REKAPITULASI

ENGINEER ESTIMATE (EE)

PROGRAM : PROGRAM PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM


KEGIATAN : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM) DIDAERAH KABUPATEN/KOTA
SUB. KEGIATAN : #REF!
PEKERJAAN : #REF!
LOKASI : KECAMATAN TEMBILAHAN
BIAYA : Err:509

N0. URAIAN PEKERJAAN JUMLAH HARGA

1 2 3

I PEKERJAAN PENDAHULUAN Rp 3,500,000.00


II Err:509 Err:509
III Err:509 Err:509
IV Err:509 Err:509
V Err:509 Err:509
VI Err:509 Err:509
VII Err:509 Err:509
VIII Err:509 Err:509
IX Err:509 Err:509
X Err:509 Err:509
XI Err:509 Err:509
XII Err:509 Err:509
XIII PEKERJAAN SUMUR BOR Rp 176,157,987.78
XIV PEKERJAAN PENGADAAN #REF!
XV PEKERJAAN PEMASANGAN #NAME?
XVI PEKERJAAN LAIN-LAIN Rp -

Jumlah Err:509
Ppn 10 % Err:509
Total Err:509
DIBULATKAN Err:509
Terbilang :###

Tembilahan, 2021
#VALUE! Dibuat Oleh :
#VALUE! CV. MOMENT TEKNIK
#VALUE! Konsultan Perencana

#VALUE! Ir. ADRIL


#VALUE! Team Leader

#VALUE!
#VALUE!
#VALUE!

Err:509
#VALUE!
#REF!

PROGRAM : 0
KEGIATAN : 0
SUB. KEGIATAN : 0
PEKERJAAN : #REF!
LOKASI : 0
Harga Jumlah
No. Uraian Pekerjaan Volume Satuan Harga
( Rp ) ( Rp )
1 2 4 5 6

I PEKERJAAN PENDAHULUAN
1 Pek. Pembersihan Lokasi 30.00 M2 Rp 9,000.00 Rp 270,000.00
2 Pek. Mobilisasi & Demobilisasi Peralatan Bor 1.00 Ls Rp 3,500,000.00 Rp 3,500,000.00
3 Pek. Pengukuran / Pas. Bowplank 22.000 M' #NAME? #NAME?
4 Pek. Papan Nama Proyek 1.00 Ls Rp 450,000.00 Rp 450,000.00
Sub Jumlah #NAME?
II PEKERJAAN SMK3 KONTRUKSI
1 ALAT PELINDUNG DIRI
Topi Pelindung (Safety Helmet) 3.00 Bh Rp 110,000.00 Rp 330,000.00
Pelindung Mata (Goggles, Spectacles) 3.00 Bh Rp 25,000.00 Rp 75,000.00
Pelindung Pernafasan dan Mulut (Masker) 3.00 Box Rp 50,000.00 Rp 150,000.00
Sarung Tangan (Safety Gloves) 3.00 Psg Rp 10,000.00 Rp 30,000.00
Sepatu Keselamatan (Safety Shoes) 3.00 Psg Rp 250,000.00 Rp 750,000.00
Rompi Keselamatan (Safety Vest) 3.00 Bh Rp 25,000.00 Rp 75,000.00
2 PERALATAN P3K
Kotak P3k (Obat Luka, Perban, dll) 1.00 Ktk Rp 500,000.00 Rp 500,000.00
3 RAMBU - RAMBU
Police Line 1.00 Roll Rp 75,000.00 Rp 75,000.00
Sub Jumlah Rp 1,985,000.00

IIIPEKERJAAN PONDASI
1 Pek. Galian Tanah Pondasi 2.968 M3 Rp 38,000.00 Rp 112,784.00
2 Pek. Pasang Cerocok Bakau Pjg. 6 m 78.000 Btg Rp 41,163.43 Rp 3,210,747.43
3 Pek. Pasang Cerocok Bakau Pjg. 3 m 49.000 Btg Rp 20,581.71 Rp 1,008,504.00
4 Pek. Urugan Pasir Bawah Pondasi tbl 10 cm 0.524 M3 Rp 184,900.00 Rp 96,887.60
5 Pek. Cor Lantai Kerja 1:4:6, tbl 5 cm 0.332 M3 Rp 774,803.00 Rp 257,234.60
6 Pek. Cor Tapak Pondasi Umpak camp. 1:2:4 0.960 M3 Rp 1,461,079.00 Rp 1,402,635.84
7 Pek. Cor Tiang Pondasi 20/20 camp. 1:2:4 0.168 M3 Rp 1,461,079.00 Rp 245,461.27
8 Pek. Pembesian Tapak, Tiang dan Sloof
- Tulangan Pokok Besi Polos dia. 10 mm 95.018 Kg Rp 10,651.94 Rp 1,012,125.80
- Beugel Besi dia. 6 mm 4.662 Kg Rp 11,375.34 Rp 53,031.81
9 Pek. Bekisting Tapak Pondasi 4.800 M2 Rp 132,335.00 Rp 635,208.00
10 Pek. Bekisting Tiang Pondasi 3.360 M2 Rp 241,040.00 Rp 809,894.40
11 Pek. Urugan Kembali Bekas Galian 0.742 M3 Rp 18,220.00 Rp 13,519.24
Sub Jumlah Rp 8,858,033.99

IV PEKERJAAN LANTAI
1 Pek. Cor Balok 20/30 camp. 1:2:4 0.700 M3 Rp 1,461,079.00 Rp 1,022,755.30
2 Pek. Pembesian Balok dan Lantai
- Tulangan Pokok Besi Polos dia. 10 mm 110.443 kg Rp 10,651.94 Rp 1,176,431.93
- Tulangan Pokok Besi Polos dia. 10 mm 22.555 gk Rp 11,375.34 Rp 256,572.97
3 Pek. Bekisting Balok 10.060 Kg Rp 249,340.00 Rp 2,508,360.40
4 Pek. Bekisting Lantai 5.980 M2 Rp 277,940.00 Rp 1,662,081.20
5 Pek. Cor Lantai Camp. 1:2:4, Tbl. 12 cm 0.773 M3 Rp 1,461,079.00 Rp 1,129,121.85
6 Pek. Pemasangan Keramik (40x40 cm) Kualitas Sedang 3.750 M2 #NAME? #NAME?
Sub Jumlah #NAME?
Harga Jumlah
No. Uraian Pekerjaan Volume Satuan Harga
( Rp ) ( Rp )
1 2 4 5 6
V PEKERJAAN STRUKTUR
1 Pek. Cor Kolom 20/20 Camp. 1:2:4 0.480 M3 Rp 1,461,079.00 Rp 701,317.92
2 Pek. Pembesian Kolom
- Tulangan Pokok Besi Polos dia. 10 mm 51.088 kg Rp 10,651.94 Rp 544,181.92
- Beugel Besi dia. 6 mm 11.810 kg Rp 11,375.34 Rp 134,347.26
3 Pek. Bekisting Kolom 9.600 M2 Rp 241,040.00 Rp 2,313,984.00
4 Pek. Cor Balok 20/30, Camp. 1:2:4 (Elev. +3) 0.456 M3 Rp 1,461,079.00 Rp 666,252.02
5 Pek. Pembesian Balok (Elev. +3)
- Tulangan Pokok Besi Polos dia. 10 mm 19.744 kg Rp 10,651.94 Rp 210,311.85
- Beugel Besi dia. 6 mm 10.190 kg Rp 11,375.34 Rp 115,912.39
6 Pek. Bekisting Balok (Elev. +3) 6.080 M2 Rp 249,340.00 Rp 1,515,987.20
7 Pek. Cor Plat Lantai Tebal 12 cm (Elev. +3) 0.359 M3 Rp 1,461,079.00 Rp 524,235.15
8 Pek. Pembesian Plat Lantai (Elev. +3)
- Tulangan Pokok Besi Polos dia. 10 mm 29.934 Kg Rp 10,651.94 Rp 318,852.97
9 Pek. Bekisting Plat Lantai 2.990 M2 Rp 277,940.00 Rp 831,040.60
10 Pek. Cor Tiang 20/20 Camp. 1:2:4 0.288 M3 Rp 1,461,079.00 Rp 420,790.75
11 Pek. Pembesian Tiang
- Tulangan Pokok Besi Polos dia. 10 mm 19.744 kg Rp 10,651.94 Rp 210,311.85
- Beugel Besi dia. 6 mm 5.195 kg Rp 11,375.34 Rp 59,092.59
12 Pek. Bekisting Kolom 6.400 M2 Rp 241,040.00 Rp 1,542,656.00
13 Pek. Cor Ring Balok 15/15, Camp. 1:2:4 0.162 M3 Rp 1,461,079.00 Rp 236,694.80
14 Pek. Pembesian Ring Balok
- Tulangan Pokok Besi Polos dia. 10 mm 20.238 kg Rp 10,651.94 Rp 215,569.65
- Beugel Besi dia. 6 mm 5.439 kg Rp 11,375.34 Rp 61,870.45
15 Pek. Bekisting Ring Balok 4.320 M2 Rp 249,340.00 Rp 1,077,148.80
Sub Jumlah Rp 11,700,558.18

VI PEKERJAAN DINDING, KOZEN


1 Pek. Pasangan Bata Dinding Camp. 1:4 20.860 M2 Rp 178,449.00 Rp 3,722,446.14
2 Pek. Plesteran Dinding Camp 1 : 3 41.900 M2 Rp 41,034.20 Rp 1,719,332.98
3 Pek. Kusen Kayu Klas II 0.036 M3 Rp 5,782,000.00 Rp 208,152.00
Sub Jumlah Rp 5,649,931.12

VII PEKERJAAN PINTU & JENDELA


1 Pek. Pasangan Bata Dinding Camp. 1:4 1.000 bh Rp 900,000.00 Rp 900,000.00
Sub Jumlah Rp 900,000.00

VIII PEKERJAAN ALAT PENGGANTUNG


1 Pek. Pasang kunci Tanam 2 Slaagh 1.000 bh Rp 121,000.00 Rp 121,000.00
Sub Jumlah Rp 121,000.00

IX PEKERJAAN PERPIPAAN DAN TANGKI


1 Tangki Plastik Kapasitas 1000 Liter (Rumah Mesin) 2.00 Unit #REF! #REF!
2 Pek. Kran Air 3/4" 3.00 Bh Rp 55,850.00 Rp 167,550.00
3 Pek. Pasang Pipa PVC 3/4" 12.00 M' Rp 8,250.00 Rp 99,000.00
4 Pek. Pasang Pipa PVC 2" 16.00 M' Rp 24,750.00 Rp 396,000.00
5 Pek. Pasang Stop Kran PVC 2" 2.00 Bh Rp 45,000.00 Rp 90,000.00
6 Pek. Pasang Tee PVC 2" 4.00 Bh Rp 22,000.00 Rp 88,000.00
Sub Jumlah #REF!

X PEKERJAAN PENGECATAN
1 Pek. Cat Air 31.43 M2 Rp 29,762.79 Rp 935,295.54
2 Pek. Cat Minyak 14.34 M2 Rp 24,878.81 Rp 356,861.64
Sub Jumlah Rp 1,292,157.18

XI PEKERJAAN ALAT LISTRIK DAN ACCESSORIES


1 Titik Lampu + Instalasi 1.00 Titik Rp 98,880.00 Rp 98,880.00
2 Stop kontak + Instalasi 1.00 Titik Rp 98,880.00 Rp 98,880.00
Sub Jumlah Rp 197,760.00
Harga Jumlah
No. Uraian Pekerjaan Volume Satuan Harga
( Rp ) ( Rp )
1 2 4 5 6
XII PEKERJAAN ATAP
Pek. Pasang Kuda-kuda Kayu Klas III 0.06 Rp 4,033,080.00 Rp 257,471.83
Pek. Pasang Reng Kayu Klas III 0.05 Rp 4,033,080.00 Rp 184,755.39
Pek. Pasang Atap Genteng Metal Zincalume 0,25 mm 12.00 Rp 66,474.00 Rp 797,688.00
Pek. Pasang Perabung Genteng Metal Zincalume 9.00 Rp 80,705.00 Rp 726,345.00
Pek. Pasang Listplank Kayu Klas II 2.80 Rp 48,247.00 Rp 135,091.60
Sub Jumlah Rp 2,101,351.82

XIII PEKERJAAN SUMUR BOR


1 Pembuatan Pilot Hole Max Dia 2" ,termasuk pengadaan Air,
Pelaksanaan Simplefield Permability Test dll.
- Dari Titik 0 mtr - 50 mtr. 50.00 Mtr Rp 140,227.00 Rp 7,011,350.00
- Dari Titik 50 mtr - 100 mtr. 50.00 Mtr Rp 143,870.40 Rp 7,193,520.00
- Dari Titik 100 mtr - 150 mtr 50.00 Mtr Rp 158,308.40 Rp 7,915,420.00
2 Pembesaran Lubang Bor/Reaming Untuk Sumur Uji/Produksi dia 4"
Termasuk Betonit,Air, dll.
- Dari Titik 0 mtr - 50 mtr. 50.00 Mtr Rp 129,371.20 Rp 6,468,560.00
3 Pengadaan dan Pemasangan Pipa Cassing & Saringan (Screen)
- Pipa Jambang / Pump House Chasing. 20.00 Mtr Rp 791,984.00 Rp 15,839,680.00
Jenis Pipa PVC.
In Dia 4" (100 mm)
- Pipa Jambang / Pump House Chasing. 110.00 Mtr Rp 451,384.00 Rp 49,652,240.00
Jenis Pipa PVC.
In Dia 2" (50 mm)
- Pipa Naik. 16.00 Mtr Rp 454,842.00 Rp 7,277,472.00
Jenis Pipa PVC
Class AW.
In Dia 1" (25 mm)
- Pipa Saringan. 20.00 Mtr Rp 182,962.00 Rp 3,659,240.00
Jenis Pipa PVC.
Opening Area 30%.
4 Pek. Pandal Cerocok Pj 1 m Dia 8-10 cm 4.00 M Rp 13,059.74 Rp 52,238.94
5 Pek. Papan Lantai Kerja Tebal 2 cm 1.00 M2 #NAME? #NAME?
6 Pek. Cor Lantai Beton dan Selimut Pipa Bor (Permukaan) camp. 1:2:4, 0.20 M 3
Rp 1,461,079.00 Rp 296,599.04
tbl 10 cm
7 Pekerjaan Pemasangan Reduser 4" ke 2" 1.00 Bh #REF! #REF!
8 Pekerjaan Pemasangan Reduser 2" ke 1.5" 1.00 Bh #REF! #REF!
9 Pembersihan Sumur Secara Water Jetting (Development ) 1.00 Smr #NAME? #NAME?
10 Pengujian Sumur Termasuk Recovery (Pumping Test) 12.00 Jam Rp 178,030.00 Rp 2,136,360.00
Sub Jumlah #REF!

XIV PEKERJAAN PENGADAAN


1 Pipa PVC dia 2" 145.0 Mtr #REF! #REF!
2 Pipa PVC dia 3/4 " 5.0 Mtr #REF! #REF!
3 Stop Krant PVC dia 2" 5.0 Bh #REF! #REF!
4 Elbow 2" 5.0 Bh #REF! #REF!
5 Recuder 2" - 3/4" 5.0 Bh #REF! #REF!
6 Valve Socket dia 3/4" 5.0 Bh Rp 9,000.00 Rp 45,000.00
Sub Jumlah #REF!

XV PEKERJAAN PEMASANGAN
1 Pemasangan Pipa 145.0 Mtr Rp 3,000.00 Rp 435,000.00
2 Pekerjaan Galian Tanah 8.7 M3 #NAME? #NAME?
3 Pekerjaan Urugan Kembali 8.7 M3 #NAME? #NAME?
4 Pemasangan Acesories Pipa 1.0 Ls Rp 293,000.00 Rp 293,000.00
5 Pembersihan Akhir 1.0 Ls Rp 200,000.00 Rp 200,000.00
Sub Jumlah #NAME?
Harga Jumlah
No. Uraian Pekerjaan Volume Satuan Harga
( Rp ) ( Rp )
1 2 4 5 6
XVI PEKERJAAN LAIN-LAIN
1 Pekerjaan Finishing 1.00 Ls Rp 400,000.00 Rp 400,000.00
2 Pemasangan Tangga Besi Pipa 1.5 " 1.00 Ls Rp 1,500,000.00 Rp 1,500,000.00
3 Pek. Pembuatan Logo pada bangunan dan Tangki 1.00 Ls Rp 500,000.00 Rp 500,000.00
4 Pek Pembersihan Akhir 1.00 Ls Rp 300,000.00 Rp 300,000.00
5 #REF! 1.00 Unit #REF! #REF!
Sub Jumlah #REF!

Jumlah Seluruh #REF!

Tembilahan, 2021
Diperiksa Oleh : Dibuat Oleh :
CV. MOMENT TEKNIK CV. MOMENT TEKNIK
Konsultan Perencana Konsultan Perencana

HIKMATULLAH, ST Ir. ADRIL


Direktur Team Leader

Diketahui Oleh :
PEJABAT PEMBUAT KOMITMEN
( PPK)

ARIF GUNAWAN, ST
NIP. 19840830 201001 1 006
REKAPITULASI

ENGINEER ESTIMATE (EE)

PROGRAM :
KEGIATAN :
SUB. KEGIATAN :
PEKERJAAN :
LOKASI :
TAHUN : 2022

N0. URAIAN PEKERJAAN JUMLAH HARGA


1 2 3
A PEKERJAAN SUMUR BOR Rp 179,657,987.78
B PEMBANGUNAN KEDUDUKAN IPA Rp 658,363,187.71

JUMLAH Rp 838,021,175.49
PPN 11% Rp 92,182,329.30
TOTAL Rp 930,203,504.79
DIBULATKAN Rp 930,000,000.00

Terbilang : Sembilan Ratus Tiga Puluh Juta Rupiah Rupiah

Tembilahan, 2022
Disetujui oleh: Dibuat oleh:
CV. MOMEN TEKNIK CV. MOMEN TEKNIK
Konsultan Perencanaan, Konsultan Perencanaan,

HIKMATULLAH, ST Ir. ADRIL


Direktur Team Leader

Diketahui oleh: Disetujui oleh:


PERUMDAM TIRTA INDRAGIRI PEJABAT PEMBUAT KOMITMEN
KAB. INDRAGIRI HILIR (PPK)

Ir. AHMAD HAFIS ARIF GUNAWAN, ST


Direktur NIP. 19840830 201001 1 006
ENGINEER ESTIMATE (EE)

PROGRAM :
KEGIATAN :
SUB. KEGIATAN :
PEKERJAAN :
LOKASI :
TAHUN : 2022

HARGA SATUAN JUMLAH HARGA


NO. URAIAN PEKERJAAN ANALISA VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
A PEKERJAAN SUMUR BOR
I PEKERJAAN PENDAHULUAN
1 Pek. Pembersihan Lokasi 1.00 Ls Rp - Rp -
2 Pek. Papan Nama Proyek 1.00 Ls Rp - Rp -
3 Pek. Mobilisasi & Demobilisasi Peralatan Bor 1.00 Ls Rp 3,500,000.00 Rp 3,500,000.00
SUB. JUMLAH Rp 3,500,000.00
II PEKERJAAN SUMUR BOR
1 Pek. Pembuatan Pilot Hole Max Dia 4" ,termasuk pengadaan Air, Pelaksanaan
Simplefield Permability Test dll.
- Dari Titik 0 M - 50 M 22.00 50.00 M Rp 113,039.20 Rp 5,651,960.00
- Dari Titik 50 M - 100 M 23.00 50.00 M Rp 129,371.20 Rp 6,468,560.00
- Dari Titik 100 M - 150 M 24.00 50.00 M Rp 136,120.40 Rp 6,806,020.00
- Dari Titik 150 M - 200 M 25.00 50.00 M Rp 146,508.40 Rp 7,325,420.00
- Dari Titik 200 M - 250 M 25.00 50.00 M Rp 146,508.40 Rp 7,325,420.00
2 Pek. Pembesaran Lubang Bor/Reaming Untuk Sumur Uji/Produksi dia 8"
Termasuk Betonit, Air, dll.
- Dari Titik 0 mtr - 50 mtr. 24.00 50.00 M Rp 136,120.40 Rp 6,806,020.00
3 Pek. Pengadaan dan Pemasangan Pipa Cassing & Saringan (Screen)
- Pipa Jambang / Pump House Chasing. 26.00 20.00 M Rp 791,984.00 Rp 15,839,680.00
Jenis Pipa PVC.
In Dia 8" (100 mm)
- Pipa Jambang / Pump House Chasing. 27.00 200.00 M Rp 451,384.00 Rp 90,276,800.00
Jenis Pipa PVC.
In Dia 6" (50 mm)
- Pipa Naik. 31.00 50.00 M Rp 454,842.00 Rp 22,742,100.00
Jenis Pipa PVC
Class AW.
In Dia 4" (100 mm)
- Pipa Saringan. 28.00 20.00 M Rp 182,962.00 Rp 3,659,240.00
Jenis Pipa PVC.
Opening Area 30%.
4 Pek. Cor Lantai Beton dan Selimut Pipa Bor (Permukaan) camp. 1:2:4 0.42 M3 Rp 1,910,256.00 Rp 804,217.78
5 Pek. Pemasangan Reduser 6" ke 4" 1.00 Bh Rp 82,000.00 Rp 82,000.00
6 Pek. Pemasangan Reduser 4" ke 2" 1.00 Bh Rp 55,000.00 Rp 55,000.00
7 Pek. Pembersihan Sumur Secara Water Jetting (Development ) 29.00 1.00 Smr Rp 179,190.00 Rp 179,190.00
8 Pek. Pengujian Sumur Bor Termasuk Recovery (Pumping Test) 30.00 12.00 Jam Rp 178,030.00 Rp 2,136,360.00
SUB. JUMLAH Rp 176,157,987.78
III PEKERJAAN LAIN-LAIN
1 Pek. Pembersihan Akhir 1.00 Ls Rp - Rp -
SUB. JUMLAH Rp -
JUMLAH Rp 179,657,987.78
PPN 11% Rp 19,762,378.66
TOTAL Rp 199,420,366.43
DIBULATKAN Rp 199,000,000.00

Tembilahan, 2022
Disetujui oleh: Dibuat oleh:
CV. MOMEN TEKNIK CV. MOMEN TEKNIK
Konsultan Perencanaan, Konsultan Perencanaan,

HIKMATULLAH, ST Ir. ADRIL


Direktur Team Leader

Diketahui oleh: Disetujui oleh:


PERUMDAM TIRTA INDRAGIRI PEJABAT PEMBUAT KOMITMEN
KAB. INDRAGIRI HILIR (PPK)

Ir. AHMAD HAFIS ARIF GUNAWAN, ST


Direktur NIP. 19840830 201001 1 006
DAFTAR ANALISA HARGA SATUAN
SUMUR BOR

PROGRAM : PROGRAM PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM


KEGIATAN : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM) DIDAERAH KABUPATEN/KOTA
PEKERJAAN : PEMBANGUNAN SUMUR BOR PRIT 3 DARAT KELURAHAN SUNGAI PERAK KEC. TEMBILAHAN
LOKASI : KECAMATAN TEMBILAHAN

HARGA
NO URAIAN KEGIATAN VOLUME SATUA
( Rp )
1 2 3 4
I Pembuatan Pilot Hole Maximum 150 mm Interval kedalaman 0 s/d 50 meter.

1. Bahan - bahan.
- Minyak Solar Penggerak Mud Pompa. 7.00 Liter #REF!
- Olie SAE 40 Mud Pompa 0.30 Liter #REF!
- Olie SAE 90 Mud Pompa 0.30 Liter #REF!
- Bentonit. 5.00 Kg #REF!
2. Tenaga Kerja
- Site Meneger. 0.10 Hari #REF!
- Driller 0.12 Hari #REF!
- Ass. Driller. 0.10 Hari #REF!
- Maknik. 0.10 Hari #REF!
- Pembantu 0.10 Hari #REF!
- Tenaga Lokal. 0.10 Hari #REF!
3. Alat - alat.
- Depresiasi Mesin Mud Pompa 0.10 Hari 15,000.00
- Mata Bor dia 150 mm. 0.10 Hari 17,500.00
Jumlah

II Pembuatan Pilot Hole Maximum 150 mm Interval kedalaman 50 s/d 100 meter.

1. Bahan - bahan.
- Minyak Solar Penggerak Mud Pompa. 8.00 Liter #REF!
- Olie SAE 40 Mud Pompa 0.30 Liter #REF!
- Olie SAE 90 Mud Pompa 0.30 Liter #REF!
- Bentonit. 6.00 Kg #REF!
2. Tenaga Kerja
- Site Meneger. 0.10 Hari #REF!
- Driller 0.12 Hari #REF!
- Ass. Driller. 0.10 Hari #REF!
- Maknik. 0.10 Hari #REF!
- Pembantu 0.10 Hari #REF!
- Tenaga Lokal. 0.10 Hari #REF!
3. Alat - alat.
- Deprisiasi Mesin Mud Pompa 0.10 Hari 15,000.00
- Mata Bor dia 150 mm. 0.10 Hari 17,500.00
Jumlah

III Pembuatan Pilot Hole Maximum 150 mm Interval kedalaman 100 s/d 150 meter.

1. Bahan - bahan.
- Minyak Solar Penggerak Mud Pompa. 12.00 Liter #REF!
- Olie SAE 40 Mud Pompa 0.30 Liter #REF!
- Olie SAE 90 Mud Pompa 0.30 Liter #REF!
- Bentonit. 7.00 Kg #REF!
2. Tenaga Kerja
- Site Meneger. 0.10 Hari #REF!
- Driller 0.12 Hari #REF!
- Ass. Driller. 0.10 Hari #REF!
- Maknik> 0.10 Hari #REF!
- Pembantu 0.10 Hari #REF!
- Tenaga Lokal. 0.10 Hari #REF!
3. Alat - alat.
- Deprisiasi Mesin Mud Pompa 0.10 Hari 15,000.00
- Mata Bor dia 150 mm. 1.00 Hari 17,500.00

8 - 79
HARGA
NO URAIAN KEGIATAN VOLUME SATUA
( Rp )
1 2 3 4
Jumlah

9 - 79
HARGA
NO URAIAN KEGIATAN VOLUME SATUA
( Rp )
1 2 3 4
IV. Pengadaan & Pemasangan Pipa dia 100 mm
1. Bahan - bahan
- Minyak Solar Mesin Pompa 0.50 Liter #REF!
- Pipa PVC Jenis AW dia 100 mm 1.00 Mtr #REF!
- Lem Pipa 0.20 Kg #REF!
2. Tenaga Kerja.
- Site Meneger 0.10 Hari #REF!
- Driller 0.03 Hari #REF!
- Ass. Driller 0.03 Hari #REF!
- Mekanik 0.04 Hari #REF!
- Pembantu 0.40 Hari #REF!
- Tenaga Lokal. 0.30 Hari #REF!
3. Alat - alat
- Deprisiasi Mesin Pompa 0.40 Hari 15,000.00
Jumlah

V. Pengadaan & Pemasangan Pipa dia 50 mm


1. Bahan - bahan.
- Minyak Soler 0.80 Liter #REF!
- Pipa PVC Jenis AW dia 50 mm 1.00 Mtr #REF!
- Lem 0.10 Kg #REF!
2. Tenaga Kerja.
- Site Meneger 0.06 Hari #REF!
- Driller 0.06 Hari #REF!
- Ass. Driller 0.06 Hari #REF!
- Mekanik 0.06 Hari #REF!
- Pembantu 0.06 Hari #REF!
- Tenaga Lokal. 0.06 Hari #REF!
3 Alat - alat
- Deprisiasi Mesin Bor 0.07 Hari 15,000.00
Jumlah

VI. Bor Hole Logging SP& Resestivity Gamma.


1. Tenaga Kerja
- Site Meneger 0.06 Hari #REF!
- Drilling 0.06 Hari #REF!
- Operator Logging 0.06 Hari #REF!
- Ass. Operator Logging. 0.06 Hari #REF!
- Pembantu 0.06 Hari #REF!
2. Alat - alat
- Deprisiasi alat logging. 0.06 Hari 15,000.00
Jumlah

VII. Pembersihan Sumur Bor Secara Water Jetting


1. Bahan - bahan.
- Minyak Solar Mesin Bor 45.00 Lt #REF!
- Minyak Solar Penggerak Mud Pompa 40.00 Lt #REF!
- Liquiter 25.25 Kg #REF!
2. Tenaga Kerja
- Site Meneger 3.00 Hari #REF!
- Driller 3.00 Hari #REF!
- Ass. Driller 3.00 Hari #REF!
- Pembantu 3.00 Hari #REF!
- Tenaga Lokal 3.00 Hari #REF!
3. Alat - alat
- Deprisiasi Mesin Bor 3.00 Hari 15,000.00
- Deprisiasi Mesin Pompa. 3.00 Hari 15,000.00
Jumlah

VIII. Pengujian Sumur Termasuk Recovery.


1. Bahan - bahan.
- Solar Mesin Geerator. 2.25 Lt #REF!
- Olie SAE 40 Mesin Generator. 0.05 Lt #REF!
Alat - alat Tulis. 1.00 Ls 5,000.00
2. Tenaga Kerja

10 - 79
HARGA
NO URAIAN KEGIATAN VOLUME SATUA
( Rp )
1 2 3 4
- Site Meneger. 0.10 Hari #REF!
- Driller. 0.10 Hari #REF!
- Ass. Driller. 0.10 Hari #REF!

