Anda di halaman 1dari 1

COR BETON T= 70 MM+WIREMESH M-6

WATERPROFING MEMBRAN
+9.750 PLAT BETON + BONDEK T=150 MM LISPLANG BETON

TIANG PIPA BESI ∅ 1.5 ''


TIAP JARAK 1500 MM

3500
PIPA BESI ∅ 1.5 ''
RELING BESI ∅ 2.5 ''

BALOK T 1/2 WF 300


ATAP DAK BETON
+6.200 +6.280

BALOK WF 400

4080
4000

LANTAI 2
+2.200
4000

4000
AREA PARKIR 300

TERAS BETON
BESI ∅ 10~150
SATU LAPIS
LANTAI 1 TURAP
-1.800
2350 300 300 300

250
TURAP BARU

PAS.BT.KOSONG LANTAI KERJA 50 MM


150 MM PASIR URUG 100 MM
550
GORONG-GORONG ∅ 300 MM
850 TANAH URUG DIPADATKAN
BAK KONTROL 1000 6000 6000 1000
TIEBEAM 250X400 12000
PONDASI BOR PILE 2 ∅ 300

4a 3a 2a

PUSAT PEMANFAATAN DAN


PERENCANAAN DESIGN FASILITAS PRODUKSI
INOVASI IPTEK - LIPI REKOMBINAN VAKSIN AHU.ARS-04 A3 / 1 : 75 14/02/2022
LIPI

EDVAMECON DESIGN INDONESIA POTONGAN A SR ED

Anda mungkin juga menyukai