Anda di halaman 1dari 4

2

200 KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT


(A) DIREKTORAT JENDERAL CIPTA KARYA
TABLE OF DIMENSION BALAI PRASARANA PERMUKIMAN WILAYAH SUMATERA SELATAN
SATUAN KERJA PELAKSANAAN PRASARANA PERMUKIMAN

170
CONVERSION SLAB W8-33
LENGHT (A) PROVINSI SUMATERA SELATAN

S13-150 PEKERJAAN :

940
100

600
PEMBANGUNAN JARINGAN IPAL KOTA PALEMBANG

200

200
PAKET B2 B
940 150

50
SUMBER DANA : APBN

170
1 200
RUBBER BUTYL TAHUN ANGGARAN : 2020-2021-2022
170 600 170
- ALL DIMENSIONS ARE IN SEALANT (25x5mm) RUBBER BUTYL
940 MILLIMETRES UNLESS SEALANT (75x5mm) LOKASI PROYEK : KOTA PALEMBANG
(ASTM C443) 200
OTHERWISE STATED (ASTM C443)
NO CATATAN / REVISI PARAF
DETAIL 2 R.1 For Construction

DETAIL 1 1 : 20
SPACER RING DETAIL
1 : 20 1 : 20
LEVEL 1 PLAN
TABLE MANHOLE 2000
1 : 40
LENGTH HEIGHT / UNIT
Spacer Ring DETAIL 4
940 Cover Ductile Cast Iron 940 2000 1 UNIT, 6.63 T
Max 400mm
730 170 600 170 730
170 600 170 1430 1500 1 UNIT, 4.97 T SHOP DRAWING
Level 1 Level 1
1000 1 UNIT, 3.32 T
DIBUAT

450
200

200
500 1 UNIT, 1.66 T
250

KONTRAKTOR
Level 2 Level 2 PT. WASKITA KARYA (Persero) Tbk

150 70
200 2000 200 Precast Conversion Slab DETAIL 1
LENGTH

LENGTH
200 2000 200 275
Precast Reinforced Ring
Yanuar Raditya
STEEL BAR Project Manager
DETAIL 3 WRAPPING
PLASTIC Ø22mm DIPERIKSA
Rubber Butyl Sealant DETAIL 2
KONSULTAN MANAJEMEN KONSTRUKSI
(ASTM C443) LIFTING POINT PT MOTT MACDONALD INDONESIA
LENGTH

LENGTH
SPHERICAL HEAD

Level 3 Level 3

PIPE Ø1000 (ID) Ronald Van De Kuilen


Team Leader
PIPE Ø450 (OD) PIPE Ø1000 (ID)
PIPE Ø280 (OD) Benching PIPE Ø450 (OD) DIPERIKSA

PIPE Ø225 (OD) Slope 1:8 PIPE Ø280 (OD) DIREKSI TEKNIS
PEMBANGUNAN JARINGAN IPAL KOTA PALEMBANG PAKET B2 B
Concrete K-225 PIPE Ø225 (OD) 200 2000 200 SATUAN KERJA PELAKSANAAN PRASARANA
PERMUKIMAN PROVINSI SUMATERA SELATAN
LENGTH

LENGTH

Grade to Suit Hydrophilic Hydrophilic 2400

Pipe Slope Waterstop Waterstop


LEVEL 2 PLAN
1 : 40
Victor, S.T.
Level 4 Level 4 NIP.199602202018021001
CEMENT TYPE V CEMENT TYPE V
Base Slab K-225 DETAIL 5 Keterangan :
DIKETAHUI

1. Semua Dimensi Berada Dalam Milimeter (mm) PPK SANITASI


SATUAN KERJA PELAKSANAAN PRASARANA
Base Slab K-225 2. Material Concrete : PERMUKIMAN PROVINSI SUMATERA SELATAN
- Cement Type V K-300 - fc'= 24.90 Mpa
Level 5 Level 5 - Cement Type V K-225 - fc'= 18.68 Mpa
- Cement Type I K-175 - fc'= 14.53 Mpa
3. Material Steel Bar :
LENGTH

LENGTH

CEMENT TYPE 1 CEMENT TYPE 1 -Grade BjTS 420B / fy = 420 Mpa Larap Kemayan Estu, S.T.
4. Tebal Selimut Beton = 40 mm. NIP.198610292009121001
Concrete Plug K-175 Concrete Plug K-175
NAMA GAMBAR SKALA

