Daftar Balok Baja - 300.150.(6.5).9 RUMAH SAKIT UMUM DAERAH

Section DIKETAHUI OLEH :


PEJABAT PEMBUAT KOMITMEN (PPK)
Shape: LANJUTAN PEMBANGUNAN GEDUNG A
RUMAH SAKIT UMUM DAERAH

Phase Nominal KABUPATEN BOMBANA

Type Structural Material Created Mark Weight Length Cut Length Count Berat Reference Level Comments
Andi Muhammad Kamal, ST, M.Eng
NIP. 19870219 201402 1 001
W 300.150.(6.5).9 DIPERIKSA OLEH :

W 300.150.(6.5).9 Metal - Steel 43-275 Phase 1 B2_A 36.70 kgf/m 5680 5680 6 1250.74 kgf LT. 2 B1 DIREKSI TEKNIS PEMBANGUNAN
RSUD KAB. BOMBANA

W 300.150.(6.5).9 Metal - Steel 43-275 Phase 1 B2_B 36.70 kgf/m 3970 3970 6 874.19 kgf LT. 2 B2
W 300.150.(6.5).9 Metal - Steel 43-275 Phase 1 B2_C 36.70 kgf/m 4570 4570 3 503.16 kgf LT. 2 B2
W 300.150.(6.5).9 Metal - Steel 43-275 Phase 1 B2_D 36.70 kgf/m 3680 3680 2 270.11 kgf LT. 2 B2 Muh. Masri Sulaiman, ST
NIP. 19840496 201101 1 016
W 300.150.(6.5).9 Metal - Steel 43-275 Phase 1 B2_E1 36.70 kgf/m 12000 12000 4 1761.60 kgf
W 300.150.(6.5).9 Metal - Steel 43-275 Phase 1 B2_E2 36.70 kgf/m 265 265 6 58.35 kgf B2
W 300.150.(6.5).9 Metal - Steel 43-275 Phase 1 B2_E2X 36.70 kgf/m 266 266 2 19.52 kgf Atap B2
Muh. Masri Sulaiman, ST
Grand total: 29 4737.68 kgf NIP. 19840496 201101 1 016

DIPERIKSA OLEH :
KONSULTAN SUPERVISI
PT. ARISTA CIPTA

Muh. Aras Kadir, ST


Site Engineer

DIBUAT OLEH :
KONTRAKTOR PELAKSANA
PT. FIKRI BANGUN PERSADA

Ir. Gazali
Direktur

PEKERJAAN

LANJUTAN PEMBANGUNAN
GEDUNG A
RSUD KAB. BOMBANA

SHOP DRAWING

JUDUL GAMBAR

Daftar Balok Baja

UKURAN LEMBAR KODE HALAMAN

A3 5_BL-1-001
CATATAN / REVISI
Semua satuan dalam milimeter (mm), kecuali
disebutkan lain

Daftar Balok Baja - 200.100.(5.5).8


Section
Shape:
Phase Nominal
Type Structural Material Created Mark Weight Length Cut Length Count Berat Reference Level Comments

W 200.100.(5.5).8
W 200.100.(5.5).8 Metal - Steel 43-275 Phase 1 B4_A 21.30 kgf/m 4574 4574 1 97.43 kgf Top Tengah RB3
W 200.100.(5.5).8 Metal - Steel 43-275 Phase 1 B4_A* 21.30 kgf/m 4572 4572 1 97.38 kgf Top Tengah RB3
W 200.100.(5.5).8 Metal - Steel 43-275 Phase 1 B4_B 21.30 kgf/m 3974 3974 2 169.29 kgf Top Tengah RB3 PEMERINTAH DAERAH KABUPATEN BOMBANA

RUMAH SAKIT UMUM DAERAH


W 200.100.(5.5).8 Metal - Steel 43-275 Phase 1 B4_B* 21.30 kgf/m 3972 3972 2 169.21 kgf Top Tengah RB3
DIKETAHUI OLEH :

W 200.100.(5.5).8 Metal - Steel 43-275 Phase 1 B4_C 21.30 kgf/m 2655 2655 2 113.10 kgf Top Tengah RB3 PEJABAT PEMBUAT KOMITMEN (PPK)
LANJUTAN PEMBANGUNAN GEDUNG A
RUMAH SAKIT UMUM DAERAH
W 200.100.(5.5).8 Metal - Steel 43-275 Phase 1 B4_D 21.30 kgf/m 5780 5780 16 1969.82 kgf RB3 KABUPATEN BOMBANA

W 200.100.(5.5).8 Metal - Steel 43-275 Phase 1 B4_E 21.30 kgf/m 3780 3780 2 161.03 kgf Top Tengah RB3
W 200.100.(5.5).8 Metal - Steel 43-275 Phase 1 B4_F 21.30 kgf/m 5972 5972 16 2035.26 kgf Top Sayap RB3 Andi Muhammad Kamal, ST, M.Eng
NIP. 19870219 201402 1 001
W 200.100.(5.5).8 Metal - Steel 43-275 Phase 1 B4_G1a 21.30 kgf/m 3740 3740 2 159.32 kgf LT. 2 NA DIPERIKSA OLEH :

W 200.100.(5.5).8 Metal - Steel 43-275 Phase 1 B4_G1b 21.30 kgf/m 3818 3818 2 162.63 kgf LT. 2 NA DIREKSI TEKNIS PEMBANGUNAN
RSUD KAB. BOMBANA

W 200.100.(5.5).8 Metal - Steel 43-275 Phase 1 B4_G2a 21.30 kgf/m 3780 3780 2 161.03 kgf Top Sayap RB3
W 200.100.(5.5).8 Metal - Steel 43-275 Phase 1 B4_G2b 21.30 kgf/m 3830 3830 2 163.16 kgf Top Sayap RB3
W 200.100.(5.5).8 Metal - Steel 43-275 Phase 1 B4_H 21.30 kgf/m 6772 6772 4 576.97 kgf Muh. Masri Sulaiman, ST
NIP. 19840496 201101 1 016
W 200.100.(5.5).8 Metal - Steel 43-275 Phase 1 B4_I 21.30 kgf/m 3690 3690 4 314.39 kgf LT. 2 B2
W 200.100.(5.5).8 Metal - Steel 43-275 Phase 1 B4_J 21.30 kgf/m 4020 4020 4 342.50 kgf LT. 2 B2
W 200.100.(5.5).8 Metal - Steel 43-275 Phase 1 B4_K 21.30 kgf/m 3755 3755 4 319.93 kgf LT. 2 B2
Muh. Masri Sulaiman, ST
W 200.100.(5.5).8 Metal - Steel 43-275 Phase 1 B4_L1 21.30 kgf/m 3705 3705 2 157.83 kgf LT. 2 B2 NIP. 19840496 201101 1 016

DIPERIKSA OLEH :
W 200.100.(5.5).8 Metal - Steel 43-275 Phase 1 B4_L2 21.30 kgf/m 3768 3768 2 160.50 kgf LT. 2 B2 KONSULTAN SUPERVISI
PT. ARISTA CIPTA

W 200.100.(5.5).8 Metal - Steel 43-275 Phase 1 B4_M 21.30 kgf/m 5822 5822 2 248.02 kgf LT. 2 B1
W 200.100.(5.5).8 Metal - Steel 43-275 Phase 1 B4_N 21.30 kgf/m 1771 1771 2 75.44 kgf LT. 2 B2
Muh. Aras Kadir, ST
W 200.100.(5.5).8 Metal - Steel 43-275 Phase 1 Ba_1 21.30 kgf/m 6000 5984 96 12268.80 kgf Site Engineer

W 200.100.(5.5).8 Metal - Steel 43-275 Phase 1 Ba_2 21.30 kgf/m 3000 2984 144 9201.60 kgf
DIBUAT OLEH :
KONTRAKTOR PELAKSANA
PT. FIKRI BANGUN PERSADA

W 200.100.(5.5).8 Metal - Steel 43-275 Phase 1 Ba_3 21.30 kgf/m 2850 2834 80 4856.40 kgf
W 200.100.(5.5).8 Metal - Steel 43-275 Phase 1 Ba_4 21.30 kgf/m 4000 3983 8 681.60 kgf LT. 2 B2
W 200.100.(5.5).8 Metal - Steel 43-275 Phase 1 Ba_5 21.30 kgf/m 4600 4583 4 391.92 kgf LT. 2 B2 Ir. Gazali
Direktur

W 200.100.(5.5).8 Metal - Steel 43-275 Phase 1 Ba_6 21.30 kgf/m 2900 2884 27 1667.79 kgf PEKERJAAN

W 200.100.(5.5).8 Metal - Steel 43-275 Phase 1 Ba_7a 21.30 kgf/m 4050 4034 2 172.53 kgf Atap RB2
W 200.100.(5.5).8 Metal - Steel 43-275 Phase 1 Ba_7b 21.30 kgf/m 4000 3984 2 170.40 kgf Atap RB2
W 200.100.(5.5).8 Metal - Steel 43-275 Phase 1 Ba_7c 21.30 kgf/m 4600 4584 1 97.98 kgf Atap RB2
W 200.100.(5.5).8 Metal - Steel 43-275 Phase 1 BT 21.30 kgf/m 4050 4050 6 517.59 kgf
Grand total: 444 37680.85 kgf
JUDUL GAMBAR

Daftar Balok Baja

UKURAN LEMBAR KODE HALAMAN

A3 5_BL-1-002
CATATAN / REVISI

Daftar Balok Baja - 250.125.6.9 Semua satuan dalam milimeter (mm), kecuali
disebutkan lain

Section
Shape:
Phase Nominal Reference
Type Structural Material Created Mark Weight Length Cut Length Count Berat Level Comments

W 250.125.6.9
W 250.125.6.9 Metal - Steel 43-275 Phase 1 B3_A 29.60 kgf/m 5780 5780 56 9580.93 kgf RB1
W 250.125.6.9 Metal - Steel 43-275 Phase 1 B3_B 29.60 kgf/m 5972 5972 40 7070.85 kgf RB1
W 250.125.6.9 Metal - Steel 43-275 Phase 1 B3_B* 29.60 kgf/m 5971 5971 10 1767.42 kgf LT. 3 RB1
W 250.125.6.9 Metal - Steel 43-275 Phase 1 B3_C 29.60 kgf/m 5672 5672 10 1678.91 kgf Atap RB1
W 250.125.6.9 Metal - Steel 43-275 Phase 1 B3_D1 29.60 kgf/m 2615 2615 14 1083.66 kgf LT. 2 B2
W 250.125.6.9 Metal - Steel 43-275 Phase 1 B3_D2 29.60 kgf/m 2655 2655 12 943.06 kgf RB2
PEMERINTAH DAERAH KABUPATEN BOMBANA

W 250.125.6.9 Metal - Steel 43-275 Phase 1 B3_D3 29.60 kgf/m 2678 2678 2 158.51 kgf LT. 2 B2 RUMAH SAKIT UMUM DAERAH

W 250.125.6.9 Metal - Steel 43-275 Phase 1 B3_D4 29.60 kgf/m 2718 2718 2 160.88 kgf Atap RB2 DIKETAHUI OLEH :
PEJABAT PEMBUAT KOMITMEN (PPK)
W 250.125.6.9 Metal - Steel 43-275 Phase 1 B3_D5 29.60 kgf/m 2605 2605 6 462.65 kgf LT. 3 B2 LANJUTAN PEMBANGUNAN GEDUNG A
RUMAH SAKIT UMUM DAERAH
KABUPATEN BOMBANA
W 250.125.6.9 Metal - Steel 43-275 Phase 1 B3_D6 29.60 kgf/m 2668 2668 2 157.92 kgf LT. 3 B2
W 250.125.6.9 Metal - Steel 43-275 Phase 1 B3_E 29.60 kgf/m 5974 5974 16 2829.29 kgf
W 250.125.6.9 Metal - Steel 43-275 Phase 1 B3_F 29.60 kgf/m 5824 5824 6 1034.34 kgf Andi Muhammad Kamal, ST, M.Eng
NIP. 19870219 201402 1 001

W 250.125.6.9 Metal - Steel 43-275 Phase 1 B3_G_Kn 29.60 kgf/m 5824 5824 3 517.17 kgf DIPERIKSA OLEH :
DIREKSI TEKNIS PEMBANGUNAN

W 250.125.6.9 Metal - Steel 43-275 Phase 1 B3_G_Kr 29.60 kgf/m 5824 5824 3 517.17 kgf RSUD KAB. BOMBANA

W 250.125.6.9 Metal - Steel 43-275 Phase 1 B3_H1 29.60 kgf/m 3974 3974 6 705.78 kgf
W 250.125.6.9 Metal - Steel 43-275 Phase 1 B3_H2 29.60 kgf/m 3970 3970 6 705.07 kgf
W 250.125.6.9 Metal - Steel 43-275 Phase 1 B3_H2* 29.60 kgf/m 3972 3972 4 470.28 kgf Atap RB2 Muh. Masri Sulaiman, ST
NIP. 19840496 201101 1 016

W 250.125.6.9 Metal - Steel 43-275 Phase 1 B3_H3 29.60 kgf/m 3986 3978 2 235.97 kgf Atap RB1
W 250.125.6.9 Metal - Steel 43-275 Phase 1 B3_I1 29.60 kgf/m 4574 4574 3 406.17 kgf
W 250.125.6.9 Metal - Steel 43-275 Phase 1 B3_I2 29.60 kgf/m 4570 4570 2 270.54 kgf Muh. Masri Sulaiman, ST
NIP. 19840496 201101 1 016
W 250.125.6.9 Metal - Steel 43-275 Phase 1 B3_I2* 29.60 kgf/m 4572 4572 2 270.66 kgf Atap RB2 DIPERIKSA OLEH :
KONSULTAN SUPERVISI
W 250.125.6.9 Metal - Steel 43-275 Phase 1 B3_I3 29.60 kgf/m 4600 4584 1 136.16 kgf Atap RB1 PT. ARISTA CIPTA

