Anda di halaman 1dari 5

Nama Proyek :

PEMBANGUNAN JALAN TOL


PASURUAN - PROBOLINGGO
STA. 31+300 - STA. 43+756
RUANG MILIK JALAN Status Gambar :
552 2023 150 1170 80 1170 150 1767 487
PENAMBAHAN
LAHAN
300
BAHU
2@360=720 150 150
JALUR LALU LINTAS MEDIAN
2@360=720
JALUR LALU LINTAS
300
BAHU
PENAMBAHAN
LAHAN
SHOP DRAWING
LUAR BAHU BAHU LUAR
( 2 JALUR ) DALAM DALAM ( 2 JALUR )
℄ Judul Gambar
Rounding
28 Common Borrow POTONGAN MELINTANG
Material
26 2 Rigid Pavement T=30cm
2 STA 37+450 - STA 37+475
200 1 1
200
24

500
Lean Concrete T=10cm ROW

500
DS-8A ROW
Drainage Layer T=15cm DS-8A
22 ROW ROW +10% +10% Timbunan
Timbunan DS-1
20 DS-1 Acuan Gambar No : Tanggal

Datum: 16.000 18 ELEVASI = 18.275


ELEVASI = 18.957 Legenda :

16

26.453

19.094
26.687

26.023

20.873
26.551
26.921
-33.329 17.826

-25.900 21.541
-23.900 21.401

21.013
ELEVASI DESAIN Pemilik Proyek :

-13.600
-12.100

23.900
25.900

29.738
13.600
12.100
0.000
JARAK DARI CL PT. TRANS-JAWA PASPRO JALAN TOL
Diketahui Oleh :

-39.729 17.532

-32.520 17.755

18.358

18.659

18.779

19.247
19.287
19.088

18.836
-38.082 17.631

17.813

19.118
ELEVASI TANAH ASLI

-27.381

18.058 -17.078

43.267
36.083
37.583
38.972
12.095

31.210
0.000
Ir. WACHYUDI PRATOMO
JARAK DARI CL Pimpinan Proyek
Konsultan :

18.794
-33.329 17.526

18.359

18.479
17.513
ELEVASI CLEARING

-27.381

-17.078

29.738
12.095
0.000
Diperiksa dan Disetujui Oleh :
JARAK DARI CL

Potongan Melintang - STA 37+450 Ir. SLAMET ADI


Resident Engineer
Geodetic Highway Structure Quantity Drainage ME
Engineer. Engineer. Engineer. Engineer. Engineer. Engineer.

Kontraktor Pelaksana :

PT. WASKITA KARYA (Persero). Tbk


INFRA II DIVISION

RUANG MILIK JALAN Dibuat dan Diajukan Oleh :


595 2047 150 1170 80 1170 150 1780 480
PENAMBAHAN 300 2@360=720 150 150 2@360=720 300 PENAMBAHAN
LAHAN BAHU MEDIAN BAHU LAHAN
JALUR LALU LINTAS BAHU BAHU JALUR LALU LINTAS
LUAR ( 2 JALUR ) ( 2 JALUR ) LUAR
DALAM DALAM

Rounding ℄
28 Common Borrow
ANDESIT KRISNA ADITYA, ST, MT.
Material Project Manager
26 200
2 Rigid Pavement T=30cm 2
1 DRAFTER
HEAD OF
1 200
QUANTITY SURVEYOR
ENGINEERING
500

Lean Concrete T=10cm


24

500
DS-8A Drainage Layer T=15cm DS-8A ROW ROW
ROW
22 ROW +10% +10% Galian
Timbunan
DS-1 DS-1
20
Datum: 16.000 18 ELEVASI = 18.522 ELEVASI = 18.991
Kronologis Gambar
16 Revisi Tanggal Uraian Paraf
18.962 -13.600 26.793

