 Caterpain 3,200 2,880 Bh
485 Clamp bougel 13,150 11,835 Bh
486 Clamp ground rod 13,900 12,510 Bh
487 Clamp ground wire 13,900 12,510 Bh
488 Clamp hot line top assembly 149,350 134,415 Bh
489 Clamp Hot line ( 35 mm2 s/d 70 mm2) 64,600 58,140 Bh
490 Clamp Hot line ( 150 mm2 s/d 240 mm2) 110,200 99,180 Bh
491 Clamp Loop Dead End / LC ( 35 s/d 240 ) mm2 25,770 23,193 Bh
492 Clevis Swinging Secondary 19,050 17,145 Bh
493 Compression Connector H Type 150 mm2 / 240 mm2 40,000 36,000 Bh
494 Compression Connector H Type 240 mm2 / 240 mm2 43,280 38,952 Bh
495 Compression Connector H Type 50 mm2 / 70 mm2 24,720 22,248 Bh
496 Compression Connector H Type 70 mm2 / 150 mm2 37,000 33,300 Bh
497 Compression Connector H Type 70 mm2 / 70 mm2 28,600 25,740 Bh
498 Compression Terminal Lug 35 mm2 36,050 32,445 Bh
499 Compression Terminal Lug 50 mm2 10,600 9,540 Bh
500 Compression Terminal Lug 70 mm2 13,300 11,970 Bh
501 Compression Terminal Lug 150 mm2 25,400 22,860 Bh
502 Compression Terminal Lug 240 mm2 31,800 28,620 Bh
503 Cross Arm Steel 1.500 mm (UNSP 10) galvanis 269,600 242,640 Bh
504 Cross Arm Steel 2000 mm (UNSP 10) galvanis 359,500 323,550 Bh
505 Cross Arm Steel 3000 mm (UNSP 10) galvanis 539,400 485,460 Bh
506 Dead End Assembly ( CJ6-T) 73,140 65,826 Bh
507 Distribusi trafo CSP 50 KVA 33,359,700 30,023,730 Unit
508 Distribusi trafo CSP 25 KVA 31,953,100 28,757,790 Unit
509 Distribusi trafo CST 105 / CG 1 Phase 50 KVA 27,912,500 25,121,250 Unit
510 Distribusi trafo CST 106 / CG 3 Phase 50 KVA 36,540,000 32,886,000 Unit
511 Distribusi trafo CST 106 / CG 3 Phase 100 KVA 44,152,500 39,737,250 Unit
512 Distribusi trafo CST 106 / CG 3 Phase 160 KVA 68,005,000 61,204,500 Unit
513 Freeformed Guy Wire 22 mm2 27,600 24,840 Bh
514 Freeformed Guy Wire 35 mm2 32,800 29,520 Bh
515 Freeformed Guy Wire 70 mm2 38,200 34,380 Bh
516 Fuse Cut Out 20 KV, 100A 1,133,000 1,019,700 Bh
517 Fuse Link 3A 36,900 33,210 Bh
518 Fuse Link 6A 36,900 33,210 Bh
519 Fuse Link 8A 36,900 33,210 Bh
520 Fuse Link 10A 36,900 33,210 Bh
521 Fuse Link 15A 36,900 33,210 Bh
522 Fuse Link 20A 47,100 42,390 Bh
523 Fuse Link 25A 47,100 42,390 Bh
524 Fuse Link 30A 47,100 42,390 Bh
525 Fuse Link 50A 60,500 54,450 Bh
526 Fuse Link 60A 60,500 54,450 Bh
527 Fuse Link 65A 60,500 54,450 Bh
528 Fuse Link 80A 60,500 54,450 Bh
529 Fuse Link 100A 50,400 45,360 Bh
530 NT Fuse 63 - 100 A lengkap size 0 74,000 66,600 Bh
531 NT Fuse 63 - 100 A lengkap size 1 94,300 84,870 Bh
532 NT Fuse 63 - 100 A lengkap size 2 114,400 102,960 Bh
533 NT Fuse 63 - 100 A lengkap size 3 148,200 133,380 Bh
534 Guy Attachment / Guy hok 12,800 11,520 Bh
535 Guy wire SM 7 strad 7,000 6,300 m
536 Guy wire 22 mm2 8,450 7,605 Bh
537 Guy wire 35 mm2 12,400 11,160 Bh
538 Guy wire 70 mm2 22,500 20,250 Bh
539 Ground rod 5/8" x 8 " steel 73,500 66,150 Bh
540 Ground Wire CU 16 mm2 23,200 20,880 Bh
541 Ground Wire CU 25 mm2 36,900 33,210 Bh
542 Ground Wire CU 50 mm2 67,300 60,570 Bh
543 Grounding Iron Plate Form Plat / Eart safety mats 1,138,400 1,024,560 Bh
544 Ground rod and Washer 11,300 10,170 Bh
545 Ground rod 5/8" x 8 " Cooper weld 119,800 107,820 Bh
546 Insulating tape 23,300 20,970 Bh
547 Insulator suspension 10 KVA 215,000 193,500 Bh
548 Insulator starint road 28,100 25,290 Bh
549 Isolator Tumpu ( Line Post ) 20 KV 215,600 194,040 Bh
550 Isolator Tumpu ( Pin Post ) 20 KV 215,600 194,040 Bh
551 Isolator tarik ( Suspension ) 20 KV 245,200 220,680 Bh
552 Isolator tarik ( Suspension ) 20 KV Komplit dng Strain Clamp 35-150 377,400 339,660 Bh
553 Joint sleeve 35 mm2 26,950 24,255 Bh
554 Joint sleeve 50 mm2 31,900 28,710 Bh
555 Joint sleeve 70 mm2 33,700 30,330 Bh
556 Joint sleeve 150 mm2 96,900 87,210 Bh
557 Joint sleeve 240 mm2 118,600 106,740 Bh
558 Kousen 4,000 3,600 Bh
559 Large Angle Assembly ( CJ7-T) 106,200 95,580 Bh
560 Lock Nut 5/8" 9,900 8,910 Bh
561 LCC 240 mm2 191,900 172,710 Bh
562 Nut eye 5/8" 9,800 8,820 Bh
563 Nut Timble Eye 5/8" 15,000 13,500 Bh
564 Oval eye bolt 5/8" x 8" 20,950 18,855 Bh
565 Oval eye bolt 5/8" x 9" 11,100 9,990 Bh
566 Oval eye bolt 5/8" x (14 s/d 22") 22,800 20,520 Bh
567 Oval eye bolt 5/8" x 10" 16,750 15,075 Bh
568 Oval eye bolt 5/8" x 12" 18,000 16,200 Bh
569 Oval Eye Nut 5/8" 19,096 17,186 Bh
570 Paralel Group Clamp(150-70 mm2/35-16 mm2) 23,300 20,970 Bh
571 Pin Adapater insulator 31,000 27,900 Bh
572 Plastic Strap for Clamping 2,060 1,854 Bh
573 Pole band Double rack 3" atau 3 1/2" 26,200 23,580 Bh
574 Pole band Double rack 4" atau 4 1/2" 27,470 24,723 Bh
575 Pole band Double rack 5" atau 5 1/2" 28,900 26,010 Bh
