Anda di halaman 1dari 1

150.

0
37.5 37.5 37.5 37.5
DINAS PEKERJAAN UMUM
Skampal Beton 25/25 Skampal Beton 25/25 Skampal Beton 25/25 Skampal Beton 25/25
Jarak per 3,75m Jarak per 3,75m Jarak per 3,75m Jarak per 3,75m
BINA MARGA DAN SUMBER DAYA AIR
Plesteran Pas. Batu Kolom 15/25 kolom 30/40 Ring 15/25 Pas. Batu Ring 40/20
KABUPATEN JEMBER

NAMA PENYEDIA

NAMA GAMBAR

SHOP DRAWING
NAMA KEGIATAN
PEMELIHARAAN BERKALA JALAN
RING ROAD UTARA
JALAN SUKORAMBI - NOGOSARI

MENGETAHUI TANDA TANGAN

80.0 Plt. KEPALA DINAS PEKERJAAN UMUM


BINA MARGA DAN SDA KAB. JEMBER
SELAKU
PENGGUNA ANGGARAN

JUPRIONO, S.T., M.Si.


NIP.19730302 199901 1 001

MENYETUJUI TANDA TANGAN

PEJABAT PELAKSANA TEKNIS KEGIATAN


(PPTK)
BIDANG PEMBANGUNAN DAN
PEMELIHARAAN JALAN DAN
DRAINASE

KHURNIA WIDYASTUTI, ST., M.Si.


NIP.19780313 200604 2 031

DIPERIKSA TANDA TANGAN

KONSULTAN SUPERVISI
CV. KUSUMA ABADI
7.0

KBGoss Ø30 KBGoss Ø30 EDY WINARTO, S.T


Supervision Engineer
Ring 15/25 SLOOF 70/200
20.0 DIBUAT OLEH TANDA TANGAN

KONTRAKTOR PELAKSANA
PT. BUMI MARGA KONTRUKSI

3.5 24.7 23.4 23.3 23.3 23.4 24.8 3.5


MOH. ROFIQ, S.T
Project Manager

JUDUL GAMBAR SKALA

PENAHAN JALAN STA 4+100 - LONG SECTION NTS

Skala: 1:50 -oOo-

KODE GAMBAR NOMOR GAMBAR JUMLAH GAMBAR

SKR-NGR 65 67

Anda mungkin juga menyukai