26.929

26.695
26.265
-23.900 21.643
-32.863 18.002 -33.568 18.294 -32.863 18.302

-25.900 21.783

27.163

21.255

19.230
21.115
ELEVASI DESAIN
-12.100

23.900
25.900

29.950
13.600
12.100
0.000

JARAK DARI CL Distribusi Kepada : Status Dok Tanggal

19.244
18.466

18.849
-38.978 17.975

18.905
-41.125 17.814

18.941
18.961

18.751

19.221
19.231
ELEVASI TANAH ASLI
Catatan
-16.334
-17.128

-15.517

47.284
44.114
17.486

40.013
15.907

38.199
0.000

-Data Eksisting menggunakan data OGL Trimble


JARAK DARI CL
18.549

18.943
18.662

18.930
18.451
18.661
18.166

ELEVASI CLEARING
-16.334
-17.128

-15.517

29.950
15.907
17.419
0.000

JARAK DARI CL

Potongan Melintang - STA 37+475


Skala No Gambar Lembar Ke Jumlah Lbr

124
1:250 INF2/PS4/H01-124
Tgl: 14.07.2021
Nama Proyek :
PEMBANGUNAN JALAN TOL
PASURUAN - PROBOLINGGO
STA. 31+300 - STA. 43+756
RUANG MILIK JALAN Status Gambar :
645 2073 150 1170 80 1170 150 1813 443
PENAMBAHAN 300 2@360=720 150 150 2@360=720 300 PENAMBAHAN SHOP DRAWING
32 LAHAN
BAHU
LUAR
JALUR LALU LINTAS MEDIAN
BAHU BAHU JALUR LALU LINTAS BAHU
LUAR
LAHAN
( 2 JALUR ) DALAM DALAM ( 2 JALUR )
30 Judul Gambar
Rounding

POTONGAN MELINTANG
28 Common Borrow
Material STA 37+500 - STA 37+525
26 2 Rigid Pavement T=30cm 2
200 1 1
200

500
Lean Concrete T=10cm
24

500
DS-8A Drainage Layer T=15cm DS-8A ROW ROW
ROW
ROW +10% +10%
22 Galian
DS-1 DS-1 Acuan Gambar No : Tanggal
20
Legenda :
Datum: 16.000 18 ELEVASI = 18.769
ELEVASI = 19.024

16

26.473
26.903
27.001
27.371
-32.824 18.529

27.137

21.323
21.463
-25.644 18.472 -25.644 18.772 -25.900 21.991
-23.919 18.516 -23.919 18.816 -23.900 21.851

19.123
ELEVASI DESAIN Pemilik Proyek :

-13.600
-12.100

23.900
25.900

30.580
13.600
12.100
0.000
JARAK DARI CL PT. TRANS-JAWA PASPRO JALAN TOL
Diketahui Oleh :

-11.442 18.524 -11.442 18.824

18.974
-43.058 17.977

-35.310 18.235

-30.849 18.463 -30.849 18.763

-9.532 18.923 -9.532 19.223

18.870

19.053

19.086

18.996
19.174
19.146

19.131
ELEVASI TANAH ASLI

44.806
42.896

46.759
41.294
38.503
Ir. WACHYUDI PRATOMO

13.639

31.073
0.000
JARAK DARI CL Pimpinan Proyek
Konsultan :

18.846
-32.824 18.229

18.570

18.725

18.823
ELEVASI CLEARING
Diperiksa dan Disetujui Oleh :

23.988

30.580
13.639
0.000
JARAK DARI CL

Potongan Melintang - STA 37+500 Ir. SLAMET ADI


Resident Engineer
Geodetic Highway Structure Quantity Drainage ME
Engineer. Engineer. Engineer. Engineer. Engineer. Engineer.

Kontraktor Pelaksana :

PT. WASKITA KARYA (Persero). Tbk


INFRA II DIVISION
Dibuat dan Diajukan Oleh :

RUANG MILIK JALAN


592 2120 150 1170 80 1170 150 1903 357
PENAMBAHAN 300 2@360=720 150 150 2@360=720 300 PENAMBAHAN
32 LAHAN
BAHU
LUAR
JALUR LALU LINTAS
( 2 JALUR )
MEDIAN
BAHU BAHU JALUR LALU LINTAS
( 2 JALUR )
BAHU
LUAR
LAHAN
ANDESIT KRISNA ADITYA, ST, MT.
DALAM DALAM
30 Rounding
℄ Project Manager
HEAD OF
28 Common Borrow
Material
DRAFTER QUANTITY SURVEYOR
ENGINEERING
26 2 Rigid Pavement T=30cm 2
200 1 1
200
500