576 Pole band Double rack 6" atau 6 1/2" 30,200 27,180 Bh
577 Pole band Double rack 7" atau 7 1/2" 45,700 41,130 Bh
578 Pole band Double rack 8" atau 8 1/2" 51,550 46,395 Bh
579 Pole band Double rack 9" s/d 12" 36,900 33,210 Bh
580 Pole band Double Side 3" atau 3 1/2" 30,200 27,180 Bh
581 Pole band Double Side 4" atau 4 1/2" 32,200 28,980 Bh
582 Pole band Double Side 5" atau 5 1/2" 34,300 30,870 Bh
583 Pole band Double Side 6" atau 6 1/2" 36,300 32,670 Bh
584 Pole band Double Side 7" atau 7 1/2" 50,600 45,540 Bh
585 Pole band Double Side 8" atau 8 1/2" 56,200 50,580 Bh
586 Pole band Double Side 9" s/d 12" 44,400 39,960 Bh
587 Pole band Single rack 3" atau 3 1/2" 24,200 21,780 Bh
588 Pole band Single rack 4" atau 4 1/2" 25,500 22,950 Bh
589 Pole band Single rack 5" atau 5 1/2" 26,900 24,210 Bh
590 Pole band Single rack 6" atau 6 1/2" 28,200 25,380 Bh
591 Pole band Single rack 7" atau 7 1/2" 29,500 26,550 Bh
592 Pole band Single rack 8" atau 8 1/2" 30,900 27,810 Bh
593 Pole band Single rack 9" s/d 12" 35,000 31,500 Bh
594 Pole Band Single rack 10" 45,500 40,950 Bh
595 Pole band Single Up Side 3" atau 3 1/2" 28,200 25,380 Bh
596 Pole band Single Up Side 4" atau 4 1/2" 30,200 27,180 Bh
597 Pole band Single Up Side 5" atau 5 1/2" 32,200 28,980 Bh
598 Pole band Single Up Side 6" atau 6 1/2" 34,300 30,870 Bh
599 Pole band Single Up Side 7" atau 7 1/2" 47,300 42,570 Bh
600 Pole band Single Up Side 8" atau 8 1/2" 52,400 47,160 Bh
601 Pole band Single Up Side 9" s/d 12" 42,300 38,070 Bh
602 Primary Angle Clamp ( 35 s/d 70) mm2 56,650 50,985 Bh
603 Primary Angle Clamp ( 150 s/d 240 ) mm2 60,500 54,450 Bh
604 Primary Dead End Clamp ( 35 s/d 70) mm2 67,300 60,570 Bh
605 Primary Dead End ( 150 s/d 240 ) mm2 94,300 84,870 Bh
606 Shackle Anchor 5/8" 18,000 16,200 Bh
607 Side Bracket 69,300 62,370 Bh
608 Split bolt connector 23,100 20,790 Bh
609 Split plastic sleeve 2,100 1,890 Bh
610 Spol Insulator ANSI 53-2 36,050 32,445 Bh
611 Spol Insulator ANSI 53-4 41,200 37,080 Bh
612 Stainless Steel Strap 20 x 0,7 mm 10,900 9,810 Mtr
613 Stainless Steel Strap 2,800 2,520 Bh
614 Strap for clamping 2,650 2,385 Bh
615 Steel L 70 x 70 x 7 x 1.000 mm galvanis 20,600 18,540 Bh
616 Steel L 70 x 70 x 7 x 1.262 mm galvanis 215,200 193,680 Bh
617 Steel L 70 x 70 x 7 x 780 mm galvanis 107,200 96,480 Bh
618 Stopping Buckle / Yokes 2,100 1,890 Bh
619 Suspension / Small Angle Assembly ( CJ5-T) 33,100 29,790 Bh
620 Tap Connector ( 35s/d 70) mm2 5,200 4,680 Bh
621 Tap Connector ( 35s/d 150) mm2 13,600 12,240 Bh
622 Tap Connector ( 70 s/d 150 ) mm2 18,300 16,470 Bh
623 Tap Connector ( 70 s/d 240 ) mm2 23,200 20,880 Bh
624 Three Bolt Clamp 38,100 34,290 Bh
625 Tie Wire # 4 / Alluminium Bonding Wire # 20 6,600 5,940 Mtr
626 Washer Square 2 1/4" 3,200 2,880 Bh
627 Washer Square 2 1/2" 3,200 2,880 Bh
628 Washer Round 3/8" 1,500 1,350 Bh
629 Penghalang panjat 88,100 79,290 Bh
630 Papan tanda bahaya 17,600 15,840 Bh
631 Lampu TL 5 Watt 22,000 19,800 Bh
632 Lampu TL 10 Watt 22,000 19,800 Bh
633 Lampu TL 15 Watt 22,000 19,800 Bh
634 Lampu TL 18 Watt 22,000 19,800 Bh
635 Lampu TL 20 Watt 29,000 26,100 Bh
636 Lampu TL 36 Watt 39,600 35,640 Bh
637 ML 40 Watt 99,000 89,100 Bh
638 ML 100 Watt 110,000 99,000 Bh
639 ML 160 Watt 165,000 148,500 Bh
640 ML 250 Watt 165,000 148,500 Bh
641 SON 70 Watt 93,500 84,150 Bh
642 SON 150 Watt 110,000 99,000 Bh
643 SON 250 Watt 176,000 158,400 Bh
644 SON 400 Watt 275,000 247,500 Bh
645 BALAST / TRAFO 296,500 266,850 Bh
646 HPL 50 watt 48,150 43,335 Bh
647 HPL 70 watt 53,500 48,150 Bh
648 HPL 80 watt 69,550 62,595 Bh
649 HPL 125 watt 101,650 91,485 Bh
650 HPL 250 watt 117,700 105,930 Bh
651 HPL 400 watt 160,500 144,450 Bh
652 Contactor 25 Ampere 148,200 133,380 Bh
653 Contactor 35 Ampere 229,000 206,100 Bh
654 Contactor 16 Ampere 229,000 206,100 Bh
655 Ignitor SN 58 34,700 31,230 Bh
656 Kapasitor 32,100 28,890 Bh
657 MCB 6-16 Ampere 30,700 27,630 Bh
658 MCB 17-35 Ampere 48,150 43,335 Bh
659 MCB Lebih dari 63 Ampere 149,800 134,820 Bh
660 Megnetic Switch MS 10 Ampere 309,900 278,910 Bh
661 Megnetic Switch MS 20 Ampere 1,078,200 970,380 Bh
662 Megnetic Switch MS 29 Ampere 1,347,800 1,213,020 Bh
663 Megnetic Switch MS 35 Ampere 1,887,000 1,698,300 Bh
664 Megnetic Switch MS 50 Ampere 2,021,800 1,819,620 Bh
665 Megnetic Switch MS 65 Ampere 2,695,700 2,426,130 Bh
666 Megnetic Switch MS 95 Ampere 4,043,600 3,639,240 Bh
667 Megnetic Switch MS 125 Ampere 5,661,000 5,094,900 Bh
668 Megnetic Switch MS 150 Ampere 8,761,100 7,884,990 Bh
