DAERAH LAMPUNG
BIRO LOGISTIK
Jl. Terusan Ryacudu No. 1 Jati Agung, Lampung Selatan
GAMBAR RENCANA
KEGIATAN
PENINGKATAN SARANA DAN PRASARANA APARATUR POLRI
PEKERJAAN
JASA KONSULTANSI PERENCANAAN PEMBANGUNAN
GEDUNG RPK POLDA LAMPUNG
1850 KETERANGAN
PAGAR POLDA
100
PAGAR POLDA
1 TOILET TOILET
160
PRIA WANITA
Elv. -0.05 Elv. +2.00 KEGIATAN
Elv. -0.05
400
R. PEMERIKSAAN PENINGKATAN SARANA & PRASARANA
240
PPA KEPOLISIAN
R.KANIT PPA
PEKERJAAN
2
1000
1000
250
250
JASA KONSULTANSI PERENCANAAN
1350
KORIDOR KORIDOR KORIDOR
Elv. ±0.00 Elv. ±0.00 Elv. ±0.00
PEMBANGUNAN GEDUNG RPK
POLDA LAMPUNG
A 3 A T.A 2024
R. ISTIRAHAT R. KONSELING
Elv. ±0.00 Elv. ±0.00
NAMA GAMBAR SKALA
350
350
KORIDOR
Elv. -0.05
RUANG
Elv. ±0.00
DENAH RENCANA LANTAI 1 1 : 150
TOWER 4
SUTET KONSULTAN PERENCANA
250
250
TERAS
Elv. -0.20
KORIDOR KORIDOR
Elv. -0.20 Elv. -0.20
CV. PANDU CONSULTANT ENGINEERING
4'
Elv. -0.20
DIGAMBAR DIPERIKSA
3,5 m 300 350 450 300 450
1200
DIPERIKSA
1200
( PPK )
EXISTING
DISETUJUI
KABAG FASKON POLDA LAMPUNG
DISETUJUI
1200 KUASA PENGGUNA ANGGARAN
( KPA )
2024
C B
A B C D E F KEPOLISIAN NEGARA REPUBLIK INDONESIA
DAERAH LAMPUNG
1850 KETERANGAN
1 TOILET TOILET
160
PRIA WANITA
190
Elv. +2.00 KEGIATAN
GUDANG
400
Elv. +4.00
RENMIN PENINGKATAN SARANA & PRASARANA
R.KANIT TPPO R. PEMERIKSAAN Elv. +4.00
240
Elv. +4.00
TPPO KEPOLISIAN
Elv. +4.00
PEKERJAAN
2
1000
250
250
JASA KONSULTANSI PERENCANAAN
KORIDOR KORIDOR
Elv. +4.00 Elv. +4.00 PEMBANGUNAN GEDUNG RPK
POLDA LAMPUNG
A 3 R.KANIT ASUSILA
A T.A 2024
R. PEMERIKSAAN
ASUSILA Elv. +4.00
Elv. +4.00
NAMA GAMBAR SKALA
R. GELAR
350
350
Pantry PERKARA/ Elv. +4.00
Elv. +4.00
R.RAPAT
DENAH RENCANA LANTAI 2 1 : 150
4
KONSULTAN PERENCANA
Daag Beton
CV. PANDU CONSULTANT ENGINEERING
DIPERIKSA
DISETUJUI
KABAG FASKON POLDA LAMPUNG
DISETUJUI
KUASA PENGGUNA ANGGARAN
( KPA )
2024
KEPOLISIAN NEGARA REPUBLIK INDONESIA
DAERAH LAMPUNG
KETERANGAN
KEGIATAN
PEKERJAAN
KONSULTAN PERENCANA
DIGAMBAR DIPERIKSA
TAMPAK 3D
NTS
DIPERIKSA
DISETUJUI
KABAG FASKON POLDA LAMPUNG
DISETUJUI
KUASA PENGGUNA ANGGARAN
( KPA )
2024
KEPOLISIAN NEGARA REPUBLIK INDONESIA
DAERAH LAMPUNG
KETERANGAN
KEGIATAN
PEKERJAAN
KONSULTAN PERENCANA
DIGAMBAR DIPERIKSA
TAMPAK 3D
NTS
DIPERIKSA
DISETUJUI
KABAG FASKON POLDA LAMPUNG
DISETUJUI
KUASA PENGGUNA ANGGARAN
( KPA )
2024
KEPOLISIAN NEGARA REPUBLIK INDONESIA
DAERAH LAMPUNG
KETERANGAN
KEGIATAN
PEKERJAAN
KONSULTAN PERENCANA
TAMPAK DEPAN
Skala 1 : 125 CV. PANDU CONSULTANT ENGINEERING
DIGAMBAR DIPERIKSA
DIPERIKSA
DISETUJUI
KABAG FASKON POLDA LAMPUNG
DISETUJUI
KUASA PENGGUNA ANGGARAN
( KPA )
TAMPAK BELAKANG
Skala 1 : 125 Drs. SUPRIADI, M.M
KOMBES POL NRP 68120452
TAHUN JML. LEMBAR NO. LEMBAR
2024
KEPOLISIAN NEGARA REPUBLIK INDONESIA
DAERAH LAMPUNG
KETERANGAN
KEGIATAN
PEKERJAAN
KONSULTAN PERENCANA
DIGAMBAR DIPERIKSA
DIPERIKSA
DISETUJUI
KABAG FASKON POLDA LAMPUNG
DISETUJUI
PFL KUASA PENGGUNA ANGGARAN
Eksisting
( KPA )
2024
3
290
3125
KEPOLISIAN NEGARA REPUBLIK INDONESIA
DAERAH LAMPUNG
KETERANGAN
A A
C
195 105 195
166
F
30
D D
40
C C C KEGIATAN
E C
PEKERJAAN
380
570
510
D
NAMA GAMBAR SKALA
A A A A
E
40
C C C C C
10
30
DIGAMBAR DIPERIKSA
F GEDUNG PPA
250
B
EXISTING
A B A RIMITA NESZIA, ST. YOHANES MARIA D, ST.
A B Drafman Team Leader
DIPERIKSA
DISETUJUI
KABAG FASKON POLDA LAMPUNG
NOTASI
SIMBOL KETERANGAN
2024
KEPOLISIAN NEGARA REPUBLIK INDONESIA
DAERAH LAMPUNG
KETERANGAN
40
Pelat Beton t: 10 cm Pelat Beton t: 10 cm
PEKERJAAN
380
POLDA LAMPUNG
T.A 2024
60
30 60
Pelat Beton t: 10 cm X X Pelat Beton t: 10 cm
40
40
Pelat Beton t: 7 cm Pelat Beton t: 7 cm KONSULTAN PERENCANA
DIPERIKSA
48
12
60
48
12
Pas. Bata Pas. Bata Pas. Bata Pas. Bata
Finishing Acian + Cat Finishing Acian + Cat Finishing Acian + Cat Finishing Acian + Cat DJOKO ANGGORO, SH.,MH.
AKBP NRP. 71010455
DISETUJUI
40 100 310 40 260 40 300 100 40 KABAG FASKON POLDA LAMPUNG
DETAIL POTONGAN X
2024
KEPOLISIAN NEGARA REPUBLIK INDONESIA
DAERAH LAMPUNG
KETERANGAN
KEGIATAN
30
30
Pas. ACP
Warna Maroon
PENINGKATAN SARANA & PRASARANA
KEPOLISIAN
125
125
PEKERJAAN
Pas. ACP Lasser Cuting
Warna Gold
JASA KONSULTANSI PERENCANAAN
PEMBANGUNAN GEDUNG RPK
POLDA LAMPUNG
Rangka ACP T.A 2024
Hollo 4/4 cm
Rangka ACP NAMA GAMBAR SKALA
120
120
Hollo 4/4 cm
Pas. ACP
Warna Maroon DETAIL ACP VARIASI 1 : 20
550
550
KONSULTAN PERENCANA
Rangka ACP
120
120
Hollo 4/4 cm
Pas. ACP Lasser Cuting CV. PANDU CONSULTANT ENGINEERING
Warna Gold Rangka ACP
Hollo 4/4 cm
DIGAMBAR DIPERIKSA
14 19 13 29 13 19 14
125
125
RIMITA NESZIA, ST. YOHANES MARIA D, ST.
Drafman Team Leader
DIPERIKSA
( PPK )
30
Pas. ACP
Warna Maroon
30 125 30
5 DJOKO ANGGORO, SH.,MH.
5
195 AKBP NRP. 71010455
DISETUJUI
Rangka ACP Rangka ACP
Hollo 4/4 cm KABAG FASKON POLDA LAMPUNG
25
Hollo 4/4 cm
40
15
30 125 30
5 5 AFANDI RAHARJO, SE.
195
AKBP NRP. 70050475
DISETUJUI
KUASA PENGGUNA ANGGARAN
( KPA )
2024
Rangka Kuda-Kuda Baja Ringan Rangka Kuda-Kuda Baja Ringan
PEKERJAAN
KONSULTAN PERENCANA
DIGAMBAR DIPERIKSA
140
Lantai Granit Lantai Granit Lantai Granit Lantai Granit
20 50 70 60x60 60x60 60x60 60x60
Tanah Asli
Elv. ± 0.00 Elv. ± 0.00 Elv. ± 0.00 Elv. ± 0.00 Elv. ± 0.00 RIMITA NESZIA, ST. YOHANES MARIA D, ST.
Elv. + 0.10 Lantai 1 ±0.00 Drafman Team Leader
DIPERIKSA
70
50
-2.20
DJOKO ANGGORO, SH.,MH.
AKBP NRP. 71010455
DISETUJUI
KABAG FASKON POLDA LAMPUNG
300 350 450 300 450
1850
AFANDI RAHARJO, SE.
A B C D E F AKBP NRP. 70050475
DISETUJUI
KUASA PENGGUNA ANGGARAN
( KPA )
POTONGAN A-A
Skala 1 : 75 Drs. SUPRIADI, M.M
KOMBES POL NRP 68120452
TAHUN JML. LEMBAR NO. LEMBAR
2024
RB.1 20/25
85 Atap Spandek Pasir KEPOLISIAN NEGARA REPUBLIK INDONESIA
DAERAH LAMPUNG
Lisplang GRC Rangka Kuda-Kuda Baja Ringan
2/30 cm KETERANGAN
Ringbalok Atap +9.80
Rangka Kuda-Kuda Baja Ringan
163
RB.2 20/55
Ringbalok Lt. 2 +8.00
40
RB.1 20/25 RB.1 20/25 RB.1 20/25 KEGIATAN
PEKERJAAN
380
JASA KONSULTANSI PERENCANAAN
PEMBANGUNAN GEDUNG RPK
POLDA LAMPUNG
T.A 2024
Lantai Granit
Pelat Lantai Beton 60x60 NAMA GAMBAR SKALA
t: 13 cm
Elv. PFL +4.00 Elv. PFL +4.00
Lantai 2 +4.00
40
Plafon Plafon
Elv. +2.90 Elv. + 3.50 Elv. + 3.50
KONSULTAN PERENCANA
Plafon
Elv. + 2.60
CV. PANDU CONSULTANT ENGINEERING
+2.00
350
Eksisting
-2.20
DJOKO ANGGORO, SH.,MH.
