MBFE ISYE6196037 IndustrialFeasibilityAnalysis-Question
MBFE ISYE6196037 IndustrialFeasibilityAnalysis-Question
BINUS University
Academic Year :
Final Exam Others Exam : _____________
2021/2022
Faculty / Dept. : BOL/ Industrial Engineering
Student ID :
Course : ISYE6196037-Industrial Feasibility Analysis
Day/ Date : Senin – Senin / 14 s.d 21 Februari 2022
BULC : Bandung, Bekasi, Semarang Name :
Jakarta, Malang, Palembang, Pekanbaru
Class : MBBE, MBCE, MBFE, MCEE, MDEE
Time : Takehome Test (1 Minggu)
Signature :
Exam Feature : Open / Close Books )
Equipment : Exam Booklet / Calculator / Laptop )
) Strikethrough the unnecessary items
Please insert this test paper into the exam booklet and submit both documents after the test!!!
The penalty for CHEATING is DROP OUT!!!
1. LO 1 (20%)
Sebuah komunitas bisnis sedang melakukan studi kelayakan proyek PLTA, hanya
mereka masih belum mengetahui bagaimana memulainya. Sebagai mahasiswa,
saudara ingin membantu menganalisanya dengan menggunakan analisa SWOT.
Pertanyaan:
a. Apa manfaat dari analisa SWOT, mengapa diperlukan dalam analisa
bisnis/proyek?
b. Jelaskan analisa SWOT sesuai dengan kasus diatas.
2. LO2 (25%)
Pertanyaan : hitunglah….
1. Payback Period
2. Internal Rate of Return
Page 1 of 2
FM-BINUS-AA-FPU-579/R3
3. LO 3 (55%)
Buatlah analisa kelayakan bisnis Rumah Sakit Bersalin dengan menggunakan aspek-
aspek dibawah ini :
1. Pemasaran/SWOT 4. Organisasi/Struktur Organisasi
2. Yuridis dan Lingkungan/Perijinan 5. Finansial(tentukan sendiri)
3. Teknologi/Alat/Mesin 6. PERT/GanttChart
===GoodLuck===