669 Megnetic Switch MS 220 Ampere 9,435,100 8,491,590 Bh
670 Stop kontak outbow 12,804,700 11,524,230 Bh
671 Stop kontak outbow 20,150 18,135 Bh
672 Stop kontak In bow 107,800 97,020 Bh
673 Stop kontak In bow 1,900 1,710 Bh
674 Stop kontak In bow 67,300 60,570 Bh
675 Stop kontak In bow 47,100 42,390 Bh
676 Saklar Engkel outbow 40,400 36,360 Bh
677 Saklar Engkel In bow 20,150 18,135 Bh
678 Staker Biasa / tanpa arde 18,700 16,830 Bh
679 Staker dengan arde 4,000 3,600 Bh
680 Klem U 16,100 14,490 Bh
681 Klem Kabel 13,400 12,060 Bh
682 Fitting Plafon 13,400 12,060 Pak
683 Fitting Gantung 8,600 7,740 Bh
684 Fitting NYM Uk. 2x2,5 mm 4,550 4,095 Bh
685 Fitting NYM Uk. 2 x 4 mm 9,300 8,370 m'
686 Fitting NYM Uk. 4 x 4 mm 20,100 18,090 m'
687 Fitting NYY Uk. 3x2,5 mm 9,300 8,370 m'
688 Fitting NYY Uk. 2x4 mm 14,700 13,230 m'
689 Fitting NYY Uk. 3x4 mm 16,100 14,490 m'
690 Fitting NYY Uk. 4x4 mm 21,500 19,350 m'
691 Fitting NYY Uk. 4x6 mm 26,900 24,210 m'
692 Fitting DX / Twisted 53,800 48,420 m'
693 Fitting LVTC 2x70 +N.50 14,700 13,230 m'
694 Fitting LVTC 2x35 +N.50 53,800 48,420 m'
695 Isolasi keci 2,650 2,385 Bh
696 Isolasi besar 10,700 9,630 Bh
697 Test pen 20,150 18,135 Bh
698 Fotosel ( otomat ) 202,000 181,800 Bh
699 Modul Lampu amar 242,500 218,250 Bh
700 Modul Traffic Light 3,369,600 3,032,640 Bh
701 Tangga Aluminium Lipat P 8 meter 5,391,400 4,852,260 Bh
702 Klem Pole Band 175,150 157,635 Bh
703 Pal Bantu RS 9 2,021,800 1,819,620 Bh
704 Konsol panjang 6 meter Æ 2 " tebal 3 mm Medium A 673,900 606,510 Bh
705 Konsol panjang 6 meter Æ 2 " tebal 2 mm Medium A 606,500 545,850 Bh
706 Pool Massa 121,250 109,125 Bh
707 Kap lampu Son 250 Watt Lengkap 3,774,000 3,396,600 Bh
708 Kap lampu Son 250 Watt Type SMR 511 1,010,900 909,810 Bh
709 Kap lampu TL isi 2 606,500 545,850 Bh
710 Kap Lampu Caping LHE 1,077,000 969,300 Bh
711 Sekering 33,600 30,240 Bh
712 Fiting SON 53,800 48,420 Bh
713 T Doos 6,600 5,940 Bh
714 Stop kontak AC 80,800 72,720 Bh
715 Contak cleaner 33,600 30,240 Bh
716 Jek AC 26,900 24,210 Bh
717 Pal bantu berornamen 5,484,100 4,935,690 Bh
718 Tambang plastik besar 3,800 3,420 m'
719 Sayang bambu komplit 127,900 115,110 Set
720 Martil / palu 5 Kg 33,600 30,240 Bh
721 Bor listrik 1,213,000 1,091,700 Bh
722 Mata bor 269,500 242,550 Set
723 Digger Tanah 202,100 181,890 Bh
724 KWH Meter 1 phasa 220 v, 5 / 20 A, st 204,200 183,780 Bh
725 KWH Meter 1 Phasa 220 v, 20/60A, st 166,300 149,670 Bh
726 KWH Meter 1 Phasa 220 v, 50/100 A, st 297,700 267,930 Bh
727 KWH Meter 3 Phasa 220/380 v,5/20 A, st 1,199,550 1,079,595 Bh
728 KWH Meter 3 Phasa 220/380 v,20/60 A, st 1,266,700 1,140,030 Bh
729 KWH Meter 3 Phasa 220/380 v,50/100A, st 1,347,300 1,212,570 Bh
730 KWH Meter 3 Phasa 220/380 v,5/20 A, DT 1,546,800 1,392,120 Bh
731 KWH Meter 3 Phasa 220/380 v,20/60 A, DT 1,616,800 1,455,120 Bh
732 KWH Meter 3 Phasa 220/380 v,50/100 A, DT 1,751,500 1,576,350 Bh
733 KVARH Meter 3 Ph 220/380 v,5/20 A, ST 1,198,800 1,078,920 Bh
734 KVARH Meter 3 Ph 220/380 v,20/60 A, ST 1,266,700 1,140,030 Bh
735 KVARH Meter 3 Ph 220/380 v,50/100 A, ST 1,347,300 1,212,570 Unit
736 KWH Meter 3 Phasa 57, 7/100 v, /5A, ST 1,226,400 1,103,760 Unit
737 KWH Meter 3 Phasa 57, 7/100 v, /5A, DT 1,549,900 1,394,910 Bh
738 Kotak APP Type Lipat, lengkap 50,300 45,270 Bh
739 Kotak APP Type III Lipat, lengkap 235,800 212,220 Bh
740 Kotak APP TR Type IV Tanpa Topi, lengkap 4,717,550 4,245,795 Bh
741 Kotak APP TR Type I A Single tarif lengkap 5,822,700 5,240,430 Bh
742 Kotak APP TR Double Tarif, lengkap 6,038,400 5,434,560 Bh
743 Kotak APP TM, lengkap 5,607,000 5,046,300 Bh
744 Trafo 1 Phasa CSP 12,7 KV/B2 50 KVA 32,427,490 29,184,741 Bh
745 Trafo 3 Phasa 20 KV/B2 50 KVA 41,252,200 37,126,980 Bh
746 Trafo 3 Phasa 20 KV/B2 100 KVA 50,805,400 45,724,860 Bh
747 Trafo 3 Phasa 20 KV/B2 160 KVA 70,900,760 63,810,684 Bh
748 Trafo 3 Phasa 20 KV/B2 200 KVA 81,618,230 73,456,407 Bh
749 Trafo 3 Phasa 20 KV/B2 250 KVA 90,687,000 81,618,300 Bh
750 Trafo 3 Phasa 20 KV/B2 315 KVA 91,374,000 82,236,600 Bh
751 Trafo 3 Phasa 20 KV/B3 400 KVA 97,007,600 87,306,840 Bh
752 Trafo 3 Phasa 20 KV/B2 630 KVA 141,946,800 127,752,120 Bh
753 AAAC 25 mm2 22,000 19,800 Mtr
754 AAAC 35 mm2 27,500 24,750 Mtr
755 AAAC 50 mm2 38,500 34,650 Mtr
756 AAAC 70 mm2 49,500 44,550 Mtr
757 AAAC 150 mm2 82,500 74,250 Mtr
758 AAAC 240 mm2 93,500 84,150 Mtr
759 AAAC/S 150 mm2 88,000 79,200 Mtr
760 AAAC/S 240 mm2 110,000 99,000 Mtr
761 ACSR 70 mm2 14,850 13,365 Mtr
762 ACSR 150 mm2 31,700 28,530 Mtr
763 ACSR 240 mm2 51,900 46,710 Mtr
764 NFA2X-T 2 x 35 + N 50 mm2 23,100 20,790 Mtr