AKBP NRP. 71010455
DISETUJUI
KABAG FASKON POLDA LAMPUNG
250 350 250 400
1000
AFANDI RAHARJO, SE.
AKBP NRP. 70050475
4' 4 3 2 1 DISETUJUI
KUASA PENGGUNA ANGGARAN
( KPA )
POTONGAN B-B
Skala 1 : 75 Drs. SUPRIADI, M.M
KOMBES POL NRP 68120452
TAHUN JML. LEMBAR NO. LEMBAR
2024
RB.1 20/25
Atap Spandek Pasir KEPOLISIAN NEGARA REPUBLIK INDONESIA
DAERAH LAMPUNG
Rangka Kuda-Kuda Baja Ringan
RB.2 20/55
+8.00 Ringbalok Lt. 2 Ringbalok Lt. 2 +8.00
RB.1 20/25 RB.1 20/25 RB.1 20/25 RB.1 20/25 KEGIATAN
PEKERJAAN
Lantai Granit
Pelat Lantai Beton 60x60 Pelat Lantai Beton NAMA GAMBAR SKALA
t: 13 cm t: 13 cm
Elv. PFL +4.00 Elv. PFL +4.00
Daag Beton t : 10 cm Lantai 2 +4.00
BL.1 20/40 BL.1 20/40 BL.1 20/40 POTONGAN C - C 1 : 75
Daag Beton Kanopi Plafon Plafon
t : 8 cm Elv. + 3.50 Elv. + 3.50
+2.85 Lantai 2 Elv. +2.85 KONSULTAN PERENCANA
Plafon
Elv. + 2.60 CV. PANDU CONSULTANT ENGINEERING
+2.00
DIGAMBAR DIPERIKSA
315
Lantai Granit
Lantai Granit 60x60
60x60 RIMITA NESZIA, ST. YOHANES MARIA D, ST.
Elv. ± 0.00 Elv.± 0.05
Elv. - 0.20 Lantai 1 ±0.00 Drafman Team Leader
Elv. - 0.30
-0.30 TB.1 20/20 Pengupasan Tanah -0.25 DIPERIKSA
TB.1 20/20
TB.1 20/20 TB.1 20/20 PEJABAT PEMBUAT KOMITMEN
( PPK )
-1.25
Pondasi Pondasi Pondasi Pondasi
Footplat FP.1 Footplat FP.1 Footplat FP.1 Footplat FP.2
-2.20
DJOKO ANGGORO, SH.,MH.
AKBP NRP. 71010455
DISETUJUI
KABAG FASKON POLDA LAMPUNG
250 350 250 240 160
1000
AFANDI RAHARJO, SE.
AKBP NRP. 70050475
4' 4 3 2 1 DISETUJUI
KUASA PENGGUNA ANGGARAN
( KPA )
POTONGAN C-C
Skala 1 : 75 Drs. SUPRIADI, M.M
KOMBES POL NRP 68120452
TAHUN JML. LEMBAR NO. LEMBAR
2024
KEPOLISIAN NEGARA REPUBLIK INDONESIA
1992 DAERAH LAMPUNG
734 1256
PAGAR POLDA
PAGAR POLDA
100
KEGIATAN
950
TANAH 25 CM PEKERJAAN
850
1000
JASA KONSULTANSI PERENCANAAN
1350
PEMBANGUNAN GEDUNG RPK
POLDA LAMPUNG
T.A 2024
400
Existing Yang
SUTET Sudah Terkupas KONSULTAN PERENCANA
250
50
CV. PANDU CONSULTANT ENGINEERING
DIGAMBAR DIPERIKSA
214 250
1200
PENGUPASAN
TANAH 40 CM RIMITA NESZIA, ST. YOHANES MARIA D, ST.
Drafman Team Leader
GEDUNG PPA
1450
DIPERIKSA
EXISTING PEJABAT PEMBUAT KOMITMEN
1200
( PPK )
DISETUJUI
KABAG FASKON POLDA LAMPUNG
DISETUJUI
142 400 250 1200 KUASA PENGGUNA ANGGARAN
( KPA )
792
2024
A B C D E F
KEPOLISIAN NEGARA REPUBLIK INDONESIA
DAERAH LAMPUNG
1850 KETERANGAN
F2 KEGIATAN
1 PENINGKATAN SARANA & PRASARANA
400
F1 F1 F1 F1 F1 KEPOLISIAN
PEKERJAAN
F1 F1 F1 F1 F1 F2
POLDA LAMPUNG
T.A 2024
F1 F1 F1 F1 F1 FOOTPLAT
F2 KONSULTAN PERENCANA
3
CV. PANDU CONSULTANT ENGINEERING
350
DIGAMBAR DIPERIKSA
F1 F1 F1 F1 F1 F2
4 RIMITA NESZIA, ST.
Drafman
YOHANES MARIA D, ST.
DIPERIKSA
Team Leader
250
2024
A B C D E F
KEPOLISIAN NEGARA REPUBLIK INDONESIA
DAERAH LAMPUNG
1850 KETERANGAN
KEGIATAN
1
PB-1
160
PENINGKATAN SARANA & PRASARANA
KEPOLISIAN
PB-1
PEKERJAAN
PB-1
PB-1
240
JASA KONSULTANSI PERENCANAAN
PEMBANGUNAN GEDUNG RPK
POLDA LAMPUNG
T.A 2024
KONSULTAN PERENCANA
3
CV. PANDU CONSULTANT ENGINEERING
350
DIGAMBAR DIPERIKSA
DIPERIKSA
Team Leader
PB-1
PB-1
PB-1
250
PB-1
4'
DJOKO ANGGORO, SH.,MH.
AKBP NRP. 71010455
2024
35 30
40 KEPOLISIAN NEGARA REPUBLIK INDONESIA
DAERAH LAMPUNG
KETERANGAN
3 D 16 5 D 16
7 D 16
7 D 16
7 D 16
7 D 16
Sengkang Sengkang
110
100
6 D 16 2 D 16
40
30
Ø8 - 150 Ø8 - 150
KEGIATAN
5 D 16
3 D 16 7 D 16 PENINGKATAN SARANA & PRASARANA
7 D 16 KEPOLISIAN
7 D 16
7 D 16 PEKERJAAN
Muka Tanah
55
55
KONSULTAN PERENCANA
Muka Tanah
30
DIGAMBAR DIPERIKSA
3 D 16 4 D 16
RIMITA NESZIA, ST. YOHANES MARIA D, ST.
Drafman Team Leader
210
Ø 8 - 150 Ø 8 - 150
220
Ø 8 - 150 Ø 8 - 150
DISETUJUI
Tul. Pokok D 16 mm Tul. Pokok D 16 mm KABAG FASKON POLDA LAMPUNG
36 36
Tul. Pokok D 16 mm Tul. Pokok D 16 mm
15
15
20
KETERANGAN
5 D 16 3 D 16
7 D 16
7 D 16
7 D 16
7 D 16
Sengkang Sengkang
100
110
2 D 16 6 D 16
40
30
Ø8 - 150 Ø8 - 150
KEGIATAN
5 D 16
7 D 16 3 D 16
PENINGKATAN SARANA & PRASARANA
7 D 16 KEPOLISIAN
7 D 16
7 D 16 PEKERJAAN
Muka Tanah
55
KONSULTAN PERENCANA
Muka Tanah
30
CV. PANDU CONSULTANT ENGINEERING
DIGAMBAR DIPERIKSA
5 D 16 3 D 16
RIMITA NESZIA, ST. YOHANES MARIA D, ST.
Drafman Team Leader
Ø 8 - 150
220
Ø 8 - 150
180
Ø 8 - 150
DJOKO ANGGORO, SH.,MH.
AKBP NRP. 71010455
DISETUJUI
Tul. Pokok D 16 mm Tul. Pokok D 16 mm KABAG FASKON POLDA LAMPUNG
36
Tul. Pokok D 16 mm Tul. Pokok D 16 mm
15
15
Pondasi Footplat Pondasi Footplat
20
20
AFANDI RAHARJO, SE.
AKBP NRP. 70050475
Lantai Kerja t : 5 cm Lantai Kerja t : 5 cm
10
KETERANGAN
25
Besi Ø 8- 150
5 D 13
5 D 13
80 Besi D13 Besi D13
30
KEGIATAN
PEKERJAAN
10
Muka Lantai DETAIL PONDASI BATU 1 : 20
BELAH
Spesi
15 5 5
Pasir Urug
KONSULTAN PERENCANA
Besi D13 Urugan Tanah
65
Kembali Urugan Tanah
Ø 8 - 150 15 CV. PANDU CONSULTANT ENGINEERING
100 30
DIGAMBAR DIPERIKSA
60
Pondasi Batu Belah
15
Besi D13
20
5 10
Lantai Kerja t : 5 cm Drafman Team Leader
Lapisan Pasir DIPERIKSA
5
DISETUJUI
DETAIL PONDASI FOOTPLAT F.3 DETAIL PONDASI BATU BELAH PB.1 KABAG FASKON POLDA LAMPUNG
Skala 1 : 20 Skala 1 : 20
DISETUJUI
KUASA PENGGUNA ANGGARAN
( KPA )
2024
KEPOLISIAN NEGARA REPUBLIK INDONESIA
DAERAH LAMPUNG
70 70 KETERANGAN
20 50
Rabat Beton
Lap. Pasir
Tanah Asli Elv.+ 0.10
Elv.± 0.00 KEGIATAN
20
Elv.- 0.10
PENINGKATAN SARANA & PRASARANA
KEPOLISIAN
70
PEKERJAAN
50
50
JASA KONSULTANSI PERENCANAAN
Pondasi Rolag Bata Batu PEMBANGUNAN GEDUNG RPK
POLDA LAMPUNG
5 5
T.A 2024
Lap. Pasir
Lap. Pasir NAMA GAMBAR SKALA
25 40 25
DETAIL RABAT BETON 1 : 20
KONSULTAN PERENCANA
DETAIL RABAT & SIRING SAMPING
Skala 1 : 20 CV. PANDU CONSULTANT ENGINEERING
DIGAMBAR DIPERIKSA
pagar existing
Skala 1 : 20
2024
KEPOLISIAN NEGARA REPUBLIK INDONESIA
5 D 16 5 D 16 DAERAH LAMPUNG
KETERANGAN
2 D 16 2 D 16
30
30
Ø8-150
Ø 8-125 Ø 8-150 Ø8-150
6 Ø 12
15
4 Ø 10
11
KEGIATAN
5 D 16 5 D 16
PENINGKATAN SARANA & PRASARANA
40 40 KEPOLISIAN
30 11
TUMPUAN PEKERJAAN
LAPANGAN
DETAIL KOLOM (K.1) (30/40) DETAIL KOLOM (K.2) (15/30) DET. KOLOM PRAKTIS (K.P) JASA KONSULTANSI PERENCANAAN
PEMBANGUNAN GEDUNG RPK
POLDA LAMPUNG
Skala 1 : 10 Skala 1 : 10 Skala 1 : 10 T.A 2024
2 D 16
3 D 16 Ø 8-150 KONSULTAN PERENCANA
15
Ø8-150
12
20
2 Ø 10
3 D 16 12 DIGAMBAR DIPERIKSA
35 2 D 16
20
RIMITA NESZIA, ST. YOHANES MARIA D, ST.