W 250.125.6.9 Metal - Steel 43-275 Phase 1 B3_J 29.60 kgf/m 3680 3680 6 653.57 kgf LT. 3 B2
W 250.125.6.9 Metal - Steel 43-275 Phase 1 B3_K 29.60 kgf/m 4020 4020 8 951.94 kgf Muh. Aras Kadir, ST
Site Engineer
W 250.125.6.9 Metal - Steel 43-275 Phase 1 B3_K* 29.60 kgf/m 4022 4022 6 714.31 kgf Atap RB2 DIBUAT OLEH :

W 250.125.6.9 Metal - Steel 43-275 Phase 1 B3_L1 29.60 kgf/m 3705 3705 2 219.34 kgf LT. 3 B2 KONTRAKTOR PELAKSANA
PT. FIKRI BANGUN PERSADA

W 250.125.6.9 Metal - Steel 43-275 Phase 1 B3_L2 29.60 kgf/m 3768 3768 2 223.04 kgf LT. 3 B2
W 250.125.6.9 Metal - Steel 43-275 Phase 1 B3_M1 29.60 kgf/m 3780 3780 4 447.55 kgf Atap RB2 Ir. Gazali

W 250.125.6.9 Metal - Steel 43-275 Phase 1 B3_M2 29.60 kgf/m 3818 3818 2 226.00 kgf Atap RB2 PEKERJAAN
Direktur

W 250.125.6.9 Metal - Steel 43-275 Phase 1 B3_N1 29.60 kgf/m 3780 3780 4 447.55 kgf Atap RB2
W 250.125.6.9 Metal - Steel 43-275 Phase 1 B3_N2 29.60 kgf/m 3890 3882 2 230.29 kgf Atap RB2
W 250.125.6.9 Metal - Steel 43-275 Phase 1 B3_O1 29.60 kgf/m 5730 5730 4 678.43 kgf Atap RB1
W 250.125.6.9 Metal - Steel 43-275 Phase 1 B3_O2 29.60 kgf/m 6000 5983 2 355.20 kgf Atap RB1
W 250.125.6.9 Metal - Steel 43-275 Phase 1 B3_P 29.60 kgf/m 6705 6705 2 396.94 kgf Atap RB2
W 250.125.6.9 Metal - Steel 43-275 Phase 1 B3_Q1 29.60 kgf/m 3755 3755 2 222.30 kgf Atap RB2 JUDUL GAMBAR

W 250.125.6.9 Metal - Steel 43-275 Phase 1 B3_Q2 29.60 kgf/m 3818 3818 2 226.00 kgf Atap RB2
Dafar Balok Baja
W 250.125.6.9 Metal - Steel 43-275 Phase 1 B3_R 29.60 kgf/m 2730 2730 4 323.23 kgf Atap RB2
W 250.125.6.9 Metal - Steel 43-275 Phase 1 B3_S 29.60 kgf/m 4971 4971 2 294.28 kgf LT. 3 RB2
UKURAN LEMBAR KODE HALAMAN

W 250.125.6.9 Metal - Steel 43-275 Phase 1 B3_T 29.60 kgf/m 5680 5680 1 168.13 kgf LT. 3 RB1
Grand total: 263 37941.46 kgf
A3 5_BL-1-003
CATATAN / REVISI
Semua satuan dalam milimeter (mm), kecuali
disebutkan lain

B4_M B4_N B4_J B4_J B4_N B4_M J

B4_L1

B4_L1
B4_L2

B4_L2
B4_K

B4_K

B4_K

B4_K
B3_E B3_E B3_E B3_E B3_F B3_G_Kr B3_H1 B3_I1 B3_H1 B3_G_Kn B3_F B3_E B3_E B3_E B3_E I

B3_D3

B3_D3
B3_D1

B3_D1

B3_D1

B3_D1

B3_D1

B3_D1

B3_D1

B3_D1

B3_D1

B3_D1

B3_D1

B3_D1

B3_D1

B3_D1
H

B2_A

B2_A
PEMERINTAH DAERAH KABUPATEN BOMBANA

B2_B B2_C B2_B F RUMAH SAKIT UMUM DAERAH

DIKETAHUI OLEH :

B2_A

B2_A
PEJABAT PEMBUAT KOMITMEN (PPK)
LANJUTAN PEMBANGUNAN GEDUNG A
RUMAH SAKIT UMUM DAERAH
KABUPATEN BOMBANA

B2_B B2_C B2_B E

B2_A

B2_A
Andi Muhammad Kamal, ST, M.Eng
NIP. 19870219 201402 1 001

DIPERIKSA OLEH :
DIREKSI TEKNIS PEMBANGUNAN
B2_B B2_C B2_B D RSUD KAB. BOMBANA
B4_G1b

B4_G1b
B4_G1a

B4_G1a
B2_D

B2_D
B4_H B4_I B4_H C

B4_I

B4_I

B4_I
Muh. Masri Sulaiman, ST
NIP. 19840496 201101 1 016

B4_J B4_J B

Muh. Masri Sulaiman, ST


NIP. 19840496 201101 1 016

A DIPERIKSA OLEH :
KONSULTAN SUPERVISI
PT. ARISTA CIPTA

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Muh. Aras Kadir, ST
Site Engineer
Daftar Balok Baja - Lantai 2 - 250.125.6.9
DIBUAT OLEH :

Denah Balok Induk Lt 2 (elv. +4.00) KONTRAKTOR PELAKSANA

1 1 : 300 Section Shape: Reference


Com
ment
PT. FIKRI BANGUN PERSADA

Type Mark Nominal Weight Length Cut Length Count Berat Level s
W 250.125.6.9 B3_D1 29.60 kgf/m 2615 2615 14 1083.66 kgf LT. 2 B2
Daftar Balok Baja - Lantai 2 - 200.100.(5.5).8 (Balok Induk) W 250.125.6.9 B3_D3 29.60 kgf/m 2678 2678 2 158.51 kgf LT. 2 B2 Ir. Gazali
Direktur
W 250.125.6.9 B3_E 29.60 kgf/m 5974 5974 8 1414.64 kgf LT. 2 B1
Com PEKERJAAN

ment W 250.125.6.9 B3_F 29.60 kgf/m 5824 5824 2 344.78 kgf LT. 2 B1
Section Shape: Reference
Type Mark Nominal Weight Length Cut Length Count Berat Level s W 250.125.6.9 B3_G_Kn 29.60 kgf/m 5824 5824 1 172.39 kgf LT. 2 B2
W 200.100.(5.5).8 B4_G1a 21.30 kgf/m 3740 3740 2 159.32 kgf LT. 2 NA W 250.125.6.9 B3_G_Kr 29.60 kgf/m 5824 5824 1 172.39 kgf LT. 2 B2
W 200.100.(5.5).8 B4_G1b 21.30 kgf/m 3818 3818 2 162.63 kgf LT. 2 NA W 250.125.6.9 B3_H1 29.60 kgf/m 3974 3974 2 235.26 kgf LT. 2 B2
W 200.100.(5.5).8 B4_H 21.30 kgf/m 6772 6772 2 288.49 kgf LT. 2 NA W 250.125.6.9 B3_I1 29.60 kgf/m 4574 4574 1 135.39 kgf LT. 2 B2
W 200.100.(5.5).8 B4_I 21.30 kgf/m 3690 3690 4 314.39 kgf LT. 2 B2 Grand total: 31 3717.02 kgf
W 200.100.(5.5).8 B4_J 21.30 kgf/m 4020 4020 4 342.50 kgf LT. 2 B2
W 200.100.(5.5).8 B4_K 21.30 kgf/m 3755 3755 4 319.93 kgf LT. 2 B2 Daftar Balok Baja - Lantai 2 - 300.150.(6.5).9
W 200.100.(5.5).8 B4_L1 21.30 kgf/m 3705 3705 2 157.83 kgf LT. 2 B2 JUDUL GAMBAR
W 200.100.(5.5).8 B4_L2 21.30 kgf/m 3768 3768 2 160.50 kgf LT. 2 B2 Com
W 200.100.(5.5).8 B4_M 21.30 kgf/m 5822 5822 2 248.02 kgf LT. 2 B1 Section Shape: Reference ment
Type Mark Nominal Weight Length Cut Length Count Berat Level s Denah Balok Induk Lt 2
W 200.100.(5.5).8 B4_N 21.30 kgf/m 1771 1771 2 75.44 kgf LT. 2 B2
W 300.150.(6.5).9 B2_A 36.70 kgf/m 5680 5680 6 1250.74 kgf LT. 2 B1
Grand total: 26 2229.05 kgf
W 300.150.(6.5).9 B2_B 36.70 kgf/m 3970 3970 6 874.19 kgf LT. 2 B2
W 300.150.(6.5).9 B2_C 36.70 kgf/m 4570 4570 3 503.16 kgf LT. 2 B2 UKURAN LEMBAR KODE HALAMAN

W 300.150.(6.5).9 B2_D 36.70 kgf/m 3680 3680 2 270.11 kgf LT. 2 B2


Grand total: 17 2898.20 kgf A3 5_BL-2-001
CATATAN / REVISI
Semua satuan dalam milimeter (mm), kecuali
disebutkan lain

Ba_6

Ba_6

Ba_6

Ba_6

Ba_6

Ba_6

Ba_6

Ba_6

Ba_6

Ba_6

Ba_6

Ba_6
Ba_1 H

Ba_1

Ba_1

Ba_1

Ba_1

Ba_1

Ba_1

Ba_1
Ba_2 Ba_2 Ba_2 Ba_2 Ba_2 Ba_2 Ba_2 Ba_2 Ba_3 Ba_3 Ba_3 Ba_3 Ba_4 Ba_5 Ba_4 Ba_3 Ba_3 Ba_3 Ba_3 Ba_2 Ba_2 Ba_2 Ba_2 Ba_2 Ba_2 Ba_2 Ba_2

G
Ba_1

Ba_1

Ba_1

Ba_1

Ba_1

Ba_1

Ba_1

Ba_1
Ba_2 Ba_2 Ba_2 Ba_2 Ba_2 Ba_2 Ba_2 Ba_2 Ba_3 Ba_3 Ba_3 Ba_3 Ba_4 Ba_5 Ba_4 Ba_3 Ba_3 Ba_3 Ba_3 Ba_2 Ba_2 Ba_2 Ba_2 Ba_2 Ba_2 Ba_2 Ba_2

PEMERINTAH DAERAH KABUPATEN BOMBANA

F RUMAH SAKIT UMUM DAERAH

DIKETAHUI OLEH :
Ba_1

Ba_1

Ba_1

Ba_1

Ba_1

Ba_1

Ba_1

Ba_1
Ba_2 Ba_2 Ba_2 Ba_2 Ba_2 Ba_2 Ba_2 Ba_2 Ba_3 Ba_3 Ba_3 Ba_3 Ba_4 Ba_5 Ba_4 Ba_3 Ba_3 Ba_3 Ba_3 Ba_2 Ba_2 Ba_2 Ba_2 Ba_2 Ba_2 Ba_2 Ba_2 PEJABAT PEMBUAT KOMITMEN (PPK)
LANJUTAN PEMBANGUNAN GEDUNG A
RUMAH SAKIT UMUM DAERAH
KABUPATEN BOMBANA

E
Ba_1

Ba_1

Ba_1

Ba_1

Ba_1

Ba_1

Ba_1

Ba_1
Ba_2 Ba_2 Ba_2 Ba_2 Ba_2 Ba_2 Ba_2 Ba_2 Ba_3 Ba_3 Ba_3 Ba_3 Ba_4 Ba_5 Ba_4 Ba_3 Ba_3 Ba_3 Ba_3 Ba_2 Ba_2 Ba_2 Ba_2 Ba_2 Ba_2 Ba_2 Ba_2 Andi Muhammad Kamal, ST, M.Eng
NIP. 19870219 201402 1 001

DIPERIKSA OLEH :
DIREKSI TEKNIS PEMBANGUNAN
D RSUD KAB. BOMBANA

Muh. Masri Sulaiman, ST


NIP. 19840496 201101 1 016

Muh. Masri Sulaiman, ST


NIP. 19840496 201101 1 016

A DIPERIKSA OLEH :
KONSULTAN SUPERVISI
PT. ARISTA CIPTA

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Muh. Aras Kadir, ST
Site Engineer

DIBUAT OLEH :
Denah Balok Anak Lt 2 (elv. +4.00) KONTRAKTOR PELAKSANA

1 1 : 300
PT. FIKRI BANGUN PERSADA

Ir. Gazali
Daftar Balok Baja - Lantai 2 - Balok Anak Direktur

PEKERJAAN
Com
Section Shape: Reference ment
Type Mark Nominal Weight Length Cut Length Count Berat Level s
W 200.100.(5.5).8 Ba_1 21.30 kgf/m 6000 5984 32 4089.60 kgf LT. 2 B2
W 200.100.(5.5).8 Ba_2 21.30 kgf/m 3000 2984 64 4089.60 kgf LT. 2 B2
W 200.100.(5.5).8 Ba_3 21.30 kgf/m 2850 2834 32 1942.56 kgf LT. 2 B2
W 200.100.(5.5).8 Ba_4 21.30 kgf/m 4000 3983 8 681.60 kgf LT. 2 B2
W 200.100.(5.5).8 Ba_5 21.30 kgf/m 4600 4583 4 391.92 kgf LT. 2 B2
W 200.100.(5.5).8 Ba_6 21.30 kgf/m 2900 2884 12 741.24 kgf LT. 2 B2
JUDUL GAMBAR
Grand total: 152 11936.52 kgf

Denah Balok Anak Lt 2

UKURAN LEMBAR KODE HALAMAN

A3 5_BL-2-002
CATATAN / REVISI
Semua satuan dalam milimeter (mm), kecuali
disebutkan lain