765 NFA2X-T 2 x 70 + N 50 mm2 35,600 32,040 Mtr
766 NFA2X-T 3 x 70 + N 50 mm2 45,900 41,310 Mtr
767 NFA2X 2 x 10 mm2 4,300 3,870 Mtr
768 NFA2X 2 x 16 mm2 6,900 6,210 Mtr
769 NFA2X 2 x 25 mm2 9,100 8,190 Mtr
770 NFA2X 4 x 10 mm2 9,500 8,550 Mtr
771 NFA2X 4 x 16 mm2 13,600 12,240 Mtr
772 NFA2X 4 x 25 mm2 18,450 16,605 Mtr
773 Kabel NYFGBY 4 x 4 mm2 37,000 33,300 Mtr
774 Kabel NYFGBY 4 x 50 mm2 CU 271,600 244,440 Mtr
775 Kabel NYFGBY 4 x 95 mm2 CU 514,950 463,455 Mtr
776 Kabel NYFGBY 4 x 150 mm2 CU 798,500 718,650 Mtr
777 Kabel NYY 1X 150 mm2 167,100 150,390 Mtr
778 Kabel NA2XSEFGbY 20 KV, 3 X 150 mm2 367,000 330,300 Mtr
779 Kabel NA2XSY 20 KV, 1 X 240 mm2 122,100 109,890 Mtr
780 Kabel NA2XSEYBY 20 KV, 3 X 240 mm2 421,700 379,530 Mtr
781 Kabel NA2XSY 20 KV, 1 X 150 mm2 100,700 90,630 Mtr
782 Kabel NA2XSEYBY 20 KV, 3 X 300 mm2 487,400 438,660 Mtr
783 Kabel NA2XSY 20 KV, 1 X 70 mm2 71,610 64,449 Mtr
784 Kabel NA2XSEYBY 20 KV, 3 X 95 mm2 259,390 233,451 Mtr
785 Kabel NA2XS2Y 20 KV, 1 X 150 mm2 100,700 90,630 Mtr
786 Kabel NA2XS2Y 20 KV, 1 X 240 mm2 122,000 109,800 Mtr
787 Kabel NA2XS2Y 20 KV, 1 X 300 mm2 135,500 121,950 Mtr
788 Kabel NFA2XSY-T-3 X 240+50 mm2,20 KV 334,800 301,320 Mtr
789 Kabel NYA Fleksibel 2,5 mm2 2,400 2,160 Mtr
790 Kabel NYA Fleksibel 4 mm2 5,400 4,860 Mtr
791 Kabel NYA Fleksibel 6 mm2 7,950 7,155 Mtr
792 Kabel NYA Fleksibel 10 mm2 12,730 11,457 Mtr
793 Kabel NYA Fleksibel 16 mm2 13,050 11,745 Mtr
794 Kabel LVTC Ukuran 3 x 35 + N.25 27,400 24,660 Mtr
795 Kabel LVTC Ukuran 3 x 70 + N.25 39,100 35,190 Mtr
796 Sepatu Kabel AL/CU Ring 50 64,600 58,140 Bh
797 Sepatu Kabel AL/CU Ring 70 68,200 61,380 Bh
798 Sepatu Kabel AL/CU Ring 95 71,700 64,530 Bh
799 Sepatu Kabel AL/CU Ring 120 81,900 73,710 Bh
800 Sepatu Kabel AL/CU Ring 150 87,700 78,930 Bh
801 Sepatu Kabel AL/CU Ring 185 111,200 100,080 Bh
802 Sepatu Kabel AL/CU Ring 240 128,300 115,470 Bh
803 Sepatu Kabel AL/CU Kepala 50 48,400 43,560 Bh
804 Sepatu Kabel AL/CU Kepala 70 52,500 47,250 Bh
805 Sepatu Kabel AL/CU Kepala 95 55,050 49,545 Bh
806 Sepatu Kabel AL/CU Kepala 120 57,900 52,110 Bh
807 Sepatu Kabel AL/CU Kepala 150 66,400 59,760 Bh
808 Sepatu Kabel AL/CU Kepala 185 81,150 73,035 Bh
809 Sepatu Kabel AL/CU Kepala 240 85,000 76,500 Bh
810 Sepatu Kabel AL/AL 35 9,200 8,280 Bh
811 Sepatu Kabel AL/AL 50 9,800 8,820 Bh
812 Sepatu Kabel AL/AL 70 9,800 8,820 Bh
813 Sepatu Kabel AL/AL 95 11,550 10,395 Bh
814 Sepatu Kabel AL/AL 120 14,500 13,050 Bh
815 Sepatu Kabel AL/AL 150 19,800 17,820 Bh
816 Sepatu Kabel AL/AL 240 26,200 23,580 Bh
817 Sepatu Kabel CU/CU 35 21,100 18,990 Bh
818 Sepatu Kabel CU/CU 50 23,800 21,420 Bh
819 Sepatu Kabel CU/CU 70 30,650 27,585 Bh
820 Sepatu Kabel CU/CU 95 38,000 34,200 Bh
821 Sepatu Kabel CU/CU 150 61,200 55,080 Bh
822 Sepatu Kabel CU/CU 240 107,150 96,435 Bh
823 C 7M-100 daN+E 7M-100 daN+E 1,703,600 1,533,240 Btg
824 C 9M-100 daN+E 9M-100 daN+E 2,226,840 2,004,156 Btg
825 C 9M-200 daN+E 9M-200 daN+E 2,585,000 2,326,500 Btg
826 C 11M-200 daN+E 11M-200 daN+E 3,740,000 3,366,000 Btg
827 C 11M-350 daN+E 11M-350 daN+E 4,345,000 3,910,500 Btg
828 C 12M-200 daN+E 12M-200 daN+E 4,294,290 3,864,861 Btg
829 C 12M-350 daN+E 12M-350 daN+E 4,688,100 4,219,290 Btg
830 C 12M-500 daN+E 12M-500 daN+E 5,450,400 4,905,360 Btg
831 C 13M-350 daN+E 13M-350 daN+E 5,712,630 5,141,367 Btg
832 C 13M-500 daN+E 13M-500 daN+E 6,093,780 5,484,402 Btg
833 C 14M-350 daN+E 14M-350 daN+E 6,455,200 5,809,680 Btg
834 C 14M-500 daN+E 14M-500 daN+E 7,133,280 6,419,952 Btg
835 Load Break switch 20 KV-630A 20 KV, 630 A 23,586,900 21,228,210 Set
836 Load Break switch 20 KV-630A (Motorized)SF 20 KV, 630 A 172,527,800 155,275,020 Set
837 6 lengkap dengan kontrol -
838 Disconnecting Switch 20 KV-630 A 20 KV, 630 A 10,108,250 9,097,425 Set
839 Lightning Arester 20 KV, 5 KA 20 KV, 5 KA. 724,300 651,870 Bh
840 Lightning Arester 20 KV, 10 KA 20 KV, 10 KA 826,200 743,580 Bh
841 Micro Cap Controller 24,814,450 22,333,005 Bh
842 Current Sensor 17,717,900 15,946,110 Bh
843 Kawat Segel 80,800 72,720 Roll
844 Timah segel 60,400 54,360 Kg
845 Service wedge Clamp 616 3,600 3,240 Set
846 Service wedge Clamp 625 4,900 4,410 Set
847 Terminating kabel 3 x 300 mm2 ID 3 x 300 mm2 4,177,800 3,760,020 Set
848 Terminating kabel 1 x 300 mm2 ID 1 x 300 mm2 2,559,950 2,303,955 Set
849 Terminating kabel 3 x 300 mm2 OD 3 x 300 mm2 4,986,230 4,487,607 Set
850 Terminating kabel 1 x 300 mm2 OD 1 x 300 mm2 2,897,300 2,607,570 Set
851 Terminating kabel 3 X 240 mm2 ID 3 x 240 mm2 3,778,925 3,401,033 Set