Drafman Team Leader
DETAIL KOLOM (K.3) (12/35) DETAIL KOLOM (K.4) (20/20) BALOK LATEI 12/15 DIPERIKSA
DISETUJUI
2 Ø 12 Ø 8-150
20
20
DISETUJUI
2 D 16 2 D 16
2 Ø 12 KUASA PENGGUNA ANGGARAN
20 20 15 ( KPA )
TUMPUAN LAPANGAN
DETAIL BALOK BAWAH/TIE BEAM (TB.1) (20/20) SLOOF (S.L 1 15/20) Drs. SUPRIADI, M.M
KOMBES POL NRP 68120452
Skala 1 : 10 Skala 1 : 10
TAHUN JML. LEMBAR NO. LEMBAR
2024
3 D 16 2 D 16
3 D 16 2 D 16
KEPOLISIAN NEGARA REPUBLIK INDONESIA
DAERAH LAMPUNG
2 D 16
2 D 13 KETERANGAN
2 D 16 2 D 16
40
40
2 D 13
25
25
2 D 16
Ø 8-125 Ø 8-150
Ø 8-125 Ø 8-150
2 D 16 3 D 16
20 20 KEGIATAN
3 D 16 3 D 16
20 20 PENINGKATAN SARANA & PRASARANA
KEPOLISIAN
TUMPUAN LAPANGAN
TUMPUAN LAPANGAN PEKERJAAN
DETAIL BALOK INDUK BL.1 20/40 DETAIL BALOK ANAK (BL.2) (20/25) JASA KONSULTANSI PERENCANAAN
PEMBANGUNAN GEDUNG RPK
Skala 1 : 10 POLDA LAMPUNG
T.A 2024
2 D 13 2 D 13
30
25
20
Ø 8-150 Ø 8-150
DETAIL BALOK BL.3 15/25 DETAIL BALOK BL.4 15/20 DETAIL BALOK BL.5 15/30
RIMITA NESZIA, ST. YOHANES MARIA D, ST.
Skala 1 : 10 Skala 1 : 10 Skala 1 : 10 Drafman Team Leader
DIPERIKSA
3 Ø 16 3 Ø 16 DISETUJUI
25
55
55
20
Ø 8-125 Ø 8-150 2 Ø 16 2 Ø 16
1850 KETERANGAN
TB-1 KEGIATAN
1
SL-1
TB-1 TB-1 TB-1 TB-1 PENINGKATAN SARANA & PRASARANA
KEPOLISIAN
TB-1
TB-1
TB-1
TB-1
TB-1
400 PEKERJAAN
SL-1 SL-1
JASA KONSULTANSI PERENCANAAN
SL-1
PEMBANGUNAN GEDUNG RPK
POLDA LAMPUNG
T.A 2024
TB-1
TB-1
250
TB-1
350
TB-1
TB-1
TB-1
TB-1
DIGAMBAR DIPERIKSA
TB-1
4 TB-1
SL-1
TB-1 TB-1 TB-1
RIMITA NESZIA, ST.
Drafman
YOHANES MARIA D, ST.
DIPERIKSA
Team Leader
SL-1
SL-1
SL-1
SL-1
250
2024
A B C D E F
KEPOLISIAN NEGARA REPUBLIK INDONESIA
DAERAH LAMPUNG
1850 KETERANGAN
KEGIATAN
1 K1 K1 K1 K1 K1 K1 PENINGKATAN SARANA & PRASARANA
KEPOLISIAN
400 PEKERJAAN
K1 K1 K1 K1 K1 K1 KONSULTAN PERENCANA
3
CV. PANDU CONSULTANT ENGINEERING
350
DIGAMBAR DIPERIKSA
K1 K1 K1 K1 K1 K1
4 RIMITA NESZIA, ST.
Drafman
YOHANES MARIA D, ST.
DIPERIKSA
Team Leader
250
K2 K2 K2 K2 K2 K2
4'
DJOKO ANGGORO, SH.,MH.
AKBP NRP. 71010455
2024
A B C D E F KEPOLISIAN NEGARA REPUBLIK INDONESIA
DAERAH LAMPUNG
KETERANGAN
1850
300 350 450 300 450
KEGIATAN
100
KP
PENINGKATAN SARANA & PRASARANA
KEPOLISIAN
PEKERJAAN
KP KP KP KP
400
KP JASA KONSULTANSI PERENCANAAN
PEMBANGUNAN GEDUNG RPK
POLDA LAMPUNG
T.A 2024
KP DENAH RENCANA
1 : 100
1000
KOLOM PRAKTIS LANTAI 1
250
250
1350
KONSULTAN PERENCANA
KP
CV. PANDU CONSULTANT ENGINEERING
DIGAMBAR DIPERIKSA
350
350
RIMITA NESZIA, ST. YOHANES MARIA D, ST.
Drafman Team Leader
DIPERIKSA
250
DJOKO ANGGORO, SH.,MH.
AKBP NRP. 71010455
DISETUJUI
500 150 460 300 200 250 KABAG FASKON POLDA LAMPUNG
DISETUJUI
KUASA PENGGUNA ANGGARAN
( KPA )
2024
A B C D E F
KEPOLISIAN NEGARA REPUBLIK INDONESIA
DAERAH LAMPUNG
1850 KETERANGAN
206
BL-2
40
BL-1
BL-1
BL-1
BL-1
BL-1
BL-2
BL-2
400 PEKERJAAN
30
BL-2
BL-1
JASA KONSULTANSI PERENCANAAN
PEMBANGUNAN GEDUNG RPK
194
POLDA LAMPUNG
T.A 2024
BL-1
BL-1
BL-1
BL-1
BL-1
BL-1
BL-2
BL-2
250
KONSULTAN PERENCANA
3
CV. PANDU CONSULTANT ENGINEERING
BL-2
BL-2 BL-2 BL-2
BL-2
BL-1
BL-1
BL-1
BL-1
BL-1
350
DIGAMBAR DIPERIKSA
BL-1
56
51
DIPERIKSA
250
4'
DJOKO ANGGORO, SH.,MH.
AKBP NRP. 71010455
2024
A B C D E F
KEPOLISIAN NEGARA REPUBLIK INDONESIA
DAERAH LAMPUNG
1850 KETERANGAN
KEGIATAN
1 PENINGKATAN SARANA & PRASARANA
KEPOLISIAN
400 PEKERJAAN
KONSULTAN PERENCANA
3
CV. PANDU CONSULTANT ENGINEERING
350
DIGAMBAR DIPERIKSA
DIPERIKSA
Team Leader
BL-4
BL-3
BL-4
BL-3
BL-3
BL-4
BL-3
BL-3
BL-3
250
DISETUJUI
KABAG FASKON POLDA LAMPUNG
2024
A B C D E F
KEPOLISIAN NEGARA REPUBLIK INDONESIA
DAERAH LAMPUNG
1850 KETERANGAN
KEGIATAN
1 PENINGKATAN SARANA & PRASARANA
KEPOLISIAN
40 A-1 A-1
400 PEKERJAAN
A-1
30
A-1
JASA KONSULTANSI PERENCANAAN
+3.95 13CM
PEMBANGUNAN GEDUNG RPK
POLDA LAMPUNG
T.A 2024
LT.2
+3.95 13CM
LT.2
250
+3.95 13CM
KONSULTAN PERENCANA
3 LT.2
CV. PANDU CONSULTANT ENGINEERING
A-1 A-1 A-1
A-1 A-1
350
DIGAMBAR DIPERIKSA
67
57
DIPERIKSA
250
4'
DJOKO ANGGORO, SH.,MH.
AKBP NRP. 71010455
2024
A B C D E F
KEPOLISIAN NEGARA REPUBLIK INDONESIA
DAERAH LAMPUNG
1850 KETERANGAN
KEGIATAN
1
400
PENINGKATAN SARANA & PRASARANA
KEPOLISIAN
Ø01-200 Ø01-200 Ø01-200 Ø01-200
400 PEKERJAAN
Ø01-200 Ø01-200 Ø01-200 Ø01-200
Ø01-200
Ø01-200
Ø01-200
Ø01-200
Ø01-200
Ø01-200
Ø01-200
Ø01-200
JASA KONSULTANSI PERENCANAAN
+3.95 13CM
PEMBANGUNAN GEDUNG RPK
-10
-10
Ø015
Ø015
POLDA LAMPUNG
T.A 2024
LT.2
+3.95 13CM
LT.2
250
-10
-10
Ø015
Ø015
Ø01-200
Ø01-200
Ø01-200
Ø01-200
Ø01-200
Ø01-200
Ø01-200
Ø01-200
Ø01-200
Ø01-200
DENAH RENCANA 1 : 100
Ø01-200 Ø01-200 Ø01-200 Ø01-200 Ø01-200 PENULANGAN PELAT LANTAI 2
-10
-10
Ø015
Ø015
Ø01-200
Ø01-200
Ø01-200
Ø01-200
Ø01-200
Ø01-200
Ø01-200
Ø01-200
Ø01-200
Ø01-200
Ø015
-10 Ø015
-10 Ø015
-10 Ø015
-10 Ø015
-10
4 Ø015
-10 Ø015
-10
Ø015
Ø015
-10
-10
Ø015
-10
Ø015
-10
Ø015
-10
Ø015
-10
RIMITA NESZIA, ST.
Drafman
YOHANES MARIA D, ST.
Team Leader
-10
-10
-10
DIPERIKSA
Ø015
Ø015
Ø015
250
4'
DJOKO ANGGORO, SH.,MH.
