Anda di halaman 1dari 4

1000

300 400 300

PEMBESIAN WIREMESH M8 (2 LAYER)

250

250
Besi Dia 16 - 50 CM

Besi Dia 16 - 50 CM

1350

1350
1850

1850
CROSS SECTION

DRAINASE BETON DETAIL DRAINASE BETON


P = 14 M L = 30 CM P = 28 M L = 30 CM
GRATING STEEL GRATING STEEL

DENAH SEMENISASI & PARIT BETON


SKALA 1 : 70
250

250
NORMALISASI PARIT EXISTING NORMALISASI PARIT EXISTING
RENCANA SEMENISASI K-500 T = 25 CM

51000 300 400 300 24000

KEGIATAN : NAMA GAMBAR :


LOKASI : KONTRAKTOR PELAKSANA : HALAMAN :

SEMENISASI BETON K-500 SITE BONTANG - KALIMANTAN TIMUR CV. GEMILANG PERKASA

PERKERASAN JALAN AREA OPEN STORAGE DAN DRAINASE BETON


MENGETAHUI :
EAST BLOCK PT. UNITED TRACTORS TBK
JUDUL GAMBAR :

AS BUILT DRAWING ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ...
BESI DIA. 16 - 50 CM
WIREMESH M8 (2 LAYER)
SEMENISASI BETON K-500
AGREGAT TYPE B (T=10 CM)
150 150

25 350 25

400

POTONGAN A - A
SKALA 1 : 25

KEGIATAN : NAMA GAMBAR :


LOKASI : KONTRAKTOR PELAKSANA : HALAMAN :

SEMENISASI BETON K-500 SITE BONTANG - KALIMANTAN TIMUR CV. GEMILANG PERKASA

PERKERASAN JALAN AREA OPEN STORAGE DAN DRAINASE BETON


MENGETAHUI :
EAST BLOCK PT. UNITED TRACTORS TBK
JUDUL GAMBAR :

AS BUILT DRAWING ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ...
2000

BESI DIA. 16 - 50 CM
WIREMESH M8 (2 LAYER)
SEMENISASI BETON K-500
AGREGAT TYPE C (T=10 CM)

EXISTING MUKA TANAH

2000

POTONGAN B - B
SKALA 1 : 15

KEGIATAN : NAMA GAMBAR :


LOKASI : KONTRAKTOR PELAKSANA : HALAMAN :

SEMENISASI BETON K-500 SITE BONTANG - KALIMANTAN TIMUR CV. GEMILANG PERKASA

PERKERASAN JALAN AREA OPEN STORAGE DAN DRAINASE BETON


MENGETAHUI :
EAST BLOCK PT. UNITED TRACTORS TBK
JUDUL GAMBAR :

AS BUILT DRAWING ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ...
30
20 10 BESI GRATING
SEMENISASI BETON K-500

WIREMESH M8 (1 LAYER)

AGREGAT TYPE C (T=10 CM)


20 10
30

DETAIL TYPICAL PARIT BETON


SKALA 1 : 70

90
25 40 25 NORMALISASI PARIT EXISTING

YER)
1 LA
M8 (
M ESH
WIRE

K- 500
IT BETON
PAR

PERSPEKTIF PARIT BETON


25 40 25 SKALA NTS

DETAIL PARIT EXISTING


SKALA 1 : 70

KEGIATAN : NAMA GAMBAR :


LOKASI : KONTRAKTOR PELAKSANA : HALAMAN :

SEMENISASI BETON K-500 SITE BONTANG - KALIMANTAN TIMUR CV. GEMILANG PERKASA

PERKERASAN JALAN AREA OPEN STORAGE DAN DRAINASE BETON


MENGETAHUI :
EAST BLOCK PT. UNITED TRACTORS TBK
JUDUL GAMBAR :

AS BUILT DRAWING ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ...

Anda mungkin juga menyukai