852 Terminating kabel 1 x 240 mm2 ID 1 x 240 mm2 3,371,540 3,034,386 Set
853 Terminating kabel 3 x 240 mm2 OD 3 x 240 mm2 5,379,800 4,841,820 Set
854 Terminating kabel 1 x 240 mm2 OD 1 x 240 mm2 3,805,400 3,424,860 Set
855 Terminating kabel 3 x 95 mm2 ID 3 x 95 mm2 2,844,200 2,559,780 Set
856 Terminating kabel 1 x 95 mm2 ID 1 x 95 mm2 240,175 216,158 Set
857 Terminating kabel 3 x 95 mm2 OD 3 x 95 mm2 4,177,800 3,760,020 Set
858 Terminating kabel 1 x 95 mm2 OD 1 x 95 mm2 3,182,700 2,864,430 Set
859 Jointing Raychem 24 kV 3 x 300 mm2 (Armoured) OD 3 x 300 mm2 4,295,200 3,865,680 Set
860 Jointing Raychem 24 kV x 300 mm2 (Unarmoured) ID 3 x 1 x 300 mm2 4,447,200 4,002,480 Set
861 Jointing Raychem 24 kV 3 x 240 mm2 (Armoured) OD 3 x 240 mm2 473,950 426,555 Set
862 Jointing Raychem 24 kV 1 x 240 mm2 (Unarmoured) ID 3 x 1 x 240 mm2 4,380,450 3,942,405 Set
863 Jointing Raychem 24 kV 3 x 95 mm2 (Armoured) OD 3 x 95 mm2 4,380,450 3,942,405 Set
864 Jointing Raychem 24 kV 1 x 95 mm2 (Unarmoured) OD 3 x 1 x 95 mm2 3,705,700 3,335,130 Set
865 Klem beugel bevesteging 8 x 6" 30,230 27,207 Bh
866 Door Closer 183,750 165,375 Bh
867 Door holder / Pegangan pintu 25,200 22,680 Bh
868 Door stop 306,300 275,670 Bh
869 Engsel angin 7,000 6,300 Bh
870 Engsel Jendela 9,625 8,663 Bh
871 Engsel Jendela Kuning 13,100 11,790 Bh
872 Engsel Pintu Kuning 17,050 15,345 Bh
873 Engsel Pintu Biasa 8,700 7,830 Bh
874 Engsel Pintu 16,100 14,490 Set
875 Grendel jendela kuning 10,500 9,450 Psg
876 Grendel jendela biasa 6,350 5,715 Psg
877 Grendel pintu kuning 10,500 9,450 Psg
878 Grendel pintu biasa 5,700 5,130 Bh
879 Hak angin kuning 10,175 9,158 Bh
880 Hak angin biasa 5,100 4,590 Bh
881 Kait Angin 5,500 4,950 Bh
882 Kunci bulat 55,000 49,500 Bh
883 Kunci tanam 2 slag 85,000 76,500 Bh
884 Kunci tanam besar / antik - - Bh
885 Kunci lemari 12,300 11,070 Bh
886 Kunci selot 90,000 81,000 Bh
887 Kunci silinder 70,000 63,000 Bh
888 Bak cuci stainless steel Royal 211,250 190,125 Bh
889 Bak cuci stainless steel Viega ( 1.00 x 0.90 ) m2 208,300 187,470 Bh
890 Bak cuci stainless steel 80 cm 183,750 165,375 Bh
891 Bak fiberglass vol 30 ltr - Bh
892 Bak mandi fiber glass, vol 120 ltr sudut 219,600 197,640 Bh
893 Bak mandi fiber glass, vol 120 ltr kotak 231,800 208,620 Bh
894 Bak mandi fiber glass, vol 150 ltr 369,250 332,325 Bh
895 Bak mandi fiber glass, vol 1000 ltr - Bh
896 Bak Tandon air fiber isi 500 Ltr 919,000 827,100 Bh
897 Bak Tandon air fiber isi 1000 Ltr 1,250,000 1,125,000 Bh
898 Floor Drain / Saringan pembuang pada lantai KM/WC 13,800 12,420 Bh
899 Kloset duduk / Monoblok "INA", Putih 1,043,250 938,925 Bh
900 Kloset duduk / Monoblok "INA", Warna Tua 1,070,000 963,000 Bh
901 Kloset duduk / Monoblok + pembilas otomatis "INA" 1,230,500 1,107,450 Bh
902 Kloset duduk Colour 425,500 382,950 Bh
903 Kloset Jongkok INA warna tua 184,100 165,690 Bh
904 Kloset Jongkok INA warna muda 147,600 132,840 Bh
905 Stop Kran 1/2" 11,500 10,350 Bh
906 Stop Kran 3/4" 15,000 13,500 Bh
907 Shower Tray 93,000 83,700 Bh
908 Tempat Sabun keramik 30,600 27,540 Bh
909 Urinoir 363,800 327,420 Bh
910 Water Drain Asesoris 87,550 78,795 Set
911 Wastafel ( INA ) 343,700 309,330 Bh
912 Wastafel Colour 224,500 202,050 Bh
913 Baut Salang kuda2 18,500 16,650 Kg
914 Baut lawa - lawa 17,500 15,750 Bh
915 Paku (Reng, Usuk, Plafond) 20,750 18,675 Kg
916 Paku 12 cm 300 270 Bh
917 Paku Asbes 26,000 23,400 Kg
918 Paku sekrup 1,500 1,350 Bh
919 Paku sekrup 21,500 19,350 Kg
920 Paku skrup fixer 1,500 1,350 Bh
921 Paku Sekrup Asbes 1,200 1,080 Bh
922 Paku Payung 25,700 23,130 Kg
923 Paku Keling 25,150 22,635 Kg
924 Paku Eternit 17,000 15,300 Kg
925 Paku Pancing 45,300 40,770 Kg
926 Anti Rayap 26,500 23,850 Ltr
927 Air 100 90 Ltr
928 Aspal curah 9,400 8,460 Kg
929 Aspal Drum 11,110 9,999 Kg
930 Alat Bantu 50,000 45,000 Set
931 Daun Naco - Bh
932 Elastomer strip uk. 30 x 30 1,195,000 1,075,500 Bh
933 Elastomer strip uk. 20 x 20 857,500 771,750 Bh
934 Gebalan rumput 35,310 31,779 M2
935 Geotextile 24,200 21,780 M2
936 Ijuk 42,800 38,520 Kg
937 Karpet 13,200 11,880 M2
938 Karet dan epoxy mortar 26,900 24,210 Kg
939 Minyak Bekisting 18,300 16,470 Ltr
940 Minyak flux 17,700 15,930 Ltr
941 Minyak pelumas 35,000 31,500 Ltr
942 Minyak Tanah 11,950 10,755 Ltr
943 Minyak Bakar 9,550 8,595 Ltr
944 Minyak solar 5,500 4,950 Ltr
945 Minyak solar industri 11,600 10,440 Ltr
946 Minyak bensin 6,500 5,850 Ltr
947 Minyak bensin industri - Ltr
948 Sealent 24,000 21,600 Tube
949 Sewa Wales - Hari
950 Soda api 20,250 18,225 Kg
951 Sabun 10,900 9,810 Kg