AKBP NRP. 71010455
DISETUJUI
KUASA PENGGUNA ANGGARAN
( KPA )
2024
KEPOLISIAN NEGARA REPUBLIK INDONESIA
Sengkang Ø8 - 150 DAERAH LAMPUNG
KETERANGAN
Sengkang Ø8 - 150
OverStek Sambungan
Sengkang Ø8 - 100
Tulangan Kolom
Sengkang Ø8 - 100 Tul. Pokok D16
80
Sengkang Ø8 - 125 Sengkang Ø8 - 150 Sengkang Ø8 - 125 KEGIATAN
3 D 16
Tulangan Balok
40
45
40
2 D 12
OverStek
Ø 8-150
PEKERJAAN
75
3 D 16
20
TUMPUAN
Sengkang Ø8 - 150
410
KONSULTAN PERENCANA
370
365
Sengkang Ø8 - 150
CV. PANDU CONSULTANT ENGINEERING
DIGAMBAR DIPERIKSA
DIPERIKSA
Sengkang Ø8 - 100 Tul. Pokok D16 Sengkang Ø8 - 100 PEJABAT PEMBUAT KOMITMEN
80
Muka Tanah
DJOKO ANGGORO, SH.,MH.
AKBP NRP. 71010455
3 D 16 3 D 16 DISETUJUI
KABAG FASKON POLDA LAMPUNG
Urugan Tanah Kembali Urugan Tanah Kembali
80 240 80
Ø 8 - 150 Ø 8 - 150
190
Ø 8 - 150 Ø 8 - 150
15
10 20
( KPA )
Lantai Kerja t : 5 cm Lantai Kerja t : 5 cm
Lap. Pasir t : 5 cm Lap. Pasir t : 5 cm
400
DETAIL POT. STRUKTUR BALOK & KOLOM 1 Drs. SUPRIADI, M.M
KOMBES POL NRP 68120452
2024
KEPOLISIAN NEGARA REPUBLIK INDONESIA
Sengkang Ø8 - 150 DAERAH LAMPUNG
KETERANGAN
Sengkang Ø8 - 150
OverStek Sambungan
Sengkang Ø8 - 100
Tulangan Kolom
Sengkang Ø8 - 100 Tul. Pokok D16
80
Sengkang Ø8 - 125 Sengkang Ø8 - 150 KEGIATAN
Tulangan Balok
40
OverStek
PEKERJAAN
75
JASA KONSULTANSI PERENCANAAN
Tumpuan Lapangan Tumpuan PEMBANGUNAN GEDUNG RPK
POLDA LAMPUNG
90 270 90 T.A 2024
KONSULTAN PERENCANA
370
370
Sengkang Ø8 - 150
CV. PANDU CONSULTANT ENGINEERING
DIGAMBAR DIPERIKSA
DIPERIKSA
Sengkang Ø8 - 100 Tul. Pokok D16 Sengkang Ø8 - 100 PEJABAT PEMBUAT KOMITMEN
80
Muka Tanah
30
DISETUJUI
KUASA PENGGUNA ANGGARAN
( KPA )
450
DETAIL POT. STRUKTUR BALOK & KOLOM II Drs. SUPRIADI, M.M
KOMBES POL NRP 68120452
2024
KEPOLISIAN NEGARA REPUBLIK INDONESIA
DAERAH LAMPUNG
13
KEGIATAN
Balok BL.1 Balok BL.2 Balok BL.1 Balok BL.1
28
28
Balok BL.1 PENINGKATAN SARANA & PRASARANA
KEPOLISIAN
20 20
PEKERJAAN
70 210 70 50 150 50
JASA KONSULTANSI PERENCANAAN
350 250 PEMBANGUNAN GEDUNG RPK
POLDA LAMPUNG
T.A 2024
KONSULTAN PERENCANA
DIGAMBAR DIPERIKSA
Pelat Lantai 2
t : 13 cm RIMITA NESZIA, ST. YOHANES MARIA D, ST.
Drafman Team Leader
40
Balok BL.1 Balok BL.1 Balok BL.1
Balok BL.2
Balok BL.1 DJOKO ANGGORO, SH.,MH.
20 AKBP NRP. 71010455
20 DISETUJUI
450 300
2024
A B C D E F
KEPOLISIAN NEGARA REPUBLIK INDONESIA
DAERAH LAMPUNG
1850 KETERANGAN
KEGIATAN
1 PENINGKATAN SARANA & PRASARANA
KEPOLISIAN
40
400 PEKERJAAN
30
JASA KONSULTANSI PERENCANAAN
PEMBANGUNAN GEDUNG RPK
POLDA LAMPUNG
T.A 2024
KONSULTAN PERENCANA
3
CV. PANDU CONSULTANT ENGINEERING
350
DIGAMBAR DIPERIKSA
DIPERIKSA
Team Leader
250
259
A-2
4'
50
A-3
DJOKO ANGGORO, SH.,MH.
AKBP NRP. 71010455
DISETUJUI
50 665
KABAG FASKON POLDA LAMPUNG
2024
A B C D E F
KEPOLISIAN NEGARA REPUBLIK INDONESIA
DAERAH LAMPUNG
1850 KETERANGAN
KEGIATAN
1 PENINGKATAN SARANA & PRASARANA
KEPOLISIAN
400 PEKERJAAN
DENAH RENCANA
1 : 100
PENULANGAN DAAG
BETON TERAS
KONSULTAN PERENCANA
3
CV. PANDU CONSULTANT ENGINEERING
350
DIGAMBAR DIPERIKSA
B A
DIPERIKSA
Team Leader
Ø015
-10 Ø015
-10 Ø015
-10 Ø015
-10 Ø015
-10 Ø015
-10
C
250
-10
-10
-10
-10
-10
-10
-10
-10
-10
Ø015
Ø015
Ø015
Ø015
Ø015
Ø015
Ø015
Ø015
Ø015
Ø015
Ø015
-10 Ø015
-10 Ø015
-10 Ø015
-10 Ø015
-10 Ø015
-10
4'
DJOKO ANGGORO, SH.,MH.
Daag Pelat Beton Daag Pelat Beton AKBP NRP. 71010455
t: 10 cm t: 10 cm
DISETUJUI
Daag Pelat Beton
t: 8 cm KABAG FASKON POLDA LAMPUNG
2024
KEPOLISIAN NEGARA REPUBLIK INDONESIA
DAERAH LAMPUNG
LANTAI 2
Elv. +4.00 KETERANGAN
Pelat Lantai 2
30 10
Daag Beton t : 10 cm : 13 cm
40
BALOK BL.1
55
Pelat Beton Existing
Dibongkar
Elv.+ 3.03 PENINGKATAN SARANA & PRASARANA
KEPOLISIAN
15 10
30
PEKERJAAN
Balok 15/25
Plafon JASA KONSULTANSI PERENCANAAN
Balok 15/30 Elv. + 2.60 PEMBANGUNAN GEDUNG RPK
POLDA LAMPUNG
T.A 2024
KONSULTAN PERENCANA
308
CV. PANDU CONSULTANT ENGINEERING
323
DIGAMBAR DIPERIKSA
Gedung
Existing
RIMITA NESZIA, ST. YOHANES MARIA D, ST.
Drafman Team Leader
25
DIPERIKSA
LANTAI 1
Elv. - 0.05 DJOKO ANGGORO, SH.,MH.
Elv. - 0.20 AKBP NRP. 71010455
DISETUJUI
SLOOF SL.1
DISETUJUI
Skala 1 : 25
2024
LANTAI 2
Elv. +4.00 KEPOLISIAN NEGARA REPUBLIK INDONESIA
DAERAH LAMPUNG
Pelat Lantai 2
KETERANGAN
: 13 cm
Daag Beton t : 8 cm Daag Beton t : 10 cm BALOK BL.1
Ø10 - 150
70
KEGIATAN
30
Elv. +2.85
PENINGKATAN SARANA & PRASARANA
KEPOLISIAN
8
PEKERJAAN
Balok 15/25
Plafon
50 Balok 15/25 Elv. + 2.60 JASA KONSULTANSI PERENCANAAN
PEMBANGUNAN GEDUNG RPK
POLDA LAMPUNG
T.A 2024
KONSULTAN PERENCANA
285
315
DIGAMBAR DIPERIKSA
DIPERIKSA
DISETUJUI
KABAG FASKON POLDA LAMPUNG
80
DISETUJUI
10
2024
KEPOLISIAN NEGARA REPUBLIK INDONESIA
DAERAH LAMPUNG
KETERANGAN
KEGIATAN
PEKERJAAN
Balok 15/25 Elv. + 2.90 Balok 15/25 Balok 15/20 Balok 15/25
+2.85 Balok 15/25
Balok 15/25 Balok 15/25
NAMA GAMBAR SKALA
Plafon Plafon Plafon Plafon
Elv. + 2.60 Elv. + 2.60 Elv. + 2.60 Elv. + 2.60
Pipa PVC 4"
Air Hujan
DETAIL POTONGAN DAAG 1 : 50
BETON TERAS
335
290
285
280
KONSULTAN PERENCANA
Drainase
DIGAMBAR DIPERIKSA
-1.25 -1.25
DIPERIKSA
DISETUJUI
KUASA PENGGUNA ANGGARAN
( KPA )
2024
A B C D E F
KEPOLISIAN NEGARA REPUBLIK INDONESIA
DAERAH LAMPUNG
1850 KETERANGAN
KEGIATAN
1
95
K1 K1 K1 K1 K1 K1 PENINGKATAN SARANA & PRASARANA
190
KEPOLISIAN
400 PEKERJAAN
K1 K1 K1 K1 K1 K1 KONSULTAN PERENCANA
3
CV. PANDU CONSULTANT ENGINEERING
350
DIGAMBAR DIPERIKSA
K1 K1 K1 K1 K1 K1
4 RIMITA NESZIA, ST.
Drafman
YOHANES MARIA D, ST.
DIPERIKSA
Team Leader
4'
DJOKO ANGGORO, SH.,MH.
AKBP NRP. 71010455
2024
A B C D E F KEPOLISIAN NEGARA REPUBLIK INDONESIA
DAERAH LAMPUNG
KETERANGAN
1850
300 300 500 300 200 250
KEGIATAN
KP
1 160 PENINGKATAN SARANA & PRASARANA
KEPOLISIAN
PEKERJAAN
400
KP JASA KONSULTANSI PERENCANAAN
PEMBANGUNAN GEDUNG RPK
POLDA LAMPUNG
240
T.A 2024
2 KP KP DENAH RENCANA
1 : 100
1000
250
KONSULTAN PERENCANA
KP KP
3 CV. PANDU CONSULTANT ENGINEERING
DIGAMBAR DIPERIKSA
350
350
RIMITA NESZIA, ST. YOHANES MARIA D, ST.
