RENCANA PENGGUNAAN DANA (RPD) - TERMIN 1

Desa / Kecamatan / Kabupaten / Provinsi : Teras / Carenang / Serang / Banten

RPD Ke : 1
Volume/Progres

No. Uraian Real. s/d Unit/ Harga Satuan (Rp.) Jumlah (Rp.) Bahan (Rp.) Upah (Rp.)
Kebutuhan Pengajuan Jumlah Satuan
Tahap Sekarang Kumulatif
Lalu

1 2 3 4 5 6=4+5 7 8 9=5*8 10 11
I. KEGIATAN TEKNIK/FISIK
A. SARANA AIR MINUM
1 Sumur Bor Dalam 1.00 0.00% 80.00% 80.00% Titik Rp 80,442,000 Rp 64,353,600 Rp 64,353,600
2 Pengadaan Pemasangan Listrik 1.00 0.00% 0.00% 0.00% Unit Rp 2,710,000 Rp - Rp -
3 Pengadaan Pompa 1.00 0.00% 0.00% 0.00% Unit Rp 21,000,000 Rp - Rp -
4 Menara Air 1.00 0.00% 15.47% 15.47% Titik Rp 94,833,000 Rp 14,666,700 Rp 14,666,700 Rp -
5 Perpipaan Dan Accessories 922.00 0.00% 0.00% 0.00% m Rp 37,783,000 -
6 Sambungan Rumah 71.00 0.00% 0.00% 0.00% bh Rp 1,230,000 -
7 Biaya Oprasional 1.00 0.00% 40.00% 40.00% BOP Rp 5,000,000 Rp 2,000,000
TOTAL Rp 81,020,300 Rp 79,020,300 Rp -
PPN 10% Rp 7,902,100
PPH 1,5% Rp 1,077,600
JUMLAH Rp 90,000,000 Rp -
JUMLAH TOTAL BAHAN + UPAH Rp 90,000,000
JUMLAH PENGAJUAN
Rp90,000,000
(Terbilang : (Sembilan Puluh Juta Rupiah)

Teras, 2022
Disetujui : Dibuat :
Koordinator KKM Satlak

( Marsuta ) ( Nano Maspano )

Diperiksa : Diperiksa :
Fasilitator Senior Tim Fasilitator Teknik

( Okta Noviyanto,ST ) ( Makhusudin,ST )