TYPICAL MANHOLE
AUGER DRILLING - 2000 1:20
SEC & REINFORCEMENT 1:40

DETAIL 6 NO. GAMBAR ACUAN GAMBAR

MANHOLE SECTION 1 MANHOLE REINFORCEMENT SECTION 2


WSKT/PU/B2B/SD-TM-02-001 370282-MMD-DR-0292
1 : 40 1 : 40
STEEL BAR
WRAPPING
PLASTIC Ø22mm
S13-150
W8-33 TABLE OF DIMENSION (mm)
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
LENGTH ( L ) (A) DIREKTORAT JENDERAL CIPTA KARYA

150 70
BALAI PRASARANA PERMUKIMAN WILAYAH SUMATERA SELATAN
SATUAN KERJA PELAKSANAAN PRASARANA PERMUKIMAN
1000 950
PROVINSI SUMATERA SELATAN
275
500 450
PEKERJAAN :
℄ ℄ PEMBANGUNAN JARINGAN IPAL KOTA PALEMBANG

50

50

250 125
PAKET B2 B
A1
SUMBER DANA : APBN

L/2
S13-150

LENGTH

LENGTH
TAHUN ANGGARAN : 2020-2021-2022

(A)

(A)
LIFTING POINT
SPHERICAL HEAD W8-33

125 250
LOKASI PROYEK : KOTA PALEMBANG

L/2
NO CATATAN / REVISI PARAF

50

50
200 2000 200 200 2000 200 R.1 For Construction
A 2400 2400

LEVEL 3 PLAN VIEW A SECTION A1


200 2000 200
1 : 40 1 : 40 1 : 40
2400

S19-150
S19-150 TABLE OF DIMENSION (mm)
SHOP DRAWING
ØS13-200 LENGTH ( L ) (A)
(D1 & D2)
DIBUAT
2000 1950
KONTRAKTOR
1500 1450 PT. WASKITA KARYA (Persero) Tbk

1000 950
℄ ℄
B1

50

50

250 125
Yanuar Raditya

L/2
S19-150 Project Manager
LIFTING POINT

LENGTH

LENGTH
SPHERICAL HEAD
DIPERIKSA

(A)

(A)
LIFTING POINT S13-200
SPHERICAL HEAD S19-150
650 650 KONSULTAN MANAJEMEN KONSTRUKSI

L/2
PT MOTT MACDONALD INDONESIA
S13-200

50

50
200 2000 200 200 2000 200
B 2400 2400
Ronald Van De Kuilen
LEVEL 4 PLAN VIEW B SECTION B1 Team Leader
200 2000 200 1 : 40 1 : 40 1 : 40 DIPERIKSA
Keterangan :
2400
1. Semua Dimensi Berada Dalam Milimeter (mm) DIREKSI TEKNIS
2. Material Concrete : PEMBANGUNAN JARINGAN IPAL KOTA PALEMBANG PAKET B2 B
TABLE OF DIMENSION (mm) SATUAN KERJA PELAKSANAAN PRASARANA
- Cement Type V K-300 - fc'= 24.90 Mpa PERMUKIMAN PROVINSI SUMATERA SELATAN
LENGTH ( L ) (A) - Cement Type V K-225 - fc'= 18.68 Mpa
- Cement Type I K-175 - fc'= 14.53 Mpa
2000 1522 3. Material Steel Bar :
PLATE 4x200mm
1500 1022 -Grade BjTS 420B / fy = 420 Mpa
4. Tebal Selimut Beton = 40 mm.
1000 522 Victor, S.T.
NIP.199602202018021001
ANCHOR 200 2000 200 200 2000 200
C1 REBAR 8x2S10
DIKETAHUI
℄ ℄
PPK SANITASI
50