B T E N A G A
1 Pekerja 45,000.00 45,000.00 OH
2 Tukang gali 65,000.00 65,000.00 OH
3 Mandor 65,000.00 65,000.00 OH
4 Tukang batu 65,000.00 65,000.00 OH
5 Kepala tukang cat/ plitur / batu 65,000.00 65,000.00 OH
6 Tukang kayu 65,000.00 65,000.00 OH
7 Kepala tukang kayu 65,000.00 65,000.00 OH
8 Tukang Besi / ledeng 65,000.00 65,000.00 OH
9 Kepala Tukang besi / ledeng 65,000.00 65,000.00 OH
10 Tukang Besi Profil 65,000.00 65,000.00 OH
11 Kepala Tukang besi Profil 65,000.00 65,000.00 OH
12 Mekanik 60,000.00 60,000.00 OH
13 Mekanik Pembantu 50,000.00 50,000.00 OH
14 Operator terlatih/ masinis 60,000.00 60,000.00 OH
15 Operator kurang terlatih 55,000.00 55,000.00 OH
16 Pembantu operator/ pemb. masinis 40,000.00 40,000.00 OH
17 Sopir truk 55,000.00 55,000.00 OH
18 Sopir personil 45,000.00 45,000.00 OH
19 Pembantu sopir 45,000.00 45,000.00 OH
20 Buruh lapangan tak terlatih 40,000.00 40,000.00 OH
21 Buruh lapangan semi terlatih 45,000.00 45,000.00 OH
22 Buruh lapangan terlatih 55,000.00 55,000.00 OH
23 Tukang masak aspal 60,000.00 60,000.00 OH
24 Penjaga malam 35,000.00 35,000.00 OH
PERHITUNGAN VOLUME PEKERJAAN