Drafman Team Leader
KP KP
4 DIPERIKSA
DISETUJUI
175 600 625 450 KABAG FASKON POLDA LAMPUNG
DISETUJUI
KUASA PENGGUNA ANGGARAN
( KPA )
2024
A B C D E F
KEPOLISIAN NEGARA REPUBLIK INDONESIA
DAERAH LAMPUNG
1850 KETERANGAN
RB-1
RB-1
RB-1
RB-1
RB-1
RB-1
RB-2
80
70
KEGIATAN
1
RB-3
RB-2 RB-2 RB-2 RB-2 PENINGKATAN SARANA & PRASARANA
208
KEPOLISIAN
RB-1
RB-1
RB-1
RB-1
RB-1
400 PEKERJAAN
RB-1
RB-1
250
RB-1
RB-1
RB-1
350
DIGAMBAR DIPERIKSA
RB-1
RB-1
RB-1
RB-1
RB-1 RB-1
66
56
56
DIPERIKSA
250
DISETUJUI
KABAG FASKON POLDA LAMPUNG
2024
KEPOLISIAN NEGARA REPUBLIK INDONESIA
DAERAH LAMPUNG
300 KETERANGAN
BL.1 20/40
30
30
30
30
25 BORDES
20
30
KEGIATAN
150
150
ELV.+2.00
20 25 30
200
25
150
20
Elv.+2.00
Besi Ø12-150
20
400
ELV.+1.80 ELV.+2.40
20
ELV.+2.80
Balok 15/30 T.A 2024
30
225
20
250
ELV.+3.00
30 + Acian Bawah Tangga
20
195
30 Besi Ø12-150 ELV.+1.00 ELV.+3.20 NAMA GAMBAR SKALA
20
30 ELV.+0.80
25 Besi Ø12-150 ELV.+3.40
20
ELV+3.60
Besi Ø12-150
25
20
25
Elv. ± 0.00 ELV.+0.40 ELV+3.80
20
ELV.+0.20
ELV+4.00 KONSULTAN PERENCANA
DIPERIKSA
Skala 1 : 50
PEJABAT PEMBUAT KOMITMEN
( PPK )
300
Balok Tangga
15/30
2 Ø 16 DJOKO ANGGORO, SH.,MH.
AKBP NRP. 71010455
Balok Tangga
Balok Tangga
DISETUJUI
15/30
15/30
150
KABAG FASKON POLDA LAMPUNG
2 Ø 16
30
Ø 8-150
Balok Tangga AFANDI RAHARJO, SE.
AKBP NRP. 70050475
15/30
DISETUJUI
2 Ø 16
15 KUASA PENGGUNA ANGGARAN
( KPA )
2024
KEPOLISIAN NEGARA REPUBLIK INDONESIA
DAERAH LAMPUNG
KETERANGAN
10
10
10
10
30
104
67
0
KEGIATAN
19
PENINGKATAN SARANA & PRASARANA
KEPOLISIAN
PEKERJAAN
100
DETAIL RAILLING TANGGA 1 : 30
Railling Hollo
410 6
Stainless 2/2 cm KONSULTAN PERENCANA
100
61
DIGAMBAR DIPERIKSA
15 4
Railling Hollo
Stainless 6/6 cm
6 11 15 15 15 15 15 15 11 6 RIMITA NESZIA, ST. YOHANES MARIA D, ST.
10 139 Drafman Team Leader
10 DIPERIKSA
10
DETAIL RAILLING TANGGA PEJABAT PEMBUAT KOMITMEN
( PPK )
0 Railling Hollo
30 Skala 1 : 30
100
Stainless 4/4 cm
87
250 150
AFANDI RAHARJO, SE.
AKBP NRP. 70050475
400
DISETUJUI
KUASA PENGGUNA ANGGARAN
( KPA )
2024
A B C D E F
KEPOLISIAN NEGARA REPUBLIK INDONESIA
DAERAH LAMPUNG
1850 KETERANGAN
RB-1
RB-1
RB-1
RB-1
RB-1
RB-1
RB-2
80
70
KEGIATAN
1
RB-3
RB-2 RB-2 RB-2 RB-2 PENINGKATAN SARANA & PRASARANA
208
KEPOLISIAN
RB-1
RB-1
RB-1
RB-1
RB-1
400 PEKERJAAN
RB-1
RB-1
250
RB-1
RB-1
RB-1
350
DIGAMBAR DIPERIKSA
RB-1
RB-1
RB-1
RB-1
RB-1 RB-1
66
56
56
DIPERIKSA
250
DISETUJUI
KABAG FASKON POLDA LAMPUNG
2024
A B C D E F
KEPOLISIAN NEGARA REPUBLIK INDONESIA
DAERAH LAMPUNG
1850 KETERANGAN
KEGIATAN
1
RB-2 RB-2 RB-2 RB-2 PENINGKATAN SARANA & PRASARANA
190
KEPOLISIAN
218
400 PEKERJAAN
DENAH RENCANA
1 : 100
PELAT TALANG & DAAG BETON
KONSULTAN PERENCANA
3
CV. PANDU CONSULTANT ENGINEERING
350
DIGAMBAR DIPERIKSA
66
56
76
DIPERIKSA
250
4'
DJOKO ANGGORO, SH.,MH.
AKBP NRP. 71010455
DISETUJUI
KABAG FASKON POLDA LAMPUNG
2024
A B C D E F
KEPOLISIAN NEGARA REPUBLIK INDONESIA
DAERAH LAMPUNG
1850 KETERANGAN
-10
-10
-10
-10
-10
-10
KEGIATAN
Ø015
Ø015
Ø015
Ø015
Ø015
Ø015
1 RB-2
Ø01-200 RB-2 RB-2 RB-2 PENINGKATAN SARANA & PRASARANA
190
KEPOLISIAN
Ø01-200 Daag Beton t : 12 cm
400 Elv.+8.00 PEKERJAAN
DENAH RENCANA
PENULANGAN PELAT TALANG 1 : 100
LANTAI 2
KONSULTAN PERENCANA
3
CV. PANDU CONSULTANT ENGINEERING
350
DIGAMBAR DIPERIKSA
4 Ø015
-10 Ø015
-10 Ø015
-10
RIMITA NESZIA, ST.
Drafman
YOHANES MARIA D, ST.
Team Leader
66
56
DIPERIKSA
-10
-10
-10
-10
Ø015
Ø015
Ø015
Ø015
250
4'
DJOKO ANGGORO, SH.,MH.
AKBP NRP. 71010455
2024
A B C D E F
KEPOLISIAN NEGARA REPUBLIK INDONESIA
DAERAH LAMPUNG
1850 KETERANGAN
KEGIATAN
1 PENINGKATAN SARANA & PRASARANA
202
KEPOLISIAN
Pas. Bata Gunungan
400 Pas. Bata Gunungan PEKERJAAN
KP KP
JASA KONSULTANSI PERENCANAAN
Pas. Bata Gunungan PEMBANGUNAN GEDUNG RPK
POLDA LAMPUNG
T.A 2024
DENAH RENCANA
Pas. Bata Gunungan Pas. Bata Gunungan KOLOM ATAS
1 : 100
KONSULTAN PERENCANA
3 KP KP
Pas. Bata Gunungan CV. PANDU CONSULTANT ENGINEERING
DIGAMBAR DIPERIKSA
Pas. Dinding Bata Pas. Dinding Bata Pas. Dinding Bata Pas. Dinding Bata Pas. Dinding Bata
4 K4 K4 K4 K4 K4 K4
RIMITA NESZIA, ST.
Drafman
YOHANES MARIA D, ST.
DIPERIKSA
Team Leader
250
4'
DJOKO ANGGORO, SH.,MH.
AKBP NRP. 71010455
2024
A B C D E F
KEPOLISIAN NEGARA REPUBLIK INDONESIA
DAERAH LAMPUNG
1850 KETERANGAN
KEGIATAN
1
RB-3
PENINGKATAN SARANA & PRASARANA
KEPOLISIAN
RB-3
400 PEKERJAAN
RB-3
RB-3
250
DENAH RENCANA
1 : 100
RINGBALOK ATAS
KONSULTAN PERENCANA
3
CV. PANDU CONSULTANT ENGINEERING
RB-3
RB-3
350
DIGAMBAR DIPERIKSA
DIPERIKSA
Team Leader
250
4'
DJOKO ANGGORO, SH.,MH.
AKBP NRP. 71010455
DISETUJUI
KABAG FASKON POLDA LAMPUNG
2024
KEPOLISIAN NEGARA REPUBLIK INDONESIA
DAERAH LAMPUNG
Ringbalok 15/20
KETERANGAN
Pa. Gunungan Bata
20 Finishing Plesteran + Acian Kolom Praktis 11/11
Ringbalok 20/25
1016
Kolom K.4 20/20
20
KEGIATAN
Talang Beton
180
100
55
+8.00 PEKERJAAN
25
Kolom K.1 30/40 Kolom K.1 30/40 Kolom K.1 30/40 NAMA GAMBAR SKALA
Skala 1 : 50
CV. PANDU CONSULTANT ENGINEERING
DIGAMBAR DIPERIKSA
Ringbalok 15/20
Talang Beton
180
180
+8.37
DISETUJUI
55
DISETUJUI
KUASA PENGGUNA ANGGARAN
350 250 400 ( KPA )
1000
2024
A B C D E F
KEPOLISIAN NEGARA REPUBLIK INDONESIA
DAERAH LAMPUNG
1850 KETERANGAN
KEGIATAN
1 PENINGKATAN SARANA & PRASARANA
Tandon air KEPOLISIAN
2 m3
400 PEKERJAAN
DENAH RENCANA
1 : 100
ATAP LANTAI 2
KONSULTAN PERENCANA
3
CV. PANDU CONSULTANT ENGINEERING
350
DIPERIKSA
Team Leader
250
4'
DJOKO ANGGORO, SH.,MH.
AKBP NRP. 71010455
Y X DISETUJUI
KABAG FASKON POLDA LAMPUNG
DISETUJUI
KUASA PENGGUNA ANGGARAN
( KPA )
2024
KEPOLISIAN NEGARA REPUBLIK INDONESIA
DAERAH LAMPUNG
RB.1 20/25 Atap Spandek Pasir
Dynabolt KETERANGAN
102
Rangka Kuda-Kuda Baja Ringan
35
100 RB.2 20/55 KEGIATAN
180
80
80 Talang Beton PENINGKATAN SARANA & PRASARANA
80 +8.37 KEPOLISIAN
80
80 PEKERJAAN
80 +8.00
1008 Ringbalok Lt. 2
10°
RB.1 20/25 RB.1 20/25 80
RB.1 20/25 80
70
JASA KONSULTANSI PERENCANAAN
80 PEMBANGUNAN GEDUNG RPK
POLDA LAMPUNG
Plafon Plafon Plafon T.A 2024
10
Elv. + 7.40 Elv. + 7.40 Elv. + 7.40 70 8
NAMA GAMBAR SKALA
DETAIL ATAP 1 : 50
350 250 400
1000
KONSULTAN PERENCANA
RB.1 20/25
RIMITA NESZIA, ST. YOHANES MARIA D, ST.