Mengetahui :
Ketua DPMU/PPK Kabupaten Serang

( Deni Hartono,ST., MM )
NIP. 197101102 008011 1 008
RENCANA PENGGUNAAN DANA (RPD) TERMIN 1
Desa / Kecamatan / Kabupaten / Provinsi : Teras / Carenang / Serang / Banten
RPD Ke : 1
Volume
Real. s/d Unit /
No. Uraian Kegiatan Harga Satuan (Rp.) Jumlah (Rp.)
Kebutuhan Tahap Pengajuan Jumlah
Sekarang Kumulatif
Satuan
Lalu
1 2 3 4 5 6=4+5 7 8 9=5*8
I. SARANA AIR MINUM
1 Sumur Bor Dalam 1.00 - 0.80 0.80 Titik 80,442,000 64,353,600
2 Pemasangan Listrik / PLN 1.00 - - - Unit 2,710,000 -
3 Pompa 1.00 - - - Unit 21,000,000 -
Sub Total 1) Rp 104,152,000 Rp 64,353,600
II. MENARA AIR
I. BAHAN
1 Kayu Kaso (5/7) 47.00 - 5.00 5.00 Btg 40,000 200,000
2 Paku biasa 8.00 - 3.12 3.12 Kg 22,000 68,700
3 Kayu Papan uk. 3x20x400 18.00 - 5.00 5.00 Lbr 70,000 350,000
4 Minyak bekisiting 4.00 - - - Ltr 17,000 -
5 Besi beton polos -
Besi Ø 10 50.00 - 43.00 43.00 Btg 81,000 3,483,000
Besi Ø 12 165.00 - 50.00 50.00 Btg 117,000 5,850,000
6 Kawat beton 4.00 - 4.00 4.00 Kg 25,000 100,000
7 Semen portland 180.00 - - - Sak 65,000 -
8 Pasir beton 13.00 - 9.00 9.00 M3 215,000 1,935,000
9 Batu Split 21.00 - 10.00 10.00 M3 225,000 2,250,000
10 Plywood 9 mm 42.00 - - Lbr 125,000 -
11 Dolken 55.00 - - btg 25,000 -
12 Kayu Kaso 4/6 34.00 - 11.00 11.00 btg 20,000 220,000
13 Pasir pasang 1.00 - 1.00 1.00 M3 210,000 210,000
14 Plamir 11.00 - - - kg 27,000 -
15 Kapek 6.00 - - - Bh 17,000 -
16 Cat penutup 52.00 - - - kg 55,000 -
17 Amplas 56.00 - - - bh 5,000 -
18 Roll cat 1.00 - - - bh 20,000 -
19 Pagar BRC+Tiang 6.00 - - - bh 225,000 -
20 Pintu Besi BRC 1.00 - - - paket 400,000 -
21 Pipa GI Ø 2" 22.00 - - - n 175,000 -
22 Elbow Ø 2-90 4.00 - - - bh 50,000 -
23 Gate Valve Ø 2 3.00 - - - bh 350,000 -
24 Pipa Dinding 4.00 - - - bh 75,000 -
25 Lem PVC 1.00 bh 70,000
26 Manhole 80x80 2.00 - - - unit 700,000 -
27 Tangga Besi 1.00 - - - unit 1,000,000 -
II. APD
1 Masker Kain 30.00 - - - bh 10,000 -
2 Sarung Tangan 30.00 - - - psg 10,000 -
3 Sabun Cuci Tangan 6.00 - - - bh 30,000 -
4 Hand Sanitizer 500 ml 6.00 - - - bh 30,000 -
III. UPAH -
1 Pekerja 213.00 - - - HOK 80,000 -
2 Tukang 84.00 - - - HOK 120,000 -
Sub Total 2) Rp 14,666,700
III. PERPIPAAN + ACCESORIES
I. BAHAN
1 Pipa PVC S-10 ND dia 0,5" 300.00 - - - m 7,000 -
2 Pipa PVC S-10 ND dia 1,5" 366.00 - - - m 28,000 -
3 Pipa PVC S-12,5 ND dia 2" 516.00 - - - m 35,000 -
4 Tee Reducer ø 1 1/2'' x 1/2'' 60.00 - - - bh 36,000 -
5 Tee Reducer ø 2'' x 1 1/2'' 10.00 - - - m 84,000 -
6 Tee Pipa PVC S-10 ND (1,5") 8.00 - - - bh 25,000 -
7 Tee Pipa PVC S-12,5 ND (2") 15.00 - - - bh 84,000 -
8 Reducer Pipa PVC S-10 ND (1 1/2"X1/2") 10.00 - - - bh 36,000 -
9 Reducer Pipa PVC S-12,5 ND (2"X1 1/2") 3.00 - - - bh 84,000 -
10 Socket PVC S-10 ND (1/2") 3.00 - - - bh 8,000 -
11 Socket PVC S-10 ND (1 1/2") 5.00 - - - bh 15,000 -
12 Socket PVC S-12,5 ND (2") 2.00 - - - bh 21,000 -
13 Elbow PVC S-10 ND (1/2") 21.00 - - - bh 5,000 -
14 Elbow PVC S-10 ND (1 1/2") 15.00 - - - bh 19,000 -
15 Elbow PVC S-12,5 ND (2") 20.00 bh 75,000
16 Lem PVC 5.00 - - - kg 70,000 -
17 Cap/Dop Pipa PVC S-10 ND (1 1/2") 8.00 - - - bh 17,000 -
18 Cap/Dop Pipa PVC S-10 ND (2") 10.00 bh 37,000 -
II. APD
1 Masker Kain 21.00 - - - bh 10,000 -
2 Sarung Tangan 21.00 - - - psg 10,000 -
III. UPAH
1 Pekerja 76.00 - - - HOK 80,000 -
2 Tukang 51.00 - - - HOK 120,000 -
Sub Total 3) Rp -
IV. SAMBUNGAN RUMAH (SR)
I. Sambungan Rumah 60.00 - - - Unit 1,200,000 -
Sub Total 4) Rp -
Jumlah Total Pengajuan (1+2+3+4) Rp 79,020,300