11 - 79
HARGA
NO URAIAN KEGIATAN VOLUME SATUA
( Rp )
1 2 3 4
- Mekanik. 0.10 Hari #REF!
- Helper. 0.10 Hari #REF!
3. Alat - alat.
- Deprisiasi Mesin Generator. 0.10 Hari 15,000.00
- Depriasi Pompa Submersible. 0.10 Hari 15,000.00
Jumlah

Tembilahan, 2022
Dibuat oleh:
CV. MOMEN TEKNIK
Konsultan Perencanaan,

-
Ir. ADRIL

12 - 79
ERAH KABUPATEN/KOTA

JUMLAH
HARGA
( Rp )
5

#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

1,500.00
1,750.00
#REF!

#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

1,500.00
1,750.00
#REF!

#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

1,500.00
17,500.00

13 - 79
JUMLAH
HARGA
( Rp )
5
#REF!

14 - 79
JUMLAH
HARGA
( Rp )
5

#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

6,000.00
#REF!

#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

1,050.00
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!

900.00
#REF!

#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!

45,000.00
#REF!

#REF!
#REF!
5,000.00

15 - 79
JUMLAH
HARGA
( Rp )
5
#REF!
#REF!
#REF!

16 - 79
JUMLAH
HARGA
( Rp )
5
#REF!
#REF!

1,500.00
1,500.00
#REF!

han, 2022

17 - 79
ENGINEER ESTIMATE (EE)

PROGRAM : PROGRAM PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM


KEGIATAN : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM) DIDAERAH KABUPATEN/KOTA
SUB. KEGIATAN : PEMBANGUNAN BARU SPAM BUKAN JARINGAN PERPIPAAN DI KAWASAN PERDESAAN
PEKERJAAN : PEMBANGUNAN SUMUR BOR PRIT 3 DARAT KELURAHAN SUNGAI PERAK KEC. TEMBILAHAN
LOKASI : KECAMATAN TEMBILAHAN
BIAYA : #REF!
No. Uraian Pekerjaan Volume Satuan Harga Satuan Jumlah Harga
1 2 3 4 5 6
PEKERJAAN RUMAH MESIN DAN TOWER AIR
I PEKERJAAN PENDAHULUAN
1 Pek. Pembersihan Lokasi 30.000 M2 Rp 9,000.00 Rp 270,000.00
Sub Jumlah Rp 270,000.00

II PEKERJAAN PONDASI
1 Pek. Galian Tanah Pondasi 2.968 M3 Rp 38,000.00 Rp 112,784.00
2 Pek. Pasang Cerocok Bakau Pjg. 6 m 78.000 Btg Rp 41,163.43 Rp 3,210,747.43
3 Pek. Pasang Cerocok Bakau Pjg. 3 m 65.000 Btg Rp 20,581.71 Rp 1,337,811.43
4 Pek. Urugan Pasir Bawah Pondasi tbl 10 cm 0.524 M3 Rp 184,900.00 Rp 96,887.60
5 Pek. Cor Lantai Kerja 1:4:6, tbl 5 cm 0.332 M3 Rp 774,803.00 Rp 257,234.60
6 Pek. Cor Tapak Pondasi Umpak camp. 1:2:4 0.960 M3 Rp 1,461,079.00 Rp 1,402,635.84
7 Pek. Cor Tiang Pondasi 2 ` 0.168 M3 Rp 1,461,079.00 Rp 245,461.27
8 Pek. Pembesian Tapak, Tiang dan Sloof
- Tulangan Pokok Besi Polos dia. 10 mm 95.018 Kg Rp 10,651.94 Rp 1,012,125.80
- Beugel Besi dia. 6 mm 4.662 Kg Rp 11,375.34 Rp 53,031.81
9 Pek. Bekisting Tapak Pondasi 4.800 M2 Rp 132,335.00 Rp 635,208.00
10 Pek. Bekisting Tiang Pondasi 3.360 M2 Rp 241,040.00 Rp 809,894.40
11 Pek. Urugan Kembali Bekas Galian 0.742 M3 Rp 18,220.00 Rp 13,519.24
Sub Jumlah Rp 9,187,341.42

III PEKERJAAN LANTAI


1 Pek. Cor Balok 20/30 camp. 1:2:4 0.700 M3 Rp 1,461,079.00 Rp 1,022,755.30
2 Pek. Pembesian Balok dan Lantai
- Tulangan Pokok Besi Polos dia. 10 mm 110.443 Kg Rp 10,651.94 Rp 1,176,431.93
- Beugel Besi dia. 6 mm 22.555 Kg Rp 11,375.34 Rp 256,572.97
3 Pek. Bekisting Balok 10.060 M2 Rp 249,340.00 Rp 2,508,360.40
4 Pek. Bekisting Lantai 5.980 M2 Rp 277,940.00 Rp 1,662,081.20
5 Pek. Cor Lantai Camp. 1:2:4, Tbl. 12 cm 0.773 M3 Rp 1,461,079.00 Rp 1,129,121.85
6 Pek. Pemasangan Keramik (40x40 cm) Kualitas Sedang 3.750 M2 Rp 191,828.40 Rp 719,356.50
Sub Jumlah Rp 8,474,680.15

IV PEKERJAAN STRUKTUR
1 Pek. Cor Kolom 20/20 Camp. 1:2:4 0.480 M3 Rp 1,461,079.00 Rp 701,317.92
2 Pek. Pembesian Kolom
- Tulangan Pokok Besi Polos dia. 10 mm 51.088 Kg Rp 10,651.94 Rp 544,181.92
- Beugel Besi dia. 6 mm 11.810 Kg Rp 11,375.34 Rp 134,347.26
3 Pek. Bekisting Kolom 9.600 M2 Rp 241,040.00 Rp 2,313,984.00
4 Pek. Cor Balok 20/30, Camp. 1:2:4 (Elev. +3) 0.456 M3 Rp 1,461,079.00 Rp 666,252.02
5 Pek. Pembesian Balok (Elev. +3)
- Tulangan Pokok Besi Polos dia. 10 mm 19.744 Kg Rp 10,651.94 Rp 210,311.85
- Beugel Besi dia. 6 mm 10.190 Kg Rp 11,375.34 Rp 115,912.39
6 Pek. Bekisting Balok (Elev. +3) 6.080 M2 Rp 249,340.00 Rp 1,515,987.20
7 Pek. Cor Plat Lantai Tebal 12 cm (Elev. +3) 0.359 M3 Rp 1,461,079.00 Rp 524,235.15
8 Pek. Pembesian Plat Lantai (Elev. +3)
- Tulangan Pokok Besi Polos dia. 10 mm 29.934 Kg Rp 10,651.94 Rp 318,852.97
9 Pek. Bekisting Plat Lantai 2.990 M2 Rp 277,940.00 Rp 831,040.60
10 Pek. Cor Tiang 20/20 Camp. 1:2:4 0.288 M3 Rp 1,461,079.00 Rp 420,790.75
11 Pek. Pembesian Tiang
- Tulangan Pokok Besi Polos dia. 10 mm 19.744 Kg Rp 10,651.94 Rp 210,311.85
- Beugel Besi dia. 6 mm 5.195 Kg Rp 11,375.34 Rp 59,092.59
12 Pek. Bekisting Kolom 6.400 M2 Rp 241,040.00 Rp 1,542,656.00
13 Pek. Cor Ring Balok 15/15, Camp. 1:2:4 0.162 M3 Rp 1,461,079.00 Rp 236,694.80
14 Pek. Pembesian Ring Balok
- Tulangan Pokok Besi Polos dia. 10 mm 20.238 Kg Rp 10,651.94 Rp 215,569.65
- Beugel Besi dia. 6 mm 5.439 Kg Rp 11,375.34 Rp 61,870.45
15 Pek. Bekisting Ring Balok 4.320 M2 Rp 249,340.00 Rp 1,077,148.80
Sub Jumlah Rp 11,700,558.18
No. Uraian Pekerjaan Volume Satuan Harga Satuan Jumlah Harga
1 2 3 4 5 6

V PEKERJAAN DINDING, KOZEN


1 Pek. Pasangan Bata Dinding Camp. 1:4 20.860 M2 Rp 178,449.00 Rp 3,722,446.14
2 Pek. Plesteran Dinding Camp 1 : 3 41.900 M2 Rp 41,034.20 Rp 1,719,332.98
3 Pek. Kusen Kayu Klas II 0.036 M3 Rp 5,782,000.00 Rp 208,152.00
Sub Jumlah Rp 5,649,931.12

VI PEKERJAAN PINTU & JENDELA


1 Pek. pasang Pintu Panel (2,1x0,8) 1.000 Bh Rp 900,000.00 Rp 900,000.00
Sub Jumlah Rp 900,000.00

VII PEKERJAAN ALAT PENGGANTUNG


1 Pek. Pasang kunci Tanam 2 Slaagh 1.000 Bh Rp 121,000.00 Rp 121,000.00
Sub Jumlah Rp 121,000.00

VIII PEKERJAAN PERPIPAAN DAN TANGKI


1 Tangki Plastik Kapasitas 1000 Liter (Rumah Mesin) 2.0 Unit #REF! #REF!
2 Pek. Kran Air 3/4" 3.000 Bh Rp 55,850.00 Rp 167,550.00
3 Pek. Pasang Pipa PVC 3/4" 12.000 M' Rp 8,250.00 Rp 99,000.00
4 Pek. Pasang Pipa PVC 2" 16.000 M' Rp 24,750.00 Rp 396,000.00
5 Pek. Pasang Stop Kran PVC 2" 2.000 Bh Rp 45,000.00 Rp 90,000.00
6 Pek. Pasang Tee PVC 2" 4.000 Bh Rp 22,000.00 Rp 88,000.00
Sub Jumlah #REF!

IX PEKERJAAN PENGECATAN
1 Pek. Cat Air 31.425 M2 Rp 29,762.79 Rp 935,295.54
2 Pek. Cat Minyak 14.344 M2 Rp 24,878.81 Rp 356,861.64
Sub Jumlah Rp 1,292,157.18

X PEKERJAAN ALAT LISTRIK DAN ACCESSORIES


1 Titik Lampu + Instalasi 1.000 Titik Rp 98,880.00 Rp 98,880.00
2 Stop kontak + Instalasi 1.000 Titik Rp 98,880.00 Rp 98,880.00
Sub Jumlah Rp 197,760.00

XI PEKERJAAN ATAP
1 Pek. Pasang Kuda-kuda Kayu Klas III 0.064 M3 Rp 4,033,080.00 Rp 257,471.83
2 Pek. Pasang Reng Kayu Klas III 0.046 M3 Rp 4,033,080.00 Rp 184,755.39
3 Pek. Pasang Atap Genteng Metal Zincalume 0,25 mm 12.000 M2 Rp 66,474.00 Rp 797,688.00
4 Pek. Pasang Perabung Genteng Metal Zincalume 9.000 M' Rp 80,705.00 Rp 726,345.00
5 Pek. Pasang Listplank Kayu Klas II 2.800 M2 Rp 48,247.00 Rp 135,091.60
Sub Jumlah Rp 2,101,351.82
XII PEKERJAAN LAIN - LAIN
1 Pemasangan Tangga Besi Pipa 2 " 1.000 Ls Rp 1,500,000.00 Rp 1,500,000.00
2 Pek. Pembuatan Logo pada bangunan dan Tangki 1.000 Ls Rp 500,000.00 Rp 500,000.00
3 Pek Pembersihan Akhir 1.000 Ls Rp 300,000.00 Rp 300,000.00
Sub Jumlah Rp 2,300,000.00

JUMLAH #REF!
PPN 10% #REF!
TOTAL #REF!
DIBULATKAN #REF!
TERBILANG : #NAME?

Tembilahan, 2021
Diperiksa Oleh : Dibuat Oleh :
CV. MOMENT TEKNIK CV. MOMENT TEKNIK
Konsultan Perencana Konsultan Perencana

HIKMATULLAH, ST Ir. ADRIL


Direktur Team Leader

Diketahui Oleh :
PEJABAT PEMBUAT KOMITMEN
( PPK)
No. Uraian Pekerjaan Volume Satuan Harga Satuan Jumlah Harga
1 2 3 4 5 6

ARIF GUNAWAN, ST
NIP. 19840830 201001 1 006
ENGINEER ESTIMATE (EE)

PROGRAM :
KEGIATAN :
SUB. KEGIATAN :
PEKERJAAN :
LOKASI :
TAHUN : 2022

HARGA SATUAN JUMLAH HARGA


NO URAIAN PEKERJAAN VOLUME
(Rp.) (Rp.)
1 2 3 4 5
B PEMBANGUNAN KEDUDUKAN IPA
I PEKERJAAN PERSIAPAN
1 Pek. Pembersihan Lokasi 1.000 Ls Rp - Rp -
2 Pek. Pengukuran dan Pemasangan Bouwplank 1.000 Ls Rp - Rp -
3 Pek. Papan Nama Kegiatan 1.000 Unit Rp - Rp -
JUMLAH III Rp -
II PEKERJAAN TANAH DAN PONDASI TYPE I 1 UNIT
1 Pek. Galian Tanah 27.824 M3 Rp 108,125.00 Rp 3,008,470.00
2 Pek. Pasang Cerucuk, Pjg. 5 m 2,545.000 M1 Rp 6,850.28 Rp 17,433,949.88
3 Pek. Urugan Pasir Tebal 10 cm 3.478 M3 Rp 306,110.00 Rp 1,064,650.58
4 Pek. Lantai Kerja Beton Campuran 1 PC : 3 PS : 5 KR 3.478 M3 Rp 1,575,760.10 Rp 5,480,493.63
5 Pek. Pondasi
- Beton Campuran 1 PC : 2 PS : 4 KR 6.956 M3 Rp 1,910,256.00 Rp 13,287,740.74
- Tulangan Pokok Ulir dia. 12 mm 507.681 Kg Rp 25,181.17 Rp 12,783,994.65
- Bekisting 16.340 M2 Rp 234,905.32 Rp 3,838,352.93
JUMLAH II Rp 56,897,652.40
III PEKERJAAN DINDING TYPE I 1 UNIT
1 Pek. Dinding
- Beton Campuran 1 PC : 2 PS : 2,5 KR 31.246 M3 Rp 1,910,256.00 Rp 59,687,858.98
- Tulangan Pokok Ulir dia. 10 mm 1,350.447 Kg Rp 25,181.17 Rp 34,005,825.45
- Tulangan Begol/Sengkarng Ulir dia. 8 mm 787.584 Kg Rp 25,181.17 Rp 19,832,283.68
- Bekisting 22.563 M2 Rp 378,840.46 Rp 8,547,872.01
2 Pek. Lantai
- Pasir Timbun 20 cm 24.544 M3 Rp 306,110.00 Rp 7,513,041.40
- Cor Lantai Campuran 1 PC : 3 PS : 5 KR 12.272 M3 Rp 1,575,760.10 Rp 19,337,412.80
JUMLAH III Rp 148,924,294.31
IV PEKERJAAN TANAH DAN PONDASI TYPE II 2 UNIT
1 Pek. Galian Tanah 16.624 M3 Rp 108,125.00 Rp 1,797,470.00
2 Pek. Pasang Cerucuk, Pjg. 5 m 1,170.000 M1 Rp 6,850.28 Rp 8,014,821.75
3 Pek. Urugan Pasir Tebal 10 cm 2.078 M3 Rp 306,110.00 Rp 636,096.58
4 Pek. Lantai Kerja Beton Campuran 1 PC : 3 PS : 5 KR 2.078 M3 Rp 1,575,760.10 Rp 3,274,429.49
5 Pek. Pondasi
- Beton Campuran 1 PC : 2 PS : 2,5 KR 4.156 M3 Rp 1,910,256.00 Rp 7,939,023.94
- Tulangan Pokok Ulir dia. 12 mm 323.392 Kg Rp 25,181.17 Rp 8,143,387.73
- Bekisting 10.390 M2 Rp 234,905.32 Rp 2,440,666.27
JUMLAH IV Rp 64,491,791.52
V PEKERJAAN DINDING TYPE II 2 UNIT
1 Pek. Dinding
- Beton Campuran 1 PC : 2 PS : 2,5 KR 19.873 M3 Rp 1,910,256.00 Rp 37,962,517.49
- Tulangan Pokok Ulir dia. 10 mm 859.072 Kg Rp 25,181.17 Rp 21,632,434.90
- Tulangan Begol/Sengkarng Ulir dia. 8 mm 502.272 Kg Rp 25,181.17 Rp 12,647,794.76
- Bekisting 22.079 M2 Rp 378,840.46 Rp 8,364,323.81
2 Pek. Lantai
- Pasir Timbun 20 cm 9.604 M3 Rp 306,110.00 Rp 2,939,880.44
- Cor Lantai Campuran 1 PC : 3 PS : 5 KR 4.802 M3 Rp 1,575,760.10 Rp 7,566,800.00
JUMLAH V Rp 182,227,502.78
JUMLAH IV Rp 452,541,241.01
JUMLAH Rp 658,363,187.71
PPN 11% Rp 72,419,950.65
TOTAL Rp 730,783,138.36
DIBULATKAN Rp 730,783,000.00

Tembilahan, 2022
Disetujui oleh: Dibuat oleh:
CV. MOMEN TEKNIK CV. MOMEN TEKNIK
Konsultan Perencanaan, Konsultan Perencanaan,

HIKMATULLAH, ST Ir. ADRIL


Direktur Team Leader

Diketahui oleh: Disetujui oleh:


PERUMDAM TIRTA INDRAGIRI PEJABAT PEMBUAT KOMITMEN
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN VOLUME
(Rp.) (Rp.)
1 2 3 4 5
KAB. INDRAGIRI HILIR (PPK)

Ir. AHMAD HAFIS ARIF GUNAWAN, ST


Direktur NIP. 19840830 201001 1 006
DAFTAR ANALISA HARGA SATUAN

PROGRAM :
KEGIATAN :
SUB. KEGIATAN :
PEKERJAAN :
LOKASI :
TAHUN : 2022

1 GALIAN TANAH BIASA SEDALAM 1 M'


URAIAN HARGA BAHAN JUMLAH HARGA UPAH JUMLAH
a. Upah
0.7500 OH Pekerja Rp 139,000.00 Rp 104,250.00
0.0250 OH Mandor Rp 155,000.00 Rp 3,875.00
JUMLAH Rp 108,125.00
JUMLAH TOTAL Rp 108,125.00

2 ANALIS PEKERJAAN PEMANCANGAN CEROCOK KAYU


URAIAN HARGA BAHAN JUMLAH HARGA UPAH JUMLAH
a. Bahan
1.0000 M' Cerocok Bakau Rp 2,472.60 Rp 2,472.60

b. Upah
1.8000 OH Pekerja Rp 155,000.00 Rp 279,000.00
0.0400 OH Tukang Rp 139,000.00 Rp 5,560.00
0.0040 OH Kepala Tukang Rp 155,000.00 Rp 620.00
0.0430 OH Mandor Rp 155,000.00 Rp 6,665.00
JUMLAH Rp 2,472.60 Rp 291,845.00
Upah x 0,015 Rp 4,377.68
JUMLAH TOTAL Rp 6,850.28

3 ANALISA 1 M' PEKERJAAN PENGURUGAN PASIR


URAIAN HARGA BAHAN JUMLAH HARGA UPAH JUMLAH
a. Bahan
1.2000 M3 Pasir Urug Rp 219,050.00 Rp 262,860.00

b. Upah
0.3000 OH Pekerja Rp 139,000.00 Rp 41,700.00
0.0100 OH Mandor Rp 155,000.00 Rp 1,550.00
JUMLAH Rp 262,860.00 Rp 43,250.00
JUMLAH TOTAL Rp 306,110.00

4 ANALISA PEMBUATAN 1 M2 PEKERJAAN PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 4 PS
URAIAN HARGA BAHAN JUMLAH HARGA UPAH JUMLAH
a. Bahan
70.0000 Bh Batu Bata Merah 5 x 11 x 22 cm Rp 2,428.40 Rp 169,988.00
11.5000 Kg Semen Rp 2,124.20 Rp 24,428.30
0.0430 M3 Pasir Cor Rp 384,800.00 Rp 16,546.40

b. Upah
0.3200 OH Pekerja Rp 139,000.00 Rp 44,480.00
0.1000 OH Tukang Batu Rp 139,000.00 Rp 13,900.00
0.0100 OH Kepala Tukang Rp 155,000.00 Rp 1,550.00
0.0150 OH Mandor Rp 155,000.00 Rp 2,325.00
JUMLAH Rp 210,962.70 Rp 62,255.00
JUMLAH TOTAL Rp 273,217.70

5 ANALISA BETON SETARA CAMPURAN 1 : 3 : 5


URAIAN HARGA BAHAN JUMLAH HARGA UPAH JUMLAH
a. Bahan
218.0000 Kg Semen Rp 2,124.20 Rp 463,075.60
0.5200 M3 Pasir Cor Rp 384,800.00 Rp 200,096.00
0.8700 M3 Kerikil Rp 791,050.00 Rp 688,213.50

b. Upah
1.3200 OH Pekerja Rp 139,000.00 Rp 183,480.00
0.2050 OH Tukang Batu Rp 139,000.00 Rp 28,495.00
0.0200 OH Kepala Tukang Rp 155,000.00 Rp 3,100.00
0.0600 OH Mandor Rp 155,000.00 Rp 9,300.00
JUMLAH Rp 1,351,385.10 Rp 224,375.00
JUMLAH TOTAL Rp 1,575,760.10

6 ANALISA 1 M2 PEKERJAAN PLESTERAN CAMP. 1 PC : 4 PS TEBAL 15 MM


URAIAN HARGA BAHAN JUMLAH HARGA UPAH JUMLAH
a. Bahan
5.2000 Kg Semen Rp 2,124.20 Rp 11,045.84
0.0020 M3 Pasir Cor Rp 384,800.00 Rp 769.60

b. Upah
0.2000 OH Pekerja Rp 139,000.00 Rp 27,800.00
0.1500 OH Tukang Batu Rp 139,000.00 Rp 20,850.00
0.0150 OH Kepala Tukang Rp 155,000.00 Rp 2,325.00
0.0100 OH Mandor Rp 155,000.00 Rp 1,550.00
JUMLAH Rp 11,815.44 Rp 52,525.00
JUMLAH TOTAL Rp 64,340.44

7 ANALISA 1 M3 PEMBUATAN COR BETON BERTULANG CAMP. 1 PC : 2 PS : 4 KR


URAIAN HARGA BAHAN JUMLAH HARGA UPAH JUMLAH
a. Bahan
280.000 Kg Semen Rp 2,124.20 Rp 594,776.00
0.4500 M3 Pasir Cor Rp 384,800.00 Rp 173,160.00
0.9000 M3 Kerikil Rp 791,050.00 Rp 711,945.00

b. Upah
1.6500 OH Pekerja Rp 139,000.00 Rp 229,350.00
0.2500 OH Tukang Batu Rp 139,000.00 Rp 34,750.00
0.0250 OH Kepala Tukang Rp 155,000.00 Rp 3,875.00
0.0800 OH Mandor Rp 155,000.00 Rp 12,400.00
JUMLAH Rp 1,479,881.00 Rp 280,375.00
JUMLAH TOTAL Rp 1,760,256.00

8 ANALISA PEMAKAIAN ALAT CONCRETE MIXER UNTUK PEMBUATAN 1 M3 COR BETON


URAIAN HARGA SEWA JUMLAH
Alat
2.0000 Jam Concrete Mixer 0,3 - 0,6 Rp 75,000.00 Rp 150,000.00
JUMLAH Rp 150,000.00
JUMLAH TOTAL Rp 150,000.00
9 ANALISA PEMBUATAN 1 M3 COR BETON 1:2:4 MEMAKAI CONCRETE MIXER
URAIAN HARGA BAHAN JUMLAH HARGA SEWA
1.0000 M3 Cor Beton Tumbuk Camp. 1 PC : 2 PS : 4 KR Rp 1,760,256.00 Rp 1,760,256.00
1.0000 Ls Pemakaian Alat Concrete Mixer Rp 150,000.00 Rp 150,000.00
JUMLAH Rp 1,760,256.00 Rp 150,000.00
JUMLAH TOTAL Rp 1,910,256.00

10 ANALISA 1 KG PEMBESIAN DENGAN BESI ULIR


URAIAN HARGA BAHAN JUMLAH HARGA UPAH JUMLAH
a. Bahan
1.0500 Kg Besi Ulir Rp 21,502.00 Rp 22,577.10
0.0150 Kg Kawat Beton Rp 32,504.42 Rp 487.57

b. Upah
0.0070 OH Pekerja Rp 139,000.00 Rp 973.00
0.0070 OH Tukang Besi Rp 139,000.00 Rp 973.00
0.0007 OH Kepala Tukang Rp 155,000.00 Rp 108.50
0.0004 OH Mandor Rp 155,000.00 Rp 62.00
JUMLAH Rp 23,064.67 Rp 2,116.50
JUMLAH TOTAL Rp 25,181.17

11 ANALISA 1 M2 PEKERJAAN BEKISTING PONDASI


URAIAN HARGA BAHAN JUMLAH HARGA UPAH JUMLAH
a. Bahan
0.0400 M3 Kayu/Papan Bekisting (Terentang) Rp 2,669,420.00 Rp 106,776.80
0.3000 Kg Paku Biasa 2" - 5" Rp 28,688.40 Rp 8,606.52
0.1000 Ltr Minyak Bekisting Rp 30,420.00 Rp 3,042.00
b. Upah
0.5200 OH Pekerja Rp 139,000.00 Rp 72,280.00
0.2600 OH Tukang Kayu Rp 139,000.00 Rp 36,140.00
0.0260 OH Kepala Tukang Rp 155,000.00 Rp 4,030.00
0.0260 OH Mandor Rp 155,000.00 Rp 4,030.00
JUMLAH Rp 118,425.32 Rp 116,480.00
JUMLAH TOTAL Rp 234,905.32

12 ANALISA 1 M2 PEKERJAAN BEKISTING KOLOM


URAIAN HARGA BAHAN JUMLAH HARGA UPAH JUMLAH
a. Bahan
0.0400 M3 Kayu/Papan Bekisting (Terentang) Rp 2,669,420.00 Rp 106,776.80
0.4000 Kg Paku Biasa 2" - 5" Rp 28,688.40 Rp 11,475.36
0.2000 Ltr Minyak Bekisting Rp 30,420.00 Rp 6,084.00
0.0150 M3 Kayu Klas III Rp 4,619,420.00 Rp 69,291.30
0.3500 Lbr Plywood Tebal 9 mm Rp 177,320.00 Rp 62,062.00
2.0000 Btg Dolken Kayu Ø 8-10/400 cm Rp 14,768.00 Rp 29,536.00
b. Upah
0.3000 OH Pekerja Rp 139,000.00 Rp 41,700.00
0.3300 OH Tukang Kayu Rp 139,000.00 Rp 45,870.00
0.0330 OH Kepala Tukang Rp 155,000.00 Rp 5,115.00
0.0060 OH Mandor Rp 155,000.00 Rp 930.00
JUMLAH Rp 285,225.46 Rp 93,615.00
JUMLAH TOTAL Rp 378,840.46

13 ANALISA 1 M' PEMASANGAN PIPA PVC TYPE AW DIAMETER 1" (TEBAL)


URAIAN HARGA BAHAN JUMLAH HARGA UPAH JUMLAH
a. Bahan
1.2000 M' Pipa PVC 1" (Tebal) Rp 60,710.00 Rp 72,852.00
Perlengkapan = 35% Harga Pipa Rp 21,248.50

b. Upah
0.0360 OH Pekerja Rp 139,000.00 Rp 5,004.00
0.0600 OH Tukang Rp 139,000.00 Rp 8,340.00
0.0060 OH Kepala Tukang Rp 155,000.00 Rp 930.00
0.0018 OH Mandor Rp 155,000.00 Rp 279.00
JUMLAH Rp 94,100.50 Rp 14,553.00
JUMLAH TOTAL Rp 108,653.50
14 ANALISA 1 M' PEMASANGAN PIPA PVC TYPE AW DIAMETER 2" (TEBAL)
URAIAN HARGA BAHAN JUMLAH HARGA UPAH JUMLAH
a. Bahan
1.2000 M' Pipa PVC 2" (Tebal) Rp 125,710.00 Rp 150,852.00
Perlengkapan = 35% Harga Pipa Rp 43,998.50

b. Upah
0.0540 OH Pekerja Rp 139,000.00 Rp 7,506.00
0.0800 OH Tukang Rp 139,000.00 Rp 11,120.00
0.0090 OH Kepala Tukang Rp 155,000.00 Rp 1,395.00
0.0027 OH Mandor Rp 155,000.00 Rp 418.50
JUMLAH Rp 194,850.50 Rp 20,439.50
JUMLAH TOTAL Rp 215,290.00