Lean Concrete T=10cm

500
24 DS-8A Drainage Layer T=15cm DS-8A ROW ROW
ROW
ROW +10% +10%
22 Timbunan

20 DS-1 DS-1 Kronologis Gambar

Datum: 16.000 18 ELEVASI = 18.274 ELEVASI = 18.573 Revisi Tanggal Uraian Paraf

16
-12.100 27.545

26.647
-23.900 22.025

27.077
18.539

-25.900 22.165

27.175

21.497
21.637

19.058
27.311

ELEVASI DESAIN
Distribusi Kepada : Status Dok Tanggal
-13.600
-33.152

23.900
25.900
13.600

31.059
12.100
0.000

JARAK DARI CL
-31.866 18.584

-17.721 18.864

18.994
18.800

18.862

18.990

19.423

19.066
19.086
19.052
-45.150 18.140

18.961

ELEVASI TANAH ASLI 19.010 Catatan

-Data Eksisting menggunakan data OGL Trimble


-10.975
-21.938 18.500 -21.938

44.623
43.098

46.080
28.362
29.986

37.203
15.180
0.000

JARAK DARI CL
18.564

18.694
-33.152 18.239
-31.477 18.293

18.562

18.690

18.758
18.661

18.710

ELEVASI CLEARING
-10.975
-17.721

28.362
29.970
31.059
15.180
0.000

JARAK DARI CL

Skala No Gambar Lembar Ke Jumlah Lbr


Potongan Melintang - STA 37+525
125
1:250 INF2/PS4/H01-125
Tgl: 14.07.2021
Nama Proyek :
PEMBANGUNAN JALAN TOL
PASURUAN - PROBOLINGGO
STA. 31+300 - STA. 43+756
RUANG MILIK JALAN Status Gambar :
539 2184 150 1170 80 1170 150 1998 259

32
PENAMBAHAN
LAHAN BAHU
300 2@360=720 150 150
JALUR LALU LINTAS
2@360=720
MEDIAN
BAHU BAHU JALUR LALU LINTAS
300
BAHU
PENAMBAHAN
LAHAN
SHOP DRAWING
LUAR ( 2 JALUR ) ( 2 JALUR ) LUAR
DALAM DALAM
30 ℄ Judul Gambar
Rounding
28 Common Borrow POTONGAN MELINTANG
Material
2 2 STA 37+550 - STA 37+575
26 200 1
Rigid Pavement T=30cm 1
200

500
Lean Concrete T=10cm

500
24 DS-8A Drainage Layer T=15cm DS-8A ROW ROW
ROW
ROW +10% +10%
22 Galian
Acuan Gambar No : Tanggal
20 DS-1 DS-1
Legenda :
Datum: 16.000 18 ELEVASI = 18.046 ELEVASI = 18.339
16

-25.900 22.305

-12.100 27.685

26.787
-33.104 18.704

27.451

19.048
-23.900 22.165

18.786 -13.600 27.315

27.217

21.637
21.777
ELEVASI DESAIN Pemilik Proyek :

23.900
25.900
13.600

31.358
12.100
0.000
JARAK DARI CL PT. TRANS-JAWA PASPRO JALAN TOL
Diketahui Oleh :

-46.174 18.344

-35.641 18.694
-47.403 18.303

-37.338 18.655

19.036

18.983
18.999

19.071
19.015

19.149
19.115
ELEVASI TANAH ASLI

-12.991

43.478
19.004

45.610
Ir. WACHYUDI PRATOMO

16.921

37.115
0.000
2.557
JARAK DARI CL Pimpinan Proyek
Konsultan :

-33.104 18.404

18.486

18.748
18.736

18.683
18.699
18.410

18.715
ELEVASI CLEARING

-31.402

-12.991
Diperiksa dan Disetujui Oleh :

19.004

31.358
16.921
0.000
2.557
JARAK DARI CL

Potongan Melintang - STA 37+550 Ir. SLAMET ADI


Resident Engineer
Geodetic Highway Structure Quantity Drainage ME
Engineer. Engineer. Engineer. Engineer. Engineer. Engineer.

Kontraktor Pelaksana :

PT. WASKITA KARYA (Persero). Tbk


INFRA II DIVISION
Dibuat dan Diajukan Oleh :

RUANG MILIK JALAN


486 2263 150 1170 80 1170 150 2069 190
PENAMBAHAN 300 2@360=720 150 150 2@360=720 300 PENAMBAHAN
LAHAN MEDIAN LAHAN
32 BAHU
LUAR
JALUR LALU LINTAS
( 2 JALUR )
BAHU BAHU
DALAM DALAM
JALUR LALU LINTAS
( 2 JALUR )
BAHU
LUAR ANDESIT KRISNA ADITYA, ST, MT.
30 Rounding
℄ Project Manager
Common Borrow HEAD OF
28 Material
DRAFTER QUANTITY SURVEYOR
ENGINEERING
2
ROW = -31.071

26 200
2 Rigid Pavement T=30cm 1
1 200
500

Lean Concrete T=10cm

500
DS-8A DS-8A
24 ROW ROW
+10%
Drainage Layer T=15cm ROW ROW
+10%
22 Galian
20 DS-1 Kronologis Gambar
DS-1
Datum: 16.000 18 ELEVASI = 17.898 ELEVASI = 18.188
Revisi Tanggal Uraian Paraf