PROGRAM : PDPM-DM
LOKASI : RT….. RW …… DESA ………..
TAHUN ANGGARAN : 2014
JENIS PEKERJAAN : PEMASANGAN PAVING BLOK

GAMBAR
NO
SKETSA PERHITUNGAN VOLUME
I PEK. PERSIAPAN
1. PEMBERSIHAN LAHAN
Taksir = 1.00 LS

2 PENGUKURAN DAN BOWPLANK


Taksir = 1.00 LS

II PEKERJAAN TANAH
1 Galian Tanah Biasa Sedalam 1 m (kansteen) Lokasi 1 Lokasi 2 Lokasi 3 Lokasi 4 Lokasi 5 Lokasi 6
Panjang = 100.00 - - - - -
Lebar = 0.28 - - - - -
Tinggi = 0.18 - - - - -
Sub Volume = 5.04 - - - - -
Volume Total = 5.04 M3

2 MembuangTanah sejauh 30 m'


VOLUME = 5.04 M3

3 Urugan Pasir Bawah Kansteen Lokasi 1 Lokasi 2 Lokasi 3 Lokasi 4 Lokasi 5 Lokasi 6
Panjang = 100.00 - - - - -
Lebar (kanan + kiri) = 0.28 - - - - -
Tinggi = 0.05 - - - - -
Sub Volume = 1.40 - - - - -
Volume Total = 1.40 M3

III PEKERJAAN PASANGAN


1 Pasang Paving Blok Abu-abu Tebal 6 cm (K.175)
Lokasi 1 Lokasi 2 Lokasi 3 Lokasi 4 Lokasi 5 Lokasi 6
Panjang = 100.00 - - - - -
Lebar = 1.00 - - - - -
Sub Volume = 100.00 - - - - -
VOLUME = 100.00 M2

2 Pasang Batu Merah Tebal 1/2 bata, 1 Pc : 4 Psr


Tinggi = 0.24 M'
Panjang = 100.00 M'
Jumlah = 2.00 buah
VOLUME = 48.00 M2

3 Plesteran 1 Pc : 3 Psr Tebal 15 mm


Lebar = 0.38 M'
Panjang = 100.00 M'
LUAS = 38 M2
PROGRAM DAERAH PEMBERDAYAAN MASYARAKAT - DESA MANDIRI (PDPM-DM)
RENCANA ANGGARAN BIAYA PERUBAHAN

REKAPITULASI RENCANA ANGGARAN BIAYA


Kab. : Tegal KSPM/Panitia : ………….
Kecamatan : …………… Jenis Kegiatan : Pemasangan Paving Blok
Kelurahan/Desa : ……………. Lokasi Kegiatan : ……………….

Suber Dana (Rp)


No. Uraian Pekerjaan Biaya (Rp) Kontribusi Masyarakat Dana
In_Cash In_Kind PDPM

1 PEMASANGAN PAVING BLOK 19,833,350 - 596,900 19,236,450

JUMLAH BIAYA 19,833,350 - 596,900 19,236,449.80

PEMBULATAN 19,833,000 - 597,000 19,236,000

Tegal, 2014
Diperiksa oleh, Dilaksanakan oleh,
Fasilitator PDPM Fasilitator PDPM KSM ……………

………………………………… ……………………………. ………


Ketua

Disetujui Oleh Diverifikasi Oleh


Konsultan Manajemen Kabupaten Kepala UPTD PU Kec. ……………

S U T I K N Y O, S.TP …………………………………………………….
NIP. …………………………………….
PROGRAM DAERAH PEMBERDAYAAN MASYARAKAT - DESA MANDIRI (PDPM-DM)

RENCANA ANGGARAN BIAYA

REKAP PERHITUNGAN VOLUME PEKERJAAN


Kota : Tegal KSM/Panitia : ………….
Kecamatan : …………… Jenis Kegiatan : Pemasangan Paving Blok
Kelurahan/Desa : ……………. Lokasi Kegiatan : ……………….
Jenis Pekerjaan : Peningkatan Jalan
Jumlah Biaya (Rp.)
No. Uraian Pekerjaan Satuan Volume
PDPM Swadaya Total
I PEK. PERSIAPAN
1 PEMBERSIHAN LAHAN ls 1.00 - 100,000.00 100,000.00
2 PENGUKURAN DAN BOWPLANK ls 1.00 - 100,000.00 100,000.00
SUBTOTAL - 200,000.00 200,000.00
II PEKERJAAN TANAH
1 Galian Tanah Biasa Sedalam 1 m (kansteen) m³ 5.04 - 170,100.00 170,100.00
2 MembuangTanah sejauh 30 m' m³ 5.04 - 226,800.00 226,800.00
3 Urugan Pasir m³ 1.40 156,492.00 - 156,492.00
SUBTOTAL 156,492.00 396,900.00 553,392.00
IV PEKERJAAN PASANGAN
1 Pasang Paving Blok Abu-abu Tebal 6 cm (K.175) m² 100.00 11,033,950.00 - 11,033,950.00
2 Pasang Batu Merah Tebal 1/2 bata, 1 Pc : 4 Psr m² 48.00 5,042,184.00 - 5,042,184.00
3 Plesteran 1 Pc : 3 Psr Tebal 15 mm m² 38.00 1,255,055.64 - 1,255,055.64
SUBTOTAL 17,331,189.64 - 17,331,189.64
TOTAL 17,487,681.64 596,900.00 18,084,581.64
V PAJAK
PPN PPh (10% dari Total dana PDPM) 1,748,768.16 1,748,768.16
TOTAL ANGGARAN 19,236,449.80 596,900.00 19,833,349.80
PROGRAM DAERAH PEMBERDAYAAN MASYARAKAT - DESA MANDIRI (PDPM-DM)
RENCANA ANGGARAN BIAYA