B3_H2 B3_H2 K

G
PEMERINTAH DAERAH KABUPATEN BOMBANA

RUMAH SAKIT UMUM DAERAH

DIKETAHUI OLEH :
PEJABAT PEMBUAT KOMITMEN (PPK)
F LANJUTAN PEMBANGUNAN GEDUNG A
RUMAH SAKIT UMUM DAERAH
KABUPATEN BOMBANA

Andi Muhammad Kamal, ST, M.Eng


E NIP. 19870219 201402 1 001

DIPERIKSA OLEH :
DIREKSI TEKNIS PEMBANGUNAN
RSUD KAB. BOMBANA

Muh. Masri Sulaiman, ST


NIP. 19840496 201101 1 016
C

B
Muh. Masri Sulaiman, ST
NIP. 19840496 201101 1 016

DIPERIKSA OLEH :
KONSULTAN SUPERVISI
PT. ARISTA CIPTA

B2_E2 B2_E2
B2_E1 A

Muh. Aras Kadir, ST


Site Engineer

DIBUAT OLEH :
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 KONTRAKTOR PELAKSANA
PT. FIKRI BANGUN PERSADA

Denah Balok elv. +4.89


1 1 : 300 Ir. Gazali
Direktur

PEKERJAAN

Daftar Balok Baja - Elv. +4.89


Section Shape:
Type Mark Nominal Weight Length Cut Length Count Berat Reference Level Comments

W 250.125.6.9 JUDUL GAMBAR

W 250.125.6.9 B3_H2 29.60 kgf/m 3970 3970 2 235.02 kgf Elv. +4.89 B2
W 300.150.(6.5).9 Denah Balok elv. +4.89
W 300.150.(6.5).9 B2_E1 36.70 kgf/m 12000 12000 1 440.40 kgf Elv. +4.89 B2
W 300.150.(6.5).9 B2_E2 36.70 kgf/m 265 265 2 19.45 kgf Elv. +4.89 B2 UKURAN LEMBAR KODE HALAMAN

Grand total: 5 694.88 kgf


A3 5_BL-2-003
CATATAN / REVISI
Semua satuan dalam milimeter (mm), kecuali
disebutkan lain
K

B3_K B3_K J

B3_L1

B3_L1
B3_L2

B3_L2
B3_E B3_E B3_E B3_E B3_F B3_G_Kr B3_H1 B3_I1 B3_H1 B3_G_Kn B3_F B3_E B3_E B3_E B3_E I

B3_D6

B3_D6
B3_D5

B3_D5

B3_D5

B3_D5

B3_D5

B3_D5
B3_D2

B3_D2

B3_D2

B3_D2

B3_D2

B3_D2

B3_D2

B3_D2
Ba_6
B3_B B3_B B3_B B3_B* B3_B B3_B B3_B H
B3_A

B3_A

B3_A

B3_A

B3_A

B3_A

B3_A

B3_A
B3_B B3_B B3_B B3_B* B3_B B3_B B3_B G
B3_A

B3_A

B3_A

B3_A

B3_A

B3_A

B3_A

B3_A
PEMERINTAH DAERAH KABUPATEN BOMBANA
B3_B B3_B B3_B B3_B* B3_B B3_B B3_B B3_S F
RUMAH SAKIT UMUM DAERAH

B3_T
B3_A

B3_A

B3_A

B3_A

B3_A

B3_A

B3_A

B3_A
DIKETAHUI OLEH :
PEJABAT PEMBUAT KOMITMEN (PPK)
LANJUTAN PEMBANGUNAN GEDUNG A
RUMAH SAKIT UMUM DAERAH
KABUPATEN BOMBANA
B3_B B3_B B3_B B3_B* B3_B B3_B B3_B B3_S E
B3_A

B3_A

B3_A

B3_A

B3_A

B3_A

B3_A
Ba_1

Ba_1

Andi Muhammad Kamal, ST, M.Eng


NIP. 19870219 201402 1 001

DIPERIKSA OLEH :
B3_B B3_B B3_B B3_B* B3_H2 B3_I2 B3_H2 B3_B B3_B B3_B D DIREKSI TEKNIS PEMBANGUNAN
RSUD KAB. BOMBANA

B3_J

B3_J
C
B3_J

B3_J

B3_J

B3_J
Muh. Masri Sulaiman, ST
NIP. 19840496 201101 1 016
B3_K B3_K B

Muh. Masri Sulaiman, ST


NIP. 19840496 201101 1 016
A DIPERIKSA OLEH :
KONSULTAN SUPERVISI
PT. ARISTA CIPTA

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Muh. Aras Kadir, ST
Daftar Balok Baja - Lantai 3 - Balok Induk Site Engineer

Denah Balok Induk Lt 3 (elv. +8.00) DIBUAT OLEH :

1 1 : 300 Section Shape:


Com
Reference ment
KONTRAKTOR PELAKSANA
PT. FIKRI BANGUN PERSADA

Type Mark Nominal Weight Length Cut Length Count Berat Level s
W 250.125.6.9 B3_A 29.60 kgf/m 5780 5780 32 5474.82 kgf LT. 3 RB1
W 250.125.6.9 B3_B 29.60 kgf/m 5972 5972 30 5303.14 kgf LT. 3 RB1 Ir. Gazali
W 250.125.6.9 B3_B* 29.60 kgf/m 5971 5971 10 1767.42 kgf LT. 3 RB1 Direktur

W 250.125.6.9 B3_D2 29.60 kgf/m 2655 2655 8 628.70 kgf LT. 3 RB2 PEKERJAAN

W 250.125.6.9 B3_D5 29.60 kgf/m 2605 2605 6 462.65 kgf LT. 3 B2


W 250.125.6.9 B3_D6 29.60 kgf/m 2668 2668 2 157.92 kgf LT. 3 B2
W 250.125.6.9 B3_E 29.60 kgf/m 5974 5974 8 1414.64 kgf LT. 3 RB1
W 250.125.6.9 B3_F 29.60 kgf/m 5824 5824 2 344.78 kgf LT. 3 B1
W 250.125.6.9 B3_G_Kn 29.60 kgf/m 5824 5824 1 172.39 kgf LT. 3 B2
W 250.125.6.9 B3_G_Kr 29.60 kgf/m 5824 5824 1 172.39 kgf LT. 3 B2
W 250.125.6.9 B3_H1 29.60 kgf/m 3974 3974 2 235.26 kgf LT. 3 B2
W 250.125.6.9 B3_H2 29.60 kgf/m 3970 3970 2 235.02 kgf LT. 3 B2
W 250.125.6.9 B3_I1 29.60 kgf/m 4574 4574 1 135.39 kgf LT. 3 B2 JUDUL GAMBAR
W 250.125.6.9 B3_I2 29.60 kgf/m 4570 4570 1 135.27 kgf LT. 3 B2
W 250.125.6.9 B3_J 29.60 kgf/m 3680 3680 6 653.57 kgf LT. 3 B2
Denah Balok Induk Lt 3
W 250.125.6.9 B3_K 29.60 kgf/m 4020 4020 4 475.97 kgf LT. 3 B2
W 250.125.6.9 B3_L1 29.60 kgf/m 3705 3705 2 219.34 kgf LT. 3 B2
W 250.125.6.9 B3_L2 29.60 kgf/m 3768 3768 2 223.04 kgf LT. 3 B2 UKURAN LEMBAR KODE HALAMAN
W 250.125.6.9 B3_S 29.60 kgf/m 4971 4971 2 294.28 kgf LT. 3 RB2
W 250.125.6.9 B3_T 29.60 kgf/m 5680 5680 1 168.13 kgf LT. 3 RB1 A3 5_BL-2-004
Grand total: 123 18674.11 kgf
CATATAN / REVISI
Semua satuan dalam milimeter (mm), kecuali
disebutkan lain

I
Ba_6

Ba_6

Ba_6

Ba_6

Ba_6

Ba_6

Ba_6

Ba_6

Ba_6

Ba_6

Ba_6

Ba_6
H
Ba_1

Ba_1

Ba_1

Ba_1

Ba_1

Ba_1

Ba_1

Ba_1

Ba_1

Ba_1

Ba_1

Ba_1
Ba_2 Ba_2 Ba_2 Ba_2 Ba_2 Ba_2 Ba_2 Ba_2 Ba_3 Ba_3 Ba_3 Ba_3 Ba_3 Ba_3 Ba_3 Ba_3 Ba_2 Ba_2 Ba_2 Ba_2 Ba_2 Ba_2 Ba_2 Ba_2

G
Ba_1

Ba_1

Ba_1

Ba_1

Ba_1

Ba_1

Ba_1

Ba_1

Ba_1

Ba_1

Ba_1

Ba_1
Ba_2 Ba_2 Ba_2 Ba_2 Ba_2 Ba_2 Ba_2 Ba_2 Ba_3 Ba_3 Ba_3 Ba_3 Ba_3 Ba_3 Ba_3 Ba_3 Ba_2 Ba_2 Ba_2 Ba_2 Ba_2 Ba_2 Ba_2 Ba_2 PEMERINTAH DAERAH KABUPATEN BOMBANA

RUMAH SAKIT UMUM DAERAH

F DIKETAHUI OLEH :
PEJABAT PEMBUAT KOMITMEN (PPK)
LANJUTAN PEMBANGUNAN GEDUNG A
Ba_1

Ba_1

Ba_1

Ba_1

Ba_1

Ba_1

Ba_1

Ba_1

Ba_1

Ba_1

Ba_1

Ba_1
RUMAH SAKIT UMUM DAERAH
Ba_2 Ba_2 Ba_2 Ba_2 Ba_2 Ba_2 Ba_2 Ba_2 Ba_3 Ba_3 Ba_3 Ba_3 Ba_3 Ba_3 Ba_3 Ba_3 Ba_2 Ba_2 Ba_2 Ba_2 Ba_2 Ba_2 Ba_2 Ba_2 KABUPATEN BOMBANA

E
Andi Muhammad Kamal, ST, M.Eng
NIP. 19870219 201402 1 001
Ba_1

Ba_1

Ba_1

Ba_1

Ba_1

Ba_1

Ba_1

Ba_1

Ba_1

Ba_1

Ba_1

Ba_1
Ba_2 Ba_2 Ba_2 Ba_2 Ba_2 Ba_2 Ba_2 Ba_2 Ba_3 Ba_3 Ba_3 Ba_3 Ba_3 Ba_3 Ba_3 Ba_3 Ba_2 Ba_2 Ba_2 Ba_2 Ba_2 Ba_2 Ba_2 Ba_2 DIPERIKSA OLEH :
DIREKSI TEKNIS PEMBANGUNAN
RSUD KAB. BOMBANA

C Muh. Masri Sulaiman, ST


NIP. 19840496 201101 1 016

Muh. Masri Sulaiman, ST


NIP. 19840496 201101 1 016

DIPERIKSA OLEH :
KONSULTAN SUPERVISI
PT. ARISTA CIPTA
A

Muh. Aras Kadir, ST


Site Engineer
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
DIBUAT OLEH :
KONTRAKTOR PELAKSANA
PT. FIKRI BANGUN PERSADA

Denah Balok Anak Lt 3 (elv. +8.00)


1 1 : 300
Ir. Gazali
Direktur

PEKERJAAN

Daftar Balok Baja - Lantai 3 - Balok Anak

Com
Section Shape: Reference ment
Type Mark Nominal Weight Length Cut Length Count Berat Level s JUDUL GAMBAR
W 200.100.(5.5).8 Ba_1 21.30 kgf/m 6000 5984 48 6134.40 kgf LT. 3 RB3
W 200.100.(5.5).8 Ba_2 21.30 kgf/m 3000 2984 64 4089.60 kgf LT. 3 RB3
Denah Balok Anak Lt 3
W 200.100.(5.5).8 Ba_3 21.30 kgf/m 2850 2834 32 1942.56 kgf LT. 3 B2
W 200.100.(5.5).8 Ba_6 21.30 kgf/m 2900 2884 12 741.24 kgf LT. 3
Grand total: 156 12907.80 kgf UKURAN LEMBAR KODE HALAMAN

A3 5_BL-2-005
CATATAN / REVISI
Semua satuan dalam milimeter (mm), kecuali
disebutkan lain

B4_F B4_F B4_F B4_F B4_F B4_F B4_F B4_F H


B4_D

B4_D
G
B4_D

B4_D
PEMERINTAH DAERAH KABUPATEN BOMBANA

F RUMAH SAKIT UMUM DAERAH

DIKETAHUI OLEH :
B4_D

B4_D
PEJABAT PEMBUAT KOMITMEN (PPK)
LANJUTAN PEMBANGUNAN GEDUNG A
RUMAH SAKIT UMUM DAERAH
KABUPATEN BOMBANA

E
B4_D

B4_D
Andi Muhammad Kamal, ST, M.Eng
NIP. 19870219 201402 1 001

DIPERIKSA OLEH :
DIREKSI TEKNIS PEMBANGUNAN
B4_F B4_F B4_F B4_F B4_F B4_F B4_F B4_F D RSUD KAB. BOMBANA
B4_G2b

B4_G2b
B4_G2a

B4_G2a
B4_H B4_H C

Muh. Masri Sulaiman, ST


NIP. 19840496 201101 1 016

Muh. Masri Sulaiman, ST


NIP. 19840496 201101 1 016
B2_E2 B2_E2
B2_E1 A DIPERIKSA OLEH :
KONSULTAN SUPERVISI
PT. ARISTA CIPTA

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Muh. Aras Kadir, ST
Site Engineer

DIBUAT OLEH :