15 ANALISA 1 M' PEMASANGAN PIPA PVC TYPE AW DIAMETER 4" (TEBAL)


URAIAN HARGA BAHAN JUMLAH HARGA UPAH JUMLAH
a. Bahan
1.2000 M' Pipa PVC 4" (Tebal) Rp 389,610.00 Rp 467,532.00
Perlengkapan = 35% Harga Pipa Rp 136,363.50

b. Upah
0.0360 OH Pekerja Rp 139,000.00 Rp 5,004.00
0.0600 OH Tukang Rp 139,000.00 Rp 8,340.00
0.0060 OH Kepala Tukang Rp 155,000.00 Rp 930.00
0.0018 OH Mandor Rp 155,000.00 Rp 279.00
JUMLAH Rp 603,895.50 Rp 14,553.00
JUMLAH TOTAL Rp 618,448.50

16 ANALISA PEMASANGAN 1 BUAH KRAN AIR DIAMETER 3/4" ATAU 1/2"


URAIAN HARGA BAHAN JUMLAH HARGA UPAH JUMLAH
a. Bahan
1.0000 Bh Kran Air Rp 23,444.20 Rp 23,444.20
0.0250 Bh Seal Tape Rp 13,044.20 Rp 8,205.47

b. Upah
0.0100 OH Pekerja Rp 139,000.00 Rp 1,390.00
0.1000 OH Tukang Pipa Rp 139,000.00 Rp 13,900.00
0.0100 OH Kepala Tukang Rp 155,000.00 Rp 1,550.00
0.0050 OH Mandor Rp 155,000.00 Rp 775.00
JUMLAH Rp 31,649.67 Rp 17,615.00
JUMLAH TOTAL Rp 49,264.67
17 ANALISA 1 M1 PEMASANGAN PANDAL KAYU (BOW)
URAIAN HARGA BAHAN JUMLAH HARGA UPAH JUMLAH
a. Bahan
1.0000 Btg Kayu Cerocok Pj. 5 Rp 12,363.00 Rp 12,363.00

b. Upah
1.8000 OH Pekerja Rp 139,000.00 Rp 250,200.00
0.0400 OH Tukang Rp 139,000.00 Rp 5,560.00
1.8000 OH Kepala Tukang Rp 155,000.00 Rp 279,000.00
1.0450 OH Mandor Rp 155,000.00 Rp 161,975.00
JUMLAH Rp 12,363.00 Rp 696,735.00
Koefeisen Upah x 0,001 Rp 696.74
JUMLAH TOTAL Rp 13,059.74

18 ANALISA 1 M1 PENGEBORAN PILE HOLE DIAMENER 6' INTERPAL 0-50 M


URAIAN HARGA BAHAN JUMLAH HARGA UPAH JUMLAH
a. Bahan
1.5000 Liter Solar Mesin Bor Rp 17,290.00 Rp 25,935.00
0.1000 Liter Oli SAE 40 Mesin Bor Rp 49,920.00 Rp 4,992.00
0.1000 Kg Minyak Pelumas / Gemuk Rp 25,000.00 Rp 2,500.00

b. Upah
0.1000 OH Site Manager Rp 155,000.00 Rp 15,500.00
0.1000 OH Driller Rp 139,000.00 Rp 13,900.00
0.1000 OH Ass. Driller Rp 139,000.00 Rp 13,900.00
0.1000 OH Mekanik Rp 155,000.00 Rp 15,500.00
0.1000 OH Helper Rp 155,000.00 Rp 15,500.00

c. Peralatan
0.1000 Hr Depresiasi Mesin Bor Rp 60,000.00 Rp 6,000.00
0.1000 Hr Depresiasi Mud Pump Rp 45,000.00 Rp 4,500.00
0.4000 Hr Mata Bor 2" Rp 55,000.00 Rp 22,000.00
JUMLAH Rp 33,427.00 Rp 106,800.00
JUMLAH TOTAL Rp 140,227.00

19 ANALISA 1 M1 PENGEBORAN PILE HOLE DIAMENER 6' INTERPAL 50-100 M


URAIAN HARGA BAHAN JUMLAH HARGA UPAH JUMLAH
a. Bahan
2.0000 Liter Solar Mesin Bor Rp 17,290.00 Rp 34,580.00
0.1200 Liter Oli SAE 40 Mesin Bor Rp 49,920.00 Rp 5,990.40
0.3000 Kg Grease Rp 25,000.00 Rp 7,500.00

b. Upah
0.1000 OH Site Manager Rp 155,000.00 Rp 15,500.00
0.1000 OH Driller Rp 139,000.00 Rp 13,900.00
0.1000 OH Ass. Driller Rp 139,000.00 Rp 13,900.00
0.1000 OH Mekanik Rp 155,000.00 Rp 15,500.00
0.1000 OH Helper Rp 155,000.00 Rp 15,500.00

c. Peralatan
0.1000 Hr Depresiasi Mesin Bor Rp 60,000.00 Rp 6,000.00
0.1000 Hr Depresiasi Mud Pump Rp 45,000.00 Rp 4,500.00
0.2000 Hr Mata Bor 2" Rp 55,000.00 Rp 11,000.00
JUMLAH Rp 48,070.40 Rp 95,800.00
JUMLAH TOTAL Rp 143,870.40

20 ANALISA 1 M1 PENGEBORAN PILE HOLE DIAMENER 6' INTERPAL 50-100 M


URAIAN HARGA BAHAN JUMLAH HARGA UPAH JUMLAH
a. Bahan
2.2000 Liter Solar Mesin Bor Rp 17,290.00 Rp 38,038.00
0.1200 Liter Oli SAE 40 Mesin Bor Rp 49,920.00 Rp 5,990.40
0.4000 Kg Grease Rp 25,000.00 Rp 10,000.00

b. Upah
0.1100 OH Site Manager Rp 155,000.00 Rp 17,050.00
0.1100 OH Driller Rp 139,000.00 Rp 15,290.00
0.1100 OH Ass. Driller Rp 139,000.00 Rp 15,290.00
0.1100 OH Mekanik Rp 155,000.00 Rp 17,050.00
0.1100 OH Helper Rp 155,000.00 Rp 17,050.00
c. Peralatan
0.1100 Hr Depresiasi Mesin Bor Rp 60,000.00 Rp 6,600.00
0.1100 Hr Depresiasi Mud Pump Rp 45,000.00 Rp 4,950.00
0.2000 Hr Mata Bor 2" Rp 55,000.00 Rp 11,000.00
JUMLAH Rp 54,028.40 Rp 104,280.00
JUMLAH TOTAL Rp 158,308.40

21 ANALISA 1 M1 PENGEBORAN PILE HOLE DIAMENER 6' INTERPAL 100-150 M


URAIAN HARGA BAHAN JUMLAH HARGA UPAH JUMLAH
a. Bahan
2.4000 Liter Solar Mesin Bor Rp 17,290.00 Rp 41,496.00
0.1200 Liter Oli SAE 40 Mesin Bor Rp 49,920.00 Rp 5,990.40
0.4000 Kg Grease Rp 25,000.00 Rp 10,000.00

b. Upah
0.1200 OH Site Manager Rp 155,000.00 Rp 18,600.00
0.1200 OH Driller Rp 139,000.00 Rp 16,680.00
0.1200 OH Ass. Driller Rp 139,000.00 Rp 16,680.00
0.1200 OH Mekanik Rp 155,000.00 Rp 18,600.00
0.1200 OH Helper Rp 155,000.00 Rp 18,600.00

c. Peralatan
0.1200 Hr Depresiasi Mesin Bor Rp 60,000.00 Rp 7,200.00
0.1200 Hr Depresiasi Mud Pump Rp 45,000.00 Rp 5,400.00
0.2500 Hr Mata Bor 2" Rp 55,000.00 Rp 13,750.00
JUMLAH Rp 57,486.40 Rp 115,510.00
JUMLAH TOTAL Rp 172,996.40

22 ANALISA 1 M1 PEMBESARAN LUBANG/REAMING 6'-8' INTERVAL KEDALAMAN 0-50 M


URAIAN HARGA BAHAN JUMLAH HARGA UPAH JUMLAH
a. Bahan
1.2000 Liter Solar Mesin Bor Rp 17,290.00 Rp 20,748.00
0.1100 Liter Oli SAE 40 Mesin Bor Rp 49,920.00 Rp 5,491.20
0.1500 Kg Grease Rp 25,000.00 Rp 3,750.00

b. Upah
0.1000 OH Driller Rp 139,000.00 Rp 13,900.00
0.1000 OH Ass. Driller Rp 139,000.00 Rp 13,900.00
0.1000 OH Mekanik Rp 155,000.00 Rp 15,500.00
0.1000 OH Helper Rp 155,000.00 Rp 15,500.00

c. Peralatan
0.1000 Hr Depresiasi Mesin Bor Rp 60,000.00 Rp 6,000.00
0.1000 Hr Depresiasi Mud Pump Rp 45,000.00 Rp 4,500.00
0.2500 Hr Mata Bor 4" Rp 55,000.00 Rp 13,750.00
JUMLAH Rp 29,989.20 Rp 83,050.00
JUMLAH TOTAL Rp 113,039.20

23 ANALISA 1 M1 PEMBESARAN LUBANG/REAMING 6'-8' INTERVAL KEDALAMAN 50-100 M


URAIAN HARGA BAHAN JUMLAH HARGA UPAH JUMLAH
a. Bahan
2.0000 Liter Solar Mesin Bor Rp 17,290.00 Rp 34,580.00
0.1100 Liter Oli SAE 40 Mesin Bor Rp 49,920.00 Rp 5,491.20
0.2500 Kg Grease Rp 25,000.00 Rp 6,250.00

b. Upah
0.1000 OH Driller Rp 139,000.00 Rp 13,900.00
0.1000 OH Ass. Driller Rp 139,000.00 Rp 13,900.00
0.1000 OH Mekanik Rp 155,000.00 Rp 15,500.00
0.1000 OH Helper Rp 155,000.00 Rp 15,500.00

c. Peralatan
0.1000 Hr Depresiasi Mesin Bor Rp 60,000.00 Rp 6,000.00
0.1000 Hr Depresiasi Mud Pump Rp 45,000.00 Rp 4,500.00
0.2500 Hr Mata Bor 4" Rp 55,000.00 Rp 13,750.00
JUMLAH Rp 46,321.20 Rp 83,050.00
JUMLAH TOTAL Rp 129,371.20
24 ANALISA 1 M1 PEMBESARAN LUBANG/REAMING 6'-8' INTERVAL KEDALAMAN 100-150 M
URAIAN HARGA BAHAN JUMLAH HARGA UPAH JUMLAH
a. Bahan
2.0000 Liter Solar Mesin Bor Rp 17,290.00 Rp 34,580.00
0.1200 Liter Oli SAE 40 Mesin Bor Rp 49,920.00 Rp 5,990.40
0.5000 Kg Grease Rp 25,000.00 Rp 12,500.00

b. Upah
0.1000 OH Driller Rp 139,000.00 Rp 13,900.00
0.1000 OH Ass. Driller Rp 139,000.00 Rp 13,900.00
0.1000 OH Mekanik Rp 155,000.00 Rp 15,500.00
0.1000 OH Helper Rp 155,000.00 Rp 15,500.00

c. Peralatan
0.1000 Hr Depresiasi Mesin Bor Rp 60,000.00 Rp 6,000.00
0.1000 Hr Depresiasi Mud Pump Rp 45,000.00 Rp 4,500.00
0.2500 Hr Mata Bor 4" Rp 55,000.00 Rp 13,750.00
JUMLAH Rp 53,070.40 Rp 83,050.00
JUMLAH TOTAL Rp 136,120.40

25 ANALISA 1 M1 PEMBESARAN LUBANG/REAMING 6'-8' INTERVAL KEDALAMAN 150-200 M


URAIAN HARGA BAHAN JUMLAH HARGA UPAH JUMLAH
a. Bahan
2.2000 Liter Solar Mesin Bor Rp 17,290.00 Rp 38,038.00
0.1200 Liter Oli SAE 40 Mesin Bor Rp 49,920.00 Rp 5,990.40
0.5000 Kg Grease Rp 25,000.00 Rp 12,500.00

b. Upah
0.1100 OH Driller Rp 139,000.00 Rp 15,290.00
0.1100 OH Ass. Driller Rp 139,000.00 Rp 15,290.00
0.1100 OH Mekanik Rp 155,000.00 Rp 17,050.00
0.1100 OH Helper Rp 155,000.00 Rp 17,050.00

c. Peralatan
0.1100 Hr Depresiasi Mesin Bor Rp 60,000.00 Rp 6,600.00
0.1100 Hr Depresiasi Mud Pump Rp 45,000.00 Rp 4,950.00
0.2500 Hr Mata Bor 4" Rp 55,000.00 Rp 13,750.00
JUMLAH Rp 56,528.40 Rp 89,980.00
JUMLAH TOTAL Rp 146,508.40

26 ANALISA 1 M1 PENGADAAN DAN PEMASANGAN PIPA PVC DIA 8' (AW)


URAIAN HARGA BAHAN JUMLAH HARGA UPAH JUMLAH
a. Bahan
0.6000 Liter Solar Mesin Bor Rp 17,290.00 Rp 10,374.00
1.0000 M Pipa 8" Rp 730,210.00 Rp 730,210.00
0.0500 Kg Lem paralon Rp 225,000.00 Rp 11,250.00

b. Upah
0.0500 OH Site manager Rp 155,000.00 Rp 7,750.00
0.0500 OH Driller Rp 139,000.00 Rp 6,950.00
0.0500 OH Ass. Driller Rp 139,000.00 Rp 6,950.00
0.0500 OH Mekanik Rp 155,000.00 Rp 7,750.00
0.0500 OH Halper Rp 155,000.00 Rp 7,750.00

c. Peralatan
0.0500 Hr Depresiasi Mesin Bor Rp 60,000.00 Rp 3,000.00
JUMLAH Rp 751,834.00 Rp 40,150.00
JUMLAH TOTAL Rp 791,984.00
27 ANALISA 1 M1 PENGADAAN DAN PEMASANGAN PIPA PVC DIA 2' (AW)
URAIAN HARGA BAHAN JUMLAH HARGA UPAH JUMLAH
a. Bahan
0.6000 Liter Solar Mesin Bor Rp 17,290.00 Rp 10,374.00
1.0000 M Pipa 4" Rp 389,610.00 Rp 389,610.00
0.0500 Kg Lem paralon Rp 225,000.00 Rp 11,250.00

b. Upah
0.0500 OH Site manager Rp 155,000.00 Rp 7,750.00
0.0500 OH Driller Rp 139,000.00 Rp 6,950.00
0.0500 OH Ass. Driller Rp 139,000.00 Rp 6,950.00
0.0500 OH Mekanik Rp 155,000.00 Rp 7,750.00
0.0500 OH Halper Rp 155,000.00 Rp 7,750.00

c. Peralatan
0.0500 Hr Depresiasi Mesin Bor Rp 60,000.00 Rp 3,000.00
JUMLAH Rp 411,234.00 Rp 40,150.00
JUMLAH TOTAL Rp 451,384.00

28 ANALISA 1 M1 PENGADAAN DAN PEMASANGAN PIPA PVC DIA 2' (SCREEN)


URAIAN HARGA BAHAN JUMLAH HARGA UPAH JUMLAH
a. Bahan
0.8000 Liter Solar Mesin Bor Rp 17,290.00 Rp 13,832.00
1.0000 M Pipa 2" (saringan) Rp 125,710.00 Rp 125,710.00

b. Upah
0.0550 OH Site manager Rp 155,000.00 Rp 8,525.00
0.0550 OH Driller Rp 139,000.00 Rp 7,645.00
0.0500 OH Ass. Driller Rp 139,000.00 Rp 6,950.00
0.0500 OH Mekanik Rp 155,000.00 Rp 7,750.00
0.0500 OH Halper Rp 155,000.00 Rp 7,750.00

c. Peralatan
0.0800 Hr Depresiasi Mesin Bor Rp 60,000.00 Rp 4,800.00
JUMLAH Rp 139,542.00 Rp 43,420.00
JUMLAH TOTAL Rp 182,962.00

29 ANALISA PEMBERSIHAN SUMUR BOR DENGAN HIGHVELOCITY JETTING


URAIAN HARGA BAHAN JUMLAH HARGA UPAH JUMLAH
a. Bahan
4.0000 Liter Solar Mesin Bor Rp 17,290.00 Rp 69,160.00
0.3000 OH Liquifier Rp 42,000.00 Rp 12,600.00

b. Upah
0.0100 OH Site Manager Rp 155,000.00 Rp 1,550.00
0.0100 OH Driller Rp 139,000.00 Rp 1,390.00
0.0100 OH Ass. Driller Rp 139,000.00 Rp 1,390.00
0.0100 OH Mekanik Rp 155,000.00 Rp 1,550.00
0.0100 OH Helper Rp 155,000.00 Rp 1,550.00

c. Peralatan
1.5000 Hr Deprisiasi Mesin Bor Rp 60,000.00 Rp 90,000.00
JUMLAH Rp 81,760.00 Rp 97,430.00
JUMLAH TOTAL Rp 179,190.00

30 ANALISA PENGUJIAN POMPA SUMUR (PUMPING TEST)


URAIAN HARGA BAHAN JUMLAH HARGA UPAH JUMLAH
a. Bahan
5.0000 Liter Solar Mesin Bor Rp 17,290.00 Rp 86,450.00
1.0000 OH Olie SAE 40 Mesin Generator Rp 49,920.00 Rp 49,920.00
1.0000 OH Alat Tulis Rp 25,000.00 Rp 25,000.00

b. Upah
0.0200 OH Site Manager Rp 155,000.00 Rp 3,100.00
0.0200 OH Driller Rp 139,000.00 Rp 2,780.00
0.0200 OH Ass. Driller Rp 139,000.00 Rp 2,780.00
0.0200 OH Mekanik Rp 155,000.00 Rp 3,100.00
0.0200 OH Helper Rp 155,000.00 Rp 3,100.00

c. Peralatan
0.0200 Hr Deprisiasi Mesin Generator Rp 50,000.00 Rp 1,000.00
0.0200 Hr Depresiasi Mesin Pompa Rp 40,000.00 Rp 800.00
JUMLAH Rp 161,370.00 Rp 16,660.00
JUMLAH TOTAL Rp 178,030.00
31 ANALISA 1 M1 PENGADAAN DAN PEMASANGAN PIPA NAIK PVC 4'
URAIAN HARGA BAHAN JUMLAH HARGA UPAH JUMLAH
a. Bahan
0.8000 OH Solar Mesin Bor Rp 17,290.00 Rp 13,832.00
1.0000 OH Pipa Naik 4 " PVC AW Rp 389,610.00 Rp 389,610.00
0.0500 OH Lem PVC Rp 225,000.00 Rp 11,250.00

b. Upah
0.0500 OH Site Manager Rp 155,000.00 Rp 7,750.00
0.0500 OH Driller Rp 139,000.00 Rp 6,950.00
0.0500 OH Ass. Driller Rp 139,000.00 Rp 6,950.00
0.0500 OH Mekanik Rp 155,000.00 Rp 7,750.00
0.0500 OH Halper Rp 155,000.00 Rp 7,750.00

c. Peralatan
0.0500 Hr Deprisiasi Mesin Bor Rp 60,000.00 Rp 3,000.00
JUMLAH Rp 414,692.00 Rp 40,150.00
JUMLAH TOTAL Rp 454,842.00

Tembilahan, 2022
Disetujui oleh: Dibuat oleh:
CV. MOMEN TEKNIK CV. MOMEN TEKNIK
Konsultan Perencanaan, Konsultan Perencanaan,

HIKMATULLAH, ST Ir. ADRIL


Direktur Team Leader

Diketahui oleh: Disetujui oleh:


PERUMDAM TIRTA INDRAGIRI PEJABAT PEMBUAT KOMITMEN
KAB. INDRAGIRI HILIR (PPK)

Ir. AHMAD HAFIS ARIF GUNAWAN, ST


Direktur NIP. 19840830 201001 1 006
DAFTAR HARGA SATUAN BAHAN, UPAH DAN SEWA ALAT

PROGRAM : PROGRAM PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM


KEGIATAN : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM) DIDAERAH KABUPATEN/KOTA
SUB. KEGIATAN : PEMBANGUNAN BARU SPAM BUKAN JARINGAN PERPIPAAN DI KAWASAN PERDESAAN
PEKERJAAN : PEMBANGUNAN SUMUR BOR RT.001 RW.001 JL. PEKAN ARBA UJUNG KELURAHAN PEKAN ARBA KEC. TEMBILAHAN
LOKASI KECAMATAN TEMBILAHAN
TAHUN : 2021

NO. JENIS UPAH/BAHAN/SEWA ALAT SATUAN HARGA


1 2 3 4
UPAH
1 Mandor Orang/Hari Rp 155,000.00
2 Pekerja Orang/Hari Rp 139,000.00
3 Tukang Gali Orang/Hari Rp 139,000.00
4 Tukang Batu Orang/Hari Rp 139,000.00
5 Tukang Kayu Orang/Hari Rp 139,000.00
6 Tukang Besi Orang/Hari Rp 139,000.00
7 Tukang Meubel Orang/Hari Rp 139,000.00
8 Tukang Ledeng Orang/Hari Rp 139,000.00
9 Tukang Listrik Orang/Hari Rp 139,000.00
10 Tukang Cat / Dempul Orang/Hari Rp 139,000.00
11 Tukang Pelitur Orang/Hari Rp 139,000.00
12 Kepala Tukang Gali Orang/Hari Rp 155,000.00
13 Kepala Tukang Batu Orang/Hari Rp 155,000.00
14 Kepala Tukang Kayu Orang/Hari Rp 155,000.00
15 Kepala Tukang Besi Orang/Hari Rp 155,000.00
16 Kepala Tukang Meubel Orang/Hari Rp 155,000.00
17 Kepala Tukang Ledeng Orang/Hari Rp 155,000.00
18 Kepala Tukang Listrik Orang/Hari Rp 155,000.00
19 Kepala Tukang Cat / Dempul Orang/Hari Rp 155,000.00
20 Penjaga Malam Orang/Hari Rp 100,000.00
21 Mekanik Orang/Hari Rp 155,000.00
22 Mekanik Pembantu Orang/Hari Rp 139,000.00
23 Operator Terlatih Orang/Hari Rp 155,000.00
24 Operator Kurang Terlatih Orang/Hari Rp 139,000.00
25 Pembantu Operator Orang/Hari Rp 125,000.00
26 Supir Material / Truck Orang/Hari Rp 155,000.00
27 Supir Personil Orang/Hari Rp 139,000.00
28 Pembantu Supir / Knek Orang/Hari Rp 125,000.00
29 Buruh Terlatih Orang/Hari Rp 139,000.00
30 Buruh Kurang Terlatih Orang/Hari Rp 125,000.00
MATERIAL ALAM
1 Tanah Timbun (Lokal) M3 Rp 141,050.00
2 Tanah Timbun (Didatangkan) M3 Rp 368,550.00
3 Pasir Urug M3 Rp 219,050.00
4 Pasir Cor (Agregat Halus) M3 Rp 384,800.00
5 Batu Kerikil M3 Rp 791,050.00
6 Batu Pecah / Split (Agregat Kasar) M3 Rp 1,051,050.00
MATERIAL BESI
1 Kawat Pengikat Kilogram Rp 32,504.42
2 Besi Beton Ulir Kilogram Rp 21,502.00
3 Paku Biasa / Campur Kilogram Rp 28,688.40
4 Paku Tripleks Kilogram Rp 29,988.40
4 Paku Beton Kilogram Rp 48,321.00
MATERIAL CAMPURAN
1 Semen PC (50 KG) Kilogram Rp 2,124.20
NO. JENIS UPAH/BAHAN/SEWA ALAT SATUAN HARGA
1 2 3 4
2 Batu Bata Press (5 x 11 x 22) Buah Rp 2,428.40
MINYAK
1 Minyak Pelumas / Oli Liter Rp 30,420.00
2 Oli SAE 40 Liter Rp 49,920.00
NO. JENIS UPAH/BAHAN/SEWA ALAT SATUAN HARGA
1 2 3 4
3 Oli SAE 90 Liter Rp 54,920.00
4 Oli SAE 140 Liter Rp 64,920.00
5 Minyak Solar Liter Rp 17,290.00
6 Bentonite Liter Rp 12,000.00
7 Grease Liter Rp 25,000.00
8 Minyak Bekisting Liter Rp 30,420.00
MATERIAL KAYU
1 Plywood 9 mm Lembar Rp 177,320.00
2 Kayu Persegi Klas II M3 Rp 5,854,420.00
4 Kayu Persegi Klas III M3 Rp 4,619,420.00
5 Kayu Ikat Ikat Rp 159,315.00
6 Papan Klas II M3 Rp 5,854,420.00
8 Papan Klas III M3 Rp 4,619,420.00
9 Papan Bekisting M3 Rp 2,669,420.00
10 Cerocok Bakau Panjang 5 M M' Rp 12,363.00
11 Perancah / Dolken Ø 8-10 Panjang 4 M' Batang Rp 14,768.00
PERALATAN SANITAIR
1 Tangki Air Plastik Kapasitas 1050 Liter (SNI) Buah Rp 1,767,155.00
2 Kran Air 1/2" Kualitas Standart (Plastik) Buah Rp 23,444.20
3 Kran Air 3/4" Kualitas Standart (Plastik) Buah Rp 20,844.20
4 Seal Tape Buah Rp 13,044.20
5 Lem paralon Kg Rp 225,000.00
PERPIPAAN ACCESSORIES
1 Pipa PVC Ukuran1/2" TEBAL Batang Rp 36,010.00
2 Pipa PVC Ukuran 1/4" TEBAL Batang Rp 49,010.00
3 Pipa PVC Ukuran 3/4" TEBAL Batang Rp 43,810.00
4 Pipa PVC Ukuran 1" TEBAL Batang Rp 60,710.00
5 Pipa PVC Ukuran 1,5" TEBAL Batang Rp 90,610.00
6 Pipa PVC Ukuran 2" TEBAL Batang Rp 125,710.00
8 Pipa PVC Ukuran 2,5" TEBAL Batang Rp 210,210.00
9 Pipa PVC Ukuran 3" TEBAL Batang Rp 327,210.00
10 Pipa PVC Ukuran 4" TEBAL Batang Rp 389,610.00
11 Pipa PVC Ukuran 6" TEBAL Batang Rp 431,210.00
12 Pipa PVC Ukuran 8" TEBAL Batang Rp 730,210.00
13 Pipa PVC Ukuran 10" TEBAL Batang Rp 1,146,210.00
14 Pipa PVC Ukuran 12" TEBAL Batang Rp 1,627,210.00
15 Pipa Galvanis 1/2" TIPIS Batang Rp 65,520.00
16 Pipa Galvanis 1/2" TEBAL Batang Rp 125,320.00
17 Pipa Galvanis 3/4" TIPIS Batang Rp 86,320.00
18 Pipa Galvanis 3/4" TEBAL Batang Rp 189,020.00
19 Pipa Galvanis 1" TIPIS Batang Rp 90,220.00
20 Pipa Galvanis 1" TEBAL Batang Rp 222,820.00
21 Pipa Galvanis 1,5" TIPIS Batang Rp 142,220.00
22 Pipa Galvanis 1,5" TEBAL Batang Rp 285,220.00
23 Pipa Galvanis 2,5" TIPIS Batang Rp 407,420.00
24 Pipa Galvanis 2,5" TEBAL Batang Rp 465,920.00
25 Pipa Galvanis 3" TIPIS Batang Rp 504,920.00
26 Pipa Galvanis 3" TEBAL Batang Rp 563,420.00
CAT DAN PENGAWET
1 Cat Air Kualitas Standar Kilogram Rp 18,333.33
2 Cat Minyak Kualitas Standar Kilogram Rp 67,571.43
3 Cat Dasar Kayu Kilogram Rp 29,857.14
4 Plamir / Dempul Kilogram Rp 9,900.00
5 Cat Menie Kilogram Rp 29,857.14
6 Teer / Residu Kilogram Rp 19,800.00
NO. JENIS UPAH/BAHAN/SEWA ALAT SATUAN HARGA
1 2 3 4
7 Minyak Cat / Thinner Liter Rp 27,500.00
PERALATAN DAN MESIN
1 Depresiasi Mesin Bor Hari Rp 60,000.00
2 Depresiasi Mesin Pump Hari Rp 45,000.00
3 Depresiasi Mesin Generator Hari Rp 50,000.00
4 Depresiasi Mesin Pompa Hari Rp 40,000.00
5 Mata Bor 6" Hari Rp 55,000.00
6 Mata Bor 4" Hari Rp 45,000.00
7 Mata Bor 2" Hari Rp 30,000.00
8 Depresiasi Logging SP Hari Rp 20,000.00
9 Depresiasi Mesin Las Hari Rp 196,000.00
10 Mesin Pompa Semi Superjet Set Rp 2,990,000.00
11 Pengad. & Pemasangan Mesin Generator 4 tak 1000 watt, 220 volt Unit Rp 1,840,000.00
12 Drum Pendingin Unit Rp 250,000.00
13 Pemasukan Api Listrik (Pemasangan Meteran) Unit Rp 5,000,000.00
14 Concrete Mixer 0,3 - 0,6 M3 Unit Rp 75,000.00

Tembilahan, 2022
Disetujui oleh: Dibuat oleh:
CV. MOMEN TEKNIK CV. MOMEN TEKNIK
Konsultan Perencanaan, Konsultan Perencanaan,