PERHITUNGAN KEBUTUHAN TENAGA/ BAHAN/ ALAT DAN ADMINISTRASI


Kabupaten/Kota : Tegal KSM/Panitia : ………….
Kecamatan : …………… Jenis Kegiatan : Pemasangan Paving Blok
Kelurahan/Desa : ……………. Lokasi Kegiatan : ……………….
Jenis Pekerjaan : Peningkatan Jalan
Jumlah Harga (Rp)
No Koefisien Uraian Volume Satuan Harga Satuan (Rp) SWADAYA
Total PDPM
In_Cash In_Kind
I PEKERJAAN PERSIAPAN

1 PEMBERSIHAN LAHAN 1.000 ls -


1.000 Pembersihan Lahan 1.000 ls 100,000 100,000 - 100,000
Sub Total (1) 100,000 - - 100,000
2 PENGUKURAN DAN BOWPLANK 1.000 ls
1.000 Pengukuran dan Bowplank 1.000 ls 100,000 100,000 100,000
Sub Total (2) 100,000 - 100,000
TOTAL PEKERJAAN PERSIAPAN 200,000 - - 200,000
II PEKERJAAN TANAH

1 Galian Tanah Biasa Sedalam 1 m 5.040 m3


0.750 Pekerja 3.780 oh 45,000 170,100 - 170,100
Sub Total (1) 170,100 - - 170,100.00

2 MembuangTanah sejauh 30 m' 5.040 m3


1.000 Pekerja 5.040 Oh 45,000 226,800 - 226,800
Sub Total (2) 226,800 - - 226,800.00

3 Urugan Pasir 1.400 m3


1.200 Pasir Urug 1.680 m3 81,900 137,592 137,592
0.300 Pekerja 0.420 oh 45,000 18,900 18,900
Sub Total (3) 156,492 156,492 - -
TOTAL PEKERJAAN TANAH 553,392 156,492 - 226,800

III PEKERJAAN PASANGAN


1 Pasang Paving Blok Abu-abu Tebal 6 cm (K.175) 100.000 m²
1.000 Paving Block tebal 6 cm abu - abu K175 100.000 m2 70,740 7,074,000 7,074,000
0.105 Pasir Urug 10.500 m3 81,900 859,950 859,950
0.400 Pekerja 40.000 oh 45,000 1,800,000 1,800,000
0.200 Tukang Batu 20.000 oh 65,000 1,300,000 1,300,000
Sub Total (1) 11,033,950 11,033,950.00 - -
2 Pasang Batu Merah Tebal 1/2 bata, 1 Pc : 4 Psr 48.000 m²
70.000 Bata Merah 5 x 11 x 22 3,360.000 m2 900 3,024,000 3,024,000
11.500 Portland Sement 552.000 kg 1,530 844,560 844,560
0.043 Pasir 2.064 m3 103,500 213,624 213,624
0.300 Pekerja 14.400 oh 45,000 648,000 648,000 -
0.100 Tukang Batu 4.800 oh 65,000 312,000 312,000
Sub Total (2) 5,042,184 5,042,184 - -
3 Plesteran 1 Pc : 3 Psr Tebal 15 mm 38.000 m²
7.776 Portland Sement 295.488 kg 1,530 452,097 452,097
0.023 Pasir 0.874 m3 103,500 90,459 90,459
0.200 Pekerja 7.600 oh 45,000 342,000 342,000
0.150 Tukang batu 5.700 oh 65,000 370,500 370,500
Sub Total (3) 1,255,056 1,255,056
TOTAL PEKERJAAN PASANGAN 17,331,190 17,331,190 - -
Jumlah Biaya Kontruksi 18,084,582 17,487,682 - 426,800
PROGRAM DAERAH PEMBERDAYAAN MASYARAKAT - DESA MANDIRI (PDPM-DM)
RENCANA ANGGARAN BIAYA

PERHITUNGAN TOTAL BIAYA TENAGA/ BAHAN/ ALAT DAN ADMINISTRASI


Kabupaten : Tegal KSPM/Panitia : ………….
Kecamatan : …………… Jenis kegiatan : Pemasangan Paving Blok
Kelurahan/Desa : ……………. Lokasi Kegiatan : ……………….
Jenis Pekerjaan : Peningkatan Jalan
SUMBER PEMBIAYAAN
Volume Swadaya
NO Uraian Sat. Harga Satuan
Total Total BLM
In Cash In Kind
A. TENAGA KERJA :
1 Pekerja OH 45,000 71 3,205,800 - 396,900 2,808,900
1 Tukang batu OH 65,000 31 1,982,500 - - 1,982,500
SUB TOTAL TENAGA 102 5,188,300 - 396,900 4,791,400
B. BAHAN BANGUNAN :
1 Pembersihan Lahan ls 100,000 1 100,000 - 100,000 -
2 Pengukuran dan Bowplank ls 100,000 1 100,000 - 100,000 -
3 Pasir Urug M3 81,900 12 997,542 - - 997,542
4 Paving Block tebal 6 cm abu - abu K175 M2 70,740 100 7,074,000 - - 7,074,000
5 Bata Merah 5 x 11 x 22 Bh 900 3,360 3,024,000 - - 3,024,000
6 Portland Sement Kg 1,530 847 1,296,657 - - 1,296,657
7 Pasir M3 103,500 3 304,083 - - 304,083
SUB TOTAL BAHAN 12,896,281.64 - 200,000.00 12,696,281.64
C JUMLAH (A s/d B) 18,084,582 - 596,900 17,487,682