Denah Balok Top Sayap (elv. +9.60) KONTRAKTOR PELAKSANA

1 1 : 300
PT. FIKRI BANGUN PERSADA

Ir. Gazali
Direktur

PEKERJAAN

Daftar Balok Baja - Top Sayap

Com
Section Shape: Reference ment
Type Mark Nominal Weight Length Cut Length Count Berat Level s
W 200.100.(5.5).8 B4_D 21.30 kgf/m 5780 5780 8 984.91 kgf Top Sayap RB3
W 200.100.(5.5).8 B4_F 21.30 kgf/m 5972 5972 16 2035.26 kgf Top Sayap RB3
W 200.100.(5.5).8 B4_G2a 21.30 kgf/m 3780 3780 2 161.03 kgf Top Sayap RB3
W 200.100.(5.5).8 B4_G2b 21.30 kgf/m 3830 3830 2 163.16 kgf Top Sayap RB3 JUDUL GAMBAR
W 200.100.(5.5).8 B4_H 21.30 kgf/m 6772 6772 2 288.49 kgf Top Sayap RB3
W 300.150.(6.5).9 B2_E1 36.70 kgf/m 12000 12000 1 440.40 kgf Top Sayap RB1
W 300.150.(6.5).9 B2_E2 36.70 kgf/m 265 265 2 19.45 kgf Top Sayap B2 Denah Balok Top Sayap
Grand total: 33 4092.69 kgf

UKURAN LEMBAR KODE HALAMAN

A3 5_BL-2-006
CATATAN / REVISI
Semua satuan dalam milimeter (mm), kecuali
disebutkan lain
B3_K B3_H2 B3_I2 B3_H2 B3_K K

B3_R

B3_R

B3_R

B3_R

3000
B3_K* B3_H3 B3_I3 B3_H3 B3_K*

B3_P

B3_P
J

B3_D2 B3_Q1

B3_D2 B3_Q1
B3_Q2

B3_Q2

4000
B3_F B3_G_Kr B3_H1 B3_I1 B3_H1 B3_G_Kn B3_F I

B3_D4

B3_D4
B3_D2

B3_D2

2900
B3_B B3_C B3_C B3_B H

B3_A

B3_A

B3_A

B3_A

B3_A

B3_A

6000
B3_B B3_C B3_C B3_B G

B3_A

B3_A

B3_A

B3_A

B3_A

B3_A

6000
B3_B B3_C B3_C B3_B F PEMERINTAH DAERAH KABUPATEN BOMBANA

RUMAH SAKIT UMUM DAERAH

B3_A

B3_A

B3_A

B3_A

B3_A

B3_A

6000
DIKETAHUI OLEH :
PEJABAT PEMBUAT KOMITMEN (PPK)
LANJUTAN PEMBANGUNAN GEDUNG A
RUMAH SAKIT UMUM DAERAH
B3_B B3_C B3_C B3_B E KABUPATEN BOMBANA

B3_A

B3_A

B3_A

B3_A

B3_A

B3_A

6000
Andi Muhammad Kamal, ST, M.Eng
NIP. 19870219 201402 1 001

B3_B B3_C B3_H2* B3_I2* B3_H2* B3_C B3_B D DIPERIKSA OLEH :


DIREKSI TEKNIS PEMBANGUNAN

B3_M2
B3_M1

B3_M1

B3_M1

B3_M1
RSUD KAB. BOMBANA

4000
B3_K* B3_H2* B3_I2* B3_H2* B3_K* C
B3_N1

B3_N1

B3_N1

B3_N1
B3_N2

B3_N2

4000
Muh. Masri Sulaiman, ST
NIP. 19840496 201101 1 016
B3_K* B2_E1 B3_K* B
B3_O1

B3_O1

B3_O1

B3_O1
B3_O2

B3_O2

6000
Muh. Masri Sulaiman, ST
B3_K B2_E1 B3_K A NIP. 19840496 201101 1 016

DIPERIKSA OLEH :
KONSULTAN SUPERVISI
PT. ARISTA CIPTA
6000 6000 6000 6000 5850 1800 4050 4000 4600 4000 4050 1800 5850 6000 6000 6000 6000 5000

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Muh. Aras Kadir, ST

Denah Balok Induk Lt Atap (elv. +12.00) Daftar Balok Baja - Lantai Atap - Balok Induk
Site Engineer

1 1 : 300
DIBUAT OLEH :
KONTRAKTOR PELAKSANA
Com PT. FIKRI BANGUN PERSADA
Daftar Balok Baja - Lantai Atap - Balok Induk Section Shape: Reference ment
Type Mark Nominal Weight Length Cut Length Count Berat Level s
Com W 250.125.6.9 B3_K 29.60 kgf/m 4020 4020 4 475.97 kgf Atap RB2
Section Shape: Reference ment W 250.125.6.9 B3_K* 29.60 kgf/m 4022 4022 6 714.31 kgf Atap RB2 Ir. Gazali
Type Mark Nominal Weight Length Cut Length Count Berat Level s Direktur
W 250.125.6.9 B3_M1 29.60 kgf/m 3780 3780 4 447.55 kgf Atap RB2
W 250.125.6.9 B3_A 29.60 kgf/m 5780 5780 24 4106.11 kgf Atap RB1 PEKERJAAN
W 250.125.6.9 B3_M2 29.60 kgf/m 3818 3818 2 226.00 kgf Atap RB2
W 250.125.6.9 B3_B 29.60 kgf/m 5972 5972 10 1767.71 kgf Atap RB1
W 250.125.6.9 B3_N1 29.60 kgf/m 3780 3780 4 447.55 kgf Atap RB2
W 250.125.6.9 B3_C 29.60 kgf/m 5672 5672 10 1678.91 kgf Atap RB1
W 250.125.6.9 B3_N2 29.60 kgf/m 3890 3882 2 230.29 kgf Atap RB2
W 250.125.6.9 B3_D2 29.60 kgf/m 2655 2655 4 314.35 kgf Atap RB2
W 250.125.6.9 B3_O1 29.60 kgf/m 5730 5730 4 678.43 kgf Atap RB1
W 250.125.6.9 B3_D4 29.60 kgf/m 2718 2718 2 160.88 kgf Atap RB2
W 250.125.6.9 B3_O2 29.60 kgf/m 6000 5983 2 355.20 kgf Atap RB1
W 250.125.6.9 B3_F 29.60 kgf/m 5824 5824 2 344.78 kgf Atap RB1
W 250.125.6.9 B3_P 29.60 kgf/m 6705 6705 2 396.94 kgf Atap RB2
W 250.125.6.9 B3_G_Kn 29.60 kgf/m 5824 5824 1 172.39 kgf Atap RB2
W 250.125.6.9 B3_Q1 29.60 kgf/m 3755 3755 2 222.30 kgf Atap RB2
W 250.125.6.9 B3_G_Kr 29.60 kgf/m 5824 5824 1 172.39 kgf Atap RB2
W 250.125.6.9 B3_Q2 29.60 kgf/m 3818 3818 2 226.00 kgf Atap RB2
W 250.125.6.9 B3_H1 29.60 kgf/m 3974 3974 2 235.26 kgf Atap RB2
W 250.125.6.9 B3_R 29.60 kgf/m 2730 2730 4 323.23 kgf Atap RB2
W 250.125.6.9 B3_H2 29.60 kgf/m 3970 3970 2 235.02 kgf Atap RB2 JUDUL GAMBAR
W 300.150.(6.5).9 B2_E1 36.70 kgf/m 12000 12000 2 880.80 kgf Atap RB1
W 250.125.6.9 B3_H2* 29.60 kgf/m 3972 3972 4 470.28 kgf Atap RB2
W 300.150.(6.5).9 B2_E2 36.70 kgf/m 265 265 2 19.45 kgf Atap B2
W 250.125.6.9 B3_H3 29.60 kgf/m 3986 3978 2 235.97 kgf Atap RB1
W 300.150.(6.5).9 B2_E2X 36.70 kgf/m 266 266 2 19.52 kgf Atap B2 Denah Balok Induk Lt Atap
W 250.125.6.9 B3_I1 29.60 kgf/m 4574 4574 1 135.39 kgf Atap RB2
Grand total: 113 16235.08 kgf
W 250.125.6.9 B3_I2 29.60 kgf/m 4570 4570 1 135.27 kgf Atap RB2
W 250.125.6.9 B3_I2* 29.60 kgf/m 4572 4572 2 270.66 kgf Atap RB2 UKURAN LEMBAR KODE HALAMAN
W 250.125.6.9 B3_I3 29.60 kgf/m 4600 4584 1 136.16 kgf Atap RB1
A3 5_BL-2-007
CATATAN / REVISI
Semua satuan dalam milimeter (mm), kecuali
disebutkan lain

3000
J

4000
I

Ba_6

Ba_6

Ba_6

2900
H

Ba_1

Ba_1

Ba_1

Ba_1

6000
Ba_2 Ba_2 Ba_3 Ba_3 Ba_3 Ba_3 Ba_2 Ba_2

Ba_1

Ba_1

Ba_1

Ba_1

6000
Ba_2 Ba_2 Ba_3 Ba_3 Ba_3 Ba_3 Ba_2 Ba_2 PEMERINTAH DAERAH KABUPATEN BOMBANA

RUMAH SAKIT UMUM DAERAH

F DIKETAHUI OLEH :
PEJABAT PEMBUAT KOMITMEN (PPK)
LANJUTAN PEMBANGUNAN GEDUNG A
RUMAH SAKIT UMUM DAERAH

Ba_1

Ba_1

Ba_1

Ba_1

6000
KABUPATEN BOMBANA
Ba_2 Ba_2 Ba_3 Ba_3 Ba_3 Ba_3 Ba_2 Ba_2

E
Andi Muhammad Kamal, ST, M.Eng
NIP. 19870219 201402 1 001

Ba_1

Ba_1

Ba_1

Ba_1

6000
Ba_2 Ba_2 Ba_3 Ba_3 Ba_3 Ba_3 Ba_2 Ba_2 DIPERIKSA OLEH :
DIREKSI TEKNIS PEMBANGUNAN
RSUD KAB. BOMBANA

4000
C Muh. Masri Sulaiman, ST
NIP. 19840496 201101 1 016

4000
B

Muh. Masri Sulaiman, ST

6000
NIP. 19840496 201101 1 016
Ba_7a Ba_7b Ba_7c Ba_7b Ba_7a
DIPERIKSA OLEH :
KONSULTAN SUPERVISI
PT. ARISTA CIPTA
A

6000 6000 6000 6000 5850 1800 4050 4000 4600 4000 4050 1800 5850 6000 6000 6000 6000 5000
Muh. Aras Kadir, ST
Site Engineer
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
DIBUAT OLEH :
KONTRAKTOR PELAKSANA
PT. FIKRI BANGUN PERSADA

Denah Balok Anak Lt Atap (elv. +12.00)


1 1 : 300
Ir. Gazali
Direktur

PEKERJAAN

Daftar Balok Baja - Lantai Atap - Balok Anak

Com
Section Shape: Reference ment
Type Mark Nominal Weight Length Cut Length Count Berat Level s
W 200.100.(5.5).8 Ba_1 21.30 kgf/m 6000 5984 16 2044.80 kgf Atap RB3
W 200.100.(5.5).8 Ba_2 21.30 kgf/m 3000 2984 16 1022.40 kgf Atap RB3
W 200.100.(5.5).8 Ba_3 21.30 kgf/m 2850 2834 16 971.28 kgf Atap RB3
W 200.100.(5.5).8 Ba_6 21.30 kgf/m 2900 2884 3 185.31 kgf Atap JUDUL GAMBAR
W 200.100.(5.5).8 Ba_7a 21.30 kgf/m 4050 4034 2 172.53 kgf Atap RB2
W 200.100.(5.5).8 Ba_7b 21.30 kgf/m 4000 3984 2 170.40 kgf Atap RB2
Denah Balok Anak Lt Atap
W 200.100.(5.5).8 Ba_7c 21.30 kgf/m 4600 4584 1 97.98 kgf Atap RB2
Grand total: 56 4664.70 kgf
UKURAN LEMBAR KODE HALAMAN

A3 5_BL-2-008
CATATAN / REVISI
Semua satuan dalam milimeter (mm), kecuali
disebutkan lain

B4_B B4_A B4_B I

B4_C

B4_C
H

B4_D

B4_D
G

B4_D

B4_D
PEMERINTAH DAERAH KABUPATEN BOMBANA

RUMAH SAKIT UMUM DAERAH


F
DIKETAHUI OLEH :
PEJABAT PEMBUAT KOMITMEN (PPK)

B4_D

B4_D
LANJUTAN PEMBANGUNAN GEDUNG A
RUMAH SAKIT UMUM DAERAH
KABUPATEN BOMBANA

B4_D

B4_D
Andi Muhammad Kamal, ST, M.Eng
NIP. 19870219 201402 1 001

DIPERIKSA OLEH :
DIREKSI TEKNIS PEMBANGUNAN
RSUD KAB. BOMBANA
D

B4_E

B4_E
B4_B* B4_A* B4_B* C
Muh. Masri Sulaiman, ST
NIP. 19840496 201101 1 016

Muh. Masri Sulaiman, ST


NIP. 19840496 201101 1 016

DIPERIKSA OLEH :
A KONSULTAN SUPERVISI
PT. ARISTA CIPTA

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 Muh. Aras Kadir, ST


Site Engineer

DIBUAT OLEH :
KONTRAKTOR PELAKSANA
Denah Balok Top Tengah (elv. +12.80) PT. FIKRI BANGUN PERSADA

1 1 : 300

Ir. Gazali
Direktur

PEKERJAAN

Daftar Balok Baja - Top Tengah

Section
Shape:
Nominal Commen
Type Mark Weight Length Cut Length Count Berat Reference Level ts
W 200.100.(5.5).8 B4_A 21.30 kgf/m 4574 4574 1 97.43 kgf Top Tengah RB3
W 200.100.(5.5).8 B4_A* 21.30 kgf/m 4572 4572 1 97.38 kgf Top Tengah RB3
W 200.100.(5.5).8 B4_B 21.30 kgf/m 3974 3974 2 169.29 kgf Top Tengah RB3 JUDUL GAMBAR
W 200.100.(5.5).8 B4_B* 21.30 kgf/m 3972 3972 2 169.21 kgf Top Tengah RB3
W 200.100.(5.5).8 B4_C 21.30 kgf/m 2655 2655 2 113.10 kgf Top Tengah RB3
W 200.100.(5.5).8 B4_D 21.30 kgf/m 5780 5780 8 984.91 kgf Top Tengah RB3 Denah Balok Top Tengah
W 200.100.(5.5).8 B4_E 21.30 kgf/m 3780 3780 2 161.03 kgf Top Tengah RB3
Grand total: 18 1792.35 kgf
UKURAN LEMBAR KODE HALAMAN