HIKMATULLAH, ST Ir. ADRIL


Direktur Team Leader

Diketahui oleh: Disetujui oleh:


PERUMDAM TIRTA INDRAGIRI PEJABAT PEMBUAT KOMITMEN
KAB. INDRAGIRI HILIR (PPK)

Ir. AHMAD HAFIS ARIF GUNAWAN, ST


Direktur NIP. 19840830 201001 1 006
DAFTAR HARGA SATUAN BAHAN, UPAH DAN SEWA ALAT
WILAYAH KABUPATEN INDRAGIRI HILIR
UNTUK TAHUN ANGGARAN 2022
HARGA STANDAR
LOKASI
NO. JENIS UPAH/BAHAN/SEWA ALAT LOKASI BAHAN SATUAN GAUNG (TERMASUK KETERANGAN
OVER HEAD +
1 2 3 4 5
KEUNTUNGAN) 6
UPAH
1 Mandor Orang/Hari Rp 155,204.22
2 Pekerja Orang/Hari Rp 139,683.80
3 Tukang Gali Orang/Hari Rp 139,683.80
4 Tukang Batu Orang/Hari Rp 139,683.80
5 Tukang Kayu Orang/Hari Rp 139,683.80
6 Tukang Besi Orang/Hari Rp 139,683.80
7 Tukang Meubel Orang/Hari Rp 139,683.80
8 Tukang Ledeng Orang/Hari Rp 139,683.80
9 Tukang Listrik Orang/Hari Rp 139,683.80