Page 2
RENCANAPENGGUNAAN DANA (RPD) TERMIN 1
Desa/Kecamatan/Kabupaten/Provinsi : Teras / Tirtayasa /Serang /Banten
RPD Ke : 1
Volume Harga Biaya (Rp)
URAIAN Real.sd Pengajuan Jumlah Satuan Satuan
Kebutuhan tahap Sekarang Kumulati Total BLM
f Rp
1 2 3 4 5 6 7 8 9
1. ATK
1 Pulpen 3 - 1 1 Pcs 3,000 3,000 3,000
2 Penggaris 1 - 1 1 Pcs 7,000 7,000 7,000
3 Spidol Besar 2 - - - Pcs 10,000 - -
4 Spidol Kecil 2 - - - Pcs 5,000 - -
5 Kertas A4 70 gr 2 - 1 1 Rim 50,000 50,000 50,000
6 Kwitansi Kecil 3 - 1 1 Pcs 5,000 5,000 5,000
7 Kalkulator 1 - 1 1 Pcs 60,000 60,000 60,000
8 Lem Kertas 2 - - - Pcs 17,000 - -
9 Map Plastik 3 - 2 2 Pcs 4,000 8,000 8,000
10 Map Kertas 3 - 1 1 Pcs 3,500 3,500 3,500
11 Steples Kecil 2 - 1 1 Pcs 17,000 17,000 17,000
12 Lakban Hitam Besar 1 - - - Pcs 15,000 - -
13 Isi Steples 2 - 1 1 Box 3,000 3,000 3,000
14 Cuter Besar 1 - - - Pcs 25,000 - -
15 Binder Klip Besar 2 - 1 1 Pack 18,000 18,000 18,000
16 Peperclip 1 - - - Pack 13,000 - -
17 Materai 10000 11 - 5 5 Lbr 12,000 60,000 60,000
Sub Total 1) 234,500 234,500
2. Pembuatan & Penggandaan RKM
1. Print 150 - 150 150.00 Lbr 3,000 450,000 450,000
2. Foto Copy 286 - 286 286.00 Lbr 250 71,500 71,500
3. Jilid 3 - 3 3.00 Set 25,000 75,000 75,000
Sub Total 2) 596,500 596,500
3. Penggandaan dokumen pengadaan barang & jasa
1. Penggandaan dokumen barang dan jasa 3 - 1 1.00 Set 200,000 200,000 200,000

Sub Total 3) 200,000 200,000


4. Pembuatan & Penggandaan RPD & LPD
1. Print 150 - 4 4.00 Lbr 3,000 12,000 12,000
2. Foto Copy 200 - 8 8.00 Lbr 250 2,000 2,000
3. Jilid Biasa 3 - 1 1.00 Set 5,000 5,000 5,000
Sub Total 4) 19,000 19,000
5. Pembuatan & Penggandaan Laporan Akhir Program
1. Print 150 - - - Lbr 3,000 - -
2. Foto Copy 200 - - - Lbr 250 - -
3. Jilid Soft Cover 3 - - - Set 25,000 - -
Sub Total 5) - -
6. Dokumentasi
1. Stempel (KKM) 2 - 1 1 Bh 75,000 75,000 75,000
2. Stempel (Kp-Spams) 2 - 1 1 Bh 75,000 75,000 75,000
3. Papan Informasi KKM 2 - 1 1 Bh 300,000 300,000 300,000
4. Prasasti 1 - - - Bh 400,000 - -
Sub Total 6) 450,000 450,000
7. Transport
1. Koordinasi Tingkat Kecamatan 2 - 1 1.00 Kali 75,000 75,000 75,000
2. Koordinasi Ke Kabupaten (3 Org) 2 - 1 1.00 Kali 100,000 100,000 100,000
3. Transport Ke Bank ( 3 org ) 2 - 1 1.00 Kali 75,000 75,000 75,000
4. Transport Ke Toko Material 3 - - - Kali 50,000 - -
Sub Total 7) 250,000 250,000
8. Biaya Rapat KKM
1. Rapat KKM (Konsumsi) 3 - 1 1.00 Kali 250,000 250,000 250,000
Sub Total 8) 250,000 250,000
Jumlah Total (1 + 2 + 3 + 4 + 5 + 6 + 7 + 8) 2,000,000 Rp 2,000,000