50
SATUAN KERJA PELAKSANAAN PRASARANA
S19-150 PERMUKIMAN PROVINSI SUMATERA SELATAN
(A)

(A)
S19-150
LENGTH

LENGTH
S19-150
478

478
S19-150 Larap Kemayan Estu, S.T.
78

78
C NIP.198610292009121001
°

°
NAMA GAMBAR SKALA
100 2200 100 100 2200 100

200 2000 200 TYPICAL MANHOLE


LEVEL 5 PLAN AUGER DRILLING - 2000
VIEW C SECTION C1 1:40
2400 SEC & REINFORCEMENT
1 : 40
1 : 40 1 : 40

NO. GAMBAR ACUAN GAMBAR

WSKT/PU/B2B/SD-TM-02-002 370282-MMD-DR-0292
200

RUBBER BUTYL S16 TRIM BARS S16 CIRCULAR S16 TRIM BARS KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
SEALANT (ASTM DIREKTORAT JENDERAL CIPTA KARYA
C443) @75 AT T&B BARS AT T&B @75 AT T&B BALAI PRASARANA PERMUKIMAN WILAYAH SUMATERA SELATAN
A 220
S13-200
SATUAN KERJA PELAKSANAAN PRASARANA PERMUKIMAN
S13-200 PROVINSI SUMATERA SELATAN

125 125
S13 CIRCULAR S13-200
STEEL BAR S13 CIRCULAR PEKERJAAN :
WRAPPING BARS AT T&B BARS AT T&B PEMBANGUNAN JARINGAN IPAL KOTA PALEMBANG

275
PLASTIC Ø22mm PAKET B2 B

57
STEEL BAR
S16 TRIM BARS S13-200 S13-200
150
S13-200

250
@75 AT T&B SUMBER DANA : APBN
70 WRAPPING
PLASTIC Ø22mm
S16 CIRCULAR S16 TRIM BARS TAHUN ANGGARAN : 2020-2021-2022
220 70 150
275 BARS AT T&B @75 AT T&B
LOKASI PROYEK : KOTA PALEMBANG

NO CATATAN / REVISI PARAF

R.1 For Construction


DETAIL 3 SECTION A DETAIL 4 (CONVERSION SLAB)
1 : 20 1 : 20 1 : 30
DETAIL STEEL STEP

GROUTING

50 74
REBAR S13 (THIS REBAR SIKA GROUT

200

200
FACE TO BE PUT
CLOSER TO INNER FACE OF
K-500
SHOP DRAWING
RING CHAMBER) S13-200
650

650

600

600
(ADD REBAR D2)

1200
DIBUAT

S13-200 D1 KONTRAKTOR
PT. WASKITA KARYA (Persero) Tbk

450
ADDITIONAL REBAR S16-300 (ADD REBAR D1)

1976
FOR CONNECTING S16-300

2400

2400
WALL AND BASE SLAB 200
421 779 779 421
DETAIL 2 (BEFORE
CONNECTING WALL AND 74 50 76

1600

1600
Yanuar Raditya

900
BASESLAB) Project Manager
25
200 2000 200 5 °
13 DIPERIKSA

50 5
5 50
ADDITIONAL REBAR FOR
CONNECTING WALL AND KONSULTAN MANAJEMEN KONSTRUKSI

74 50 176
REGROUTING (AFTER REGROUTING (AFTER

25
D 50 PT MOTT MACDONALD INDONESIA

300
WALL CONNECTED BASE SLAB WALL CONNECTED RUBBER BUTYL
WITH BASE SLAB) WITH BASE SLAB) SEALANT 76 50 74
50 200 LIFTING (ASTM C443)
650 650 900 600 900
2400
HYDROPHILIC HYDROPHILIC Ronald Van De Kuilen
WATERPROOFING SEAL WATERPROOFING SEAL VIEW D Team Leader
S13-200 S13-200 TOP VIEW OF CONVERSION SLAB
S16-300 S16-300 1 : 40 DIPERIKSA
1 : 40
DETAIL 2 (AFTER LIFTING LIFTING
CONNECTING WALL AND DIREKSI TEKNIS
421 479 600 479 421 DETAIL JOINT PRECAST PEMBANGUNAN JARINGAN IPAL KOTA PALEMBANG PAKET B2 B
BASESLAB)
SATUAN KERJA PELAKSANAAN PRASARANA
1 : 10 PERMUKIMAN PROVINSI SUMATERA SELATAN
WELDING

200
DETAIL 5 (BASE SLAB) ANCHOR
PLATE REBAR

50
1 : 40 4x200mm 8x2S10
74 50 1076 1076 50 74
2400
40 25

SECTION D1 Victor, S.T.