ASUMSI KERJA PER HARI ADALAH 7 JAM


10 Tukang Cat / Dempul Orang/Hari Rp 139,683.80
11 Tukang Pelitur Orang/Hari Rp 139,683.80
12 Kepala Tukang Gali Orang/Hari Rp 155,204.22
13 Kepala Tukang Batu Orang/Hari Rp 155,204.22
14 Kepala Tukang Kayu Orang/Hari Rp 155,204.22
15 Kepala Tukang Besi Orang/Hari Rp 155,204.22
16 Kepala Tukang Meubel Orang/Hari Rp 155,204.22
17 Kepala Tukang Ledeng Orang/Hari Rp 155,204.22
18 Kepala Tukang Listrik Orang/Hari Rp 155,204.22
19 Kepala Tukang Cat / Dempul Orang/Hari Rp 155,204.22
20 Penjaga Malam Orang/Hari Rp 100,000.00
21 Mekanik Orang/Hari Rp 155,204.22
22 Mekanik Pembantu Orang/Hari Rp 139,683.80
23 Operator Terlatih Orang/Hari Rp 155,204.22
24 Operator Kurang Terlatih Orang/Hari Rp 139,683.80
25 Pembantu Operator Orang/Hari Rp 125,715.42
26 Supir Material / Truck Orang/Hari Rp 155,204.22
27 Supir Personil Orang/Hari Rp 139,683.80
28 Pembantu Supir / Knek Orang/Hari Rp 125,715.42
29 Buruh Terlatih Orang/Hari Rp 139,683.80
30 Buruh Kurang Terlatih Orang/Hari Rp 125,715.42
MATERIAL ALAM
1 Tanah Timbun (Lokal) Tembilahan M3 Rp 141,050.00
2 Tanah Timbun (Didatangkan) Tembilahan M3 Rp 368,550.00 Rp 40,000.00
3 Pasir Urug Tembilahan M3 Rp 219,050.00 Rp 81,250.00
4 Pasir Cor (Agregat Halus) Tembilahan M3 Rp 384,800.00 Rp 125,000.00
5 Batu Kerikil Tembilahan M3 Rp 791,050.00 Rp 325,000.00
6 Batu Pecah / Split (Agregat Kasar) Tembilahan M3 Rp 1,051,050.00 Rp 562,500.00
MATERIAL BESI
1 Kawat Pengikat Tembilahan Kilogram Rp 32,504.42 Rp 20,000.00
2 Kawat Berduri Tembilahan Rol Rp 162,504.42 Rp 3,500.00
3 Besi Beton Polos Tembilahan Kilogram Rp 21,892.00 Rp 7,500.00
4 Besi Beton Ulir Tembilahan Kilogram Rp 21,502.00 Rp 8,000.00
5 Besi Warmes Uk. 150x150x50m Ǿ 8 MI Tembilahan Rol Rp 4,600,000.00 Harga Pabrik
6 Besi Warmes Uk. 150x150x50m Ǿ 6 MI Tembilahan Rol Rp 4,300,000.00 Harga Pabrik
7 Paku Biasa / Campur Tembilahan Kilogram Rp 28,688.40 Rp 18,000.00
8 Paku Putih Tembilahan Kilogram Rp 36,488.40 Rp 20,000.00
9 Paku Tripleks Tembilahan Kilogram Rp 29,988.40 Rp 15,000.00
10 Paku Beton Tembilahan Kilogram Rp 48,321.00 Rp 36,000.00
11 Paku Seng Tembilahan Kilogram Rp 41,688.40 Rp 28,000.00
12 Paku Asbes Tembilahan Kilogram Rp 39,221.00 Rp 25,000.00
13 Paku Sekrup Tembilahan Buah Rp 1,084.20 Rp 100.00
14 Baut 3/4" Panjang 4" Tembilahan Buah Rp 11,094.20 Rp 4,000.00
15 Baut 1/2" Panjang 4" Tembilahan Buah Rp 9,144.20 Rp 2,000.00
16 Teralis Besi Plat / Siku Tembilahan M2 Rp 472,420.00 Rp 225,000.00
17 Kawat Las Tembilahan Kilogram Rp 53,521.00 Rp 20,000.00
18 Besi Plat Strip Tembilahan Kilogram Rp 9,971.00 Rp 3,000.00
MATERIAL CAMPURAN
1 Semen PC (50 KG) Tembilahan Kilogram Rp 2,124.20 Rp 1,160.00
2 Semen Putih/Warna Tembilahan Kilogram Rp 4,919.20 Rp 2,500.00
3 Lem Fox Putih Tembilahan Kilogram Rp 44,222.10 Rp 29,000.00
4 Lem Fox Kuning Tembilahan Kilogram Rp 50,876.80 Rp 25,000.00
5 Batu Bata Pres (5 x 11 x 22) Tembilahan Buah Rp 2,428.40 Rp 850.00
6 Batu Bata Biasa (8 x 8 x 18) Tembilahan Buah Rp 1,994.20 Rp 750.00
7 Batako Tembilahan Buah Rp 2,437.24 Rp 1,200.00
8 Beton Ready Mix K 175 Tembilahan M³ Rp 1,250,000.00 Harga Pabrik
9 Beton Ready Mix K 250 Tembilahan M³ Rp 1,350,000.00 Harga Pabrik
10 Beton Ready Mix K 350 Tembilahan M³ Rp 1,450,000.00 Harga Pabrik
11 Paving Block Tembilahan Buah Rp 3,272.10 Rp 1,500.00
HARGA STANDAR
LOKASI
NO. JENIS UPAH/BAHAN/SEWA ALAT LOKASI BAHAN SATUAN GAUNG (TERMASUK KETERANGAN
OVER HEAD +
1 2 3 4 5
KEUNTUNGAN) 6
MINYAK
1 Minyak Solar/ Dexlite Tembilahan Liter Rp 17,290.00 Rp 6,282.08
2 Minyak Bensin / Premium Tembilahan Liter Rp 12,805.00 Rp 5,564.16
3 Minyak Pertailite Tembilahan Liter Rp 14,365.00
4 Minyak Pertamax Tembilahan Liter Rp 16,640.00
5 Oli Hidrolik Tembilahan Liter Rp 53,820.00 Rp 25,000.00
6 Oli Mesin (40) Tembilahan Liter Rp 49,920.00
7 Minyak Bekisting Tembilahan Liter Rp 30,420.00 Rp 5,000.00
8 Minyak Tanah / Kerosene Tembilahan Liter Rp 18,980.00 Rp 6,500.00
9 Minyak Pelumas / Gemuk Tembilahan Liter Rp 30,420.00
MATERIAL LANTAI
1 Keramik 10 x 20 Kualitas Standar (Ex. Garuda) Tembilahan Buah Rp 1,582.10 Rp 940.00
2 Keramik 20 x 20 Kualitas Standar (Ex. Garuda) Tembilahan Buah Rp 3,424.20 Rp 2,000.00
3 Keramik 20 x 25 Kualitas Standar (Ex. Garuda) Tembilahan Buah Rp 4,616.30 Rp 2,500.00
4 Keramik 30 x 30 Kualitas Standar (Ex. Garuda) Tembilahan Buah Rp 8,408.40 Rp 5,000.00
5 Keramik 40 x 40 Kualitas Standar (Ex. Garuda) Tembilahan Buah Rp 14,150.50 Rp 10,600.00
6 Keramik 60 x 60 Kualitas Standar (Ex. Garuda) Tembilahan Buah Rp 32,632.60 Rp 40,000.00
7 Keramik 10 x 20 Kualitas Sedang (Ex. KIA/IKAD) Tembilahan Buah Rp 2,362.10 Rp 1,700.00
8 Keramik 20 x 20 Kualitas Sedang (Ex. KIA/IKAD) Tembilahan Buah Rp 4,594.20 Rp 2,520.00
9 Keramik 20 x 25 Kualitas Sedang (Ex. KIA/IKAD) Tembilahan Buah Rp 5,786.30 Rp 3,000.00
10 Keramik 30 x 30 Kualitas Sedang (Ex. KIA/IKAD) Tembilahan Buah Rp 11,268.40 Rp 6,000.00
11 Keramik 40 x 40 Kualitas Sedang (Ex. KIA/IKAD) Tembilahan Buah Rp 14,800.50 Rp 12,000.00
12 Keramik 60 x 60 Kualitas Sedang (Ex. KIA/IKAD) Tembilahan Buah Rp 35,321.00 Rp 43,000.00
13 Keramik 10 x 20 Kualitas Baik (Ex. ROMAN) Tembilahan Buah Rp 3,294.20 Rp 1,500.00
14 Keramik 20 x 20 Kualitas Baik (Ex. ROMAN) Tembilahan Buah Rp 6,414.20 Rp 8,000.00
15 Keramik 20 x 25 Kualitas Baik (Ex. ROMAN) Tembilahan Buah Rp 13,066.30 Rp 10,000.00
16 Keramik 30 x 30 Kualitas Baik (Ex. ROMAN) Tembilahan Buah Rp 24,788.40 Rp 20,000.00
17 Keramik 40 x 40 Kualitas Baik (Ex. ROMAN) Tembilahan Buah Rp 56,010.50 Rp 43,000.00
18 Keramik 60 x 60 Kualitas Baik (Ex. ROMAN) Tembilahan Buah Rp 58,632.60 Rp 45,000.00
19 Granit 30 x 30 (Ex. GRANITO) Tembilahan Buah Rp 31,553.60 Rp 25,000.00
20 Granit 40 x 40 (Ex. GRANITO) Tembilahan Buah Rp 58,853.60 Rp 34,000.00
21 Granit 60 x 60 (Ex. GRANITO) Tembilahan Buah Rp 71,544.20 Rp 55,000.00
22 Batu Tempel (ex : Candi 20 x 20) Tembilahan M2 Rp 241,605.00 Rp 120,000.00
MATERIAL KAYU
1 Kayu Ulin Panjang 1,5 M Tembilahan Batang Rp 91,663.00 Rp 45,000.00
2 Kayu Ulin Panjang 2 M Tembilahan Batang Rp 143,663.00 Rp 58,000.00
3 Kayu Ulin Panjang 3 M Tembilahan Batang Rp 221,663.00 Rp 110,000.00
4 Kayu Ulin Panjang 4 M Tembilahan Batang Rp 286,663.00 Rp 165,000.00
5 Kayu Ulin Panjang 5 M Tembilahan Batang Rp 351,663.00 Rp 190,000.00
6 Kayu Persegi Klas II Tembilahan M3 Rp 5,854,420.00 Rp 3,500,000.00
7 Kayu Persegi Kelas I Tembilahan M3 Rp 8,389,420.00 Rp 2,250,000.00
8 Kayu Persegi Klas III Tembilahan M3 Rp 4,619,420.00 Rp 1,800,000.00
9 Kayu Ikat Tembilahan Ikat Rp 159,315.00 Rp 55,000.00
10 Papan Klas II Tembilahan M3 Rp 5,854,420.00 Rp 4,500,000.00
11 Papan Kelas I Tembilahan M3 Rp 8,389,420.00 Rp 2,500,000.00
12 Papan Klas III Tembilahan M3 Rp 4,619,420.00 Rp 1,650,000.00
13 Papan Bekisting Tembilahan M3 Rp 2,669,420.00 Rp 1,400,000.00
14 Bantalan Melting Lokasi Setempat M' Rp 65,663.00 Rp 20,000.00
15 Kayu Pandal Penyirih Ø 12-15 CM Tembilahan Batang Rp 22,763.00 Rp 2,500.00
16 Cerocok Bakau Panjang 5 M Tembilahan Batang Rp 12,363.00 Rp 1,500.00
17 Cerocok Bakau Panjang 6 M Tembilahan Batang Rp 20,163.00 Rp 2,000.00
18 Cerocok Bakau Panjang 7 M Tembilahan Batang Rp 26,663.00 Rp 2,250.00
19 Perancah / Dolken Ø 8-10 Panjang 4 M' Tembilahan Batang Rp 14,768.00 Rp 3,500.00
BAHAN PELAPIS / PENUTUP PLAFOND
1 Gypsum Tembilahan Lembar Rp 106,210.00 Rp 60,000.00
2 List Gypsum Tembilahan Batang Rp 41,210.00 Rp 20,000.00
3 Plywood 4 mm Tembilahan Lembar Rp 87,815.00 Rp 60,000.00
4 Plywood 6 mm Tembilahan Lembar Rp 120,315.00 Rp 85,000.00
5 Plywood 9 mm Tembilahan Lembar Rp 177,320.00 Rp 125,000.00
6 Plywood 12 mm Tembilahan Lembar Rp 238,420.00 Rp 165,000.00
7 Plywood 15 mm Tembilahan Lembar Rp 296,920.00 Rp 210,000.00
8 Grc Tembilahan Lembar Rp 108,420.00
9 Plafound PVC Glossy P.4M, L.20CM, T. 8MM (Mengkilat) Tembilahan Lembar Rp 74,620.00
10 Plafound PVC Doff P.4M, L.20CM, T. 8MM (Mengkilat) Tembilahan Lembar Rp 118,820.00
11 List Kecil P. 4M (Putih,Coklat,Polos) Tembilahan Batang Rp 66,820.00
12 List Sedang P. 4M (Putih,Motif,Gold) Tembilahan Batang Rp 77,220.00
13 List Besar P. 4M (Gold,Silver,Polos) Tembilahan Batang Rp 98,020.00
14 Furing Tembilahan Batang Rp 20,670.00
15 Teakwood (megajati) Tembilahan Lembar Rp 165,815.00 Rp 90,000.00
16 List Profil Tembilahan M' Rp 18,005.00 Rp 2,500.00
PENUTUP ATAP
1 Seng Gelombang BJLS 20 KI Tembilahan Lembar Rp 60,710.00 Rp 42,000.00
2 Seng Plat BJLS 20 KI Tembilahan Lembar Rp 71,942.00 Rp 58,000.00
HARGA STANDAR
LOKASI
NO. JENIS UPAH/BAHAN/SEWA ALAT LOKASI BAHAN SATUAN GAUNG (TERMASUK KETERANGAN
OVER HEAD +
1 2 3 4 5
KEUNTUNGAN) 6
3 Baja Ringan Canal Taso 65/75 Tembilahan Batang Rp 145,210.00
4 Baja Ringan Canal Abadi 65/75 Tembilahan Batang Rp 99,710.00
5 Baja Ringan Taso 7565 Pekanbaru Batang Rp 112,000.00 Harga Pabrik
6 Baja Ringan Taso 7575 Pekanbaru Batang Rp 122,000.00 Harga Pabrik
7 Baja Ringan Joli Trus 7565 Pekanbaru Batang Rp 94,000.00 Harga Pabrik
8 Baja Ringan Joli Trus 7575 Pekanbaru Batang Rp 107,000.00 Harga Pabrik
9 Baja Ringan Fh Trus 7565 Pekanbaru Batang Rp 84,000.00 Harga Pabrik
10 Baja Ringan K Steel 7565 Pekanbaru Batang Rp 99,000.00 Harga Pabrik
11 Baja Ringan K Steel 7575 Pekanbaru Batang Rp 109,000.00 Harga Pabrik
12 Baja Ringan Tera Trus 7565 Pekanbaru Batang Rp 85,000.00 Harga Pabrik
13 Baja Ringan Tera Trus 7575 Pekanbaru Batang Rp 100,000.00 Harga Pabrik
14 Reng Taso Tembilahan Batang Rp 77,610.00
15 Reng Abadi Tembilahan Batang Rp 54,210.00
16 Atap Genteng Metal Zincalume 0,25 mm Tembilahan Lembar Rp 50,310.00 Rp 35,500.00
17 Atap Genteng Metal Zincalume 0,30 mm Tembilahan Lembar Rp 60,710.00 Rp 46,000.00
18 Atap Genteng Metal Zincalume 0,35 mm Tembilahan Lembar Rp 76,310.00 Rp 52,000.00
19 Atap Genteng Metal Zincalume 0,45 mm Tembilahan Lembar Rp 106,210.00 Rp 77,500.00
20 Perabung Raja Metal Zincalume Panjang 80 cm Tembilahan Lembar Rp 53,105.00 Rp 50,000.00
MATERIAL KUNCI DAN ALAT PENGGANTUNG
1 Engsel Standar 3" Tembilahan Buah Rp 14,344.20 Rp 7,500.00
2 Engsel Standar 4" Tembilahan Buah Rp 19,544.20 Rp 6,000.00
3 Grendel Jendela Standar Tembilahan Buah Rp 13,044.20 Rp 7,000.00
4 Grendel Pintu Standar Tembilahan Buah Rp 23,444.20 Rp 10,000.00
5 Engsel Kuningan 3" Tembilahan Buah Rp 32,544.20 Rp 18,000.00
6 Engsel Kuningan 4" Tembilahan Buah Rp 26,044.20 Rp 24,000.00
7 Grendel Jendela Kuningan Tembilahan Buah Rp 19,544.20 Rp 8,000.00
8 Grendel Pintu Kuningan Tembilahan Buah Rp 29,944.20 Rp 35,000.00
9 Kait Angin Kualitas Standar Tembilahan Buah Rp 19,544.20 Rp 7,000.00
10 Kait Angin Kualitas Baik Tembilahan Buah Rp 26,044.20 Rp 15,000.00
11 Door Closer Tembilahan Buah Rp 247,044.20 Rp 185,000.00
12 Door Holder (Pegangan Pintu) Tembilahan Pasang Rp 253,544.20 Rp 150,000.00
13 Kunci Tanam Bulat Kualitas Standar Tembilahan Buah Rp 71,544.20 Rp 35,000.00
14 Kunci Tanam Bulat Kualitas Sedang Tembilahan Buah Rp 97,544.20 Rp 60,000.00
15 Kunci Tanam Bulat Kualitas Baik Tembilahan Buah Rp 169,044.20 Rp 120,000.00
16 Kunci Tanam 1 Slaagh Kualitas Standart Tembilahan Buah Rp 117,044.20 Rp 45,000.00
17 Kunci Tanam 2 Slaagh Kualitas Standart Tembilahan Buah Rp 195,044.20 Rp 65,000.00
18 Kunci Tanam 1 Slaagh Kualitas Baik Tembilahan Buah Rp 325,044.20 Rp 75,000.00
19 Kunci Tanam 2 Slaagh Kualitas Baik Tembilahan Buah Rp 455,044.20 Rp 100,000.00
MATERIAL KACA
1 Kaca Bening 3 mm Tembilahan M2 Rp 133,315.00 Rp 65,000.00
2 Kaca Bening 5 mm Tembilahan M2 Rp 198,315.00 Rp 75,000.00
3 Kaca Bening 8 mm Tembilahan M2 Rp 484,315.00 Rp 95,000.00
4 Kaca Rayban 3 mm Tembilahan M2 Rp 139,815.00 Rp 75,000.00
5 Kaca Rayban 5 mm Tembilahan M2 Rp 204,815.00 Rp 85,000.00
6 Kaca Rayban 8 mm Tembilahan M2 Rp 490,815.00 Rp 105,000.00
7 Nacco / Bingkai 5 Daun Kaca Bening 3 mm Tembilahan Set Rp 126,815.00 Rp 77,500.00
8 Nacco / Bingkai 7 Daun Kaca Bening 3 mm Tembilahan Set Rp 152,815.00 Rp 109,000.00
9 Nacco / Bingkai 8 Daun Kaca Bening 3 mm Tembilahan Set Rp 165,815.00 Rp 125,000.00
10 Nacco / Bingkai 5 Daun Kaca Bening 5 mm Tembilahan Set Rp 115,115.00 Rp 82,500.00
11 Nacco / Bingkai 7 Daun Kaca Bening 5 mm Tembilahan Set Rp 157,365.00 Rp 115,000.00
12 Nacco / Bingkai 8 Daun Kaca Bening 5 mm Tembilahan Set Rp 178,815.00 Rp 132,000.00
13 Nacco / Bingkai 5 Daun Kaca Rayban 3 mm Tembilahan Set Rp 117,065.00 Rp 82,500.00
14 Nacco / Bingkai 7 Daun Kaca Rayban 3 mm Tembilahan Set Rp 159,965.00 Rp 115,000.00
15 Nacco / Bingkai 8 Daun Kaca Rayban 3 mm Tembilahan Set Rp 181,415.00 Rp 132,000.00
16 Nacco / Bingkai 5 Daun Kaca Rayban 5 mm Tembilahan Set Rp 124,215.00 Rp 87,500.00
17 Nacco / Bingkai 7 Daun Kaca Rayban 5 mm Tembilahan Set Rp 169,065.00 Rp 123,000.00
18 Nacco / Bingkai 8 Daun Kaca Rayban 5 mm Tembilahan Set Rp 191,815.00 Rp 140,000.00
19 Bingkai Alumanium Kusen Jendela Kualitas Standart Tembilahan M' Rp 653,315.00
20 Bingkai Alumanium Kusen Pintu Kualitas Standart Tembilahan M' Rp 783,315.00
21 Kusen Jendela Alumanium Kualitas Standart (Silver) Tembilahan M' Rp 328,315.00
22 Kusen Jendela Alumanium Kualitas Standart (Coklat) Tembilahan M' Rp 406,315.00
23 Pintu Alumanium (Lengkap) Tembilahan Unit Rp 2,603,315.00
PERALATAN SANITAIR
1 Bak Mandi Fiber 20 Liter Tembilahan Buah Rp 363,155.00 Rp 250,000.00
2 Bak Mandi Plastik (Persegi) 20 Liter Tembilahan Buah Rp 376,155.00 Rp 200,000.00
3 Bak Mandi Plastik (Sudut) 20 Liter Tembilahan Buah Rp 369,655.00 Rp 250,000.00
4 Kloset Jongkok Keramik Tembilahan Buah Rp 337,155.00 Rp 340,000.00
5 Kloset Duduk Keramik (Standart) Tembilahan Buah Rp 2,222,155.00 Rp 1,400,000.00
6 Kloset Duduk Keramik (Monoblok) Tembilahan Buah Rp 2,612,155.00 Rp 1,600,000.00
7 Urinoir Keramik Tembilahan Buah Rp 922,155.00 Rp 1,200,000.00
8 Washtafel Keramik (Lengkap) Tembilahan Buah Rp 597,155.00 Rp 480,000.00
9 Bak Cuci Piring Logam (2 Lubang) Tembilahan Buah Rp 506,155.00 Rp 350,000.00
10 Bak Cuci Piring Logam (1 Lubang) Tembilahan Buah Rp 220,155.00 Rp 210,000.00
HARGA STANDAR
LOKASI
NO. JENIS UPAH/BAHAN/SEWA ALAT LOKASI BAHAN SATUAN GAUNG (TERMASUK KETERANGAN
OVER HEAD +
1 2 3 4 5
KEUNTUNGAN) 6
11 Saringan Air Lantai (Floor Drain) Kuningan Tembilahan Buah Rp 64,155.00 Rp 45,000.00
12 Saringan Air Lantai (Floor Drain) Plastik Tembilahan Buah Rp 38,155.00 Rp 12,000.00
13 Pompa Air Tangan Tembilahan Buah Rp 467,155.00 Rp 300,000.00
14 Tangki Air Plastik Kapasitas 500 Liter (SNI) Tembilahan Buah Rp 987,155.00 Rp 937,500.00
15 Tangki Air Plastik Kapasitas 1050 Liter (SNI) Tembilahan Buah Rp 1,767,155.00 Rp 1,187,500.00
16 Kran Air 1/2" Kualitas Standart (Plastik) Tembilahan Buah Rp 23,444.20 Rp 8,000.00
17 Kran Air 1/2" Kualitas Baik (Plastik) Tembilahan Buah Rp 36,444.20 Rp 25,000.00
18 Kran Air 3/4" Kualitas Standart (Plastik) Tembilahan Buah Rp 20,844.20 Rp 9,000.00
19 Kran Air 3/4" Kualitas Baik (Plastik) Tembilahan Buah Rp 33,605.00 Rp 30,000.00
20 Seal Tape Tembilahan Buah Rp 13,044.20 Rp 2,000.00
21 Pompa Sumersible Tembilahan Buah Rp 2,860,884.00
PERPIPAAN DAN ACCESSORIES
1 Pipa PVC Ukuran1/2" TEBAL Tembilahan Batang Rp 36,010.00
2 Pipa PVC Ukuran 1/4" TEBAL Tembilahan Batang Rp 49,010.00
3 Pipa PVC Ukuran 3/4" TEBAL Tembilahan Batang Rp 43,810.00
4 Pipa PVC Ukuran 1" TEBAL Tembilahan Batang Rp 60,710.00
5 Pipa PVC Ukuran 1,5" TEBAL Tembilahan Batang Rp 90,610.00
6 Pipa PVC Ukuran 2" TEBAL Tembilahan Batang Rp 125,710.00
7 Pipa PVC Ukuran 2,5" TEBAL Tembilahan Batang Rp 210,210.00
8 Pipa PVC Ukuran 3" TEBAL Tembilahan Batang Rp 327,210.00
9 Pipa PVC Ukuran 4" TEBAL Tembilahan Batang Rp 389,610.00
10 Pipa PVC Ukuran 6" TEBAL Tembilahan Batang Rp 431,210.00
11 Pipa PVC Ukuran 8" TEBAL Tembilahan Batang Rp 730,210.00
12 Pipa PVC Ukuran 10" TEBAL Tembilahan Batang Rp 1,146,210.00
13 Pipa PVC Ukuran 12" TEBAL Tembilahan Batang Rp 1,627,210.00
14 Pipa Galvanis 1/2" TIPIS Tembilahan Batang Rp 65,520.00
15 Pipa Galvanis 1/2" TEBAL Tembilahan Batang Rp 125,320.00
16 Pipa Galvanis 3/4" TIPIS Tembilahan Batang Rp 86,320.00
17 Pipa Galvanis 3/4" TEBAL Tembilahan Batang Rp 189,020.00
18 Pipa Galvanis 1" TIPIS Tembilahan Batang Rp 90,220.00
19 Pipa Galvanis 1" TEBAL Tembilahan Batang Rp 222,820.00
20 Pipa Galvanis 1,5" TIPIS Tembilahan Batang Rp 142,220.00
21 Pipa Galvanis 1,5" TEBAL Tembilahan Batang Rp 285,220.00
22 Pipa Galvanis 2,5" TIPIS Tembilahan Batang Rp 407,420.00
23 Pipa Galvanis 2,5" TEBAL Tembilahan Batang Rp 465,920.00
24 Pipa Galvanis 3" TIPIS Tembilahan Batang Rp 504,920.00
25 Pipa Galvanis 3" TEBAL Tembilahan Batang Rp 563,420.00
26 Pipa HDPE Uk. 20 SDR 21 (PN 8) Jakarta M' #REF!
27 Pipa HDPE Uk. 25 SDR 21 (PN 8) Jakarta M' #REF!
28 Pipa HDPE Uk. 32 SDR 21 (PN 8) Jakarta M' #REF!
29 Pipa HDPE Uk. 40 SDR 21 (PN 8) Jakarta M' Rp 18,150.00 #REF!
30 Pipa HDPE Uk. 50 SDR 21 (PN 8) Jakarta M' Rp 28,850.00 #REF!
31 Pipa HDPE Uk. 63 SDR 21 (PN 8) Jakarta M' Rp 44,100.00 #REF!
32 Pipa HDPE Uk. 75 SDR 21 (PN 8) Jakarta M' Rp 63,150.00 #REF!
33 Pipa HDPE Uk. 90 SDR 21 (PN 8) Jakarta M' Rp 90,550.00 #REF!
34 Pipa HDPE Uk. 110 SDR 21 (PN 8) Jakarta M' Rp 135,500.00 #REF!
35 Pipa HDPE Uk. 160 SDR 21 (PN 8) Jakarta M' Rp 282,400.00 #REF!
36 Pipa HDPE Uk. 200 SDR 21 (PN 8) Jakarta M' Rp 458,900.00 #REF!
37 Pipa HDPE Uk. 250 SDR 21 (PN 8) Jakarta M' Rp 708,000.00 #REF!
38 Pipa HDPE Uk. 315 SDR 21 (PN 8) Jakarta M' Rp 1,121,800.00 #REF!
39 Pipa HDPE Uk. 355 SDR 21 (PN 8) Jakarta M' Rp 1,425,550.00 #REF!
40 Pipa HDPE Uk. 400 SDR 21 (PN 8) Jakarta M' Rp 1,818,550.00 #REF!
41 Pipa HDPE Uk. 450 SDR 21 (PN 8) Jakarta M' Rp 2,297,000.00 #REF!
42 Pipa HDPE Uk. 500 SDR 21 (PN 8) Jakarta M' Rp 2,831,250.00 #REF!
43 Pipa HDPE Uk. 630 SDR 21 (PN 8) Jakarta M' Rp 4,473,850.00 #REF!
44 Pipa HDPE Uk. 710 SDR 21 (PN 8) Jakarta M' Rp 5,885,200.00 #REF!
45 Pipa HDPE Uk. 800 SDR 21 (PN 8) Jakarta M' Rp 7,446,700.00 #REF!
46 Pipa HDPE Uk. 20 SDR 17 (PN 10) Jakarta M' #REF!
47 Pipa HDPE Uk. 25 SDR 17 (PN 10) Jakarta M' #REF!
48 Pipa HDPE Uk. 32 SDR 17 (PN 10) Jakarta M' Rp 14,400.00 #REF!
49 Pipa HDPE Uk. 40 SDR 17 (PN 10) Jakarta M' Rp 22,700.00 #REF!
50 Pipa HDPE Uk. 50 SDR 17 (PN 10) Jakarta M' Rp 34,450.00 #REF!
51 Pipa HDPE Uk. 63 SDR 17 (PN 10) Jakarta M' Rp 54,900.00 #REF!
52 Pipa HDPE Uk. 75 SDR 17 (PN 10) Jakarta M' Rp 77,400.00 #REF!
53 Pipa HDPE Uk. 90 SDR 17 (PN 10) Jakarta M' Rp 111,050.00 #REF!
54 Pipa HDPE Uk. 110 SDR 17 (PN 10) Jakarta M' Rp 164,750.00 #REF!
55 Pipa HDPE Uk. 160 SDR 17 (PN 10) Jakarta M' Rp 343,400.00 #REF!
56 Pipa HDPE Uk. 200 SDR 17 (PN 10) Jakarta M' Rp 558,550.00 #REF!
57 Pipa HDPE Uk. 250 SDR 17 (PN 10) Jakarta M' Rp 867,600.00 #REF!
58 Pipa HDPE Uk. 315 SDR 17 (PN 10) Jakarta M' Rp 1,379,600.00 #REF!
59 Pipa HDPE Uk. 355 SDR 17 (PN 10) Jakarta M' Rp 1,757,200.00 #REF!
60 Pipa HDPE Uk. 400 SDR 17 (PN 10) Jakarta M' Rp 2,217,750.00 #REF!
61 Pipa HDPE Uk. 450 SDR 17 (PN 10) Jakarta M' Rp 2,808,950.00 #REF!
HARGA STANDAR
LOKASI
NO. JENIS UPAH/BAHAN/SEWA ALAT LOKASI BAHAN SATUAN GAUNG (TERMASUK KETERANGAN
OVER HEAD +
1 2 3 4 5
KEUNTUNGAN) 6
62 Pipa HDPE Uk. 500 SDR 17 (PN 10) Jakarta M' Rp 3,460,300.00 #REF!
63 Pipa HDPE Uk. 630 SDR 17 (PN 10) Jakarta M' Rp 5,493,050.00 #REF!
64 Pipa HDPE Uk. 710 SDR 17 (PN 10) Jakarta M' Rp 7,219,800.00 #REF!
65 Pipa HDPE Uk. 800 SDR 17 (PN 10) Jakarta M' Rp 9,150,650.00 #REF!
66 Pipa HDPE Uk. 20 SDR 13,6 (PN 12,5) Jakarta M' #REF!
67 Pipa HDPE Uk. 25 SDR 13,6 (PN 12,5) Jakarta M' Rp 11,000.00 #REF!
68 Pipa HDPE Uk. 32 SDR 13,6 (PN 12,5) Jakarta M' Rp 17,900.00 #REF!
69 Pipa HDPE Uk. 40 SDR 13,6 (PN 12,5) Jakarta M' Rp 27,150.00 #REF!
70 Pipa HDPE Uk. 50 SDR 13,6 (PN 12,5) Jakarta M' Rp 41,950.00 #REF!
71 Pipa HDPE Uk. 63 SDR 13,6 (PN 12,5) Jakarta M' Rp 66,450.00 #REF!
72 Pipa HDPE Uk. 75 SDR 13,6 (PN 12,5) Jakarta M' Rp 92,550.00 #REF!
73 Pipa HDPE Uk. 90 SDR 13,6 (PN 12,5) Jakarta M' Rp 132,750.00 #REF!
74 Pipa HDPE Uk. 110 SDR 13,6 (PN 12,5) Jakarta M' Rp 199,250.00 #REF!
75 Pipa HDPE Uk. 160 SDR 13,6 (PN 12,5) Jakarta M' Rp 417,300.00 #REF!
76 Pipa HDPE Uk. 200 SDR 13,6 (PN 12,5) Jakarta M' Rp 678,100.00 #REF!
77 Pipa HDPE Uk. 250 SDR 13,6 (PN 12,5) Jakarta M' Rp 1,060,750.00 #REF!
78 Pipa HDPE Uk. 315 SDR 13,6 (PN 12,5) Jakarta M' Rp 1,683,650.00 #REF!
79 Pipa HDPE Uk. 355 SDR 13,6 (PN 12,5) Jakarta M' Rp 2,134,150.00 #REF!
80 Pipa HDPE Uk. 400 SDR 13,6 (PN 12,5) Jakarta M' Rp 2,704,600.00 #REF!
81 Pipa HDPE Uk. 450 SDR 13,6 (PN 12,5) Jakarta M' Rp 3,426,250.00 #REF!
82 Pipa HDPE Uk. 500 SDR 13,6 (PN 12,5) Jakarta M' Rp 4,223,450.00 #REF!
83 Pipa HDPE Uk. 630 SDR 13,6 (PN 12,5) Jakarta M' #REF!
84 Pipa HDPE Uk. 710 SDR 13,6 (PN 12,5) Jakarta M' #REF!
85 Pipa HDPE Uk. 800 SDR 13,6 (PN 12,5) Jakarta M' #REF!
86 Pipa HDPE Uk. 20 SDR 11 (PN 16) Jakarta M' Rp 8,800.00 #REF!
87 Pipa HDPE Uk. 25 SDR 11 (PN 16) Jakarta M' Rp 12,550.00 #REF!
88 Pipa HDPE Uk. 32 SDR 11 (PN 16) Jakarta M' Rp 21,700.00 #REF!
89 Pipa HDPE Uk. 40 SDR 11 (PN 16) Jakarta M' Rp 32,650.00 #REF!
90 Pipa HDPE Uk. 50 SDR 11 (PN 16) Jakarta M' Rp 51,000.00 #REF!
91 Pipa HDPE Uk. 63 SDR 11 (PN 16) Jakarta M' Rp 80,250.00 #REF!
92 Pipa HDPE Uk. 75 SDR 11 (PN 16) Jakarta M' Rp 110,150.00 #REF!
93 Pipa HDPE Uk. 90 SDR 11 (PN 16) Jakarta M' Rp 159,400.00 #REF!
94 Pipa HDPE Uk. 110 SDR 11 (PN 16) Jakarta M' Rp 240,500.00 #REF!
95 Pipa HDPE Uk. 160 SDR 11 (PN 16) Jakarta M' Rp 505,950.00 #REF!
96 Pipa HDPE Uk. 200 SDR 11 (PN 16) Jakarta M' Rp 823,050.00 #REF!
97 Pipa HDPE Uk. 250 SDR 11 (PN 16) Jakarta M' Rp 1,282,150.00 #REF!
106 Elbo PVC 1/2" Tembilahan Buah Rp 4,264.00
107 Elbo PVC 1/4" Tembilahan Buah Rp 6,084.00
108 Elbo PVC 3/4" Tembilahan Buah Rp 4,784.00
109 Elbo PVC 1" Tembilahan Buah Rp 8,034.00
110 Elbo PVC 1,5" Tembilahan Buah Rp 9,334.00
111 Elbo PVC 2" Tembilahan Buah Rp 13,234.00
112 Elbo PVC 2,5" Tembilahan Buah Rp 19,734.00
113 Elbo PVC 3" Tembilahan Buah Rp 26,234.00
114 Elbo Galvanis 1/2" Tembilahan Buah Rp 17,355.00
115 Elbo Galvanis 1/4" Tembilahan Buah Rp 21,255.00
116 Elbo Galvanis 3/4" Tembilahan Buah Rp 18,655.00
117 Elbo Galvanis 1" Tembilahan Buah Rp 27,755.00
118 Elbo Galvanis 1,5" Tembilahan Buah Rp 45,955.00
119 Elbo Galvanis 2" Tembilahan Buah Rp 75,205.00
120 Elbo Galvanis 2,5" Tembilahan Buah Rp 125,255.00
121 Elbo Galvanis 3" Tembilahan Buah Rp 196,105.00
122 Socket PVC 1/2" Tembilahan Buah Rp 4,134.00
123 Socket PVC 3/4" Tembilahan Buah Rp 4,784.00
124 Socket PVC 1" Tembilahan Buah Rp 6,084.00
125 Socket PVC 1,5" Tembilahan Buah Rp 6,734.00
126 Socket PVC 2" Tembilahan Buah Rp 7,384.00
127 Socket Galvanis 1/2" Tembilahan Buah Rp 12,805.00
128 Socket Galvanis 3/4" Tembilahan Buah Rp 16,705.00
129 Socket Galvanis 1" Tembilahan Buah Rp 23,205.00
130 Socket Galvanis 1,5" Tembilahan Buah Rp 33,605.00
131 Socket Galvanis 2" Tembilahan Buah Rp 98,605.00
132 Reducer PVC 1/2" - 3/4" Tembilahan Buah Rp 4,784.00
133 Reducer PVC 1/2" - 1" Tembilahan Buah Rp 5,434.00
134 Reducer PVC 1" - 1,5" Tembilahan Buah Rp 13,884.00
135 Reducer PVC 1,5" - 2" Tembilahan Buah Rp 21,684.00
136 Reducer Galvanis 1/2" - 3/4" Tembilahan Buah Rp 24,505.00
137 Reducer Galvanis 3/4" - 1" Tembilahan Buah Rp 27,105.00
138 Reducer Galvanis 1" - 1,5" Tembilahan Buah Rp 33,605.00
139 Reducer Galvanis 1,5" - 2" Tembilahan Buah Rp 37,505.00
140 Elbow 90 PN10 Ukuran 63 Tembilahan Buah Rp 157,105.00
141 Elbow 90 PN10 Ukuran 75 Tembilahan Buah Rp 261,105.00
142 Elbow 90 PN10 Ukuran 90 Tembilahan Buah Rp 396,305.00
HARGA STANDAR
LOKASI
NO. JENIS UPAH/BAHAN/SEWA ALAT LOKASI BAHAN SATUAN GAUNG (TERMASUK KETERANGAN
OVER HEAD +
1 2 3 4 5
KEUNTUNGAN) 6
143 Elbow 90 PN10 Ukuran 110 Tembilahan Buah Rp 488,605.00
144 Tee Equal PN10 Ukuran 63 Tembilahan Buah Rp 344,305.00
145 Tee Equal PN10 Ukuran 75 Tembilahan Buah Rp 427,505.00
146 Tee Equal PN10 Ukuran 90 Tembilahan Buah Rp 337,805.00
147 Tee Equal PN10 Ukuran 110 Tembilahan Buah Rp 440,505.00
148 Tee Ukuran 1/2" Tembilahan Buah Rp 5,655.00
149 Tee Ukuran 1/4" Tembilahan Buah Rp 7,605.00
150 Tee Ukuran 3/4" Tembilahan Buah Rp 6,955.00
151 Tee Ukuran 1" Tembilahan Buah Rp 11,505.00
152 Tee Ukuran 1,5" Tembilahan Buah Rp 14,105.00
153 Tee Ukuran2" Tembilahan Buah Rp 16,705.00
154 Tee Ukuran 2,5" Tembilahan Buah Rp 27,105.00
155 Tee Ukuran 3" Tembilahan Buah Rp 37,505.00
156 Tee Ukuran 4” Tembilahan Buah Rp 62,205.00
157 Tee Ukuran 5” Tembilahan Buah Rp 92,105.00
158 Tee Ukuran 6” Tembilahan Buah Rp 163,605.00
159 Tee Ukuran 8” Tembilahan Buah Rp 339,105.00
160 Dop Ukuran 1/2" Tembilahan Buah Rp 3,705.00
161 Dop Ukuran 1/4" Tembilahan Buah Rp 7,605.00
162 Dop Ukuran 3/4" Tembilahan Buah Rp 5,005.00
163 Dop Ukuran 1" Tembilahan Buah Rp 7,605.00
164 Dop Ukuran 1,5" Tembilahan Buah Rp 11,505.00
165 Dop Ukuran 2" Tembilahan Buah Rp 14,105.00
166 Dop Ukuran 2,5" Tembilahan Buah Rp 16,705.00
167 Dop Ukuran 3" Tembilahan Buah Rp 20,605.00
168 Dop Ukuran 4” Tembilahan Buah Rp 37,505.00
169 Coupler Ukuran 20 mm Tembilahan Buah Rp 18,265.00
170 Coupler Ukuran 25 mm Tembilahan Buah Rp 23,985.00
171 Coupler Ukuran 32 mm Tembilahan Buah Rp 38,285.00
172 Coupler Ukuran 40 mm Tembilahan Buah Rp 81,185.00
173 Coupler Ukuran 50 mm Tembilahan Buah Rp 98,345.00
174 Coupler Ukuran 63 mm Tembilahan Buah Rp 165,555.00
175 Coupler Ukuran 90 mm Tembilahan Buah Rp 361,465.00
176 Coupler Ukuran 110 mm Tembilahan Buah Rp 909,441.00
177 Reducer Ukuran 25 mm Tembilahan Buah Rp 26,845.00
178 Reducer Ukuran 32 mm Tembilahan Buah Rp 31,135.00
179 Reducer Ukuran 40 mm Tembilahan Buah Rp 72,605.00
180 Reducer Ukuran 50 mm Tembilahan Buah Rp 114,075.00
181 Reducer Ukuran 63 mm Tembilahan Buah Rp 148,395.00
182 Reducer Ukuran 90 mm Tembilahan Buah Rp 315,705.00
183 Reducer Tee Ukuran 25 mm Tembilahan Buah Rp 41,145.00
184 Reducer Tee Ukuran 32 mm Tembilahan Buah Rp 52,585.00
185 Reducer Tee Ukuran 40 mm Tembilahan Buah Rp 149,825.00
186 Reducer Tee Ukuran 90 mm Tembilahan Buah Rp 881,985.00
187 Male Adaptor Ukuran 20 mm Tembilahan Buah Rp 15,405.00
188 Male Adaptor Ukuran 25 mm Tembilahan Buah Rp 15,977.00
189 Male Adaptor Ukuran 32 mm Tembilahan Buah Rp 31,135.00
190 Male Adaptor Ukuran 40 mm Tembilahan Buah Rp 56,017.00
191 Male Adaptor Ukuran 50 mm Tembilahan Buah Rp 76,609.00
192 Male Adaptor Ukuran 63 mm Tembilahan Buah Rp 94,055.00
193 Male Adaptor Ukuran 90 mm Tembilahan Buah Rp 252,785.00
194 Male Elbow Ukuran 20 mm Tembilahan Buah Rp 16,835.00
195 Male Elbow Ukuran 25 mm Tembilahan Buah Rp 21,125.00
196 Male Elbow Ukuran 32 mm Tembilahan Buah Rp 33,995.00
197 Male Elbow Ukuran 40 mm Tembilahan Buah Rp 66,885.00
198 Male Elbow Ukuran 90 mm Tembilahan Buah Rp 355,745.00
199 Male Tee Ukuran 20 mm Tembilahan Buah Rp 29,705.00
200 Male Tee Ukuran 25 mm Tembilahan Buah Rp 33,995.00
201 Male Tee Ukuran 32 mm Tembilahan Buah Rp 46,865.00
202 Male Tee Ukuran 40 mm Tembilahan Buah Rp 108,355.00
203 Male Tee Ukuran 90 mm Tembilahan Buah Rp 584,545.00
204 Famale Tee Ukuran 20 mm Tembilahan Buah Rp 26,845.00
205 Famale Tee Ukuran 25 mm Tembilahan Buah Rp 38,285.00
206 Famale Tee Ukuran 32 mm Tembilahan Buah Rp 55,445.00
207 Famale Tee Ukuran 90 mm Tembilahan Buah Rp 584,545.00
208 Famale Adaptor Ukuran 20 mm Tembilahan Buah Rp 13,975.00
209 Famale Adaptor Ukuran 25 mm Tembilahan Buah Rp 22,555.00
210 Famale Adaptor Ukuran 32 mm Tembilahan Buah Rp 28,275.00
211 Famale Adaptor Ukuran 50 mm Tembilahan Buah Rp 65,455.00
212 Famale Adaptor Ukuran 63 mm Tembilahan Buah Rp 112,645.00
213 Famale Elbow Ukuran 20 mm Tembilahan Buah Rp 16,835.00
214 Famale Elbow Ukuran 25 mm Tembilahan Buah Rp 25,415.00
215 Famale Elbow Ukuran 32 mm Tembilahan Buah Rp 38,285.00
HARGA STANDAR
LOKASI
NO. JENIS UPAH/BAHAN/SEWA ALAT LOKASI BAHAN SATUAN GAUNG (TERMASUK KETERANGAN
OVER HEAD +
1 2 3 4 5
KEUNTUNGAN) 6
216 Clamp Saddle Ukuran 32 mm Tembilahan Buah Rp 38,857.00
217 Clamp Saddle Ukuran 40 mm Tembilahan Buah Rp 46,865.00
218 Clamp Saddle Ukuran 50 mm Tembilahan Buah Rp 49,153.00
219 Clamp Saddle Ukuran 63 mm Tembilahan Buah Rp 60,593.00
220 Clamp Saddle Ukuran 90 mm Tembilahan Buah Rp 155,545.00
221 Clamp Saddle Ukuran 110 mm Tembilahan Buah Rp 165,841.00
222 Clamp Saddle Ukuran 160 mm Tembilahan Buah Rp 275,665.00
223 CAP Ukuran 20 mm Tembilahan Buah Rp 10,543.00
224 CAP Ukuran 25 mm Tembilahan Buah Rp 14,690.00
225 CAP Ukuran 32 mm Tembilahan Buah Rp 23,985.00
226 CAP Ukuran 40 mm Tembilahan Buah Rp 44,577.00
227 CAP Ukuran 50 mm Tembilahan Buah Rp 51,441.00
228 CAP Ukuran 63 mm Tembilahan Buah Rp 106,925.00
229 CAP Ukuran 90 mm Tembilahan Buah Rp 219,895.00
230 Lem PVC Tube / Botol Tembilahan Buah Rp 14,105.00
231 Lem PVC Kaleng 500 Gr Tembilahan Kaleng Rp 40,105.00
232 Mesin Pompa Air Tembilahan Buah Rp 651,105.00
233 Water Meter PE 1/2" Tembilahan Buah Rp 261,105.00
234 Water Meter Brass Onda 1/2" Jakarta 1 Pcs/Kotak Rp 655,600.00 Harga Pabrik
235 Water Meter Brass Onda 3/4" Jakarta 1 Pcs/Kotak Rp 1,190,200.00 Harga Pabrik
236 Water Meter Flange 2-1/2" Jakarta 1 Pcs/Dus Rp 2,397,175.00 Harga Pabrik
237 Water Meter flange 3" Jakarta 1 Pcs/Dus Rp 2,806,100.00 Harga Pabrik
238 Water Meter Flange 4" Jakarta 1 Pcs/Dus Rp 3,142,700.00 Harga Pabrik
239 Water Meter Flange 6" Jakarta ! Pcs/Dus Rp 4,376,900.00 Harga Pabrik
240 Water Meter Flange 8" Jakarta 1 Pcs/Dus Rp 5,731,550.00 Harga Pabrik
241 Water Meter Flange 10" Jakarta 1 Pcs/Dus Rp 18,757,200.00 Harga Pabrik
242 Water Meter flange 12" Jakarta 1 Pcs/Dus Rp 23,446,500.00 Harga Pabrik
ALAT LISTRIK DAN ACCESSORIES
1 Titik Lampu + Instalasi Tembilahan Titik Rp 104,088.40 Rp 60,000.00
2 Stop kontak + Instalasi Tembilahan Titik Rp 123,544.20 Rp 60,000.00
3 Sakelar Tunggal (Biasa) Tembilahan Buah Rp 19,544.20 Rp 3,000.00
4 Saklera Ganda (Biasa) Tembilahan Buah Rp 26,044.20 Rp 4,000.00
5 Zekering Kas Lokal 1 Group Tembilahan Buah Rp 10,444.20 Rp 10,000.00
6 Zekering Kas Lokal 2 Group Tembilahan Buah Rp 17,257.50 Rp 13,000.00
7 Tool Listrik Tembilahan Set Rp 2,992,210.00
8 Gerinda Tembilahan Buah Rp 392,210.00
9 Mesin Bor Listrik Tembilahan Buah Rp 366,210.00
10 Alat Las Tembilahan Buah Rp 262,210.00
11 Multitester Tembilahan Buah Rp 1,042,210.00
12 Tang Ampere Tembilahan Buah Rp 327,210.00
13 Kabel Tuistik 2 X 10 mm Tembilahan Unit Rp 11,310.00
14 Kabel Nym 2 X 2,5 mm Tembilahan M2 Rp 21,710.00
15 Klem Percing Tembilahan M2 Rp 38,610.00
16 Klem Week Tembilahan Unit Rp 19,110.00
17 Lampu Led Strip 2835 Kelap Kelip Merah P. 100 M Tembilahan M Rp 28,210.00
18 Lampu Led Strip 2835 Kelap Kelip Kuning P. 100 M Tembilahan M Rp 28,210.00
19 Lampu Led Strip 2835 Kelap Kelip Hijau P. 100 M Tembilahan M Rp 28,210.00
20 Lampu Led Strip 2835 Kelap Kelip Biru P. 100 M Tembilahan M Rp 28,210.00
21 Adaptor / Mesin Lampu Strip 220 V Tembilahan Buah Rp 106,210.00
22 Lampu Sorot Vl 6100 50 Watt Tembilahan Buah Rp 262,210.00
23 Time Switch / Theben Tembilahan Buah Rp 496,210.00
24 Kabel Ties 200 mm Tembilahan Buah Rp 2,860.00
25 Ncb 10 A Tembilahan Buah Rp 93,210.00
26 Mesin Genset Tembilahan Buah Rp 3,902,210.00
27 Mesin Diesel 12 KVA Tembilahan Buah Rp 65,002,210.00
28 Isolasi Tembilahan Buah Rp 15,210.00
CAT DAN PENGAWET
1 Cat Air Kualitas Standar Tembilahan Kilogram Rp 24,310.00 Rp 6,500.00
2 Cat Air Kualitas Sedang Tembilahan Kilogram Rp 38,610.00 Rp 12,500.00
3 Cat Air Kualitas Baik Tembilahan Kilogram Rp 112,710.00 Rp 64,000.00
4 Cat Minyak Kualitas Standar Tembilahan Kilogram Rp 82,062.50 Rp 33,000.00
5 Cat Minyak Kualitas Sedang Tembilahan Kilogram Rp 95,066.40 Rp 35,000.00
6 Cat Minyak Kualitas Baik Tembilahan Kilogram Rp 113,638.20 Rp 45,000.00
7 Cat Dasar Kayu Tembilahan Kilogram Rp 39,352.30 Rp 25,000.00
8 Plamir / Dempul Tembilahan Kilogram Rp 17,160.00 Rp 14,000.00
9 Cat Menie Tembilahan Kilogram Rp 39,352.30 Rp 12,000.00
10 Teer / Residu Tembilahan Kilogram Rp 28,210.00 Rp 12,000.00
11 Minyak Cat / Thinner Tembilahan Liter Rp 37,310.00 Rp 20,000.00
12 Cat Marka Jalan (Thermo Plastic) Tembilahan Kilogram Rp 73,710.00 Rp 48,000.00
13 Blass Bit Tembilahan Kilogram Rp 60,710.00 Rp 25,000.00
PERALATAN KERJA
1 Cangkul Tembilahan Buah Rp 54,210.00
2 Parang Tembilahan Buah Rp 236,210.00
HARGA STANDAR
LOKASI
NO. JENIS UPAH/BAHAN/SEWA ALAT LOKASI BAHAN SATUAN GAUNG (TERMASUK KETERANGAN
OVER HEAD +
1 2 3 4 5
KEUNTUNGAN) 6
3 Gunting Pangkas Tembilahan Buah Rp 93,210.00
4 Gunting Setek Tembilahan Buah Rp 54,210.00
5 Sendok Dempol/ Sekrap Tembilahan Buah Rp 8,710.00
6 Garu/ Garpu Tembilahan Buah Rp 132,210.00
7 Gerobak Sorong Tembilahan Buah Rp 782,210.00
8 Kaca Mata Pengaman Tembilahan Buah Rp 67,210.00
9 Plang Rambu Tembilahan M Rp 67,210.00
10 Sekop Tembilahan Buah Rp 106,210.00
11 Pakaian Kerja THL (Setelan) Tembilahan Buah Rp 197,210.00
12 Sepatu Bot Karet Tembilahan Pasang Rp 132,210.00
13 Sarung Tangan Karet Tembilahan Buah Rp 67,210.00
14 Helm Tembilahan Buah Rp 67,210.00
15 Sarung Tangan 20 KV Tembilahan Buah Rp 652,210.00
16 Rompi Scotlight Tembilahan Buah Rp 67,210.00
17 Sepatu Safety Tembilahan Buah Rp 522,210.00
18 Tali Safety Tembilahan Set Rp 457,210.00
HARGA SEWA ALAT
1 Asphalt Mixing Plant Jam Rp 4,265,013.00
2 Asphalt Finisher Jam Rp 1,055,618.83
3 Asphalt Sprayer Jam Rp 316,841.10
4 Buldozer 100 -150 HP Jam Rp 546,145.86
5 Compressor 4000 - 6500 L/M Jam Rp 276,795.80
6 Concrete Mixer 0,3 - 0,6 M3 Jam Rp 75,000.00
7 Crane 10 -15 Ton Jam Rp 614,539.30
8 Dump Truck 3 - 4 M3 Jam Rp 294,430.00
9 Dump Truck Jam Rp 560,934.35
10 Excavator 80 - 140 HP Jam Rp 697,044.11
11 Flat Bed Truck 3 - 4 M3 Jam Rp 346,404.15
12 Generator Set Jam Rp 462,863.00
13 Motor Grader > 100 HP Jam Rp 928,857.51
14 Track Loader 75 - 100 HP Jam Rp 604,495.20
15 Wheel Loader 1,0 - 1,6 M3 Jam Rp 797,751.89
16 Three Wheel Roller 6 - 8 T Jam Rp 236,410.10
17 Tandem Roller 6 - 8 T Jam Rp 583,048.61
18 Tire Roller 8 - 10 T Jam Rp 638,974.27
19 Vibratory Roller 5 - 8 T Jam Rp 385,205.22
20 Concrete Vibrator Jam Rp 39,935.00
21 Stone Crusher Jam Rp 788,020.25
22 Water Pump 70 - 100 mm Jam Rp 29,934.00
23 Water Tanker 3000 - 4500 L Jam Rp 251,385.00
24 Pedestrian Roller Jam Rp 72,599.50
25 Tamper Jam Rp 48,180.40
26 Jack Hammer Jam Rp 42,236.05
27 Fulvi Mixer Jam Rp 241,202.15
28 Concrete Pump Jam Rp 355,629.45
29 Trailer 20 Ton Jam Rp 761,218.35
30 Pile Driver + Hammer Jam Rp 328,598.70
31 Crane On Track 35 Ton Jam Rp 459,843.60
32 Welding Set Jam Rp 295,884.65
33 Bore Pile Machine Jam Rp 1,128,331.70
34 Ponton Jam Rp 345,000.00
35 Tug Boat Jam Rp 230,000.00

Direkap Oleh :
Panitia Penyusunan Standar
Bahan dan Upah (HSBU)
Sekretaris,

H. SUDARTO, SE
NIP. 19740905 199403 1 006

Disetujui Oleh :
Kepala Dinas Pekerjaan Umum dan Tata Ruang
Kabupaten Indragiri Hilir
Pelindung,