A3 5_BL-2-009
CATATAN / REVISI
5700 Semua satuan dalam milimeter (mm), kecuali

10 5680 10
5 disebutkan lain

5_BL-3-001
10 534 10 4593 10 534 10

5
300

540
W 300.150.(6.5).9
B2_A

5 230
1 1 : 25
10 544 4593 544 10

10 534 10
3990

10 3970 10

80 5

5
10 534 10 2883 10 534 10

50 50 50
5

300
300
PEMERINTAH DAERAH KABUPATEN BOMBANA

540
W 300.150.(6.5).9 RUMAH SAKIT UMUM DAERAH
B2_B

540
5 230

5 50 50 50 50 30 70
2 1 : 25
DIKETAHUI OLEH :
PEJABAT PEMBUAT KOMITMEN (PPK)
10 544 2883 544 10 LANJUTAN PEMBANGUNAN GEDUNG A
RUMAH SAKIT UMUM DAERAH
KABUPATEN BOMBANA

230
4590

10 4570 10
Andi Muhammad Kamal, ST, M.Eng

5
10 534 10 3483 10 534 10 NIP. 19870219 201402 1 001
544 10
DIPERIKSA OLEH :

5
DIREKSI TEKNIS PEMBANGUNAN
RSUD KAB. BOMBANA
B2_A-B-C-D (siku)

300
5 1 : 10

540
W 300.150.(6.5).9

5 230
B2_C
3 1 : 25 Muh. Masri Sulaiman, ST
10 544 3483 544 10 NIP. 19840496 201101 1 016

3700
B2_A
10 3680 10
Muh. Masri Sulaiman, ST
B2_B NIP. 19840496 201101 1 016
10 534 10 2593 10 534 10
DIPERIKSA OLEH :
KONSULTAN SUPERVISI
5

PT. ARISTA CIPTA


B2_A
300

B2_B B2_A
540

Muh. Aras Kadir, ST


B2_D
5 230

B2_A Site Engineer


4 1 : 25
B2_B DIBUAT OLEH :

10 544 2593 544 10 B2_A KONTRAKTOR PELAKSANA


B2_C PT. FIKRI BANGUN PERSADA
B2_B

B2_A B2_B
.2
LT 0 Ir. Gazali
9 2 Direktur
3 B2_D B2_C
PEKERJAAN

B2_B

.1
LT
0
B2_D

3D - B2_A-B-C-D
6 JUDUL GAMBAR

Phase Reference Section Shape: Cut


Type Created Mark Count Level Nominal Weight Length Berat Sheet Balok B2_A-B-C-D
W 300.150.(6.5).9 Phase 1 B2_A 6 LT. 2 36.70 kgf/m 5680 1250.74 kgf B2_A-B-C-D
W 300.150.(6.5).9 Phase 1 B2_B 6 LT. 2 36.70 kgf/m 3970 874.19 kgf B2_A-B-C-D
W 300.150.(6.5).9 Phase 1 B2_C 3 LT. 2 36.70 kgf/m 4570 503.16 kgf B2_A-B-C-D UKURAN LEMBAR KODE HALAMAN

W 300.150.(6.5).9 Phase 1 B2_D 2 LT. 2 36.70 kgf/m 3680 270.11 kgf B2_A-B-C-D
A3 5_BL-3-001
CATATAN / REVISI
12590 Semua satuan dalam milimeter (mm), kecuali
disebutkan lain
10 12000 10

10 10 10 10 10
10 265 534 10 10913 10 534 265

540
265 544 10913 544 265
10 10 10
10 10 10
2 B2_E
5_BL-3-002 1 1 : 40

285

10 10
10 265 534 10
B2_E2X
5
80 5

80 5
PEMERINTAH DAERAH KABUPATEN BOMBANA

RUMAH SAKIT UMUM DAERAH

p
50 50 50

50 50 50

Ata 20
DIKETAHUI OLEH :
9 PEJABAT PEMBUAT KOMITMEN (PPK)
300

11 B2_E2 LANJUTAN PEMBANGUNAN GEDUNG A


RUMAH SAKIT UMUM DAERAH
KABUPATEN BOMBANA
ap B2_E1
ay
pS
To 0
540

5 50 50 50 50 30 70

5 50 50 50 50 30 70

2
96

B2_E2X Andi Muhammad Kamal, ST, M.Eng


NIP. 19870219 201402 1 001
B2_E2
230

DIPERIKSA OLEH :
B2_E1 DIREKSI TEKNIS PEMBANGUNAN
RSUD KAB. BOMBANA

9
4.8
.+
5

El v 0 B2_E2
10 10 9
10 265 544 48

Muh. Masri Sulaiman, ST


B2_E2 NIP. 19840496 201101 1 016

B2_E (siku) LT
2 1 : 10 B2_E1
.
79 3
20

B2_E2
Muh. Masri Sulaiman, ST
NIP. 19840496 201101 1 016

DIPERIKSA OLEH :
KONSULTAN SUPERVISI
PT. ARISTA CIPTA
B2_E1
K1_G

B2_E2 Muh. Aras Kadir, ST


B2_E2 Site Engineer
3D - B2_E
3 DIBUAT OLEH :
KONTRAKTOR PELAKSANA
LT PT. FIKRI BANGUN PERSADA
.1
B2_E1 0

Ir. Gazali
Direktur

PEKERJAAN

3D - B2_E (siku) - displ


5
JUDUL GAMBAR

Phase Reference Section Shape: Cut Balok B2_E


Type Created Mark Count Level Nominal Weight Length Berat Sheet
3D - B2_E (siku) W 300.150.(6.5).9 Phase 1 B2_E1 4 36.70 kgf/m 12000 1761.60 kgf B2_E
4 W 300.150.(6.5).9 Phase 1 B2_E2 6 36.70 kgf/m 265 58.35 kgf B2_E UKURAN LEMBAR KODE HALAMAN

W 300.150.(6.5).9 Phase 1 B2_E2X 2 Atap 36.70 kgf/m 266 19.52 kgf B2_E
A3 5_BL-3-002
CATATAN / REVISI
Semua satuan dalam milimeter (mm), kecuali
disebutkan lain
5800

10 5780 10

250 5
B3_A
1

510
W 250.125.6.9 1 : 25

5 250
10 520 4740 520 10

5992

10 5972 10

250 5
B3_B
W 250.125.6.9 2 1 : 25

5 250
PEMERINTAH DAERAH KABUPATEN BOMBANA

RUMAH SAKIT UMUM DAERAH


10 520 4932 520 10
DIKETAHUI OLEH :
5692 PEJABAT PEMBUAT KOMITMEN (PPK)
LANJUTAN PEMBANGUNAN GEDUNG A
RUMAH SAKIT UMUM DAERAH
10 5672 10 KABUPATEN BOMBANA

250 5
B3_C
3 1 : 25
Andi Muhammad Kamal, ST, M.Eng
NIP. 19870219 201402 1 001
W 250.125.6.9
DIPERIKSA OLEH :

5 250
DIREKSI TEKNIS PEMBANGUNAN
RSUD KAB. BOMBANA

10 520 4632 520 10

Phase Reference Section Shape: Cut Muh. Masri Sulaiman, ST


Type Created Mark Count Level Nominal Weight Length Berat Sheet NIP. 19840496 201101 1 016

W 250.125.6.9 Phase 1 B3_A 56 29.60 kgf/m 5780 9580.93 kgf B3_A-B-C


B3_C
W 250.125.6.9 Phase 1 B3_B 40 29.60 kgf/m 5972 7070.85 kgf B3_A-B-C
W 250.125.6.9 Phase 1 B3_B* 10 LT. 3 29.60 kgf/m 5971 1767.42 kgf B3_A-B-C
W 250.125.6.9 Phase 1 B3_C 10 Atap 29.60 kgf/m 5672 1678.91 kgf B3_A-B-C
B3_B Muh. Masri Sulaiman, ST
NIP. 19840496 201101 1 016

DIPERIKSA OLEH :
B3_B KONSULTAN SUPERVISI
PT. ARISTA CIPTA
B3_A
B3_B
B3_B*
Muh. Aras Kadir, ST
B3_B Site Engineer

B3_C DIBUAT OLEH :

p B3_B* KONTRAKTOR PELAKSANA


Ata 0 PT. FIKRI BANGUN PERSADA
2
119
B3_B B3_B*

Ir. Gazali
3 B3_B* Direktur
LT. A ta
0 119 p
792 PEKERJAAN
20
Top
Sa
yap
962
0
LT.
B3_A 3
B3_B* 792
0

B3_B

3D - B3_A-B-C JUDUL GAMBAR

4
Balok B3_A-B-C

UKURAN LEMBAR KODE HALAMAN

A3 5_BL-3-003
CATATAN / REVISI
Semua satuan dalam milimeter (mm), kecuali
2625 2688 disebutkan lain

10 2615 10 2678
250 5

250

250

250
B3_D1 B3_D3
W 250.125.6.9
1 1 : 25 W 250.125.6.9
3 1 : 25
5 250

10 520 2095

2675 2738

10 2655 10 10 2718 10

250 5

250 5
250
B3_D2 B3_D4
2 1 : 25
W 250.125.6.9
4 1 : 25
W 250.125.6.9

5 250

5 250
PEMERINTAH DAERAH KABUPATEN BOMBANA

10 520 1615 520 10 10 2198 520 10 RUMAH SAKIT UMUM DAERAH

DIKETAHUI OLEH :
PEJABAT PEMBUAT KOMITMEN (PPK)
LANJUTAN PEMBANGUNAN GEDUNG A
RUMAH SAKIT UMUM DAERAH
KABUPATEN BOMBANA

2625
2688
10 2605 10
10 2668 10
Andi Muhammad Kamal, ST, M.Eng
NIP. 19870219 201402 1 001

250 5

250 5
250
DIPERIKSA OLEH :
DIREKSI TEKNIS PEMBANGUNAN
B3_D5 B3_D6
5 6
RSUD KAB. BOMBANA

W 250.125.6.9 1 : 25 W 250.125.6.9 1 : 25
5 250

5 250
10 2148 520 10
10 520 1565 520 10
Muh. Masri Sulaiman, ST
NIP. 19840496 201101 1 016
5994

10 5974 10

250 5
Muh. Masri Sulaiman, ST
NIP. 19840496 201101 1 016
B3_E
W 250.125.6.9
7 1 : 25
DIPERIKSA OLEH :
KONSULTAN SUPERVISI
PT. ARISTA CIPTA

5 250
10 520 4934 520 10
Muh. Aras Kadir, ST
Site Engineer
5844 DIBUAT OLEH :
KONTRAKTOR PELAKSANA
10 5824 10 PT. FIKRI BANGUN PERSADA

250 5
B3_F
8 1 : 25
Ir. Gazali
Direktur

W 250.125.6.9 PEKERJAAN

5 250
10 520 4784 520 10

Phase Reference Section Shape: Cut


Type Created Mark Count Level Nominal Weight Length Berat Sheet
W 250.125.6.9 Phase 1 B3_D1 14 LT. 2 29.60 kgf/m 2615 1083.66 kgf B3_D-E-F
W 250.125.6.9 Phase 1 B3_D2 12 29.60 kgf/m 2655 943.06 kgf B3_D-E-F JUDUL GAMBAR
W 250.125.6.9 Phase 1 B3_D3 2 LT. 2 29.60 kgf/m 2678 158.51 kgf B3_D-E-F
W 250.125.6.9 Phase 1 B3_D4 2 Atap 29.60 kgf/m 2718 160.88 kgf B3_D-E-F
Balok B3_D-E-F
W 250.125.6.9 Phase 1 B3_D5 6 LT. 3 29.60 kgf/m 2605 462.65 kgf B3_D-E-F
W 250.125.6.9 Phase 1 B3_D6 2 LT. 3 29.60 kgf/m 2668 157.92 kgf B3_D-E-F
W 250.125.6.9 Phase 1 B3_E 16 29.60 kgf/m 5974 2829.29 kgf B3_D-E-F
UKURAN LEMBAR KODE HALAMAN
W 250.125.6.9 Phase 1 B3_F 6 29.60 kgf/m 5824 1034.34 kgf B3_D-E-F
A3 5_BL-3-004
CATATAN / REVISI
Semua satuan dalam milimeter (mm), kecuali
disebutkan lain

B3_D2

B3_D4

B3_D2 B3_F PEMERINTAH DAERAH KABUPATEN BOMBANA


B3_D5
RUMAH SAKIT UMUM DAERAH
B3_D5
DIKETAHUI OLEH :
PEJABAT PEMBUAT KOMITMEN (PPK)
LANJUTAN PEMBANGUNAN GEDUNG A
RUMAH SAKIT UMUM DAERAH
KABUPATEN BOMBANA
B3_D6

Andi Muhammad Kamal, ST, M.Eng


B3_D5 NIP. 19870219 201402 1 001
B3_D1
B3_F DIPERIKSA OLEH :
DIREKSI TEKNIS PEMBANGUNAN
RSUD KAB. BOMBANA
B3_D1
B3_D2
B3_E