NIP.199602202018021001
S19-150
200

1 : 40
135

S19-150 DIKETAHUI
PPK SANITASI
WELDING ANCHOR SATUAN KERJA PELAKSANAAN PRASARANA
REBAR 300 PERMUKIMAN PROVINSI SUMATERA SELATAN
WELDING
8x2S10
ANCHOR PLATE
40 25

REBAR 4x200mm
8x2S10
PLATE Larap Kemayan Estu, S.T.
WELDING
PLATE
135

NIP.198610292009121001
4x200mm
4x200mm NAMA GAMBAR SKALA
Keterangan :
75 4

4 75 1. Semua Dimensi Berada Dalam Milimeter (mm) TYPICAL MANHOLE 1:10


100 2. Material Concrete : AUGER DRILLING - 2000 1:20
SEC & REINFORCEMENT 1:30
- Cement Type V K-300 - fc'= 24.90 Mpa
300 1:40
- Cement Type V K-225 - fc'= 18.68 Mpa
- Cement Type I K-175 - fc'= 14.53 Mpa
DETAIL 6 (STEEL CUTTING EDGE) NO. GAMBAR ACUAN GAMBAR
3. Material Steel Bar :
ANCHOR
1 : 10 -Grade BjTS 420B / fy = 420 Mpa
REBAR
4. Tebal Selimut Beton = 40 mm. WSKT/PU/B2B/SD-TM-02-003 370282-MMD-DR-0292
8x2S10
Ø600 MH. OPENING KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL CIPTA KARYA
S16 TRIM BARS @75 S16 TRIM BARS @75 BALAI PRASARANA PERMUKIMAN WILAYAH SUMATERA SELATAN
TOP & BOTTOM TOP & BOTTOM SATUAN KERJA PELAKSANAAN PRASARANA PERMUKIMAN
PROVINSI SUMATERA SELATAN
S13 CIRCULAR BAR
TOP & BOTTOM PEKERJAAN :
PEMBANGUNAN JARINGAN IPAL KOTA PALEMBANG
Ø600 PAKET B2 B

SUMBER DANA : APBN


LIFTING LUGS
S13-200 TOP & BOTTOM

LOCATION 3 NOS TAHUN ANGGARAN : 2020-2021-2022

S16 TRIM BARS @75 LOKASI PROYEK : KOTA PALEMBANG


TOP & BOTTOM
NO CATATAN / REVISI PARAF
S16 TRIM BARS @75
TOP & BOTTOM R.1 For Construction

S13-200 TOP & BOTTOM


00
20
Ø

REINFORCEMENT OF CONVERSION SLAB


1 : 40 SHOP DRAWING
A6
A5 DIBUAT
KONTRAKTOR
PT. WASKITA KARYA (Persero) Tbk

A4
Yanuar Raditya
Project Manager
A3
DIPERIKSA
A1
KONSULTAN MANAJEMEN KONSTRUKSI
PT MOTT MACDONALD INDONESIA
A2 A2

Ronald Van De Kuilen


Team Leader

DIPERIKSA
REINFORCEMENT OF CONVERSION SLAB
DIREKSI TEKNIS
PEMBANGUNAN JARINGAN IPAL KOTA PALEMBANG PAKET B2 B
1 : 40 SATUAN KERJA PELAKSANAAN PRASARANA
PERMUKIMAN PROVINSI SUMATERA SELATAN
C8
C7

B1

B2
Victor, S.T.
B3 NIP.199602202018021001
B4
DIKETAHUI
B5
PPK SANITASI
B6 SATUAN KERJA PELAKSANAAN PRASARANA
PERMUKIMAN PROVINSI SUMATERA SELATAN
B7

B8

B9
C1

Larap Kemayan Estu, S.T.


B10 NIP.198610292009121001
B11 NAMA GAMBAR SKALA
C2

B12
C3

TYPICAL MANHOLE
AUGER DRILLING - 2000 1:40
C4

C5

C6

SEC & REINFORCEMENT

REINFORCEMENT OF CONVERSION SLAB


NO. GAMBAR ACUAN GAMBAR
1 : 40
WSKT/PU/B2B/SD-TM-02-004 370282-MMD-DR-0292

Anda mungkin juga menyukai