UMAR, ST, MT
NIP. 19681010 200003 1 005
BACK UP DATA

PROGRAM :
KEGIATAN :
SUB. KEGIATAN :
PEKERJAAN :
LOKASI :
TAHUN : 2022

NO. URAIAN PEKERJAAN/ GAMBAR SEKETSA DAN UKURAN DIMENSI PERHITUNGAN VOLUME & SATUAN

1 2 4
I PEKERJAAN SUMUR BOR
1 Pek. Pembuatan Pilot Hole Max Dia 2" ,termasuk pengadaan Air, Pelaksanaan
Simplefield Permability Test dll.
- Dari Titik 0 mtr - 50 mtr. 50.00 50.00 Mtr
- Dari Titik 50 mtr - 100 mtr. 50.00 50.00 Mtr
- Dari Titik 100 mtr - 150 mtr 50.00 50.00 Mtr
- Dari Titik 150 mtr - 200 mtr 50.00 50.00 Mtr
- Dari Titik 200 mtr - 250 mtr 50.00 50.00 Mtr
2 Pek. Pembesaran Lubang Bor/Reaming Untuk Sumur Uji/Produksi dia 4"
Termasuk Betonit, Air, dll.
- Dari Titik 0 mtr - 50 mtr. 50.00 50.00 Mtr
3 Pek. Pengadaan dan Pemasangan Pipa Cassing & Saringan (Screen)
- Pipa Jambang / Pump House Chasing. 20.00 20.00 Mtr
Jenis Pipa PVC.
In Dia 4" (100 mm)
- Pipa Jambang / Pump House Chasing. 200.00 200.00 Mtr
Jenis Pipa PVC.
In Dia 2" (50 mm)
- Pipa Naik. 50.00 16.00 Mtr
Jenis Pipa PVC
Class AW.
In Dia 1" (25 mm)
- Pipa Saringan. 20.00 20.00 Mtr
Jenis Pipa PVC.
Opening Area 30%.
4 Pek. Pandal Cerocok Pj 1 m Dia 8-10 cm 4*0,8 4.00 M1
5 Pek. Cor Lantai Beton dan Selimut Pipa Bor (Permukaan) camp. 1:2:4 ((0,8*0,8*0,15))+((0,5+0,3/2))*(0,5) 0.42 M3
6 Pek. Pemasangan Reduser 4" ke 2" 1.00 1.00 Bh
7 Pek. Pemasangan Reduser 2" ke 1.5" 1.00 1.00 Bh
8 Pek. Pembersihan Sumur Secara Water Jetting (Development ) 1.00 1.00 Smr
9 Pek. Pengujian Sumur Bor Termasuk Recovery (Pumping Test) 12.00 12.00 Jam
BACK UP DATA

PROGRAM :
KEGIATAN :
SUB. KEGIATAN :
PEKERJAAN :
LOKASI :
TAHUN : 2022

NO URAIAN PEKERJAAN PERHITUNGAN VOLUME & SATUAN

1 2 3 4
I PEKERJAAN PERSIAPAN
1 Pek. Pembersihan Lokasi 1.000 1.000 Ls
2 Pek. Pengukuran dan Pemasangan Bouwplank 1.000 1.000 Ls
3 Pek. Papan Nama Kegiatan 1.000 1.000 Unit
II PEKERJAAN TANAH DAN PONDASI TYPE I 1 UNIT
1 Pek. Galian Tanah 34,78*0,8 27.824 M3
2 Pek. Pasang Cerucuk, Pjg. 5 m 509*5 2,545.000 M1
3 Pek. Urugan Pasir Tebal 10 cm 34,78*0,1 3.478 M3
4 Pek. Lantai Kerja Beton Campuran 1 : 3 : 5 Tebal 5 cm 34,78*0,1 3.478 M3
5 Pek. Pondasi Setempat Beton Bertulang
- Beton Campuran 1 PC : 2 PS : 2,5 KR 34,78*0,2 6.956 M3
- Tulangan Pokok Ulir dia. 10 mm 409,42*0,62*2 507.681 Kg
- Bekisting 81,70*0,2 16.340 M2
III PEKERJAAN DINDING TYPE I 1 UNIT
1 Pek. Dinding
- Beton Campuran 1 PC : 2 PS : 2,5 KR 18,38*1,70 31.246 M3
- Tulangan Pokok Ulir dia. 10 mm 1089,07*2*0,62 1,350.447 Kg
- Tulangan Begol/Sengkarng Ulir dia. 8 mm 1968,96*0,4 787.584 Kg
- Bekisting (27,96+25,13)*0,85/2 22.563 M2
2 Pek. Lantai
- Pasir Timbun 20 cm 122,718*0,2 24.544 M3
- Cor Lantai Campuran 1 PC : 3 PS : 5 KR 122,718*0,1 12.272 M3
IV PEKERJAAN TANAH DAN PONDASI TYPE II 2 UNIT
1 Pek. Galian Tanah 20,78*0,8 16.624 M3
2 Pek. Pasang Cerucuk, Pjg. 5 m 324*5 1,170.000 M1
3 Pek. Urugan Pasir Tebal 10 cm 20,78*0,1 2.078 M3
4 Pek. Lantai Kerja Beton Campuran 1 : 3 : 5 Tebal 5 cm 20,78*0,1 2.078 M3
5 Pek. Pondasi Setempat Beton Bertulang
- Beton Campuran 1 PC : 2 PS : 2,5 KR 20,78*0,2 4.156 M3
- Tulangan Pokok Ulir dia. 10 mm 260,80*0,62*2 323.392 Kg
- Bekisting 51,95*0,2 10.390 M2
V PEKERJAAN DINDING TYPE II 2 UNIT
1 Pek. Dinding
- Beton Campuran 1 PC : 2 PS : 2,5 KR 11,69*1,7 19.873 M3
- Tulangan Pokok Ulir dia. 10 mm 692,8*2*0,62 859.072 Kg
- Tulangan Begol/Sengkarng Ulir dia. 8 mm 1255,68*0,4 502.272 Kg
- Bekisting (27,39+24,56)*1,7/4 22.079 M2
2 Pek. Lantai
- Pasir Timbun 20 cm 48,02*0,2 9.604 M3
- Cor Lantai Campuran 1 PC : 3 PS : 5 KR 48,02*0,1 4.802 M3
IV PEKERJAAN LAIN - LAIN
1 Pek. Pembersihan Akhir 1.000 Ls
ENGINEER ESTIMATE (EE)

PROGRAM : PROGRAM PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM


KEGIATAN : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM) DIDAERAH KABUPATEN/KOTA
SUB. KEGIATAN : #REF!
PEKERJAAN : #REF!
LOKASI : KECAMATAN TEMBILAHAN
BIAYA : #REF!

No. Uraian Pekerjaan Volume Satuan Harga Satuan Jumlah Harga

1 2 3 4 5 6

PEKERJAAN RUMAH MESIN

I PEKERJAAN PONDASI
1 Pek. Galian Tanah Pondasi 0.576 M3 Rp 38,000.00 Rp 21,888.00
2 Pek. Pasang Cerocok Bakau Pjg. 6 m 36.000 Btg Rp 41,163.43 Rp 1,481,883.43
3 Pek. Urugan Pasir Bawah Pondasi tbl 5 cm 0.144 M3 Rp 184,900.00 Rp 26,625.60
4 Pek. Cor Lantai Kerja 1:4:6, tbl 10 cm 0.072 M3 Rp 774,803.00 Rp 55,785.82
5 Pek. Cor Tapak Pondasi Umpak camp. 1:2:4 0.288 M3 Rp 1,461,079.00 Rp 420,790.75
6 Pek. Cor Tiang Pondasi 20/20 camp. 1:2:4 0.160 M3 Rp 1,461,079.00 Rp 233,772.64
7 Pek. Pembesian Tapak dan Tiang
- Tulangan Pokok Besi Polos dia. 10 mm 49.854 Kg Rp 10,651.94 Rp 531,037.43
- Beugel Besi dia. 6 mm 4.351 Kg Rp 11,375.34 Rp 49,496.36
8 Pek. Bekisting Tapak Pondasi 1.920 M2 Rp 132,335.00 Rp 254,083.20
9 Pek. Bekisting Tiang Pondasi 3.200 M2 Rp 241,040.00 Rp 771,328.00
10 Pek. Urugan Kembali Bekas Galian 0.576 M3 Rp 18,220.00 Rp 10,494.72
Sub Jumlah Rp 3,857,185.95

II PEKERJAAN LANTAI
1 Pek. Cor Balok 20/20 camp. 1:2:4 0.248 M3 Rp 1,461,079.00 Rp 362,347.59
2 Pek. Pembesian Balok
- Tulangan Pokok Besi Polos dia. 10 mm 15.795 Kg Rp 10,651.94 Rp 168,249.48
- Beugel Besi dia. 6 mm 6.527 Kg Rp 11,375.34 Rp 74,244.54
3 Pek. Bekisting Balok 3.720 M2 Rp 249,340.00 Rp 927,544.80
4 Pek. Cor Plat Lantai tebal 10 cm camp. 1:2:4 0.145 M3 Rp 1,461,079.00 Rp 212,148.67
5 Pek. Pembesian plat Lantai dan Kolom
- Tulangan Pokok Besi Polos dia. 10 mm 25.667 Kg Rp 11,375.34 Rp 291,973.01
6 Pek. Bekisting Plat lantai 1.210 M2 Rp 277,940.00 Rp 336,307.40
Sub Jumlah Rp 2,656,084.49

III PEKERJAAN LANTAI ATAP


1 Pek. Cor Balok 20/20 camp. 1:2:4 0.160 M3 Rp 1,461,079.00 Rp 233,772.64
2 Pek. Pembesian Balok Atap
- Tulangan Pokok Besi Ulir dia. 10 mm 12.834 Kg Rp 10,651.94 Rp 136,702.71
- Beugel Besi dia. 6 mm 4.351 Kg Rp 11,375.34 Rp 49,496.36
3 Pek. Bekisting Balok Atap 4.200 M2 Rp 277,940.00 Rp 1,167,348.00
4 Pek. Cor Plat Lantai Atap tebal 10 cm camp. 1:2:4 0.324 M3 Rp 1,461,079.00 Rp 473,389.60
5 Pek. Pembesian plat Lantai Atap
- Tulangan Pokok Besi Ulir dia. 10 mm 12.834 Kg Rp 11,375.34 Rp 145,986.50
6 Pek. Bekisting Plat lantai Atap 1.210 M2 Rp 277,940.00 Rp 336,307.40
Sub Jumlah Rp 2,543,003.21

IV PEKERJAAN PERPIPAAN DAN TANGKI


1 Tangki Plastik Kapasitas 1000 Liter (Hidrant Umum) 1.000 Unit #REF! #REF!
2 Pek. Kran Air 3/4" 4.000 Bh Rp 55,850.00 Rp 223,400.00
3 Pek. Pasang Pipa PVC 3/4" 4.000 M' Rp 8,250.00 Rp 33,000.00
4 Pek. Stop Kran 3/4" 2.000 Bh Rp 15,000.00 Rp 30,000.00
Sub Jumlah #REF!

V PEKERJAAN PENGECATAN
1 Pek. Cat Air 11.200 M2 Rp 29,762.79 Rp 333,343.20
Sub Jumlah Rp 333,343.20
No. Uraian Pekerjaan Volume Satuan Harga Satuan Jumlah Harga

1 2 3 4 5 6

VI PEKERJAAN LAIN - LAIN


1 Pek. Pasang Cerocok Bakau Pjg. 3 m 36.000 M' Rp 20,581.71 Rp 740,941.71
2 Pek. Urugan Pasir Bawah Pondasi tbl 5 cm 0.124 M3 Rp 184,900.00 Rp 22,927.60
3 Pek. Cor Lantai Kerja 1:4:6, tbl 10 cm 0.062 M3 Rp 774,803.00 Rp 48,037.79
4 Pek. Cor Sloof 20/20 camp. 1:2:4 0.248 M3 Rp 1,461,079.00 Rp 362,347.59
5 Pek. Pembesian Sloof
- Tulangan Pokok Besi Polos dia. 10 mm 15.302 Kg Rp 10,651.94 Rp 162,991.69
- Beugel Besi dia. 6 mm 5.284 Kg Rp 11,375.34 Rp 60,102.72
6 Pek. Bekisting Sloof 1.240 M2 Rp 23,400.00 Rp 29,016.00
7 Pek. Urugan Pasir 0.242 M3 Rp 184,900.00 Rp 44,745.80
8 Pek. Cor Plat Lantai tebal 10 cm camp. 1:2:4 0.145 M3 Rp 1,461,079.00 Rp 212,148.67
9 Pek. Pemasangan Keramik (40x40 cm) Kualitas Sedang 2.550 M2 #NAME? #NAME?
Sub Jumlah #NAME?

VII PEKERJAAN LAIN - LAIN


1 Cor Dudukan Kran 1.000 Ls Rp 400,000.00 Rp 400,000.00
2 Pek. Pembuatan Logo pada bangunan dan Tangki 1.000 Ls Rp 500,000.00 Rp 500,000.00
3 Pek. Pagar Pengaman mesin 1.000 Ls Rp 2,000,000.00 Rp 2,000,000.00
4 Pek Pembersihan Akhir 1.000 Ls Rp 200,000.00 Rp 200,000.00
Sub Jumlah Rp 3,100,000.00
#REF!

JUMLAH 1.0 #REF!


PPN 10% #REF!
TOTAL #REF!
DIBULATKAN #REF!
TERBILANG : #NAME?

Tembilahan, 2021
Diperiksa Oleh : Dibuat Oleh :
CV. MOMENT TEKNIK CV. MOMENT TEKNIK
Konsultan Perencana Konsultan Perencana

HIKMATULLAH, ST Ir. ADRIL


Direktur Team Leader

Diketahui Oleh :
PEJABAT PEMBUAT KOMITMEN
( PPK)

ARIF GUNAWAN, ST
NIP. 19840830 201001 1 006
ENGINEER ESTIMATE (EE)

PROGRAM : PROGRAM PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM


KEGIATAN : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM) DIDAERAH KABUPATEN/KOTA
SUB. KEGIATAN : #REF!
PEKERJAAN : #REF!
LOKASI : KECAMATAN TEMBILAHAN
BIAYA : #NAME?

No. Uraian Pekerjaan Volume Satuan Harga Satuan Jumlah Harga

1 2 3 4 5 6

PEKERJAAN PENGADAAN PIPA DISTRIBUSI

I PEKERJAAN PENDAHULUAN
1 Pek. Pembersihan Lokasi Jalur Pipa 27.5 M2 #NAME? #NAME?
2 Pek. Pengukuran Jalur Pipa 1.0 Ls Rp - Rp -
Sub Jumlah #NAME?

II PEKERJAAN PENGADAAN
1 Pipa PVC dia 2" 110.0 Mtr #REF! #REF!
2 Pipa PVC dia 3/4 " 4.0 Mtr #REF! #REF!
3 Stop Krant PVC dia 2" 4.0 Bh #REF! #REF!
4 Elbow 2" 4.0 Bh #REF! #REF!
5 Recuder 2" - 3/4" 4.0 Bh #REF! #REF!
6 Valve Socket dia 3/4" 4.0 Bh Rp 9,000.00 Rp 36,000.00
Sub Jumlah #REF!

III PEKERJAAN PEMASANGAN


1 Pemasangan Pipa 110.0 Mtr Rp 3,000.00 Rp 330,000.00
2 Pekerjaan Galian Tanah 6.6 M3 #NAME? #NAME?
3 Pekerjaan Urugan Kembali 6.6 M3 #NAME? #NAME?
4 Pemasangan Acesories Pipa 1.0 Ls Rp 350,000.00 Rp 350,000.00
5 Pembersihan Akhir 1.0 Ls Rp 200,000.00 Rp 200,000.00
Sub Jumlah #NAME?

JUMLAH #NAME?
PPN 10% #NAME?
TOTAL #NAME?
DIBULATKAN #NAME?
Terbilang : #NAME?

Tembilahan, 2021
Diperiksa Oleh : Dibuat Oleh :
CV. MOMENT TEKNIK CV. MOMENT TEKNIK
Konsultan Perencana Konsultan Perencana

HIKMATULLAH, ST Ir. ADRIL


Direktur Team Leader

Diketahui Oleh :
PEJABAT PEMBUAT KOMITMEN
( PPK)
ARIF GUNAWAN, ST
NIP. 19840830 201001 1 006
ANALISA HARGA SATUAN PEKERJAAN
STANDAR NASIONAL INDONESIA
PROGRAM : 0
KEGIATAN : 0
PEKERJAAN : 0

LOKASI : 0
PEKERJAAN PERSIAPAN
01 1 M' Pekerjaan Pengukuran dan Pemasangan Bouwplank
HARGA SATUAN JUMLAH HARGA
No URAIAN KOEFISIEN SATUAN
(Rp) (Rp)
A BAHAN
1 Kayu 5/7 0.500 Btg #NAME? #NAME?
2 Paku Biasa 0.020 Kg #REF! #REF!
3 Papan Bakisting 0.007 M3 #REF! #REF!
Jumlah #NAME?
B TENAGA
1 Pekerja 0.100 Oh #REF! #REF!
2 Tukang 0.100 Oh #REF! #REF!
3 Kepala Tukang 0.010 Oh #REF! #REF!
4 Mandor 0.005 Oh #REF! #REF!
Jumlah #REF!
C Jumlah A + B #REF!
D Harga Satuan #REF!

01 1 M2 Pekerjaan Papan Pondasi (BOW)


HARGA SATUAN JUMLAH HARGA
No URAIAN KOEFISIEN SATUAN
(Rp) (Rp)
A BAHAN
1 Papan Bakisting 0.015 M3 #REF! #REF!
2 Paku Biasa 2"-5" 0.050 Kg #REF! #REF!
Jumlah #REF!
B TENAGA
1 Pekerja 0.200 Oh #REF! #REF!
2 Tukang 0.500 Oh #REF! #REF!
3 Kepala Tukang 0.050 Oh #REF! #REF!
4 Mandor 0.010 Oh #REF! #REF!
Jumlah #REF!
C Jumlah A + B #REF!
D Harga Satuan #REF!

01 1 M' Pemasangan Pandal Kayu (BOW)


HARGA SATUAN JUMLAH HARGA
No URAIAN KOEFISIEN SATUAN
(Rp) (Rp)
A BAHAN
1 Kayu Bakau Pj. 6 1.000 M' #REF! #REF!
Jumlah #REF!
B TENAGA
1 Pekerja 1.800 Oh #REF! #REF!
2 Tukang 0.040 Oh #REF! #REF!
3 Kepala Tukang 1.800 Oh #REF! #REF!
4 Mandor 1.045 Oh #REF! #REF!
Jumlah #REF!
Koefesien Upah x 0,001 #REF!
C Jumlah A + B #REF!
D Harga Satuan #REF!
PEKERJAAN PENGEBORAN
02 Pengeboran Pilot Hole Diameter 2" Interval Kedalaman 0 - 50 M
HARGA SATUAN JUMLAH HARGA
No URAIAN KOEFISIEN SATUAN
(Rp) (Rp)
A BAHAN
1 Solar Mesin Bor 1.500 Liter #REF! #REF!
2 Oli SAE 40 Mesin Bor 0.100 Liter #REF! #REF!
3 Grease 0.100 Kg #REF! #REF!
Jumlah #REF!
B TENAGA
1 Site Manager 0.100 Oh #REF! #REF!
2 Driller 0.100 Oh #REF! #REF!
3 Ass. Driller 0.100 Oh #REF! #REF!
4 Mekanik 0.100 Oh #REF! #REF!
5 Helper 0.100 Oh #REF! #REF!
Jumlah #REF!
C PERALATAN
1 Depresiasi Mesin Bor 0.100 Hari #REF! #REF!
2 Depresiasi Mud Pump 0.100 Hari #REF! #REF!
3 Mata Bor 2" 0.400 Hari #REF! #REF!
Jumlah #REF!
D Jumlah A + B + C #REF!
E Harga Satuan #REF!

03 Pengeboran Pilot Hole Diameter 2" Interval Kedalaman 50 - 100 M


HARGA SATUAN JUMLAH HARGA
No URAIAN KOEFISIEN SATUAN
(Rp) (Rp)
A BAHAN
1 Solar Mesin Bor 2.000 Liter #REF! #REF!
2 Oli SAE 40 Mesin Bor 0.120 Liter #REF! #REF!
3 Grease 0.300 Kg #REF! #REF!
Jumlah #REF!
B TENAGA
1 Site Manager 0.100 Oh #REF! #REF!
2 Driller 0.100 Oh #REF! #REF!
3 Ass. Driller 0.100 Oh #REF! #REF!
4 Mekanik 0.100 Oh #REF! #REF!
5 Helper 0.100 Oh #REF! #REF!
Jumlah #REF!
C PERALATAN
1 Depresiasi Mesin Bor 0.100 Hari #REF! #REF!
2 Depresiasi Mud Pump 0.100 Hari #REF! #REF!
3 Mata Bor 2" 0.600 Hari #REF! #REF!
Jumlah #REF!
D Jumlah A + B + C #REF!
E Harga Satuan #REF!

04 Pengeboran Pilot Hole Diameter 2" Interval Kedalaman 100 - 150 M


HARGA SATUAN JUMLAH HARGA
No URAIAN KOEFISIEN SATUAN
(Rp) (Rp)
A BAHAN
1 Solar Mesin Bor 2.200 Liter #REF! #REF!
2 Oli SAE 40 Mesin Bor 0.120 Liter #REF! #REF!
3 Grease 0.400 Kg #REF! #REF!
Jumlah #REF!
B TENAGA
1 Site Manager 0.110 Oh #REF! #REF!
2 Driller 0.110 Oh #REF! #REF!
3 Ass. Driller 0.110 Oh #REF! #REF!
4 Mekanik 0.110 Oh #REF! #REF!
5 Helper 0.110 Oh #REF! #REF!
Jumlah #REF!
C PERALATAN
1 Depresiasi Mesin Bor 0.110 Hari #REF! #REF!
2 Depresiasi Mud Pump 0.110 Hari #REF! #REF!
3 Mata Bor 2" 2:" 0.800 Hari #REF! #REF!
Jumlah #REF!
D Jumlah A + B + C #REF!
E Harga Satuan #REF!
05 Pengeboran Pilot Hole Diameter 2" Interval Kedalaman 150 - 200 M
HARGA SATUAN JUMLAH HARGA
No URAIAN KOEFISIEN SATUAN
(Rp) (Rp)
A BAHAN
1 Solar Mesin Bor 2.400 Liter #REF! #REF!
2 Oli SAE 40 Mesin Bor 0.120 Liter #REF! #REF!
3 Grease 0.400 Kg #REF! #REF!
Jumlah #REF!
B TENAGA
1 Site Manager 0.120 Oh #REF! #REF!
2 Driller 0.120 Oh #REF! #REF!
3 Ass. Driller 0.120 Oh #REF! #REF!
4 Mekanik 0.120 Oh #REF! #REF!
5 Helper 0.120 Oh #REF! #REF!
Jumlah #REF!
C PERALATAN
1 Depresiasi Mesin Bor 0.120 Hari #REF! #REF!
2 Depresiasi Mud Pump 0.120 Hari #REF! #REF!
3 Mata Bor 2" 1.000 Hari #REF! #REF!
Jumlah #REF!
D Jumlah A + B + C #REF!
E Harga Satuan #REF!

06 Pembesaran lobang / Reaming dari diameter 2"-4" Interval Kedalaman 0 - 50 M


HARGA SATUAN JUMLAH HARGA
No URAIAN KOEFISIEN SATUAN
(Rp) (Rp)
A BAHAN
1 Solar Mesin Bor 1.200 Liter #REF! #REF!
2 Oli SAE 40 Mesin Bor 0.110 Liter #REF! #REF!
3 Grease 0.150 Kg #REF! #REF!
Jumlah #REF!
B TENAGA
1 Driller 0.100 Oh #REF! #REF!
2 Ass. Driller 0.100 Oh #REF! #REF!
3 Mekanik 0.100 Oh #REF! #REF!
4 Helper 0.100 Oh #REF! #REF!
Jumlah #REF!
C PERALATAN
1 Depresiasi Mesin Bor 0.100 Hari #REF! #REF!
2 Depresiasi Mud Pump 0.100 Hari #REF! #REF!
3 Mata Bor 4" 0.400 Hari #REF! #REF!
Jumlah #REF!
D Jumlah A + B + C #REF!
E Harga Satuan #REF!

07 Pembesaran lobang / Reaming dari diameter 2"-4" Interval Kedalaman 50 - 100 M


HARGA SATUAN JUMLAH HARGA
No URAIAN KOEFISIEN SATUAN
(Rp) (Rp)
A BAHAN
1 Solar Mesin Bor 2.000 Liter #REF! #REF!
2 Oli SAE 40 Mesin Bor 0.110 Liter #REF! #REF!
3 Grease 0.250 Kg #REF! #REF!
Jumlah #REF!
B TENAGA
1 Driller 0.100 Oh #REF! #REF!
2 Ass. Driller 0.100 Oh #REF! #REF!
3 Mekanik 0.100 Oh #REF! #REF!
4 Helper 0.100 Oh #REF! #REF!
Jumlah #REF!
C PERALATAN
1 Depresiasi Mesin Bor 0.100 Hari #REF! #REF!
2 Depresiasi Mud Pump 0.100 Hari #REF! #REF!
3 Mata Bor 4" 0.500 Hari #REF! #REF!
Jumlah #REF!
D Jumlah A + B + C #REF!
E Harga Satuan #REF!
08 Pembesaran lobang / Reaming dari diameter 2"-4" Interval Kedalaman 100 - 150 M
HARGA SATUAN JUMLAH HARGA
No URAIAN KOEFISIEN SATUAN
(Rp) (Rp)
A BAHAN
1 Solar Mesin Bor 2.000 Liter #REF! #REF!
2 Oli SAE 40 Mesin Bor 0.120 Liter #REF! #REF!
3 Grease 0.500 Kg #REF! #REF!
Jumlah #REF!
B TENAGA
1 Driller 0.100 Oh #REF! #REF!
2 Ass. Driller 0.100 Oh #REF! #REF!
3 Mekanik 0.100 Oh #REF! #REF!
4 Helper 0.100 Oh #REF! #REF!
Jumlah #REF!
C PERALATAN
1 Depresiasi Mesin Bor 0.100 Hari #REF! #REF!
2 Depresiasi Mud Pump 0.100 Hari #REF! #REF!
3 Mata Bor 4" 0.600 Hari #REF! #REF!
Jumlah #REF!
D Jumlah A + B + C #REF!
E Harga Satuan #REF!

09 Pembesaran lobang / Reaming dari diameter 2"-4" Interval Kedalaman 150 - 200 M
HARGA SATUAN JUMLAH HARGA
No URAIAN KOEFISIEN SATUAN
(Rp) (Rp)
A BAHAN
1 Solar Mesin Bor 2.200 Liter #REF! #REF!
2 Oli SAE 40 Mesin Bor 0.120 Liter #REF! #REF!
3 Grease 0.500 Kg #REF! #REF!
Jumlah #REF!
B TENAGA
1 Driller 0.110 Oh #REF! #REF!
2 Ass. Driller 0.110 Oh #REF! #REF!
3 Mekanik 0.110 Oh #REF! #REF!
4 Helper 0.110 Oh #REF! #REF!
Jumlah #REF!
C PERALATAN
1 Depresiasi Mesin Bor 0.110 Hari #REF! #REF!
2 Depresiasi Mud Pump 0.110 Hari #REF! #REF!
3 Mata Bor 4" 0.650 Hari #REF! #REF!
Jumlah #REF!
D Jumlah A + B + C #REF!
E Harga Satuan #REF!

10 Pengadaan dan pemasangan pipa PVC Diameter 4" (AW)


HARGA SATUAN JUMLAH HARGA
No URAIAN KOEFISIEN SATUAN
(Rp) (Rp)
A BAHAN
1 Solar Mesin Bor 0.600 Liter #REF! #REF!
2 pipa Æ 4" 1.000 meter #REF! #REF!
3 Lem paralon 0.050 Kg #REF! #REF!
Jumlah #REF!
B TENAGA
1 Site manager 0.050 Oh #REF! #REF!
2 Driller 0.050 Oh #REF! #REF!
3 Ass. Driller 0.050 Oh #REF! #REF!
4 Mekanik 0.050 Oh #REF! #REF!
5 Halper 0.050 Oh #REF! #REF!
Jumlah #REF!
C PERALATAN
1 Depresiasi Mesin Bor 0.050 Hari #REF! #REF!
Jumlah #REF!
D Jumlah A + B + C #REF!
E Harga Satuan #REF!
11 Pengadaan dan pemasangan pipa PVC Diameter 2" (AW)
HARGA SATUAN JUMLAH HARGA
No URAIAN KOEFISIEN SATUAN
(Rp) (Rp)
A BAHAN
1 Solar Mesin Bor 0.600 Liter #REF! #REF!
2 pipa Æ 4" 1.000 meter #REF! #REF!
3 Lem paralon 0.050 Kg #REF! #REF!
Jumlah #REF!
B TENAGA
1 Site manager 0.050 Oh #REF! #REF!
2 Driller 0.050 Oh #REF! #REF!
3 Ass. Driller 0.050 Oh #REF! #REF!
4 Mekanik 0.050 Oh #REF! #REF!
5 Halper 0.050 Oh #REF! #REF!
Jumlah #REF!
C PERALATAN
1 Depresiasi Mesin Bor 0.050 Hari #REF! #REF!
Jumlah #REF!
D Jumlah A + B + C #REF!
E Harga Satuan #REF!