Atap
0
1192 B3_D3
Muh. Masri Sulaiman, ST
B3_D2 B3_E NIP. 19840496 201101 1 016

B3_D1 B3_F
B3_D2 B3_E

B3_E Muh. Masri Sulaiman, ST


B3_D1 NIP. 19840496 201101 1 016
B3_D2 B3_E DIPERIKSA OLEH :
LT. 3 KONSULTAN SUPERVISI

7920
PT. ARISTA CIPTA

B3_D1 B3_E

Muh. Aras Kadir, ST


Site Engineer
B3_E
B3_D1 DIBUAT OLEH :
KONTRAKTOR PELAKSANA
PT. FIKRI BANGUN PERSADA

B3_D1 B3_E
LT. 2
3920
Ir. Gazali
3D - B3_D-E-F Direktur

1 PEKERJAAN

JUDUL GAMBAR

3D - B3_D-E-F

UKURAN LEMBAR KODE HALAMAN

A3 5_BL-3-004a
5844 CATATAN / REVISI
Semua satuan dalam milimeter (mm), kecuali
10 5824 10 disebutkan lain

250 5
5 250
B3_G_Kn
1 1 : 25
10 520 4784 520 10

PEMERINTAH DAERAH KABUPATEN BOMBANA

RUMAH SAKIT UMUM DAERAH

DIKETAHUI OLEH :
PEJABAT PEMBUAT KOMITMEN (PPK)
LANJUTAN PEMBANGUNAN GEDUNG A
RUMAH SAKIT UMUM DAERAH
KABUPATEN BOMBANA

Andi Muhammad Kamal, ST, M.Eng


NIP. 19870219 201402 1 001

DIPERIKSA OLEH :
DIREKSI TEKNIS PEMBANGUNAN
RSUD KAB. BOMBANA

5844 Muh. Masri Sulaiman, ST


NIP. 19840496 201101 1 016
10 5824 10

250 5
Muh. Masri Sulaiman, ST
NIP. 19840496 201101 1 016

5 250
B3_G_Kr DIPERIKSA OLEH :

2 1 : 25
KONSULTAN SUPERVISI
PT. ARISTA CIPTA
10 520 4784 520 10

B3_G_Kr Muh. Aras Kadir, ST


Site Engineer

DIBUAT OLEH :
KONTRAKTOR PELAKSANA
PT. FIKRI BANGUN PERSADA

B3_G_Kr
B3_G_Kn
Atap
0 Ir. Gazali
1192 Direktur

PEKERJAAN

B3_G_Kr
B3_G_Kn
LT. 3
7920

B3_G_Kn
LT. 2
3920
JUDUL GAMBAR

Balok B3_G
Phase Reference Section Shape: Cut
Type Created Mark Count Level Nominal Weight Length Berat Sheet
3D - B3_G
W 250.125.6.9 Phase 1 B3_G_Kn 3
W 250.125.6.9 Phase 1 B3_G_Kr 3
29.60 kgf/m
29.60 kgf/m
5824
5824
517.17 kgf
517.17 kgf
B3_G
B3_G
3 UKURAN LEMBAR KODE HALAMAN

A3 5_BL-3-005
3994 CATATAN / REVISI
B3_H2 Semua satuan dalam milimeter (mm), kecuali
10 3974 10 disebutkan lain

B3_I2

250 5
B3_H2
B3_H3

B3_H1 B3_I3
W 250.125.6.9

5 250
B3_H1 3D - B3_H-I (atap) B3_I1 B3_H3
1 1 : 25 7 B3_H1
10 520 2934 520 10

3990

10 3970 10

B3_H2*

250 5
B3_I2*

W 250.125.6.9 B3_H2* B3_H2*

5 250
B3_H2 B3_I2*
2 1 : 25 11
9
p
Ata 20
B3_H2*
10 520 2930 520 10 B3_H1
PEMERINTAH DAERAH KABUPATEN BOMBANA
B3_I1
RUMAH SAKIT UMUM DAERAH
B3_H1
DIKETAHUI OLEH :
PEJABAT PEMBUAT KOMITMEN (PPK)
LANJUTAN PEMBANGUNAN GEDUNG A
3988 RUMAH SAKIT UMUM DAERAH
KABUPATEN BOMBANA
3978 10

250 5
3D - B3_H-I (Lt 3)
B3_H2
8 Andi Muhammad Kamal, ST, M.Eng
NIP. 19870219 201402 1 001

B3_I2 DIPERIKSA OLEH :

5 250
DIREKSI TEKNIS PEMBANGUNAN
B3_H3 B3_H2 B3_H2 RSUD KAB. BOMBANA

3 1 : 25
3458 520 10 .3
LT 0
2
79
B3_H2
B3_H1
Muh. Masri Sulaiman, ST
El v
B3_I1 .+
4.8
NIP. 19840496 201101 1 016

48 9
4594 B3_H1 90

10 4574 10

Muh. Masri Sulaiman, ST

250 5
NIP. 19840496 201101 1 016

DIPERIKSA OLEH :
KONSULTAN SUPERVISI
PT. ARISTA CIPTA
W 250.125.6.9
B3_I1

5 250
4 1 : 25 3D - B3_H-I (Lt 2)
10 520 3534 520 10
9 Muh. Aras Kadir, ST
Site Engineer

DIBUAT OLEH :
.2
LT 0 KONTRAKTOR PELAKSANA
2 PT. FIKRI BANGUN PERSADA
39

4590

10 4570 10 Ir. Gazali


Direktur

PEKERJAAN
250 5

W 250.125.6.9
5 250

B3_I2
5 1 : 25
10 520 3530 520 10
Phase Reference Section Shape: Cut
Type Created Mark Count Level Nominal Weight Length Berat Sheet
4584 W 250.125.6.9 Phase 1 B3_H1 6 29.60 kgf/m 3974 705.78 kgf B3_H-I
JUDUL GAMBAR
W 250.125.6.9 Phase 1 B3_H2 6 29.60 kgf/m 3970 705.07 kgf B3_H-I
W 250.125.6.9 Phase 1 B3_H2* 4 Atap 29.60 kgf/m 3972 470.28 kgf B3_H-I
W 250.125.6.9 Phase 1 B3_H3 2 Atap 29.60 kgf/m 3978 235.50 kgf B3_H-I Balok B3_H-I
250

W 250.125.6.9 Phase 1 B3_I1 3 29.60 kgf/m 4574 406.17 kgf B3_H-I


W 250.125.6.9 Phase 1 B3_I2 2 29.60 kgf/m 4570 270.54 kgf B3_H-I
W 250.125.6.9
B3_I3 W 250.125.6.9 Phase 1 B3_I2* 2 Atap 29.60 kgf/m 4572 270.66 kgf B3_H-I UKURAN LEMBAR KODE HALAMAN

6 1 : 25
W 250.125.6.9 Phase 1 B3_I3 1 Atap 29.60 kgf/m 4584 135.69 kgf B3_H-I
A3 5_BL-3-006
CATATAN / REVISI

3700 Semua satuan dalam milimeter (mm), kecuali


disebutkan lain

10 3680 10

250 5
B3_J
W 250.125.6.9
1 1 : 25

5 250
10 520 2640 520 10

B3_K

4040 B3_K*
10 4020 10

B3_K PEMERINTAH DAERAH KABUPATEN BOMBANA

250 5
RUMAH SAKIT UMUM DAERAH

B3_K
2
DIKETAHUI OLEH :
W 250.125.6.9 PEJABAT PEMBUAT KOMITMEN (PPK)
1 : 25

5 250
B3_K* LANJUTAN PEMBANGUNAN GEDUNG A
RUMAH SAKIT UMUM DAERAH
KABUPATEN BOMBANA

10 520 2980 520 10


B3_K*

B3_K*
Andi Muhammad Kamal, ST, M.Eng
NIP. 19870219 201402 1 001

B3_K
3D - B3_J-K-L (Atap) DIPERIKSA OLEH :

p
Ata 20
5 DIREKSI TEKNIS PEMBANGUNAN
RSUD KAB. BOMBANA
9
11
B3_K*
B3_K*

3725 Muh. Masri Sulaiman, ST


B3_K B3_L2 NIP. 19840496 201101 1 016
10 3705 10
B3_K

250 5
B3_L1
B3_L1
3
Muh. Masri Sulaiman, ST
NIP. 19840496 201101 1 016
W 250.125.6.9 1 : 25 B3_L1
5 250

DIPERIKSA OLEH :
B3_K KONSULTAN SUPERVISI
PT. ARISTA CIPTA

10 520 2665 520 10


B3_L2
Muh. Aras Kadir, ST
Site Engineer
B3_J
DIBUAT OLEH :
KONTRAKTOR PELAKSANA
B3_J PT. FIKRI BANGUN PERSADA

B3_J
.3
LT 0 B3_K
79
2 B3_J Ir. Gazali
Direktur
3788
3D - B3_J-K-L (Lt 3)
10 3768 10
B3_J
6 PEKERJAAN
250 5

B3_J
B3_L2
250

4 1 : 25
B3_K

W 250.125.6.9
5 250

10 520 3248 10
Phase Reference Section Shape: Cut JUDUL GAMBAR
Type Created Mark Count Level Nominal Weight Length Berat Sheet
W 250.125.6.9 Phase 1 B3_J 6 LT. 3 29.60 kgf/m 3680 653.57 kgf B3_J-K-L
Balok B3_J-K-L
W 250.125.6.9 Phase 1 B3_K 8 29.60 kgf/m 4020 951.94 kgf B3_J-K-L
W 250.125.6.9 Phase 1 B3_K* 6 Atap 29.60 kgf/m 4022 714.31 kgf B3_J-K-L
W 250.125.6.9 Phase 1 B3_L1 2 LT. 3 29.60 kgf/m 3705 219.34 kgf B3_J-K-L
UKURAN LEMBAR KODE HALAMAN
W 250.125.6.9 Phase 1 B3_L2 2 LT. 3 29.60 kgf/m 3768 223.04 kgf B3_J-K-L
A3 5_BL-3-007
CATATAN / REVISI

3800 Phase Reference Section Shape: Cut Semua satuan dalam milimeter (mm), kecuali
Type Created Mark Count Level Nominal Weight Length Berat Sheet disebutkan lain

10 3780 10 W 250.125.6.9 Phase 1 B3_M1 4 Atap 29.60 kgf/m 3780 447.55 kgf B3_M-N-O
W 250.125.6.9 Phase 1 B3_M2 2 Atap 29.60 kgf/m 3818 226.00 kgf B3_M-N-O

250 5
W 250.125.6.9 Phase 1 B3_N1 4 Atap 29.60 kgf/m 3780 447.55 kgf B3_M-N-O
B3_M1 W 250.125.6.9 Phase 1 B3_N2 2 Atap 29.60 kgf/m 3882 229.80 kgf B3_M-N-O
1 1 : 25 W 250.125.6.9 Phase 1 B3_O1 4 Atap 29.60 kgf/m 5730 678.43 kgf B3_M-N-O
W 250.125.6.9 W 250.125.6.9 Phase 1 B3_O2 2 Atap 29.60 kgf/m 5983 354.22 kgf B3_M-N-O

5 250
10 520 2740 520 10

3838

10 3818 10

250 5
B3_M2
2 1 : 25
B3_M2
PEMERINTAH DAERAH KABUPATEN BOMBANA

5 250
B3_N1 B3_M1 RUMAH SAKIT UMUM DAERAH

10 3298 520 10 DIKETAHUI OLEH :


B3_O1 B3_N1 B3_M1 PEJABAT PEMBUAT KOMITMEN (PPK)
LANJUTAN PEMBANGUNAN GEDUNG A
RUMAH SAKIT UMUM DAERAH
KABUPATEN BOMBANA

B3_O1 B3_N2
B3_M1
p
Ata 20 B3_O2
Andi Muhammad Kamal, ST, M.Eng
9 NIP. 19870219 201402 1 001
11
B3_N2 B3_M1 DIPERIKSA OLEH :
3800 DIREKSI TEKNIS PEMBANGUNAN
RSUD KAB. BOMBANA

10 3780 10 B3_O2 B3_N1

250 5
B3_O1
B3_N1 B3_M2
W 250.125.6.9
3 1 : 25
Muh. Masri Sulaiman, ST
NIP. 19840496 201101 1 016

5 250
B3_N1
10 520 2740 520 10

Muh. Masri Sulaiman, ST


B3_O1 NIP. 19840496 201101 1 016

3892 DIPERIKSA OLEH :


KONSULTAN SUPERVISI
PT. ARISTA CIPTA
10 3882
250 5

B3_N2
4
250

Muh. Aras Kadir, ST


1 : 25 Site Engineer

W 250.125.6.9 DIBUAT OLEH :


5 250

KONTRAKTOR PELAKSANA
PT. FIKRI BANGUN PERSADA

10 520 3362

5750
Ir. Gazali
Direktur
10 5730 10
PEKERJAAN

250 5
B3_O1
W 250.125.6.9
5 1 : 25

5 250

10 520 4690 520 10

3D - B3_M-N-O
7 5983
JUDUL GAMBAR

Balok B3_M-N-O
B3_O2
6
250

1 : 25
UKURAN LEMBAR KODE HALAMAN
W 250.125.6.9
A3 5_BL-3-008
6725 CATATAN / REVISI
Semua satuan dalam milimeter (mm), kecuali
10 6705 10 disebutkan lain

250 5
B3_P
W 250.125.6.9
1 1 : 25

5 250
10 520 5665 520 10

3775

10 3755 10

250 5
B3_Q1
2 1 : 25
W 250.125.6.9

5 250
10 520 2715 520 10 PEMERINTAH DAERAH KABUPATEN BOMBANA

RUMAH SAKIT UMUM DAERAH

DIKETAHUI OLEH :
PEJABAT PEMBUAT KOMITMEN (PPK)
LANJUTAN PEMBANGUNAN GEDUNG A
RUMAH SAKIT UMUM DAERAH
B3_R KABUPATEN BOMBANA

B3_Q2
Andi Muhammad Kamal, ST, M.Eng
B3_R NIP. 19870219 201402 1 001

DIPERIKSA OLEH :
DIREKSI TEKNIS PEMBANGUNAN
RSUD KAB. BOMBANA

p
Ata 20 B3_Q1
9
11

Muh. Masri Sulaiman, ST


B3_P NIP. 19840496 201101 1 016

Muh. Masri Sulaiman, ST


B3_P NIP. 19840496 201101 1 016

B3_R DIPERIKSA OLEH :


