NAMA PEKERJAAN
20
20
20
DIPERIKSA OLEH :
45
50
50
45
Pipa Inlet Ø 4"
KEPALA SEKSI SANITASI LINGKUNGAN
Pipa Inlet Ø 4"
Pipa Outlet Ø 4" Galian Ipal PE Cell
Pipa Outlet Ø 4" Ipal PE Cell SELAKU PPTK
ABR 4 ABR 3 ABR 2 ABR 1
200
200
LARGE LARGE
200
SETTLER
155
155
150
150
150
Urugan Tanah + pasir
Lantai kerja tbl. 10 cm
ad. 1:2:3
Pasir Urug
10
10
10
5
5
176 176 176 176
MENGETAHUI :
20
LARGE LARGE LARGE LARGE
KEPALA BIDANG SANITASI LINGKUNGAN,
Pipa Outlet Ø 4"
AIR MINUM DAN PENATAAN BANGUNAN
SETTLER
140
ABR 1
ABR 2
ABR 4
ABR 3
180
20
Galian Ipal PE Cell
176 176
15 20 200 30 200 20 15 15 20 200 30 200 20 15
500 500
HENDRI SUMAWIJAYA,S.T,M.Eng
DETAIL IPAL FABRIKASI NIP. 19790811 200312 1 001
KONSULTAN PERENCANA
1:100 #7 17 Lbr
NO. CATATAN