81 Rangka Kuda-Kuda Baja Ringan Drafman Team Leader
80
RB.3 15/20
80
80
155
17 20
37
+8.00
Ringbalok Lt. 2 KABAG FASKON POLDA LAMPUNG
RB.1 20/25
RB.1 20/25 RB.1 20/25 RB.1 20/25
DISETUJUI
208
KUASA PENGGUNA ANGGARAN
350 250 240 160 ( KPA )
1000
2024
KEPOLISIAN NEGARA REPUBLIK INDONESIA
DAERAH LAMPUNG
KETERANGAN
KEGIATAN
PEKERJAAN
13
NAMA GAMBAR SKALA
25
DETAIL TALANG BETON 1 : 20
20
3 Ø 16 2 Ø 16 KONSULTAN PERENCANA
Ø 10-100
30
40
55
3 Ø 16 3 Ø 16 DIGAMBAR DIPERIKSA
25
55
RINGBALOK
5 5 10
20/55 2 Ø 16 2 Ø 16
RIMITA NESZIA, ST. YOHANES MARIA D, ST.
Drafman Team Leader
Ø 10-100 Sengkang Ø8-150 Sengkang Ø8-150 DIPERIKSA
Ø 10-100
PEJABAT PEMBUAT KOMITMEN
20 70 8 5 ( PPK )
2 Ø 16 3 Ø 16
20 20
TUMPUAN LAPANGAN
DJOKO ANGGORO, SH.,MH.
DETAIL TALANG BETON DETAIL BALOK RB.2 20/55 AKBP NRP. 71010455
Skala 1 : 10 DISETUJUI
Skala 1 : 20 KABAG FASKON POLDA LAMPUNG
DISETUJUI
KUASA PENGGUNA ANGGARAN
( KPA )
2024
1850
KEPOLISIAN NEGARA REPUBLIK INDONESIA
300 350 450 300 450 DAERAH LAMPUNG
KETERANGAN
Siring Air Rabat Beton Siring Air Rabat Beton Siring Air Rabat Beton
Bangunan Elv. -0.10 Bangunan Elv. -0.10 Bangunan Elv. -0.10
100
50
Siring Air
Bangunan KEGIATAN
400
PENINGKATAN SARANA & PRASARANA
KEPOLISIAN
Rabat Beton
Elv. -0.10
PEKERJAAN
1000
250
50 70
1350
NAMA GAMBAR SKALA
Siring Air
Bangunan KONSULTAN PERENCANA
350
CV. PANDU CONSULTANT ENGINEERING
DIGAMBAR DIPERIKSA
Rabat Beton
Elv. -0.10
250
RIMITA NESZIA, ST. YOHANES MARIA D, ST.
Drafman Team Leader
DIPERIKSA
DISETUJUI
KABAG FASKON POLDA LAMPUNG
DISETUJUI
KUASA PENGGUNA ANGGARAN
( KPA )
2024
A B C D E F KEPOLISIAN NEGARA REPUBLIK INDONESIA
DAERAH LAMPUNG
KETERANGAN
1850
300 350 450 300 450
KEGIATAN
100
1 160
PENINGKATAN SARANA & PRASARANA
KEPOLISIAN
PEKERJAAN
400
JASA KONSULTANSI PERENCANAAN
PEMBANGUNAN GEDUNG RPK
POLDA LAMPUNG
240
T.A 2024
1000
LANTAI 1
250
250
1350
KONSULTAN PERENCANA
DIGAMBAR DIPERIKSA
350
350
RIMITA NESZIA, ST. YOHANES MARIA D, ST.
Drafman Team Leader
4 DIPERIKSA
250
4' DJOKO ANGGORO, SH.,MH.
AKBP NRP. 71010455
DISETUJUI
500 150 450 300 200 250 KABAG FASKON POLDA LAMPUNG
NOTASI
SIMBOL KETERANGAN JUMLAH
AFANDI RAHARJO, SE.
AKBP NRP. 70050475
P1 Kusen Pintu Alumunium + Kaca 6
DISETUJUI
P2 Kusen Pintu Alumunium + Kaca 1
KUASA PENGGUNA ANGGARAN
P3 Kusen KM/WC UPVC 4 ( KPA )
2024
A B C D E F KEPOLISIAN NEGARA REPUBLIK INDONESIA
DAERAH LAMPUNG
KETERANGAN
1850
300 300 500 300 200 250
KEGIATAN
PEKERJAAN
400
JASA KONSULTANSI PERENCANAAN
PEMBANGUNAN GEDUNG RPK
POLDA LAMPUNG
240
T.A 2024
LANTAI 2
250
250
KONSULTAN PERENCANA
DIGAMBAR DIPERIKSA
350
350
RIMITA NESZIA, ST. YOHANES MARIA D, ST.
Drafman Team Leader
4 DIPERIKSA
DISETUJUI
175 600 625 450 KABAG FASKON POLDA LAMPUNG
NOTASI
SIMBOL KETERANGAN JUMLAH
AFANDI RAHARJO, SE.
AKBP NRP. 70050475
P1 Kusen Pintu Alumunium + Kaca 8
DISETUJUI
P2 Kusen Pintu Alumunium + Kaca -
KUASA PENGGUNA ANGGARAN
P3 Kusen KM/WC UPVC 4 ( KPA )
2024
KEPOLISIAN NEGARA REPUBLIK INDONESIA
DAERAH LAMPUNG
KETERANGAN
KEGIATAN
Kusen Alumunium Warna Coklat Kusen Alumunium Warna Coklat
PENINGKATAN SARANA & PRASARANA
Kaca Riben Kaca Riben KEPOLISIAN
t : 5mm t : 5mm
5
5
PEKERJAAN
40
40
40
40
JASA KONSULTANSI PERENCANAAN
PEMBANGUNAN GEDUNG RPK
POLDA LAMPUNG
5
5
T.A 2024
270
270
270
t : 8 mm t : 8 mm
CV. PANDU CONSULTANT ENGINEERING
220
220
220
220
DIGAMBAR DIPERIKSA
DIPERIKSA
10 10
DJOKO ANGGORO, SH.,MH.
AKBP NRP. 71010455
10
10
10
10
DISETUJUI
DISETUJUI
KUASA PENGGUNA ANGGARAN
DETAIL PINTU P1 DETAIL PINTU P2 ( KPA )
Skala 1 : 25 Skala 1 : 25
2024
KEPOLISIAN NEGARA REPUBLIK INDONESIA
DAERAH LAMPUNG
KETERANGAN
KEGIATAN
5
PEKERJAAN
Kaca Riben
40
t : 5mm JASA KONSULTANSI PERENCANAAN
PEMBANGUNAN GEDUNG RPK
POLDA LAMPUNG
5
T.A 2024
Kusen Alumunium
Warna Coklat
NAMA GAMBAR SKALA
165
Kusen Pintu UPVC
Warna Coklat
DETAIL KUSEN PINTU & 1 : 25
JENDELA
110
Daun Pintu UPVC
Warna Coklat
5
200
DIGAMBAR DIPERIKSA
105
Drafman Team Leader
DIPERIKSA
70
DISETUJUI
KABAG FASKON POLDA LAMPUNG
5 60 5
70
DISETUJUI
KUASA PENGGUNA ANGGARAN
DETAIL PINTU PA KM/WC DETAIL JENDELA J1 ( KPA )
Skala 1 : 25 Skala 1 : 25
2024
KEPOLISIAN NEGARA REPUBLIK INDONESIA
DAERAH LAMPUNG
KETERANGAN
KEGIATAN
5
Warna Coklat
5
PEKERJAAN
40
t : 5mm Kaca Riben Kaca Riben Kaca Riben JASA KONSULTANSI PERENCANAAN
t : 5mm
85
t : 5mm t : 5mm t : 5mm PEMBANGUNAN GEDUNG RPK
POLDA LAMPUNG
5
T.A 2024
Kusen Alumunium
Warna Coklat
NAMA GAMBAR SKALA
5
165
DETAIL KUSEN JENDELA 1 : 25
110
Kaca Riben Kaca Riben Kaca Riben
Kaca Riben
Daun Jendela t : 5mm Kusen Alumunium t : 5mm t : 5mm
85
t : 5mm KONSULTAN PERENCANA
Alumunium Warna Coklat
Warna Hitam
CV. PANDU CONSULTANT ENGINEERING
5
5
DIGAMBAR DIPERIKSA
Kusen Alumunium
Warna Coklat
Kaca Riben Kaca Riben Kaca Riben
85
RIMITA NESZIA, ST. YOHANES MARIA D, ST.
105
DIPERIKSA
5
DJOKO ANGGORO, SH.,MH.
AKBP NRP. 71010455
DISETUJUI
KABAG FASKON POLDA LAMPUNG
5 60 5 60 5
135
5 45 5 95 5 45 5
205
AFANDI RAHARJO, SE.
AKBP NRP. 70050475
DISETUJUI
KUASA PENGGUNA ANGGARAN
DETAIL JENDELA J2 DETAIL JENDELA J3 ( KPA )
Skala 1 : 25 Skala 1 : 25
2024
KEPOLISIAN NEGARA REPUBLIK INDONESIA
DAERAH LAMPUNG
KETERANGAN
KEGIATAN
PEKERJAAN
5
40
40
KONSULTAN PERENCANA
Kaca t : 5 mm Kaca t : 5 mm Kaca t : 5 mm
CV. PANDU CONSULTANT ENGINEERING
5
DIGAMBAR DIPERIKSA
220
220
Muka Lantai Muka Lantai
DIPERIKSA
5 60 5 5 60 5 60 5
70 135
DISETUJUI
KUASA PENGGUNA ANGGARAN
( KPA )
2024
A B C D E F KEPOLISIAN NEGARA REPUBLIK INDONESIA
DAERAH LAMPUNG
KETERANGAN
1850
300 350 450 300 450
KEGIATAN
100
1 160
B-LT B-LT B-LT B-LT B-LT
PENINGKATAN SARANA & PRASARANA
KEPOLISIAN
400
B-LT" B-LT" JASA KONSULTANSI PERENCANAAN
PEMBANGUNAN GEDUNG RPK
POLDA LAMPUNG
240
T.A 2024
B-LT
107
NAMA GAMBAR SKALA
1000
212 LATEI LANTAI 1
200 130
250
250
B-LT
1350
265 130 130
KONSULTAN PERENCANA
DIGAMBAR DIPERIKSA
B-LT
350
350
165
4 DIPERIKSA
250
B-LT
4' 3,5 m
DJOKO ANGGORO, SH.,MH.