KONSULTAN SUPERVISI
PT. ARISTA CIPTA

3838
B3_Q1
10 3818 10 B3_R
Muh. Aras Kadir, ST
Site Engineer
250 5

B3_Q2 DIBUAT OLEH :

3
250

KONTRAKTOR PELAKSANA
1 : 25 B3_Q2 PT. FIKRI BANGUN PERSADA

W 250.125.6.9
5 250

Ir. Gazali
10 520 3298 10 Direktur

3D - B3_P-Q-R
5 PEKERJAAN

2750

10 2730 10
250 5

B3_R
W 250.125.6.9 4 1 : 25
5 250

Phase Reference Section Shape: Cut JUDUL GAMBAR


Type Created Mark Count Level Nominal Weight Length Berat Sheet
10 520 1690 520 10 W 250.125.6.9 Phase 1 B3_P 2 Atap 29.60 kgf/m 6705 396.94 kgf B3_P-Q-R
Balok B3_P-Q-R
W 250.125.6.9 Phase 1 B3_Q1 2 Atap 29.60 kgf/m 3755 222.30 kgf B3_P-Q-R
W 250.125.6.9 Phase 1 B3_Q2 2 Atap 29.60 kgf/m 3818 226.00 kgf B3_P-Q-R
W 250.125.6.9 Phase 1 B3_R 4 Atap 29.60 kgf/m 2730 323.23 kgf B3_P-Q-R
UKURAN LEMBAR KODE HALAMAN

A3 5_BL-3-009
CATATAN / REVISI
Semua satuan dalam milimeter (mm), kecuali
4991 disebutkan lain

10 4971 10

250 5
B3_S
W 250.125.6.9 1 1 : 25

5 250
10 520 3931 520 10

5700

10 5680 10

250 5
B3_T
2 1 : 25
PEMERINTAH DAERAH KABUPATEN BOMBANA

W 250.125.6.9 RUMAH SAKIT UMUM DAERAH

5 250
DIKETAHUI OLEH :
PEJABAT PEMBUAT KOMITMEN (PPK)
10 520 4640 520 10 LANJUTAN PEMBANGUNAN GEDUNG A
RUMAH SAKIT UMUM DAERAH
KABUPATEN BOMBANA

Andi Muhammad Kamal, ST, M.Eng


NIP. 19870219 201402 1 001

DIPERIKSA OLEH :
DIREKSI TEKNIS PEMBANGUNAN
B3_S RSUD KAB. BOMBANA

Muh. Masri Sulaiman, ST


NIP. 19840496 201101 1 016

B3_S
.3
LT 0 Muh. Masri Sulaiman, ST
2
79 NIP. 19840496 201101 1 016

DIPERIKSA OLEH :
KONSULTAN SUPERVISI
PT. ARISTA CIPTA
B3_T

Muh. Aras Kadir, ST


Site Engineer

DIBUAT OLEH :
KONTRAKTOR PELAKSANA
PT. FIKRI BANGUN PERSADA

.2
LT 0
2
39 Ir. Gazali
Direktur

PEKERJAAN

.1
LT JUDUL GAMBAR
0
Phase Reference Section Shape: Cut
Type Created Mark Count Level Nominal Weight Length Berat Sheet Balok B3_S-T
W 250.125.6.9 Phase 1 B3_S 2 LT. 3 29.60 kgf/m 4971 294.28 kgf B3_S-T
3D - B3_S-T W 250.125.6.9 Phase 1 B3_T 1 LT. 3 29.60 kgf/m 5680 168.13 kgf B3_S-T
3 UKURAN LEMBAR KODE HALAMAN

A3 5_BL-3-010
CATATAN / REVISI
Semua satuan dalam milimeter (mm), kecuali
4594 disebutkan lain

10 4574 10

200 5
B4_A
W 200.100.(5.5).8
1 1 : 25

5 190
10 329 3916 329 10

3994

10 3974 10

200 5
B4_B
W 200.100.(5.5).8
2 1 : 25

5 190
10 329 3316 329 10
PEMERINTAH DAERAH KABUPATEN BOMBANA

RUMAH SAKIT UMUM DAERAH

2675 Phase Reference Section Shape: Cut


DIKETAHUI OLEH :
Type Created Mark Count Level Nominal Weight Length Berat Sheet PEJABAT PEMBUAT KOMITMEN (PPK)
10 2655 10 W 200.100.(5.5).8 Phase 1 B4_A 1 Top Tengah 21.30 kgf/m 4574 97.43 kgf B4_A-B-C-D-E-F LANJUTAN PEMBANGUNAN GEDUNG A
RUMAH SAKIT UMUM DAERAH
W 200.100.(5.5).8 Phase 1 B4_A* 1 Top Tengah 21.30 kgf/m 4572 97.38 kgf B4_A-B-C-D-E-F KABUPATEN BOMBANA

200 5
W 200.100.(5.5).8 Phase 1 B4_B 2 Top Tengah 21.30 kgf/m 3974 169.29 kgf B4_A-B-C-D-E-F
B4_C W 200.100.(5.5).8 Phase 1 B4_B* 2 Top Tengah 21.30 kgf/m 3972 169.21 kgf B4_A-B-C-D-E-F
W 200.100.(5.5).8
3 1 : 25 W 200.100.(5.5).8 Phase 1 B4_C 2 Top Tengah 21.30 kgf/m 2655 113.10 kgf B4_A-B-C-D-E-F

5 190
Andi Muhammad Kamal, ST, M.Eng
W 200.100.(5.5).8 Phase 1 B4_D 16 21.30 kgf/m 5780 1969.82 kgf B4_A-B-C-D-E-F NIP. 19870219 201402 1 001
W 200.100.(5.5).8 Phase 1 B4_E 2 Top Tengah 21.30 kgf/m 3780 161.03 kgf B4_A-B-C-D-E-F
10 329 1997 329 10 DIPERIKSA OLEH :
W 200.100.(5.5).8 Phase 1 B4_F 16 Top Sayap 21.30 kgf/m 5972 2035.26 kgf B4_A-B-C-D-E-F DIREKSI TEKNIS PEMBANGUNAN
RSUD KAB. BOMBANA

5800

10 5780 10
Muh. Masri Sulaiman, ST
NIP. 19840496 201101 1 016

200 5
B4_D
W 200.100.(5.5).8
4 1 : 25

5 190
Muh. Masri Sulaiman, ST
10 329 5122 329 10 NIP. 19840496 201101 1 016

DIPERIKSA OLEH :
KONSULTAN SUPERVISI
PT. ARISTA CIPTA

3800

10 3780 10 Muh. Aras Kadir, ST


Site Engineer
200 5

DIBUAT OLEH :

B4_E KONTRAKTOR PELAKSANA

W 200.100.(5.5).8
5 1 : 25
PT. FIKRI BANGUN PERSADA
5 190

10 329 3122 329 10


Ir. Gazali
Direktur

PEKERJAAN

5992

10 5972 10

200 5
B4_F
6 1 : 25
W 200.100.(5.5).8 5 190
JUDUL GAMBAR

10 329 5314 329 10


Balok B4_A-B-C-D-E-F

UKURAN LEMBAR KODE HALAMAN

A3 5_BL-3-011
CATATAN / REVISI
Semua satuan dalam milimeter (mm), kecuali
disebutkan lain

B4_C
B4_B

B4_D
B4_A

B4_D B4_B

B4_D B4_C
B4_D PEMERINTAH DAERAH KABUPATEN BOMBANA

RUMAH SAKIT UMUM DAERAH

B4_D DIKETAHUI OLEH :


B4_D At PEJABAT PEMBUAT KOMITMEN (PPK)
11 ap LANJUTAN PEMBANGUNAN GEDUNG A
92
0 RUMAH SAKIT UMUM DAERAH
B4_E KABUPATEN BOMBANA

B4_D
LT
.
79 3
B4_D 20 Andi Muhammad Kamal, ST, M.Eng
B4_B* NIP. 19870219 201402 1 001
B4_F
DIPERIKSA OLEH :

ah B4_E DIREKSI TEKNIS PEMBANGUNAN


ng B4_A* RSUD KAB. BOMBANA
p Te
To 20 B4_F
8
12
B4_B*
p
ya
pSa
To 0 B4_F
2 Muh. Masri Sulaiman, ST
96 NIP. 19840496 201101 1 016

B4_F

Muh. Masri Sulaiman, ST


B4_D NIP. 19840496 201101 1 016

DIPERIKSA OLEH :
KONSULTAN SUPERVISI
B4_F B4_D PT. ARISTA CIPTA

B4_D
Muh. Aras Kadir, ST
B4_F Site Engineer

DIBUAT OLEH :
KONTRAKTOR PELAKSANA
B4_F B4_D PT. FIKRI BANGUN PERSADA

B4_F
3D - B4_A-B-C-D-E-F
1
Ir. Gazali
Direktur

PEKERJAAN

JUDUL GAMBAR

3D - B4_A-B-C-D-E-F

UKURAN LEMBAR KODE HALAMAN

A3 5_BL-3-011a
CATATAN / REVISI
Semua satuan dalam milimeter (mm), kecuali
disebutkan lain

3750

3740 10

200 5
B4_G1a
200

1 1 : 25
W 200.100.(5.5).8

5 190
329 10
ap
Say
Top
0
962

B4_G2b
3
LT.
9 20
7
10 3818 10
PEMERINTAH DAERAH KABUPATEN BOMBANA

200 5
RUMAH SAKIT UMUM DAERAH
B4_G2a
200

B4_G1b
2
DIKETAHUI OLEH :

W 200.100.(5.5).8 PEJABAT PEMBUAT KOMITMEN (PPK)

5 190
1 : 25 B4_H LANJUTAN PEMBANGUNAN GEDUNG A
RUMAH SAKIT UMUM DAERAH
KABUPATEN BOMBANA
10 3488 329 10
2
LT.
0
392
Andi Muhammad Kamal, ST, M.Eng
NIP. 19870219 201402 1 001

DIPERIKSA OLEH :
DIREKSI TEKNIS PEMBANGUNAN
RSUD KAB. BOMBANA

B4_G1b

1 B4_H B4_G1a
LT.
3800
0 Muh. Masri Sulaiman, ST
NIP. 19840496 201101 1 016
10 3780 10

W 200.100.(5.5).8 200 5
Muh. Masri Sulaiman, ST
5 190 NIP. 19840496 201101 1 016

DIPERIKSA OLEH :
10 329 3122 329 10
3D - B4_G-H KONSULTAN SUPERVISI

6
PT. ARISTA CIPTA
B4_G2a
3 1 : 25

Muh. Aras Kadir, ST


3850 Site Engineer

10 3830 10 DIBUAT OLEH :


KONTRAKTOR PELAKSANA
PT. FIKRI BANGUN PERSADA
200 5

Phase Reference Section Shape: Cut


200

Type Created Mark Count Level Nominal Weight Length Berat Sheet
W 200.100.(5.5).8 Phase 1 B4_G1a 2 LT. 2 21.30 kgf/m 3740 159.32 kgf B4_G-H
W 200.100.(5.5).8
5 190

W 200.100.(5.5).8 Phase 1 B4_G1b 2 LT. 2 21.30 kgf/m 3818 162.63 kgf B4_G-H Ir. Gazali
Direktur
W 200.100.(5.5).8 Phase 1 B4_G2a 2 Top Sayap 21.30 kgf/m 3780 161.03 kgf B4_G-H
PEKERJAAN
10 3501 329 10 W 200.100.(5.5).8 Phase 1 B4_G2b 2 Top Sayap 21.30 kgf/m 3830 163.16 kgf B4_G-H
B4_G2b
4 1 : 25
W 200.100.(5.5).8 Phase 1 B4_H 4 21.30 kgf/m 6772 576.97 kgf B4_G-H

6792

10 6772 10

200 5
B4_H
W 200.100.(5.5).8
5 1 : 25 JUDUL GAMBAR

5 190
10 329 6114 329 10 Balok B4_G-H

UKURAN LEMBAR KODE HALAMAN

A3 5_BL-3-012
CATATAN / REVISI
Semua satuan dalam milimeter (mm), kecuali
3700 disebutkan lain

3690 10

Phase Reference Section Shape: Cut

200 5
Type Created Mark Count Level Nominal Weight Length Berat Sheet
B4_I
200

1 1 : 25
W 200.100.(5.5).8 Phase 1 B4_I
W 200.100.(5.5).8 Phase 1 B4_J
4
4
LT. 2
LT. 2
21.30 kgf/m
21.30 kgf/m
3690
4020
314.39 kgf
342.50 kgf
B4_I-J
B4_I-J
W 200.100.(5.5).8

5 190
3361 339

4040

10 4020 10

200 5
B4_J
2 1 : 25
W 200.100.(5.5).8

5 190
10 329 3362 329 10
PEMERINTAH DAERAH KABUPATEN BOMBANA

RUMAH SAKIT UMUM DAERAH

DIKETAHUI OLEH :
PEJABAT PEMBUAT KOMITMEN (PPK)
LANJUTAN PEMBANGUNAN GEDUNG A
B4_J RUMAH SAKIT UMUM DAERAH
KABUPATEN BOMBANA

Andi Muhammad Kamal, ST, M.Eng


NIP. 19870219 201402 1 001

DIPERIKSA OLEH :
DIREKSI TEKNIS PEMBANGUNAN
RSUD KAB. BOMBANA

B4_J
Muh. Masri Sulaiman, ST
NIP. 19840496 201101 1 016

Muh. Masri Sulaiman, ST


NIP. 19840496 201101 1 016

DIPERIKSA OLEH :
KONSULTAN SUPERVISI
PT. ARISTA CIPTA

Muh. Aras Kadir, ST


.2 B4_I Site Engineer
LT 0
2
39 DIBUAT OLEH :
KONTRAKTOR PELAKSANA
PT. FIKRI BANGUN PERSADA
B4_J B4_I

.1
LT Ir. Gazali
0 Direktur

PEKERJAAN

B4_I

3D - B4_I-J B4_J B4_I


3 JUDUL GAMBAR

Balok B4_I-J

UKURAN LEMBAR KODE HALAMAN

A3 5_BL-3-013
3775 CATATAN / REVISI
Semua satuan dalam milimeter (mm), kecuali
disebutkan lain
10 3755 10