12 Pengadaan dan pemasangan pipa Diameter 1,5" (SCREEN)


HARGA SATUAN JUMLAH HARGA
No URAIAN KOEFISIEN SATUAN
(Rp) (Rp)
A BAHAN
1 Solar Mesin Bor 0.800 Liter #REF! #REF!
2 pipa Æ 1,5" (saringan) 1.000 Meter #REF! #REF!
Jumlah #REF!
B TENAGA
1 Site manager 0.055 Oh #REF! #REF!
2 Driller 0.055 Oh #REF! #REF!
3 Ass. Driller 0.050 Oh #REF! #REF!
4 Mekanik 0.050 Oh #REF! #REF!
5 Halper 0.050 Oh #REF! #REF!
Jumlah #REF!
C PERALATAN
1 Depresiasi Mesin Bor 0.080 Hari #REF! #REF!
Jumlah #REF!
D Jumlah A + B + C #REF!
E Harga Satuan #REF!

13 Pengadaan dan pemasangan Centralizer dipasang Tiap 30 M


HARGA SATUAN JUMLAH HARGA
No URAIAN KOEFISIEN SATUAN
(Rp) (Rp)
A BAHAN
1 Centralizer 1.000 Set #REF! #REF!
Jumlah #REF!
B TENAGA
1 Site manager 0.020 Oh #REF! #REF!
2 Driller 0.020 Oh #REF! #REF!
3 Ass. Driller 0.020 Oh #REF! #REF!
4 Mekanik 0.020 Oh #REF! #REF!
5 Helper 0.020 Oh #REF! #REF!
Jumlah #REF!
C Jumlah A + B #REF!
D Harga Satuan #REF!
14 Penyemenan (Grouting) dari permukaan Tanah Sampai 20 M'
HARGA SATUAN JUMLAH HARGA
No URAIAN KOEFISIEN SATUAN
(Rp) (Rp)
A BAHAN
1 Semen 125.000 Kg #REF! #REF!
2 Pasir cor 0.500 M3 #REF! #REF!
3 Betonite 2.000 Oh #REF! #REF!
Jumlah #REF!
B TENAGA
1 Driller 0.100 Oh #REF! #REF!
2 Ass. Driller 0.100 Oh #REF! #REF!
3 Helper 0.100 Oh #REF! #REF!
Jumlah #REF!
C Jumlah A + B #REF!
D Harga Satuan #REF!

15 Pembersihan Sumur Dengan Highvelocity Jetting


HARGA SATUAN JUMLAH HARGA
No URAIAN KOEFISIEN SATUAN
(Rp) (Rp)
A BAHAN
1 Solar Mesin Bor 4.000 Liter #REF! #REF!
2 Liquifier 0.300 Oh #REF! #REF!
Jumlah #REF!
B TENAGA
1 Site Manager 0.010 Oh #REF! #REF!
2 Driller 0.010 Oh #REF! #REF!
3 Ass. Driller 0.010 Oh #REF! #REF!
4 Mekanik 0.010 Oh #REF! #REF!
5 Helper 0.010 Oh #REF! #REF!
Jumlah #REF!
C PERALATAN
1 Deprisiasi Mesin Bor 1.500 Hari #REF! #REF!
Jumlah #REF!
D Jumlah A + B + C #REF!
E Harga Satuan #REF!

16 Pengujian Pompa Sumur (Pumpping Test)


HARGA SATUAN JUMLAH HARGA
No URAIAN KOEFISIEN SATUAN
(Rp) (Rp)
A BAHAN
1 Solar Mesin BoGenarator 5.000 Liter #REF! #REF!
2 Olie SAE 40 Mesin Generator 1.000 Oh #REF! #REF!
3 Alat Tulis 1.000 Oh 15,000.00 15,000.00
Jumlah #REF!
B TENAGA
1 Site Manager 0.020 Oh #REF! -
2 Driller 0.020 Oh #REF! #REF!
3 Ass. Driller 0.020 Oh #REF! #REF!
4 Mekanik 0.020 Oh #REF! #REF!
5 Helper 0.020 Oh #REF! #REF!
Jumlah #REF!
C PERALATAN
1 Deprisiasi Mesin Generator 0.020 Hari #REF! #REF!
2 Depresiasi Mesin Pompa 0.020 Hari #REF! #REF!
Jumlah #REF!
D Jumlah A + B + C #REF!
E Harga Satuan #REF!
17 1 M' Mengerjakan Barhole Logging Resistivity / Sp
HARGA SATUAN JUMLAH HARGA
No URAIAN KOEFISIEN SATUAN
(Rp) (Rp)
A BAHAN

Jumlah
B TENAGA
1 Site Manager 0.050 Oh #REF! #REF!
2 Driller 0.050 Oh #REF! #REF!
3 Ass. Driller 0.050 Oh #REF! #REF!
4 Mekanik 0.050 Oh #REF! #REF!
5 Helper 0.050 Oh #REF! #REF!
Jumlah #REF!
C PERALATAN
1 Deprisiasi Alat Logging 0.020 Hari #REF! #REF!
2 Depresiasi Mesin Pompa 0.020 Hari #REF! #REF!
Jumlah #REF!
D Jumlah A + B + C #REF!
E Harga Satuan #REF!

18 1 M' Pemasangan Filter Gravel


HARGA SATUAN JUMLAH HARGA
No URAIAN KOEFISIEN SATUAN
(Rp) (Rp)
A BAHAN
1 Gravel Æ 2-5 cm 1.000 M3 #REF! #REF!
Jumlah #REF!
B TENAGA
1 Driller 0.120 Oh #REF! #REF!
2 Ass. Driller 0.150 Oh #REF! #REF!
3 Mekanik 0.120 Oh #REF! #REF!
4 Helper 0.120 Oh #REF! #REF!
Jumlah #REF!
C PERALATAN
1 Deprisiasi Alat Logging 0.020 Hari #REF! #REF!
Jumlah #REF!
D Jumlah A + B + C #REF!
E Harga Satuan #REF!

19 1 M' Pengadaan dan Pemasangan pipa Naik PVC Æ 1 "


HARGA SATUAN JUMLAH HARGA
No URAIAN KOEFISIEN SATUAN
(Rp) (Rp)
A BAHAN
1 Solar Mesin Bor 0.800 Oh #REF! #REF!
2 Pipa Naik Æ 1 " PVC AW 1.000 Oh #REF! #REF!
3 Lem PVC 0.050 Oh #REF! #REF!
Jumlah #REF!
B TENAGA
1 Site Manager 0.050 Oh #REF! #REF!
2 Driller 0.050 Oh #REF! #REF!
3 Ass. Driller 0.050 Oh #REF! #REF!
4 Mekanik 0.050 Oh #REF! #REF!
5 Halper 0.050 Oh #REF! #REF!
Jumlah #REF!
C PERALATAN
1 Deprisiasi Mesin Bor 0.050 Hari #REF! #REF!
Jumlah #REF!
D Jumlah A + B + C #REF!
E Harga Satuan #REF!
20 1 M' Pemasangan Pipa Air bersih 1,5" (Produksi)
HARGA SATUAN JUMLAH HARGA
No URAIAN KOEFISIEN SATUAN
(Rp) (Rp)
A BAHAN
1 pipa PVC 1,5" (sumur bor-Tangki-stop
1.200 M1 #REF! #REF!
Kran) Perlengkapan = 34% Harga pipa
Jumlah #REF!
B TENAGA
1 Pekerja 0.036 Oh #REF! #REF!
2 Tukang 0.060 Oh #REF! #REF!
3 Kepala tukang 0.006 Oh #REF! #REF!
4 Mandor 0.002 Oh #REF! #REF!
Jumlah #REF!
C Jumlah A + B #REF!
D Harga Satuan #REF!

21 1 Bh Pemasangan Stop Kran 1 "


HARGA SATUAN JUMLAH HARGA
No URAIAN KOEFISIEN SATUAN
(Rp) (Rp)
A BAHAN
1 Stop Air Plastik 1 " 1.000 Bh #REF! #REF!
2 Seal Tape 1.000 Bh #REF! #REF!
Jumlah #REF!
B TENAGA
1 Pekerja 0.010 Oh #REF! #REF!
2 Tukang 0.010 Oh #REF! #REF!
3 Kepala tukang 0.010 Oh #REF! #REF!
4 Mandor 0.001 Oh #REF! #REF!
Jumlah #REF!
C Jumlah A + B #REF!
D Harga Satuan #REF!
BACK UP HITUNGAN
Tinggi Kolom 0.7
PEKERJAAN : PEKERJAAN RUMAH MESIN DAN TOWER AIR Tinggi Balok 0.5
Besi Tulangan Balok 6
Pakai Sloof 0
DIMENSI JUMLAH
ITEM QTTY KOEF. BESI TOTAL SATUAN
P L T UNIT
GALIAN PONDASI 0.800 0.800 0.700 0.280 4.000 2.072 M3
CEROCOK PONDASI 13.000 6.000 78.000 BTG
CEROCOK PONDASI 22.000 13.000 4.000 63.000 BTG
TIMBUN LANTAI KERJA 0.800 0.800 0.100 0.140 4.000 0.396 M3
LANTAI KERJA 0.800 0.800 0.050 0.140 4.000 0.268 M3
KERAMIK 2.500 1.500 3.750 M2
COR SLOFF 0.300 0.200 7.000 1.000 -
BESI 10 SLOF 8.000 - - 6.000 1.000 0.617 -
BESI BEGEL 6 SLOFF 0.900 - - 46.000 1.000 0.222 -
BEKISTING SLOFF 7.000 - 0.600 - 1.000 - -
COR TAPAK 0.800 0.800 0.250 4.000 0.640 M3
BEKISTING TAPAK 0.800 0.250 4.000 4.000 3.200 M2
COR TIANG PONDASI 20/20 0.200 0.200 0.700 4.000 0.112 M3
BEKISTING TIANG PONDASI 0.200 0.700 4.000 4.000 2.240 M2
BESI 10 TAPAK PONDASI 1.800 12.000 4.000 0.617 53.309 Kg
BESI 10 TIANG PONDASI 1.100 4.000 4.000 0.617 10.859 Kg
BESI 6 BEWGEL PONDASI 0.700 5.000 4.000 0.222 3.108 Kg
COR BALOK LANTAI 20/50 7.000 0.200 0.500 1.000 0.700 M3
BESI 10 BALOK LANTAI 8.000 6.000 1.000 0.617 29.616 Kg
BESI BEGEL 6 BALOK LANTAI 1.400 46.000 1.000 0.222 14.297 Kg
BEKISTING BALOK LANTAI 7.000 1.000 1.000 7.000 M2
COR LANTAI TEBAL 12 1.400 2.300 0.120 1.000 0.386 M3
BESI 10 PLAT (MEMANJANG) 1.500 16.000 0.617 14.808 Kg
BESI 10 PLAT (MELINTANG) 2.500 10.000 0.617 15.425 Kg
BEKISTING LANTAI 2.300 1.300 1.000 2.990 M2

Tempat wuduh

GALIAN PONDASI 0.800 0.800 0.700 0.120 2.000 0.896 M3


CEROCOK PONDASI 8.000 11.000 13.000 2.000 35.500 BTG
TIMBUN LANTAI KERJA 0.800 0.800 0.100 2.000 0.128 M3
LANTAI KERJA 0.800 0.800 0.050 2.000 0.064 M3
KERAMIK 2.700 1.500 - M2
COR SLOFF 0.200 0.300 5.100 1.000 -
BESI 10 SLOF 5.100 - - 6.000 1.000 0.617 -
BESI BEGEL 6 SLOFF 0.900 - - 34.000 1.000 0.222 -
BEKISTING SLOFF 5.100 - 0.600 - 1.000 - -
COR TAPAK 0.800 0.800 0.250 2.000 0.320 M3
BEKISTING TAPAK 0.800 0.250 4.000 2.000 1.600 M2
COR TIANG PONDASI 20/20 DEPAN 0.200 0.200 0.700 2.000 0.056 M3
BEKISTING TIANG PONDASI DEPAN 0.200 0.700 4.000 2.000 1.120 M2
BESI 10 TAPAK PONDASI DEPAN 1.900 12.000 2.000 0.617 28.135 Kg
BESI 10 TIANG PONDASI DEPAN 1.100 2.000 2.000 0.617 2.715 Kg
BESI 10 BALOK LANTAI DEPAN 5.500 6.000 1.000 0.617 20.361 Kg
BESI 6 BEWGEL PONDASI DEPAN 0.700 5.000 2.000 0.222 1.554 Kg
COR BALOK LANTAI 20/20 DEPAN 5.100 0.200 0.400 1.000 0.408 M3
BESI BEGEL 6 BALOK LANTAI DEPAN 1.200 31.000 1.000 0.222 8.258 Kg
BEKISTING BALOK LANTAI DEPAN 5.100 0.600 1.000 3.060 M2
COR LANTAI TEBAL 12 1.400 2.300 0.120 1.000 0.386 M3
BESI 10 PLAT (MEMANJANG)DEPN 1.500 16.000 0.617 14.808 Kg
BESI 10 PLAT (MELINTANG)DEPN 2.500 10.000 0.617 15.425 Kg
BEKISTING LANTAI DEPAN 2.300 1.300 1.000 2.990 M2
PASANGAN BATA 1/2 1.000 1.500 1.000 1.500 M2
PELASTERAN 1.000 1.500 2.000 3.000 M2

Page 63 BACK UP RUMAH GENSET


COR KOLOM 20/20 s/d LEV. 3 0.200 0.200 3.000 4.000 0.480 M3
BESI 10 KOLOM s/d LEV. 3 3.450 6.000 4.000 0.617 51.088 Kg
BESI 6 KOLOM s/d LEV. 3 0.700 19.000 4.000 0.222 11.810 Kg
BEKISTING KOLOM s/d LEV. 3 0.200 3.000 4.000 4.000 9.600 M2
COR BALOK 20/30 LEV. 3 7.600 0.200 0.300 1.000 0.456 M3
BESI 10 BALOK 8.000 4.000 1.000 0.617 19.744 Kg
BESI 6 BALOK 0.900 51.000 1.000 0.222 10.190 Kg
BEKISTING BALOK 7.600 0.800 1.000 6.080 M2
COR PLAT LANTAI LEV. 4 2.300 1.300 0.120 1.000 0.359 M3
BESI 10 PLAT (MEMANJANG) 2.400 9.000 0.617 13.327 Kg
BESI 10 PLAT (MELINTANG) 1.400 16.000 0.617 13.821 Kg
27.148
BEKISTING PLAT 2.990 1.000 2.990 M2

COR KOLOM 20/20 LEV. 4,8 0.200 0.200 1.800 4.000 0.288 M3
BESI 10 KOLOM 20/20 2.000 4.000 4.000 0.617 19.744 Kg
BESI 6 KOLOM 20/20 0.450 13.000 4.000 0.222 5.195 Kg
BEKISTING KOLOM 20/20 2.000 0.200 4.000 4.000 6.400 M2

PEKERJAAN : PEKERJAAN RUMAH MESIN DAN TOWER AIR


COR RING BALOK 15/15 7.200 0.150 0.150 1.000 0.162 M3
BESI 10 RING BALOK 8.200 4.000 1.000 0.617 20.238 Kg
BESI 6 RING BALOK 0.500 49.000 1.000 0.222 5.439 Kg
BEKISTING RING BALOK 7.200 0.600 1.000 4.320 M2

JUMLAH
ITEM VERT QTTY HOR QTTY TOTAL
UNIT
KUSEN TYPE P1 (PANJANG) 2.000 2.000 0.900 1.000 1.000 4.900
KUSEN TYPE V1 (PANJANG) 0.400 2.000 0.750 2.000 1.000 2.300
KUSEN TYPE P1 (LUAS) 2.100 0.900 1.000 1.890
KUSEN TYPE V1 (LUAS) 0.500 0.700 1.000 0.350

ITEM P T JLH KUSEN QTTY type KUSEN TOTAL

PAS. BATA DINDING 7.200 3.000 21.600 2.240 p1+v1 19.360


PENGECATAN CAT AIR 8.800 3.000 26.400 2.240 2.000 p1+v1 48.320
PENGECATAN CAT MINYAK 7.200 0.220 1.584

Page 64 BACK UP RUMAH GENSET


BACK UP HITUNGAN

PEKERJAAN : PEKERJAAN RUMAH MESIN DAN TOWER AIR

DIMENSI JUMLAH
ITEM QTTY KOEF. BESI TOTAL SATUAN
P L T UNIT
GALIAN PONDASI 0.600 0.600 0.400 4.000 0.576 M3
CEROCOK PONDASI 9.000 4.000 36.000 BTG
CEROCOK SLOOF
TIMBUN LANTAI KERJA 0.600 0.600 0.100 4.000 0.144 M3
LANTAI KERJA 0.600 0.600 0.050 4.000 0.072 M3
COR TAPAK 0.600 0.600 0.200 4.000 0.288 M3
BEKISTING TAPAK 0.600 0.200 4.000 4.000 1.920 M2
COR TIANG PONDASI 20/20 0.200 0.200 1.000 4.000 0.160 M3
BEKISTING TIANG PONDASI 0.200 1.000 4.000 4.000 3.200 M2
BESI 10 TAPAK PONDASI 1.500 10.000 4.000 0.617 37.020 Kg
BESI 10 TIANG PONDASI 1.300 4.000 4.000 0.617 12.834 Kg
BESI 6 BEWGEL PONDASI 0.700 7.000 4.000 0.222 4.351 Kg
COR BALOK LANTAI 20/20 6.200 0.200 0.200 1.000 0.248 M3
BESI 10 BALOK LANTAI 6.400 4.000 1.000 0.617 15.795 Kg
BESI BEGEL 6 BALOK LANTAI 0.700 42.000 1.000 0.222 6.527 Kg
BEKISTING BALOK LANTAI 6.200 0.600 1.000 3.720 M2
COR LANTAI TEBAL 12 1.100 1.100 0.120 1.000 0.145 M3
BESI 10 PLAT (MEMANJANG) 1.300 8.000 0.617 6.417 Kg
BESI 10 PLAT (MELINTANG) 1.300 8.000 0.617 6.417 Kg
BEKISTING LANTAI 1.210 1.000 1.000 1.210 M2
TEMPAT MESIN
COR TIANG PONDASI 20/20 0.200 0.200 1.000 4.000 0.160
BEKISTING TIANG PONDASI 0.200 - 1.000 4.000 4.000 3.200
BESI 10 TIANG PONDASI 1.300 - - 4.000 4.000 0.617 12.834
BESI 6 BEWGEL PONDASI 0.700 - - 7.000 4.000 0.222 4.351
COR BALOK LANTAI 20/20 6.200 0.200 0.200 - 1.000 - 0.248
BESI 10 BALOK LANTAI 6.400 - - 4.000 1.000 0.617 15.795
BESI BEGEL 6 BALOK LANTAI 0.700 - - 42.000 1.000 0.222 6.527
BEKISTING BALOK LANTAI 6.200 - 0.600 - 1.000 - 3.720
COR LANTAI TEBAL 12 1.100 1.100 0.120 1.000 0.145
BESI 10 PLAT (MEMANJANG) 1.300 8.000 0.617 6.417
BESI 10 PLAT (MELINTANG) 1.300 8.000 0.617 6.417
BEKISTING LANTAI 1.210 1.000 1.000 1.210

TEMPAT CUCI
CEROCOK PONDASI 9.000 4.000 36.000 BTG
TIMBUN LANTAI KERJA 6.200 0.200 0.100 1.000 0.124 M3
LANTAI KERJA 6.200 0.200 0.050 1.000 0.062 M3
COR BALOK LANTAI 20/20 6.200 0.200 0.200 - 1.000 - 0.248
BESI 10 BALOK LANTAI 6.200 - - 4.000 1.000 0.617 15.302
BESI BEGEL 6 BALOK LANTAI 0.700 - - 34.000 1.000 0.222 5.284
BEKISTING BALOK LANTAI 6.200 - 0.200 - 1.000 - 1.240
TIMBUNAN 1.100 1.100 0.200 1.000 0.242
COR LANTAI TEBAL 12 1.100 1.100 0.120 1.000 0.145

PEK. PEMASANGAN KERAMIK 1.700 1.500 2.550


FORMAT PENERAPAN SMK3 TAHAP PELAKSANAAN KONTRUKSI
No. Dokumen : Nama Proyek :
FORMAT PENERAPAN SMK3 TAHAP PELAKSANAAN KONTRUKSI Nama Penanggung Jawab :

Bagian : Tgl :

IDENTIFIKASI DAN PENETAPAN POTENSI BAHAYA K3 KONTRUKSI No. Hal : dari


PENILAIAN RISIKO SKALA PENGENDALIAN
NO PEKERJAAN BERISIKO K3 IDENTIFIKASI BAHAYA PENANGGUNG JAWAB
Keterangan Keparahan TR = (KxA) PRIORITAS RISIKO K3
(1) (2) (2a) (3) (4) (5)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

Tembilahan, 2021
Pelaksana Pekerjaan
PT/CV …………………………………..

………………………………………………..
IDENTIFIKASI DAN PENETAPAN POTENSI BAHAYA K3 KONTRUKSI

PROGRAM 0
KEGIATAN 0
SUB. KEGIATAN 0
PEKERJAAN 0
LOKASI 0
TAHUN 2022

DESKRIPSI RISIKO PENILAIAN TINGKAT RESIKO PENILAIAN SISA RESIKO


PERSYARATAN
PENGEDALIAN
NO IDENTIFIKASI BAHAYA JENIS BAHAYA ( Tipe PEMENUHAN PENGENDALIAN AWAL KEMUNGKINA KEPARAHAN NILAI RISIKO KEMUNGKIN KEPARAHA NILAI RISIKO TINGKAT KET
URAIAN PEKERJAAN TINGKAT RISIKO LANJUTAN
(Skenario Bahaya) Kecelakaan) PERATURAN N (F) (A) (F x A) AN (F) N (A) (F x A) RISIKO

1 2 3 4 5 6 7 8 9 10 11 7 8 9 10 11

Menggunakan Kaos Tangan,


Permen PU No.
1 Pek. Pembersihan Lokasi Terkena Alat Kerja Luka
05/PRT/M/2014
sepatu dan helem dan selalu 1 1 1 KECIL N/A N/A N/A N/A
bekerja sesuai instruksi

Tangan dan kaki bisa Menggunakan Kaos Tangan,


Pek. Mobilisasi & Demobilisasi Permen PU No.
2 Kejatohan Alat patah, kepala bisa sepatu dan helem dan selalu 3 3 9 SEDANG N/A N/A N/A N/A
Peralatan Bor 05/PRT/M/2014
pecah dan meninggal bekerja sesuai instruksi

Menggunakan Kaos Tangan,


Permen PU No.
3 Pek. Papan Nama Proyek Pukulan Martil Lecet/Bengkak
05/PRT/M/2014
sepatu dan helem dan selalu 1 1 1 KECIL N/A N/A N/A N/A
bekerja sesuai instruksi

Menggunakan Kaos Tangan,


Permen PU No.
4 Err:509 Pukulan Martil Lecet/Bengkak
05/PRT/M/2014
sepatu dan helem dan selalu 1 2 2 KECIL N/A N/A N/A N/A
bekerja sesuai instruksi

Menggunakan Kaos Tangan,


Permen PU No.
5 Err:509 Tertusuk Benda tajam Luka sepatu dan helem dan selalu 1 2 2 KECIL N/A N/A N/A N/A
05/PRT/M/2014
bekerja sesuai instruksi

Tangan dan kaki bisa Menggunakan Kaos Tangan,


Permen PU No.
6 Err:509 Tertimpa kayu patah, kepala bisa
05/PRT/M/2014
sepatu dan helem dan selalu 3 3 9 SEDANG N/A N/A N/A N/A
pecah dan meninggal bekerja sesuai instruksi

Menggunakan Kaos Tangan,


Permen PU No.
7 Err:509 Terjatoh Lecet/Bengkak
05/PRT/M/2014
sepatu dan helem dan selalu 1 2 2 KECIL N/A N/A N/A N/A
bekerja sesuai instruksi

Tertusuk benda tajam saat Tangan dan kaki bisa Menggunakan Kaos Tangan,
Permen PU No.
8 Err:509 meakukan pengecoran, terluka dan sepatu dan helem dan selalu 1 2 2 KECIL N/A N/A N/A N/A
05/PRT/M/2014
tertusuk besi dan kawan pendarahan bekerja sesuai instruksi
DESKRIPSI RISIKO PENILAIAN TINGKAT RESIKO PENILAIAN SISA RESIKO
PERSYARATAN
PENGEDALIAN
NO IDENTIFIKASI BAHAYA JENIS BAHAYA ( Tipe PEMENUHAN PENGENDALIAN AWAL KEMUNGKINA KEPARAHAN NILAI RISIKO KEMUNGKIN KEPARAHA NILAI RISIKO TINGKAT KET
URAIAN PEKERJAAN TINGKAT RISIKO LANJUTAN
(Skenario Bahaya) Kecelakaan) PERATURAN N (F) (A) (F x A) AN (F) N (A) (F x A) RISIKO

Tertusuk benda tajam saat Tangan dan kaki bisa Menggunakan Kaos Tangan,
Permen PU No.
9 Err:509 meakukan pengecoran, terluka dan sepatu dan helem dan selalu 2 2 4 KECIL N/A N/A N/A N/A
05/PRT/M/2014
tertusuk besi dan kawan pendarahan bekerja sesuai instruksi

Tertusuk benda tajam saat Tangan dan kaki bisa Menggunakan Kaos Tangan,
Permen PU No.
10 Err:509 meakukan pengecoran, terluka dan
05/PRT/M/2014
sepatu dan helem dan selalu 2 2 4 KECIL N/A N/A N/A N/A
tertusuk besi dan kawan pendarahan bekerja sesuai instruksi

Tertusuk benda tajam saat Tangan dan kaki bisa Menggunakan Kaos Tangan,
Permen PU No.
11 Err:509 meakukan pengecoran, terluka dan sepatu dan helem dan selalu 2 2 4 KECIL N/A N/A N/A N/A
05/PRT/M/2014
tertusuk besi dan kawan pendarahan bekerja sesuai instruksi

Menggunakan Kaos Tangan,


Permen PU No.
12 Err:509 Tertusuk Benda tajam Luka
05/PRT/M/2014
sepatu dan helem dan selalu 1 2 2 KECIL N/A N/A N/A N/A
bekerja sesuai instruksi

Tertusuk benda tajam saat Tangan dan kaki bisa Menggunakan Kaos Tangan,
Permen PU No.
13 Err:509 meakukan pengecoran, terluka dan
05/PRT/M/2014
sepatu dan helem dan selalu 2 2 4 KECIL N/A N/A N/A N/A
tertusuk besi dan kawan pendarahan bekerja sesuai instruksi

Tertusuk benda tajam saat Tangan dan kaki bisa Menggunakan Kaos Tangan,
Permen PU No.
14 Err:509 meakukan pengecoran, terluka dan
05/PRT/M/2014
sepatu dan helem dan selalu 2 2 4 KECIL N/A N/A N/A N/A
tertusuk besi dan kawan pendarahan bekerja sesuai instruksi

Tertusuk benda tajam saat Tangan dan kaki bisa Menggunakan Kaos Tangan,
Permen PU No.
15 Err:509 meakukan pengecoran, terluka dan sepatu dan helem dan selalu 1 2 2 KECIL N/A N/A N/A N/A
05/PRT/M/2014
tertusuk besi dan kawan pendarahan bekerja sesuai instruksi

Menggunakan Kaos Tangan,


Luka Terkena Mesin Permen PU No.
16 Err:509
Pemotong keramik
Luka
05/PRT/M/2014
sepatu dan helem dan selalu 2 3 6 SEDANG N/A N/A N/A N/A
bekerja sesuai instruksi

Tertusuk benda tajam saat Tangan dan kaki bisa Menggunakan Kaos Tangan,
Permen PU No.
17 Err:509 meakukan pengecoran, terluka dan
05/PRT/M/2014
sepatu dan helem dan selalu 2 2 4 KECIL N/A N/A N/A N/A
tertusuk besi dan kawan pendarahan bekerja sesuai instruksi

Tertusuk benda tajam saat Tangan dan kaki bisa Menggunakan Kaos Tangan,
Permen PU No.
18 Err:509 meakukan pengecoran, terluka dan
05/PRT/M/2014
sepatu dan helem dan selalu 2 2 4 KECIL N/A N/A N/A N/A
tertusuk besi dan kawan pendarahan bekerja sesuai instruksi

Tertusuk benda tajam saat Tangan dan kaki bisa Menggunakan Kaos Tangan,
Permen PU No.
19 Err:509 meakukan pengecoran, terluka dan sepatu dan helem dan selalu 3 3 9 SEDANG N/A N/A N/A N/A
05/PRT/M/2014
tertusuk besi dan kawan pendarahan bekerja sesuai instruksi
DESKRIPSI RISIKO PENILAIAN TINGKAT RESIKO PENILAIAN SISA RESIKO
PERSYARATAN
PENGEDALIAN
NO IDENTIFIKASI BAHAYA JENIS BAHAYA ( Tipe PEMENUHAN PENGENDALIAN AWAL KEMUNGKINA KEPARAHAN NILAI RISIKO KEMUNGKIN KEPARAHA NILAI RISIKO TINGKAT KET
URAIAN PEKERJAAN TINGKAT RISIKO LANJUTAN
(Skenario Bahaya) Kecelakaan) PERATURAN N (F) (A) (F x A) AN (F) N (A) (F x A) RISIKO

