SHOP DRAWING

P A K E T

PENGADAAN DAN PEMASANGAN IPA LENGKAP


KAP 150 L/D TERMASUK UNIT AIR BAKU
DAN RESERVOAR 2400 M3
KOTA JABABEKA
A
OWNER

MUKA TANAH -0,15 250 500 250 MUKA TANAH


-0,30
WALL PIPE Ø300
250 500 250

200
-0,80
100
JABABEKA INFRASTRUKTUR

150
KONTRAKTOR

150
1000

800
1850

KETERANGAN

300
250

500 15000

PANDANGAN SAMPING
SKALA 1 : 30

KONTRAKTOR

250 5000 250 5000 250


MUKA TANAH -0,15 -0,15 MUKA TANAH
-0,30
0 0
30 30
Ø Ø
DIPERIKSA
500

500
500 500
120

120
2000

2000
2000 1000 2000 2000 1000 2000
DISETUJUI
700 700
200

200
PASIR BETON PASIR BETON

300
300 KERIKIL JAGUNG KERIKIL JAGUNG 300
250

250
KERIKIL 2 - 3 CM KERIKIL 2 - 3 CM

500 NO TGL REVISI DIP. DIST.

250 500 250 250 500 250


1000 1000
JUDUL GAMBAR

POTONGAN A-A POTONGAN SDB


SKALA 1 : 30
A3
1 : 100

No. Gambar : TB-IT-150-07.