AKBP NRP. 71010455
DISETUJUI
500 150 450 300 200 250 KABAG FASKON POLDA LAMPUNG
2024
A B C D E F KEPOLISIAN NEGARA REPUBLIK INDONESIA
DAERAH LAMPUNG
KETERANGAN
1850
300 300 500 300 200 250
KEGIATAN
1 160
B-LT B-LT B-LT B-LT B-LT B-LT B-LT
PENINGKATAN SARANA & PRASARANA
KEPOLISIAN
400
B-LT" B-LT" JASA KONSULTANSI PERENCANAAN
PEMBANGUNAN GEDUNG RPK
POLDA LAMPUNG
240
T.A 2024
B-LT
LATEI LANTAI 2
212 130 130 130
250
250
100 130 130
KONSULTAN PERENCANA
130
B-LT B-LT B-LT
3 CV. PANDU CONSULTANT ENGINEERING
DIGAMBAR DIPERIKSA
350
350
B-LT
165
DISETUJUI
175 600 625 450 KABAG FASKON POLDA LAMPUNG
2024
A B C D E F KEPOLISIAN NEGARA REPUBLIK INDONESIA
DAERAH LAMPUNG
KETERANGAN
1850
300 350 450 300 450
182 165 165 165
KEGIATAN
50
50
50
50
1 160
PENINGKATAN SARANA & PRASARANA
KEPOLISIAN
PEKERJAAN
400
JASA KONSULTANSI PERENCANAAN
PEMBANGUNAN GEDUNG RPK
POLDA LAMPUNG
240
T.A 2024
100
1000
KANOPI LANTAI 1
250
250
165
1350
KONSULTAN PERENCANA
3 50
CV. PANDU CONSULTANT ENGINEERING
DIGAMBAR DIPERIKSA
350
350
165
250
4' DJOKO ANGGORO, SH.,MH.
AKBP NRP. 71010455
DISETUJUI
3,5 m 500 450 300 200 250 KABAG FASKON POLDA LAMPUNG
2024
A B C D E F KEPOLISIAN NEGARA REPUBLIK INDONESIA
DAERAH LAMPUNG
KETERANGAN
1850
300 300 500 300 200 250
KEGIATAN
PEKERJAAN
400
JASA KONSULTANSI PERENCANAAN
PEMBANGUNAN GEDUNG RPK
POLDA LAMPUNG
240
T.A 2024
100
KANOPI LANTAI 2
250
250
165
KONSULTAN PERENCANA
3 50
CV. PANDU CONSULTANT ENGINEERING
DIGAMBAR DIPERIKSA
350
350
165
50
4 DIPERIKSA
105
DISETUJUI
175 600 625 450 KABAG FASKON POLDA LAMPUNG
2024
Balok Latei 12/15
KEPOLISIAN NEGARA REPUBLIK INDONESIA
DAERAH LAMPUNG
165
15 135 15 Pelat Kanopi t:8 cm
KETERANGAN
50
Balok Latei 12/15
8
15
50
Pelat Kanopi t:8 cm Ø10-100 KEGIATAN
Skala 1 : 20
CV. PANDU CONSULTANT ENGINEERING
DIGAMBAR DIPERIKSA
DIPERIKSA
8
5 15
Ø10-100
40
AFANDI RAHARJO, SE.
Besi Ø10 - 100 Kusen Boven AKBP NRP. 70050475
DISETUJUI
90 5 KUASA PENGGUNA ANGGARAN
Dinding 1/2 Bata Finishing ( KPA )
Plesteran, Acian & Cat
2024
A B C D E F KEPOLISIAN NEGARA REPUBLIK INDONESIA
DAERAH LAMPUNG
KETERANGAN
1850
300 350 450 300 450
KEGIATAN
100
1 160
PENINGKATAN SARANA & PRASARANA
KEPOLISIAN
CL4 CL4
PEKERJAAN
400
JASA KONSULTANSI PERENCANAAN
CL1 CL1 CL1 CL1 PEMBANGUNAN GEDUNG RPK
POLDA LAMPUNG
240
T.A 2024
CL4 CL4
NAMA GAMBAR SKALA
1000
LANTAI LT. 1
250
250
CL1 CL1 CL1 CL1
1350
KONSULTAN PERENCANA
DIGAMBAR DIPERIKSA
350
350
CL1 CL1 CL2 CL1
4 DIPERIKSA
250
CL3 CL3 CL3
CL3
4' DJOKO ANGGORO, SH.,MH.
AKBP NRP. 71010455
DISETUJUI
3,5 m 500 150 460 300 200 250 KABAG FASKON POLDA LAMPUNG
2024
A B C D E F KEPOLISIAN NEGARA REPUBLIK INDONESIA
DAERAH LAMPUNG
KETERANGAN
1850
300 350 450 300 450
KEGIATAN
100
1 160
PENINGKATAN SARANA & PRASARANA
KEPOLISIAN
CL5 CL5
PEKERJAAN
400
JASA KONSULTANSI PERENCANAAN
PEMBANGUNAN GEDUNG RPK
POLDA LAMPUNG
240
T.A 2024
1000
DINDING LT. 1
250
250
400
1350
KONSULTAN PERENCANA
DIGAMBAR DIPERIKSA
350
350
250
4 DIPERIKSA
250
350
4' 3,5 m
DJOKO ANGGORO, SH.,MH.
AKBP NRP. 71010455
DISETUJUI
500 150 460 300 200 250 KABAG FASKON POLDA LAMPUNG
2024
A B C D E F KEPOLISIAN NEGARA REPUBLIK INDONESIA
DAERAH LAMPUNG
KETERANGAN
1850
300 300 500 300 200 250
KEGIATAN
CL1 CL1
400
CL1 CL1 JASA KONSULTANSI PERENCANAAN
PEMBANGUNAN GEDUNG RPK
POLDA LAMPUNG
240
T.A 2024
CL4 CL4
NAMA GAMBAR SKALA
LANTAI LT. 2
250
250
CL1 CL1 CL1 CL1
KONSULTAN PERENCANA
DIGAMBAR DIPERIKSA
CL1
350
350
CL1 CL1 CL1
4 DIPERIKSA
DISETUJUI
175 600 625 450 KABAG FASKON POLDA LAMPUNG
2024
A B C D E F KEPOLISIAN NEGARA REPUBLIK INDONESIA
DAERAH LAMPUNG
KETERANGAN
1850
300 300 500 300 200 250
KEGIATAN
400
JASA KONSULTANSI PERENCANAAN
PEMBANGUNAN GEDUNG RPK
POLDA LAMPUNG
240
T.A 2024
DINDING LT. 2
250
250
KONSULTAN PERENCANA
DIGAMBAR DIPERIKSA
350
350
CL6
RIMITA NESZIA, ST. YOHANES MARIA D, ST.
Drafman Team Leader
4 DIPERIKSA
DISETUJUI
175 600 625 450 KABAG FASKON POLDA LAMPUNG
2024
A B C D E F KEPOLISIAN NEGARA REPUBLIK INDONESIA
DAERAH LAMPUNG
KETERANGAN
1850
300 350 450 300 450
KEGIATAN
100
60 60 60 60
60
PL1
PL1
60
400
JASA KONSULTANSI PERENCANAAN
Rangka Hollo 4/4 Jarak
PL1 PEMBANGUNAN GEDUNG RPK
POLDA LAMPUNG
240
60 x 60 cm T.A 2024
PL1 PL1
NAMA GAMBAR SKALA
1000
LANTAI 1
60 x 60 cm
250
250
PL1 PL1
60
1350
PL1
KONSULTAN PERENCANA
60
350
60 x 60 cm
60
4 DIPERIKSA
250
PL2 PL2 PL2
4' 3,5 m
DJOKO ANGGORO, SH.,MH.
AKBP NRP. 71010455
DISETUJUI
500 150 450 300 200 250 KABAG FASKON POLDA LAMPUNG
2024
A B C D E F KEPOLISIAN NEGARA REPUBLIK INDONESIA
DAERAH LAMPUNG
KETERANGAN
1850
300 300 500 300 200 250
KEGIATAN
PL1 PEKERJAAN
PL1
Rangka Hollo 4/4 Jarak
400
PL1 60 x 60 cm PL1 JASA KONSULTANSI PERENCANAAN
PL1 PL1 PEMBANGUNAN GEDUNG RPK
POLDA LAMPUNG
240
60
PL1
60
NAMA GAMBAR SKALA
60
LANTAI 2
250
250
60
PL1 PL1 Rangka Hollo 4/4 Jarak PL1
60 x 60 cm
KONSULTAN PERENCANA
60
DIGAMBAR DIPERIKSA
60
350
350
PL1 PL1 Rangka Hollo 4/4 Jarak PL1
PL1 60 x 60 cm
4 DIPERIKSA
DISETUJUI
175 600 625 450 KABAG FASKON POLDA LAMPUNG
2024
A B C D E F KEPOLISIAN NEGARA REPUBLIK INDONESIA
DAERAH LAMPUNG
KETERANGAN
1850
300 300 500 300 200 250
82 KEGIATAN
PL4
PEKERJAAN
400
JASA KONSULTANSI PERENCANAAN
PEMBANGUNAN GEDUNG RPK
POLDA LAMPUNG
240
T.A 2024
ATAP
250
250
PL4
KONSULTAN PERENCANA
DIGAMBAR DIPERIKSA
350
350
RIMITA NESZIA, ST. YOHANES MARIA D, ST.
Drafman Team Leader
4 DIPERIKSA
105
PL4 PL4 PL4 PL4 ( PPK )
DISETUJUI
175 600 625 450 KABAG FASKON POLDA LAMPUNG
2024
KEPOLISIAN NEGARA REPUBLIK INDONESIA
DAERAH LAMPUNG
KETERANGAN
DETAIL PLAFON 1 : 20
DIGAMBAR DIPERIKSA
DIPERIKSA
DISETUJUI
60 60 Elv +3.50 60 60 Elv +3.50
KABAG FASKON POLDA LAMPUNG
DISETUJUI
KUASA PENGGUNA ANGGARAN
( KPA )
2024
KEPOLISIAN NEGARA REPUBLIK INDONESIA
DAERAH LAMPUNG
KETERANGAN
1850
300 350 450 300 450
230 215
150 30 KEGIATAN
100
Floordrain
400
Pipa PVC 3" JASA KONSULTANSI PERENCANAAN
PEMBANGUNAN GEDUNG RPK
POLDA LAMPUNG
Pipa PVC 2" Pipa PVC 2" Pipa PVC 2"
T.A 2024
1000
AIR KOTOR LT. 1
250
1350
KONSULTAN PERENCANA
DIGAMBAR DIPERIKSA
350
RIMITA NESZIA, ST. YOHANES MARIA D, ST.
Drafman Team Leader
DIPERIKSA
250
DJOKO ANGGORO, SH.,MH.