Tertusuk benda tajam saat Tangan dan kaki bisa Menggunakan Kaos Tangan,
Permen PU No.
20 Err:509 meakukan pengecoran, terluka dan sepatu dan helem dan selalu 2 2 4 KECIL N/A N/A N/A N/A
05/PRT/M/2014
tertusuk besi dan kawan pendarahan bekerja sesuai instruksi

Tangan dan kaki bisa Menggunakan Kaos Tangan,


Terjatoh tertimba bangan Permen PU No.
21 Err:509
bangunan
terluka dan
05/PRT/M/2014
sepatu dan helem dan selalu 1 2 2 KECIL N/A N/A N/A N/A
pendarahan bekerja sesuai instruksi

Tangan dan kaki bisa Menggunakan Kaos Tangan,


Terjatoh tertimba bangan Permen PU No.
22 Err:509 terluka dan sepatu dan helem dan selalu 1 2 2 KECIL N/A N/A N/A N/A
bangunan 05/PRT/M/2014
pendarahan bekerja sesuai instruksi

Tangan dan kaki bisa Menggunakan Kaos Tangan,


Terjatoh tertimba bangan Permen PU No.
23 Err:509
bangunan
terluka dan
05/PRT/M/2014
sepatu dan helem dan selalu 1 2 2 KECIL N/A N/A N/A N/A
pendarahan bekerja sesuai instruksi

Tangan dan kaki bisa Menggunakan Kaos Tangan,


Terjatoh tertimba bangan Permen PU No.
24 Err:509
bangunan
terluka dan
05/PRT/M/2014
sepatu dan helem dan selalu 1 2 2 KECIL N/A N/A N/A N/A
pendarahan bekerja sesuai instruksi

Tangan dan kaki bisa Menggunakan Kaos Tangan,


Terjatoh tertimba bangan Permen PU No.
25 Err:509
bangunan
terluka dan
05/PRT/M/2014
sepatu dan helem dan selalu 1 2 2 KECIL N/A N/A N/A N/A
pendarahan bekerja sesuai instruksi

Menggunakan Kaos Tangan,


Permen PU No.
26 Err:509 Terkena Alat Kerja Luka sepatu dan helem dan selalu 1 1 1 KECIL N/A N/A N/A N/A
05/PRT/M/2014
bekerja sesuai instruksi

Menggunakan Kaos Tangan,


Permen PU No.
27 Err:509 Terkena Alat Kerja Luka
05/PRT/M/2014
sepatu dan helem dan selalu 1 1 1 KECIL N/A N/A N/A N/A
bekerja sesuai instruksi

Tangan dan kaki bisa Menggunakan Kaos Tangan,


Terjatoh tertimba bangan Permen PU No.
28 Err:509
bangunan
patah, kepala bisa
05/PRT/M/2014
sepatu dan helem dan selalu 2 3 6 SEDANG N/A N/A N/A N/A
pecah dan meninggal bekerja sesuai instruksi

Tangan dan kaki bisa Menggunakan Kaos Tangan,


Terjatoh tertimba bangan Permen PU No.
29 Err:509
bangunan
patah, kepala bisa
05/PRT/M/2014
sepatu dan helem dan selalu 2 2 4 KECIL N/A N/A N/A N/A
pecah dan meninggal bekerja sesuai instruksi

Tangan dan kaki bisa Menggunakan Kaos Tangan,


Terjatoh tertimba bangan Permen PU No.
30 Err:509 patah, kepala bisa sepatu dan helem dan selalu 2 3 6 SEDANG N/A N/A N/A N/A
bangunan 05/PRT/M/2014
pecah dan meninggal bekerja sesuai instruksi
DESKRIPSI RISIKO PENILAIAN TINGKAT RESIKO PENILAIAN SISA RESIKO
PERSYARATAN
PENGEDALIAN
NO IDENTIFIKASI BAHAYA JENIS BAHAYA ( Tipe PEMENUHAN PENGENDALIAN AWAL KEMUNGKINA KEPARAHAN NILAI RISIKO KEMUNGKIN KEPARAHA NILAI RISIKO TINGKAT KET
URAIAN PEKERJAAN TINGKAT RISIKO LANJUTAN
(Skenario Bahaya) Kecelakaan) PERATURAN N (F) (A) (F x A) AN (F) N (A) (F x A) RISIKO

Tangan dan kaki bisa Menggunakan Kaos Tangan,


Permen PU No.
31 Err:509 Terkena Alat Kerja patah, kepala bisa sepatu dan helem dan selalu 2 3 6 SEDANG N/A N/A N/A N/A
05/PRT/M/2014
pecah dan meninggal bekerja sesuai instruksi

Tangan dan kaki bisa Menggunakan Kaos Tangan,


Permen PU No.
32 Err:509 Terkena Alat Kerja patah, kepala bisa
05/PRT/M/2014
sepatu dan helem dan selalu 2 3 6 SEDANG N/A N/A N/A N/A
pecah dan meninggal bekerja sesuai instruksi

Tangan dan kaki bisa Menggunakan Kaos Tangan,


Permen PU No.
33 Err:509 Terkena Alat Kerja patah, kepala bisa sepatu dan helem dan selalu 2 3 6 SEDANG N/A N/A N/A N/A
05/PRT/M/2014
pecah dan meninggal bekerja sesuai instruksi

Menggunakan Kaos Tangan,


Permen PU No.
34 Err:509 Terkena Alat Kerja Luka
05/PRT/M/2014
sepatu dan helem dan selalu 1 2 2 KECIL N/A N/A N/A N/A
bekerja sesuai instruksi

Menggunakan Kaos Tangan,


Permen PU No.
35 Err:509 Terkena Alat Kerja Luka
05/PRT/M/2014
sepatu dan helem dan selalu 1 2 2 KECIL N/A N/A N/A N/A
bekerja sesuai instruksi

Menggunakan Kaos Tangan,


Permen PU No.
36 Err:509 Terkena Alat Kerja Luka
05/PRT/M/2014
sepatu dan helem dan selalu 1 2 2 KECIL N/A N/A N/A N/A
bekerja sesuai instruksi

Menggunakan Kaos Tangan,


Permen PU No.
37 Err:509 Terkena Alat Kerja Luka sepatu dan helem dan selalu 1 2 2 KECIL N/A N/A N/A N/A
05/PRT/M/2014
bekerja sesuai instruksi

Menggunakan Kaos Tangan,


Terjatoh tertimba bangan Permen PU No.
38 Err:509
bangunan
Lecet/Bengkak
05/PRT/M/2014
sepatu dan helem dan selalu 1 2 2 KECIL N/A N/A N/A N/A
bekerja sesuai instruksi

Menggunakan Kaos Tangan,


Terjatoh tertimba bangan Permen PU No.
39 Err:509
bangunan
Lecet/Bengkak
05/PRT/M/2014
sepatu dan helem dan selalu 1 2 2 KECIL N/A N/A N/A N/A
bekerja sesuai instruksi

Tejepit alat mesin Tangan dan kaki bisa Menggunakan Kaos Tangan,
Permen PU No.
40 Pek. Sumur Bor pengeboran, Tertimpah patah, kepala bisa
05/PRT/M/2014
sepatu dan helem dan selalu 1 2 2 KECIL N/A N/A N/A N/A
peralatan dari tower alar pecah dan meninggal bekerja sesuai instruksi

Menggunakan Kaos Tangan,


Permen PU No.
41 Err:509 Tertimpa dan jatoh Lecet/Bengkak sepatu dan helem dan selalu 1 2 2 KECIL N/A N/A N/A N/A
05/PRT/M/2014
bekerja sesuai instruksi
DESKRIPSI RISIKO PENILAIAN TINGKAT RESIKO PENILAIAN SISA RESIKO
PERSYARATAN
PENGEDALIAN
NO IDENTIFIKASI BAHAYA JENIS BAHAYA ( Tipe PEMENUHAN PENGENDALIAN AWAL KEMUNGKINA KEPARAHAN NILAI RISIKO KEMUNGKIN KEPARAHA NILAI RISIKO TINGKAT KET
URAIAN PEKERJAAN TINGKAT RISIKO LANJUTAN
(Skenario Bahaya) Kecelakaan) PERATURAN N (F) (A) (F x A) AN (F) N (A) (F x A) RISIKO

Menggunakan Kaos Tangan,


Permen PU No.
42 Err:509 Tertimpa dan jatoh Lecet/Bengkak sepatu dan helem dan selalu 1 2 2 KECIL N/A N/A N/A N/A
05/PRT/M/2014
bekerja sesuai instruksi

Menggunakan Kaos Tangan,


Permen PU No.
43 Err:509 Tertimpa dan jatoh Lecet/Bengkak
05/PRT/M/2014
sepatu dan helem dan selalu 1 2 2 KECIL N/A N/A N/A N/A
bekerja sesuai instruksi

Menggunakan Kaos Tangan,


Permen PU No.
44 Err:509 Tertimpa dan jatoh Lecet/Bengkak sepatu dan helem dan selalu 1 2 2 KECIL N/A N/A N/A N/A
05/PRT/M/2014
bekerja sesuai instruksi

Menggunakan Kaos Tangan,


Permen PU No.
45 Err:509 Tertimpa dan jatoh Lecet/Bengkak
05/PRT/M/2014
sepatu dan helem dan selalu 1 2 2 KECIL N/A N/A N/A N/A
bekerja sesuai instruksi

Menggunakan Kaos Tangan,


Permen PU No.
46 Err:509 Tertimpa dan jatoh Lecet/Bengkak
05/PRT/M/2014
sepatu dan helem dan selalu 1 2 2 KECIL N/A N/A N/A N/A
bekerja sesuai instruksi

Menggunakan Kaos Tangan,


Permen PU No.
47 Err:509 Tertimpa dan jatoh Lecet/Bengkak
05/PRT/M/2014
sepatu dan helem dan selalu 1 2 2 KECIL N/A N/A N/A N/A
bekerja sesuai instruksi

Menggunakan Kaos Tangan,


Tertimpa, terkena alat kerja Permen PU No.
48 Err:509 Lecet/Bengkak sepatu dan helem dan selalu 2 2 4 KECIL N/A N/A N/A N/A
dan terjatoh 05/PRT/M/2014
bekerja sesuai instruksi

Menggunakan Kaos Tangan,


Permen PU No.
49 Err:509 Tertimpa dan jatoh Lecet/Bengkak
05/PRT/M/2014
sepatu dan helem dan selalu 1 1 1 KECIL N/A N/A N/A N/A
bekerja sesuai instruksi

Menggunakan Kaos Tangan,


Tertimpa, terkena alat kerja Permen PU No.
50 Pek. Pembersihan Akhir
dan terjatoh
Lecet/Bengkak
05/PRT/M/2014
sepatu dan helem dan selalu 1 2 2 KECIL N/A N/A N/A N/A
bekerja sesuai instruksi

0 0

0 0

0 0
DESKRIPSI RISIKO PENILAIAN TINGKAT RESIKO PENILAIAN SISA RESIKO
PERSYARATAN
PENGEDALIAN
NO IDENTIFIKASI BAHAYA JENIS BAHAYA ( Tipe PEMENUHAN PENGENDALIAN AWAL KEMUNGKINA KEPARAHAN NILAI RISIKO KEMUNGKIN KEPARAHA NILAI RISIKO TINGKAT KET
URAIAN PEKERJAAN TINGKAT RISIKO LANJUTAN
(Skenario Bahaya) Kecelakaan) PERATURAN N (F) (A) (F x A) AN (F) N (A) (F x A) RISIKO

0 0

0 0

0
IDENTIFIKASI DAN PENETAPAN POTENSI BAHAYA K3 KONTRUKSI

PROGRAM 0
KEGIATAN 0
SUB. KEGIATAN 0
PEKERJAAN 0
LOKASI 0
TAHUN 2022

DESKRIPSI RISIKO PENILAIAN TINGKAT RESIKO PENILAIAN SISA RESIKO


PERSYARATAN
PENGENDALIAN NILAI PENGEDALIAN NILAI
NO IDENTIFIKASI BAHAYA JENIS BAHAYA ( Tipe PEMENUHAN KEMUNGKIN KEPARAHA KEMUNGKI KEPARAH TINGKAT KETERANGAN
URAIAN PEKERJAAN AWAL RISIKO (F x TINGKAT RISIKO LANJUTAN RISIKO (F x
(Skenario Bahaya) Kecelakaan) PERATURAN AN (F) N (A) NAN (F) AN (A) RISIKO
A) A)

1 2 3 4 5 6 7 8 9 10 11 7 8 9 10 11
Tangan dan kaki bisa
Pek. Mobilisasi & Demobilisasi
1
Peralatan Bor
Kejatohan Alat patah, kepala bisa 2 3 6 SEDANG N/A N/A N/A N/A
pecah dan meninggal

Terganggung Permen PU No. Menggunakan Kaos


2 Err:509 Pukulan Martil 3 2 6 SEDANG N/A N/A N/A N/A
kesehatan tubuh 05/PRT/M/2014 tangan

3 Pek. Papan Nama Proyek Pukulan Martil 1 1 1 KECIL N/A N/A N/A N/A

17 Pek. Pembersihan Lokasi #REF! 1 2 2 KECIL N/A N/A N/A N/A

Tangan dan kaki bisa Menggunakan helm,


Tertusuk benda tajam saat
18 Pek. Galian Tanah Pondasi
menggali, terkena cangkul
terluka dan #REF! kaos tangan dan 3 3 9 SEDANG N/A N/A N/A N/A
pendarahan sepatu

Menggunakan helm,
19 Pek. Pasang Cerocok Bakau Pjg. 6 m Terjatuh saat mencerocok Patah kaki atau tangan #REF! kaos tangan dan 1 2 2 KECIL N/A N/A N/A N/A
sepatu

Menggunakan helm,
20 Pek. Pasang Cerocok Bakau Pjg. 3 m Terjatuh saat mencerocok Patah kaki atau tangan #REF! kaos tangan dan 1 2 2 KECIL N/A N/A N/A N/A
sepatu

Tertusuk benda tajam saat Tangan dan kaki bisa Menggunakan helm,
22 Pek. Cor Lantai Kerja 1:4:6, tbl 5 cm meakukan pengecoran, terluka dan #REF! kaos tangan dan 1 2 2 KECIL N/A N/A N/A N/A
tertusuk besi dan kawan pendarahan sepatu

Tertusuk benda tajam saat Tangan dan kaki bisa Menggunakan helm,
Pek. Cor Tapak Pondasi Umpak camp.
23
1:2:4
meakukan pengecoran, terluka dan #REF! kaos tangan dan 1 2 2 KECIL N/A N/A N/A N/A
tertusuk besi dan kawan pendarahan sepatu
DESKRIPSI RISIKO PENILAIAN TINGKAT RESIKO PENILAIAN SISA RESIKO
PERSYARATAN
PENGENDALIAN NILAI PENGEDALIAN NILAI
NO IDENTIFIKASI BAHAYA JENIS BAHAYA ( Tipe PEMENUHAN KEMUNGKIN KEPARAHA KEMUNGKI KEPARAH TINGKAT KETERANGAN
URAIAN PEKERJAAN AWAL RISIKO (F x TINGKAT RISIKO LANJUTAN RISIKO (F x
(Skenario Bahaya) Kecelakaan) PERATURAN AN (F) N (A) NAN (F) AN (A) RISIKO
A) A)

Tertusuk benda tajam saat Tangan dan kaki bisa Menggunakan helm,
Pek. Cor Tiang Pondasi 20/20 camp.
24 meakukan pengecoran, terluka dan #REF! kaos tangan dan 1 2 2 KECIL N/A N/A N/A N/A
1:2:4
tertusuk besi dan kawan pendarahan sepatu

Tertusuk benda tajam saat Tangan dan kaki bisa Menggunakan helm,
Pek. Cor Sloof Pondasi 20/30 camp.
25
1:2:4
meakukan pengecoran, terluka dan #REF! kaos tangan dan 1 2 2 KECIL N/A N/A N/A N/A
tertusuk besi dan kawan pendarahan sepatu

Tangan dan kaki bisa Menggunakan helm,


Pek. Pembesian Tapak, Tiang dan Tertusuk besi dan kawan
26
Sloof saat proses pekerjaan
terluka dan #REF! kaos tangan dan 1 2 2 KECIL N/A N/A N/A N/A
pendarahan sepatu

Tangan dan kaki bisa Menggunakan helm,


- Tulangan Pokok Besi Polos dia. 10 Tertusuk benda tajam saat
27 terluka dan #REF! kaos tangan dan 1 2 2 KECIL N/A N/A N/A N/A
mm menggali, terkena cangkul
pendarahan sepatu

Tangan dan kaki bisa Menggunakan helm,


Tertusuk benda tajam saat
28 - Beugel Besi dia. 6 mm
menggali, terkena cangkul
terluka dan #REF! kaos tangan dan 1 2 2 KECIL N/A N/A N/A N/A
pendarahan sepatu

29 Pek. Bekisting Tapak Pondasi #REF! 1 2 2 KECIL N/A N/A N/A N/A

30 Pek. Bekisting Tiang Pondasi #REF! 1 2 2 KECIL N/A N/A N/A N/A

31 Pek. Bekisting Sloof Pondasi #REF! 1 2 2 KECIL N/A N/A N/A N/A

32 Pek. Urugan Kembali Bekas Galian #REF! 1 2 2 KECIL N/A N/A N/A N/A

Tertusuk benda tajam saat Tangan dan kaki bisa Menggunakan helm,
33 Pek. Cor Balok 20/30 camp. 1:2:4 meakukan pengecoran, terluka dan #REF! kaos tangan dan 1 2 2 KECIL N/A N/A N/A N/A
tertusuk besi dan kawan pendarahan sepatu

Tangan dan kaki bisa Menggunakan helm,


Tertusuk besi dan kawan
34 Pek. Pembesian Balok dan Lantai terluka dan #REF! kaos tangan dan 1 2 2 KECIL N/A N/A N/A N/A
saat proses pekerjaan
pendarahan sepatu

Terkena pukul martil, jatuh tangan dan kaki bisa Menggunakan helm,
37 Pek. Bekisting Balok saat memanjat tertimpa patah, kepala bisa #REF! kaos tangan dan 1 2 2 KECIL N/A N/A N/A N/A
begesting pecah dan meninggal sepatu
DESKRIPSI RISIKO PENILAIAN TINGKAT RESIKO PENILAIAN SISA RESIKO
PERSYARATAN
PENGENDALIAN NILAI PENGEDALIAN NILAI
NO IDENTIFIKASI BAHAYA JENIS BAHAYA ( Tipe PEMENUHAN KEMUNGKIN KEPARAHA KEMUNGKI KEPARAH TINGKAT KETERANGAN
URAIAN PEKERJAAN AWAL RISIKO (F x TINGKAT RISIKO LANJUTAN RISIKO (F x
(Skenario Bahaya) Kecelakaan) PERATURAN AN (F) N (A) NAN (F) AN (A) RISIKO
A) A)

Terkena pukul martil, jatuh tangan dan kaki bisa Menggunakan helm,
38 Pek. Bekisting Lantai saat memanjat tertimpa patah, kepala bisa #REF! kaos tangan dan 1 2 2 KECIL N/A N/A N/A N/A
begesting pecah dan meninggal sepatu

Tertusuk benda tajam saat Tangan dan kaki bisa Menggunakan helm,
Pek. Cor Lantai Camp. 1:2:4, Tbl. 12
39
cm
meakukan pengecoran, terluka dan #REF! kaos tangan dan 1 2 2 KECIL N/A N/A N/A N/A
tertusuk besi dan kawan pendarahan sepatu

Tertusuk benda tajam saat Tangan dan kaki bisa Menggunakan helm,
40 Pek. Cor Kolom 20/20 Camp. 1:2:4 meakukan pengecoran, terluka dan #REF! kaos tangan dan 1 2 2 KECIL N/A N/A N/A N/A
tertusuk besi dan kawan pendarahan sepatu

41 Pek. Pembesian Kolom #REF! 1 2 2 KECIL N/A N/A N/A N/A

- Tulangan Pokok Besi Polos dia. 10


42
mm
#REF! 1 2 2 KECIL N/A N/A N/A N/A

43 - Beugel Besi dia. 6 mm #REF! 1 2 2 KECIL N/A N/A N/A N/A

44 Pek. Bekisting Kolom #REF! 1 2 2 KECIL N/A N/A N/A N/A

Pek. Cor Balok 20/30, Camp. 1:2:4


45
(Elev. +3)
#REF! 1 2 2 KECIL N/A N/A N/A N/A

46 Pek. Pembesian Balok (Elev. +3) #REF! 1 2 2 KECIL N/A N/A N/A N/A

- Tulangan Pokok Besi Polos dia. 10


47
mm
#REF! 1 2 2 KECIL N/A N/A N/A N/A

48 - Beugel Besi dia. 6 mm #REF! 1 2 2 KECIL N/A N/A N/A N/A

49 Pek. Bekisting Balok (Elev. +3) #REF! 1 2 2 KECIL N/A N/A N/A N/A

Pek. Cor Plat Lantai Tebal 12 cm


50
(Elev. +3)
#REF! 1 2 2 KECIL N/A N/A N/A N/A

51 Pek. Pembesian Plat Lantai (Elev. +3) #REF! 1 2 2 KECIL N/A N/A N/A N/A

- Tulangan Pokok Besi Polos dia. 10


52
mm
#REF! 1 2 2 KECIL N/A N/A N/A N/A

53 Pek. Bekisting Plat Lantai #REF! 1 2 2 KECIL N/A N/A N/A N/A

54 Pek. Cor Tiang 20/20 Camp. 1:2:4 #REF! 1 2 2 KECIL N/A N/A N/A N/A
DESKRIPSI RISIKO PENILAIAN TINGKAT RESIKO PENILAIAN SISA RESIKO
PERSYARATAN
PENGENDALIAN NILAI PENGEDALIAN NILAI
NO IDENTIFIKASI BAHAYA JENIS BAHAYA ( Tipe PEMENUHAN KEMUNGKIN KEPARAHA KEMUNGKI KEPARAH TINGKAT KETERANGAN
URAIAN PEKERJAAN AWAL RISIKO (F x TINGKAT RISIKO LANJUTAN RISIKO (F x
(Skenario Bahaya) Kecelakaan) PERATURAN AN (F) N (A) NAN (F) AN (A) RISIKO
A) A)

55 Pek. Pembesian Tiang #REF! 1 2 2 KECIL N/A N/A N/A N/A

- Tulangan Pokok Besi Polos dia. 10


56
mm
#REF! 1 2 2 KECIL N/A N/A N/A N/A

57 - Beugel Besi dia. 6 mm #REF! 1 2 2 KECIL N/A N/A N/A N/A

58 Pek. Bekisting Kolom #REF! 1 2 2 KECIL N/A N/A N/A N/A

Pek. Cor Ring Balok Pagar 12/12,


59
Camp. 1:2:4
#REF! 1 2 2 KECIL N/A N/A N/A N/A

60 Pek. Pembesian Ring Balok Pagar #REF! 1 2 2 KECIL N/A N/A N/A N/A

61 - Tulangan Pokok Besi dia. 10 mm #REF! 1 2 2 KECIL N/A N/A N/A N/A

62 - Beugel Besi dia. 6 mm #REF! 1 2 2 KECIL N/A N/A N/A N/A

63 Pek. Bekisting Ring Balok Pagar #REF! 1 2 2 KECIL N/A N/A N/A N/A

Pek. Cor Ring Balok 15/15, Camp.


64 #REF! 1 2 2 KECIL N/A N/A N/A N/A
1:2:4

65 Pek. Pembesian Ring Balok #REF! 1 2 2 KECIL N/A N/A N/A N/A

- Tulangan Pokok Besi Polos dia. 10


66 #REF! 1 2 2 KECIL N/A N/A N/A N/A
mm

67 - Beugel Besi dia. 6 mm #REF! 1 2 2 KECIL N/A N/A N/A N/A

68 Pek. Bekisting Ring Balok #REF! 1 2 2 KECIL N/A N/A N/A N/A

Pek. Pasangan Bata Dinding Camp.


69
1:4
#REF! 1 2 2 KECIL N/A N/A N/A N/A

70 Pek. Plesteran Dinding Camp 1 : 3 #REF! 1 2 2 KECIL N/A N/A N/A N/A

71 Pek. Kusen Kayu Klas II #REF! 1 2 2 KECIL N/A N/A N/A N/A

72 Pek. pasang Pintu Panel (2,1x0,8) #REF! 1 2 2 KECIL N/A N/A N/A N/A

73 Pek. Pasang kunci Tanam 2 Slaagh #REF! 1 2 2 KECIL N/A N/A N/A N/A

Tangki Plastik Kapasitas 1000 Liter


74
(Rumah Mesin)
#REF! 1 2 2 KECIL N/A N/A N/A N/A
DESKRIPSI RISIKO PENILAIAN TINGKAT RESIKO PENILAIAN SISA RESIKO
PERSYARATAN
PENGENDALIAN NILAI PENGEDALIAN NILAI
NO IDENTIFIKASI BAHAYA JENIS BAHAYA ( Tipe PEMENUHAN KEMUNGKIN KEPARAHA KEMUNGKI KEPARAH TINGKAT KETERANGAN
URAIAN PEKERJAAN AWAL RISIKO (F x TINGKAT RISIKO LANJUTAN RISIKO (F x
(Skenario Bahaya) Kecelakaan) PERATURAN AN (F) N (A) NAN (F) AN (A) RISIKO
A) A)

75 Pek. Kran Air 3/4" #REF! 1 2 2 KECIL N/A N/A N/A N/A

76 Pek. Pasang Pipa PVC 3/4" #REF! 1 2 2 KECIL N/A N/A N/A N/A

77 Pek. Pasang Pipa PVC 2" #REF! 1 2 2 KECIL N/A N/A N/A N/A

78 Pek. Pasang Stop Kran PVC 2" #REF! 1 2 2 KECIL N/A N/A N/A N/A

79 Pek. Pasang Tee PVC 2" #REF! 1 2 2 KECIL N/A N/A N/A N/A

80 Pek. Cat Air #REF! 1 2 2 KECIL N/A N/A N/A N/A

81 Pek. Cat Minyak #REF! 1 2 2 KECIL N/A N/A N/A N/A

82 Titik Lampu + Instalasi #REF! 1 2 2 KECIL N/A N/A N/A N/A

83 Stop kontak + Instalasi #REF! 1 2 2 KECIL N/A N/A N/A N/A

Kepala bisa pecah


Menggunakan helm,
tangan dan kaki bisa
84 Pek. Pasang Kuda-kuda Kayu Klas III Terjatuh dan tertusuk kayu
patah mengakibatkan
#REF! kaos tangan dan 1 2 2 KECIL N/A N/A N/A N/A
sepatu
kematian

Kepala bisa pecah


Menggunakan helm,
tangan dan kaki bisa
85 Pek. Pasang Reng Kayu Klas III Terjatuh dan tertusuk kayu #REF! kaos tangan dan 1 2 2 KECIL N/A N/A N/A N/A
patah mengakibatkan
sepatu
kematian

Kepala bisa pecah


Menggunakan helm,
Pek. Pasang Atap Genteng Metal tangan dan kaki bisa
86
Zincalume 0,25 mm
Terjatuh dan tertusuk kayu
patah mengakibatkan
#REF! kaos tangan dan 1 2 2 KECIL N/A N/A N/A N/A
sepatu
kematian

Kepala bisa pecah


Menggunakan helm,
Pek. Pasang Perabung Genteng Metal tangan dan kaki bisa
87
Zincalume
Terjatuh dan tertusuk kayu
patah mengakibatkan
#REF! kaos tangan dan 1 2 2 KECIL N/A N/A N/A N/A
sepatu
kematian

Kepala bisa pecah


Menggunakan helm,
tangan dan kaki bisa
88 Pek. Pasang Listplank Kayu Klas II Terjatuh dan tertusuk kayu
patah mengakibatkan
#REF! kaos tangan dan 1 2 2 KECIL N/A N/A N/A N/A
sepatu
kematian

89 Pemasangan Tangga Besi Pipa 2 " #REF! 1 2 2 KECIL N/A N/A N/A N/A
DESKRIPSI RISIKO PENILAIAN TINGKAT RESIKO PENILAIAN SISA RESIKO
PERSYARATAN
PENGENDALIAN NILAI PENGEDALIAN NILAI
NO IDENTIFIKASI BAHAYA JENIS BAHAYA ( Tipe PEMENUHAN KEMUNGKIN KEPARAHA KEMUNGKI KEPARAH TINGKAT KETERANGAN
URAIAN PEKERJAAN AWAL RISIKO (F x TINGKAT RISIKO LANJUTAN RISIKO (F x
(Skenario Bahaya) Kecelakaan) PERATURAN AN (F) N (A) NAN (F) AN (A) RISIKO
A) A)

Pek. Pembuatan Logo pada bangunan


90 #REF! 1 2 2 KECIL N/A N/A N/A N/A
dan Tangki

91 Pek Pembersihan Akhir #REF! 1 2 2 KECIL N/A N/A N/A N/A