200 5
B4_K
W 200.100.(5.5).8 1 1 : 25

5 190
10 329 3097 329 10

3725

10 3705 10

200 5
B4_L1
W 200.100.(5.5).8
2 1 : 25

5 190
10 329 3047 329 10
PEMERINTAH DAERAH KABUPATEN BOMBANA

RUMAH SAKIT UMUM DAERAH

B4_L1 DIKETAHUI OLEH :


PEJABAT PEMBUAT KOMITMEN (PPK)
LANJUTAN PEMBANGUNAN GEDUNG A
RUMAH SAKIT UMUM DAERAH
KABUPATEN BOMBANA
B4_N
.2
LT 0
9 2 B4_L2
3

Andi Muhammad Kamal, ST, M.Eng


NIP. 19870219 201402 1 001

B4_M DIPERIKSA OLEH :


DIREKSI TEKNIS PEMBANGUNAN
RSUD KAB. BOMBANA
B4_K

.1
LT
0

Muh. Masri Sulaiman, ST


NIP. 19840496 201101 1 016

3788
B4_K
10 3768 10
200 5

200 B4_L2 Muh. Masri Sulaiman, ST

3 1 : 25
NIP. 19840496 201101 1 016

DIPERIKSA OLEH :
W 200.100.(5.5).8
5 190

KONSULTAN SUPERVISI
PT. ARISTA CIPTA

10 329 3438 10

3D - B4_K-L-M-N Muh. Aras Kadir, ST

5842 6 DIBUAT OLEH :


Site Engineer

KONTRAKTOR PELAKSANA
10 5822 10 PT. FIKRI BANGUN PERSADA

200 5
B4_M
W 200.100.(5.5).8
4 1 : 25
Ir. Gazali
Direktur

5 190
PEKERJAAN

10 329 5164 329 10

1791

10 1771 10

Phase Reference Section Shape: Cut


200 5

Type Created Mark Count Level Nominal Weight Length Berat Sheet
B4_N W 200.100.(5.5).8 Phase 1 B4_K 4 LT. 2 21.30 kgf/m 3755 319.93 kgf B4_K-L-M-N
W 200.100.(5.5).8
5 1 : 25 W 200.100.(5.5).8 Phase 1 B4_L1 2 LT. 2 21.30 kgf/m 3705 157.83 kgf B4_K-L-M-N
JUDUL GAMBAR
5 190

W 200.100.(5.5).8 Phase 1 B4_L2 2 LT. 2 21.30 kgf/m 3768 160.50 kgf B4_K-L-M-N
Balok B4_K-L-M-N
10 329 1113 329 10 W 200.100.(5.5).8 Phase 1 B4_M 2 LT. 2 21.30 kgf/m 5822 248.02 kgf B4_K-L-M-N
W 200.100.(5.5).8 Phase 1 B4_N 2 LT. 2 21.30 kgf/m 1771 75.44 kgf B4_K-L-M-N
UKURAN LEMBAR KODE HALAMAN

A3 5_BL-3-014
CATATAN / REVISI
5984 Semua satuan dalam milimeter (mm), kecuali
disebutkan lain

Ba_1
1

200
1 : 25
W 200.100.(5.5).8
2984

Ba_2
2

200
1 : 25
W 200.100.(5.5).8

2834

Ba_3
3

200
1 : 25
Ba_3 W 200.100.(5.5).8

Ba_3 Ba_2 PEMERINTAH DAERAH KABUPATEN BOMBANA

Ba_1 RUMAH SAKIT UMUM DAERAH


Ba_1 Ba_1
Ba_2 DIKETAHUI OLEH :
PEJABAT PEMBUAT KOMITMEN (PPK)
Ba_2 LANJUTAN PEMBANGUNAN GEDUNG A
RUMAH SAKIT UMUM DAERAH
KABUPATEN BOMBANA

p
Ata 20
19
1 Andi Muhammad Kamal, ST, M.Eng
3D - Ba_1-2-3 (Atap) Ba_3 Ba_1 NIP. 19870219 201402 1 001

4 DIPERIKSA OLEH :
DIREKSI TEKNIS PEMBANGUNAN
Ba_3 Ba_3 RSUD KAB. BOMBANA

Ba_2 Muh. Masri Sulaiman, ST


.3 Ba_2 NIP. 19840496 201101 1 016
LT 0
9 2
7 Ba_2
Ba_2

Muh. Masri Sulaiman, ST


NIP. 19840496 201101 1 016

DIPERIKSA OLEH :
KONSULTAN SUPERVISI
PT. ARISTA CIPTA

Muh. Aras Kadir, ST


Site Engineer

3D - Ba_1-2-3 (Lt 3) DIBUAT OLEH :


Ba_3 5 KONTRAKTOR PELAKSANA
PT. FIKRI BANGUN PERSADA
Ba_3

Ba_3
Ba_3 Ir. Gazali

Ba_2 Ba_1
Direktur

PEKERJAAN

.2 Ba_2 Ba_1
LT 0
9 2
3
Ba_2

3D - Ba_1-2-3 (Lt 2)
6
JUDUL GAMBAR

Phase Reference Section Shape: Cut


Type Created Mark Count Level Nominal Weight Length Berat Sheet Balok Ba_1-2-3
W 200.100.(5.5).8 Phase 1 Ba_1 96 21.30 kgf/m 5984 12236.08 kgf Ba_1-2-3
W 200.100.(5.5).8 Phase 1 Ba_2 144 21.30 kgf/m 2984 9153.24 kgf Ba_1-2-3
W 200.100.(5.5).8 Phase 1 Ba_3 80 21.30 kgf/m 2834 4829.39 kgf Ba_1-2-3 UKURAN LEMBAR KODE HALAMAN

A3 5_BL-3-015
CATATAN / REVISI
Semua satuan dalam milimeter (mm), kecuali
disebutkan lain

3983

Ba_4
1

200
1 : 25
W 200.100.(5.5).8

4583

Ba_5
2

200
1 : 25
W 200.100.(5.5).8
PEMERINTAH DAERAH KABUPATEN BOMBANA

RUMAH SAKIT UMUM DAERAH

DIKETAHUI OLEH :
PEJABAT PEMBUAT KOMITMEN (PPK)
LANJUTAN PEMBANGUNAN GEDUNG A
RUMAH SAKIT UMUM DAERAH
KABUPATEN BOMBANA

Phase Reference Section Shape: Cut


Type Created Mark Count Level Nominal Weight Length Berat Sheet Andi Muhammad Kamal, ST, M.Eng
W 200.100.(5.5).8 Phase 1 Ba_4 8 LT. 2 21.30 kgf/m 3983 678.79 kgf Ba_4-5 NIP. 19870219 201402 1 001

W 200.100.(5.5).8 Phase 1 Ba_5 4 LT. 2 21.30 kgf/m 4583 390.51 kgf Ba_4-5 Ba_4 DIPERIKSA OLEH :
DIREKSI TEKNIS PEMBANGUNAN
RSUD KAB. BOMBANA

Ba_5
Ba_4 Muh. Masri Sulaiman, ST
NIP. 19840496 201101 1 016

Ba_4

Ba_5
Muh. Masri Sulaiman, ST
NIP. 19840496 201101 1 016
Ba_4
DIPERIKSA OLEH :
KONSULTAN SUPERVISI
PT. ARISTA CIPTA

Ba_4

Ba_5 Muh. Aras Kadir, ST


Site Engineer
.2
LT 0 DIBUAT OLEH :
9 2
3 KONTRAKTOR PELAKSANA
PT. FIKRI BANGUN PERSADA

Ba_4

Ir. Gazali
Direktur

PEKERJAAN

.1
LT
0

3D - Ba_4-5
3
JUDUL GAMBAR

Balok Ba_4-5

UKURAN LEMBAR KODE HALAMAN

A3 5_BL-3-016
CATATAN / REVISI
Semua satuan dalam milimeter (mm), kecuali
disebutkan lain

2884

Ba_6
1

200
1 : 25
W 200.100.(5.5).8

PEMERINTAH DAERAH KABUPATEN BOMBANA

RUMAH SAKIT UMUM DAERAH

DIKETAHUI OLEH :
PEJABAT PEMBUAT KOMITMEN (PPK)
LANJUTAN PEMBANGUNAN GEDUNG A
RUMAH SAKIT UMUM DAERAH
KABUPATEN BOMBANA

Andi Muhammad Kamal, ST, M.Eng


NIP. 19870219 201402 1 001

Atap DIPERIKSA OLEH :

11920 DIREKSI TEKNIS PEMBANGUNAN


RSUD KAB. BOMBANA

Muh. Masri Sulaiman, ST


NIP. 19840496 201101 1 016

LT. 3
7920

Muh. Masri Sulaiman, ST


NIP. 19840496 201101 1 016

DIPERIKSA OLEH :
KONSULTAN SUPERVISI
PT. ARISTA CIPTA

LT. 2
3920 Muh. Aras Kadir, ST
Site Engineer

DIBUAT OLEH :
KONTRAKTOR PELAKSANA
PT. FIKRI BANGUN PERSADA

3D - Ba_6
2
Ir. Gazali
Direktur

PEKERJAAN

JUDUL GAMBAR
Section Shape:
Type Phase Created Mark Count Reference Level Nominal Weight Cut Length Berat Sheet
W 200.100.(5.5).8 Phase 1 Ba_6 27 21.30 kgf/m 2884 1658.57 kgf Ba_6 Balok Ba_6

UKURAN LEMBAR KODE HALAMAN

A3 5_BL-3-017
CATATAN / REVISI
Semua satuan dalam milimeter (mm), kecuali
disebutkan lain

4034

Ba_7a
1

200
1 : 25
W 200.100.(5.5).8

3984

Ba_7b
2

200
1 : 25
W 200.100.(5.5).8

4584
PEMERINTAH DAERAH KABUPATEN BOMBANA

RUMAH SAKIT UMUM DAERAH


Ba_7c
3

200
1 : 25 DIKETAHUI OLEH :
PEJABAT PEMBUAT KOMITMEN (PPK)
W 200.100.(5.5).8 LANJUTAN PEMBANGUNAN GEDUNG A
RUMAH SAKIT UMUM DAERAH
KABUPATEN BOMBANA

Andi Muhammad Kamal, ST, M.Eng


NIP. 19870219 201402 1 001

DIPERIKSA OLEH :
DIREKSI TEKNIS PEMBANGUNAN
RSUD KAB. BOMBANA

Muh. Masri Sulaiman, ST


NIP. 19840496 201101 1 016

Muh. Masri Sulaiman, ST


NIP. 19840496 201101 1 016
Ba_7a DIPERIKSA OLEH :
KONSULTAN SUPERVISI
p PT. ARISTA CIPTA
Ata 20
9
11

Muh. Aras Kadir, ST


Ba_7b Site Engineer

DIBUAT OLEH :
KONTRAKTOR PELAKSANA
PT. FIKRI BANGUN PERSADA

Ba_7c

Ir. Gazali
Direktur

PEKERJAAN

Ba_7b

3D - Ba_7
4
Ba_7a

JUDUL GAMBAR

Phase Reference Section Shape: Cut


Type Created Mark Count Level Nominal Weight Length Berat Sheet Balok Ba_7
W 200.100.(5.5).8 Phase 1 Ba_7a 2 Atap 21.30 kgf/m 4034 171.85 kgf Ba_7
W 200.100.(5.5).8 Phase 1 Ba_7b 2 Atap 21.30 kgf/m 3984 169.72 kgf Ba_7
W 200.100.(5.5).8 Phase 1 Ba_7c 1 Atap 21.30 kgf/m 4584 97.64 kgf Ba_7 UKURAN LEMBAR KODE HALAMAN

A3 5_BL-3-018
CATATAN / REVISI
Semua satuan dalam milimeter (mm), kecuali
disebutkan lain

PEMERINTAH DAERAH KABUPATEN BOMBANA

RUMAH SAKIT UMUM DAERAH

DIKETAHUI OLEH :
PEJABAT PEMBUAT KOMITMEN (PPK)
LANJUTAN PEMBANGUNAN GEDUNG A
RUMAH SAKIT UMUM DAERAH
KABUPATEN BOMBANA

Andi Muhammad Kamal, ST, M.Eng


NIP. 19870219 201402 1 001

DIPERIKSA OLEH :
DIREKSI TEKNIS PEMBANGUNAN
RSUD KAB. BOMBANA

LT
.
79 3
20

Muh. Masri Sulaiman, ST


NIP. 19840496 201101 1 016

LT
.
39 2
20

Muh. Masri Sulaiman, ST


NIP. 19840496 201101 1 016

DIPERIKSA OLEH :
KONSULTAN SUPERVISI
LT PT. ARISTA CIPTA
.1
0

Muh. Aras Kadir, ST


Site Engineer

2
5.9
DIBUAT OLEH :
2+ KONTRAKTOR PELAKSANA
Lt PT. FIKRI BANGUN PERSADA
BT 0
9 2
5

Ir. Gazali
Direktur
.92
1 +1
Lt PEKERJAAN
BT 0
9 2
1

JUDUL GAMBAR
3D - BT
1
Balok BT
Phase Reference Section Shape: Cut
Type Created Mark Count Level Nominal Weight Length Berat Sheet
W 200.100.(5.5).8 Phase 1 BT 6 21.30 kgf/m 4050 517.59 kgf BT
UKURAN LEMBAR KODE HALAMAN

A3 5_BL-3-019