AKBP NRP. 71010455
DISETUJUI
500 150 460 300 200 250 KABAG FASKON POLDA LAMPUNG
DISETUJUI
KUASA PENGGUNA ANGGARAN
( KPA )
2024
KEPOLISIAN NEGARA REPUBLIK INDONESIA
DAERAH LAMPUNG
KETERANGAN
1850
300 300 500 300 200 250
KEGIATAN
Pipa PVC 3" Floordrain
400
Pipa PVC 2" Pipa PVC 2" JASA KONSULTANSI PERENCANAAN
PEMBANGUNAN GEDUNG RPK
POLDA LAMPUNG
240
250
Pipa PVC 2"
KONSULTAN PERENCANA
DIGAMBAR DIPERIKSA
350
350
Pipa PVC 2"
DIPERIKSA
DISETUJUI
175 600 625 450 KABAG FASKON POLDA LAMPUNG
DISETUJUI
KUASA PENGGUNA ANGGARAN
( KPA )
2024
PIPA SALURAN UDARA
SEPTICTANK Ø 1"
KETERANGAN
40
150
180
80
40
50
KEGIATAN
Ø 4'' dari kloset Ø 4'' ke resapan
PENINGKATAN SARANA & PRASARANA
KEPOLISIAN
65 93 15 93
12
KONSULTAN PERENCANA
34
57
Ø 4'' dari kloset Balok 15/15 CV. PANDU CONSULTANT ENGINEERING
23
DIGAMBAR DIPERIKSA
Ø 4'' ke resapan
138
TUL Ø12 - 150
RIMITA NESZIA, ST. YOHANES MARIA D, ST.
94
94
Drafman Team Leader
15
15
15 50 15 93 15 93 15
DJOKO ANGGORO, SH.,MH.
AKBP NRP. 71010455
230
DISETUJUI
KABAG FASKON POLDA LAMPUNG
DISETUJUI
KUASA PENGGUNA ANGGARAN
( KPA )
2024
KEPOLISIAN NEGARA REPUBLIK INDONESIA
DAERAH LAMPUNG
KETERANGAN
KEGIATAN
PEKERJAAN
750
JASA KONSULTANSI PERENCANAAN
PEMBANGUNAN GEDUNG RPK
POLDA LAMPUNG
T.A 2024
DETAIL SEPTITANK 1 : 20
& RESAPAN
KONSULTAN PERENCANA
DIGAMBAR DIPERIKSA
DIPERIKSA
Pipa Ø 4'' dari
PEJABAT PEMBUAT KOMITMEN
Septictank ( PPK )
750
900
DJOKO ANGGORO, SH.,MH.
AKBP NRP. 71010455
Ø 4'' dari Septictank DISETUJUI
IJUK IJUK
KABAG FASKON POLDA LAMPUNG
KERIKIL KERIKIL
PAS. DINDING BATA PAS. DINDING BATA
AFANDI RAHARJO, SE.
AKBP NRP. 70050475
DISETUJUI
KUASA PENGGUNA ANGGARAN
( KPA )
2024
A B C D E F KEPOLISIAN NEGARA REPUBLIK INDONESIA
DAERAH LAMPUNG
KETERANGAN
1850
300 350 450 300 450
KEGIATAN
100
PENINGKATAN SARANA & PRASARANA
KEPOLISIAN
PEKERJAAN
400
JASA KONSULTANSI PERENCANAAN
PEMBANGUNAN GEDUNG RPK
Pipa PVC 1" POLDA LAMPUNG
Dari Sumur Bor T.A 2024
Ke Tandon Air
NAMA GAMBAR SKALA
1000
SUMUR BOR
250
1350
KONSULTAN PERENCANA
DIGAMBAR DIPERIKSA
350
RIMITA NESZIA, ST. YOHANES MARIA D, ST.
Drafman Team Leader
DIPERIKSA
Pipa PVC 1"
Dari Sumur Bor PEJABAT PEMBUAT KOMITMEN
( PPK )
Ke Tandon Air
250
DJOKO ANGGORO, SH.,MH.
AKBP NRP. 71010455
DISETUJUI
305
TITIK 500 150 460 300 200 250 KABAG FASKON POLDA LAMPUNG
Sumur Bor
DISETUJUI
250 KUASA PENGGUNA ANGGARAN
( KPA )
2024
A B C D E F KEPOLISIAN NEGARA REPUBLIK INDONESIA
DAERAH LAMPUNG
KETERANGAN
1850
300 350 450 300 450
KEGIATAN
100
PENINGKATAN SARANA & PRASARANA
KEPOLISIAN
Kran Air
Kran Air
PEKERJAAN
40
400
30 JASA KONSULTANSI PERENCANAAN
PEMBANGUNAN GEDUNG RPK
Pipa PVC 1"
POLDA LAMPUNG
T.A 2024
Pipa PVC 1" Pipa PVC 1"
1000
AIR BERSIH LT. 1
250
250
1350
KONSULTAN PERENCANA
DIGAMBAR DIPERIKSA
350
350
RIMITA NESZIA, ST. YOHANES MARIA D, ST.
Drafman Team Leader
DIPERIKSA
250
Kran Air
DISETUJUI
3,5 m 500 150 460 300 200 250 KABAG FASKON POLDA LAMPUNG
DISETUJUI
KUASA PENGGUNA ANGGARAN
( KPA )
2024
A B C D E F KEPOLISIAN NEGARA REPUBLIK INDONESIA
DAERAH LAMPUNG
KETERANGAN
1850
300 300 500 300 200 250
KEGIATAN
Kran Air
Kran Air
160
400
JASA KONSULTANSI PERENCANAAN
PEMBANGUNAN GEDUNG RPK
POLDA LAMPUNG
240
250
Pipa PVC 1"
KONSULTAN PERENCANA
DIGAMBAR DIPERIKSA
350
350
Pipa PVC 1"
4 DIPERIKSA
DISETUJUI
175 600 625 450 KABAG FASKON POLDA LAMPUNG
DISETUJUI
KUASA PENGGUNA ANGGARAN
( KPA )
2024
A B C D E F KEPOLISIAN NEGARA REPUBLIK INDONESIA
DAERAH LAMPUNG
KETERANGAN
1850
300 350 450 300 450
KEGIATAN
100
1 160
PENINGKATAN SARANA & PRASARANA
KEPOLISIAN
PEKERJAAN
400
JASA KONSULTANSI PERENCANAAN
PEMBANGUNAN GEDUNG RPK
POLDA LAMPUNG
240
T.A 2024
1000
LISTRIK LT. 1
250
250
1350
KONSULTAN PERENCANA
DIGAMBAR DIPERIKSA
350
350
RIMITA NESZIA, ST. YOHANES MARIA D, ST.
Drafman Team Leader
4 Z
DIPERIKSA
250
4' 3,5 m
DJOKO ANGGORO, SH.,MH.
AKBP NRP. 71010455
DISETUJUI
500 150 450 300 200 250 KABAG FASKON POLDA LAMPUNG
DENAH RENCANA INSTALASI LISTRIK LT. 1 8 LAMPU LED 7 WATT + FITING 5 BUAH
2024
KEPOLISIAN NEGARA REPUBLIK INDONESIA
DAERAH LAMPUNG
KETERANGAN
1850
300 300 500 300 200 250
KEGIATAN
400
JASA KONSULTANSI PERENCANAAN
PEMBANGUNAN GEDUNG RPK
POLDA LAMPUNG
240
T.A 2024
LISTRIK LT. 2
250
250
KONSULTAN PERENCANA
DIGAMBAR DIPERIKSA
350
350
RIMITA NESZIA, ST. YOHANES MARIA D, ST.
Drafman Team Leader
DIPERIKSA
DISETUJUI
175 600 625 450 KABAG FASKON POLDA LAMPUNG
1 Z MCB BOX -
AFANDI RAHARJO, SE.
2 SAKLAR SINGLE 8 BUAH
AKBP NRP. 70050475
3 SAKLAR TRIPLE 1 BUAH
DISETUJUI
4 SAKLAR DOUBLE 3 BUAH
KUASA PENGGUNA ANGGARAN
5 STOP KONTAK 22 BUAH ( KPA )
6 STOP KONTAK AC 9 BUAH
7 LG LAMPU GANTUNG -
2024
KEPOLISIAN NEGARA REPUBLIK INDONESIA
DAERAH LAMPUNG
1850 KETERANGAN
Pipa PVC 3" Ke Pipa PVC 3" Ke Pipa PVC 3" Ke Pipa PVC 3" Ke
Siring Bangunan Siring Bangunan Siring Bangunan Siring Bangunan
KEGIATAN
Aliran Air Hujan Dari Atap Aliran Air Hujan Dari Atap Aliran Air Hujan Dari Atap
Ke Talang Ke Talang Ke Talang DENAH RENCANA ALIRAN
Siring Air AIR HUJAN
KONSULTAN PERENCANA
DIGAMBAR DIPERIKSA
DIPERIKSA
250
DISETUJUI
KUASA PENGGUNA ANGGARAN
( KPA )
2024
KEPOLISIAN NEGARA REPUBLIK INDONESIA
1850 DAERAH LAMPUNG
Pipa PVC 3" Pipa PVC 3" Pipa PVC 3" Pipa PVC 3"
Dari Talang Siring Air Dari Talang Siring Air Dari Talang Siring Air Dari Talang
Bangunan Bangunan Bangunan
100
Siring Air
Bangunan
KEGIATAN
400
PENINGKATAN SARANA & PRASARANA
KEPOLISIAN
PEKERJAAN
1000
250
TIPE B
1350
1350
Siring Air
Bangunan
JASA KONSULTANSI PERENCANAAN
PEMBANGUNAN GEDUNG RPK
POLDA LAMPUNG
T.A 2024
350
NAMA GAMBAR SKALA
250
Bangunan
Drainase
RIMITA NESZIA, ST. YOHANES MARIA D, ST.
Drafman Team Leader
DIPERIKSA
DISETUJUI
KABAG FASKON POLDA LAMPUNG
Drainase
DISETUJUI
KUASA PENGGUNA ANGGARAN
Drainase/ Siring
Jalan Existing
( KPA )
2024
Siring air Hujan KEPOLISIAN NEGARA REPUBLIK INDONESIA
DAERAH LAMPUNG
70 70
Rabat Beton KETERANGAN
20 50
20
KEGIATAN
Elv.- 0.10 Elv.- 0.10
Pondasi Rolag PENINGKATAN SARANA & PRASARANA
Pondasi pagar
Bata Batu
70
KEPOLISIAN
existing
35
50
PEKERJAAN
50
Pondasi Rolag
Rolag Bata JASA KONSULTANSI PERENCANAAN
Bata Batu
5 5
PEMBANGUNAN GEDUNG RPK
12 28 POLDA LAMPUNG
Lap. Pasir T.A 2024
Lap. Pasir
NAMA GAMBAR SKALA
25 40 25
DETAIL DRAINASE 1 : 20
DETAIL RABAT & SIRING BELAKANG (TIPE B) DETAIL RABAT & SIRING SAMPING (TIPE B) KONSULTAN PERENCANA
Skala 1 : 20 Skala 1 : 20
CV. PANDU CONSULTANT ENGINEERING
DIGAMBAR DIPERIKSA
20 50 20
RIMITA NESZIA, ST. YOHANES MARIA D, ST.
Drafman Team Leader
Pelat Beton DIPERIKSA
t : 12 cm
Tanah Asli PEJABAT PEMBUAT KOMITMEN
10
Besi Tul. ( PPK )
Ø10-150
40
12
Elv.- 0.30 DJOKO ANGGORO, SH.,MH.
90
65
5 10
2024