16

27.324
26.894
-13.986 18.542 -13.986 18.842 -13.600 27.422

21.744
-23.900 22.272

-12.100 27.792

27.558

21.884
-25.900 22.412
-33.124 18.800

19.088
ELEVASI DESAIN
Distribusi Kepada : Status Dok Tanggal

23.900
25.900
13.600

31.491
12.100
0.000

JARAK DARI CL
-47.158 18.546

19.247
-46.484 18.573

-39.700 18.787

18.535 -15.282 18.835

18.938
18.886
19.061

19.105

19.165
19.193
19.116
ELEVASI TANAH ASLI Catatan

-Data Eksisting menggunakan data OGL Trimble

45.545
42.823
33.605
35.610

40.116
0.000

7.022
4.935

JARAK DARI CL
-33.124 18.500

18.638
18.586

18.788
18.761

ELEVASI CLEARING
-15.282

31.491
0.000

7.022
4.935

JARAK DARI CL

Skala No Gambar Lembar Ke Jumlah Lbr


Potongan Melintang - STA 37+575
126
1:250 INF2/PS4/H01-126
Tgl: 14.07.2021
Nama Proyek :
PEMBANGUNAN JALAN TOL
PASURUAN - PROBOLINGGO
STA. 31+300 - STA. 43+756
RUANG MILIK JALAN
427 2341 150 1170 80 1170 150 2097 162 Status Gambar :
PENAMBAHAN 300 2@360=720 150 150 2@360=720 300 PENAMBAHAN

32
LAHAN
BAHU
LUAR
JALUR LALU LINTAS
( 2 JALUR )
MEDIAN
BAHU BAHU
DALAM DALAM
JALUR LALU LINTAS
( 2 JALUR )
BAHU
LUAR
LAHAN
SHOP DRAWING
30 Rounding

Judul Gambar
Common Borrow
28 Material POTONGAN MELINTANG
2 2
26 200 1
Rigid Pavement T=30cm 1
200 STA 37+600 - STA 37+625

500
Lean Concrete T=10cm

500
DS-8A DS-8A
24 ROW ROW
+10%
Drainage Layer T=15cm ROW ROW
+10%
22 Galian Galian
20 DS-1 DS-1 Acuan Gambar No : Tanggal
Datum: 16.000 18 ELEVASI = 17.869 ELEVASI = 18.159 Legenda :
16

-25.900 22.484
-23.900 22.344

-13.600 27.494
-12.100 27.864

27.630

27.396
26.966
-33.126 18.570 -32.385 18.873 -33.126 18.870

21.956
21.816

19.176
ELEVASI DESAIN Pemilik Proyek :

23.900
25.900

31.458
13.600
12.100
0.000
JARAK DARI CL PT. TRANS-JAWA PASPRO JALAN TOL
Diketahui Oleh :

-44.975 18.663

-40.165 18.853
-38.599 18.853

-11.158 18.753 -11.158 19.053


-10.040 18.763 -10.040 19.063

19.006

18.972
18.992

19.270
19.164
19.201
19.017

19.185
ELEVASI TANAH ASLI

33.846

45.325
12.459

41.925
38.618
11.515
0.000
2.593
Ir. WACHYUDI PRATOMO
JARAK DARI CL Pimpinan Proyek
Konsultan :

-31.627 18.579

18.706

18.672
18.692

18.876
18.717
ELEVASI CLEARING

12.459

31.458
11.515
0.000
2.593
Diperiksa dan Disetujui Oleh :
JARAK DARI CL

Potongan Melintang - STA 37+600


Ir. SLAMET ADI
Resident Engineer
Geodetic Highway Structure Quantity Drainage ME
Engineer. Engineer. Engineer. Engineer. Engineer. Engineer.

Kontraktor Pelaksana :

PT. WASKITA KARYA (Persero). Tbk


INFRA II DIVISION
Dibuat dan Diajukan Oleh :

RUANG MILIK JALAN


380 2390 150 1170 80 1170 150 2056 202
PENAMBAHAN 300 2@360=720 150 150 2@360=720 300 PENAMBAHAN
LAHAN MEDIAN LAHAN
32 BAHU
LUAR
JALUR LALU LINTAS
( 2 JALUR )
BAHU BAHU
DALAM DALAM
JALUR LALU LINTAS
( 2 JALUR )
BAHU
LUAR ANDESIT KRISNA ADITYA, ST, MT.
30 Rounding
℄ Project Manager
Common Borrow HEAD OF
28 Material
DRAFTER QUANTITY SURVEYOR
ENGINEERING
2 2
26 200 1
Rigid Pavement T=30cm 1
200
500

Lean Concrete T=10cm

500
DS-8A DS-8A
24 +10%
Drainage Layer T=15cm ROW ROW
+10%
22 Galian
Galian
DS-6a Kronologis Gambar
20 DS-1
Datum: 16.000 18 ELEVASI = 17.839 ELEVASI = 18.129
Revisi Tanggal Uraian Paraf

16

27.433

19.404
27.667

27.003
-25.900 22.521
-23.900 22.381

-14.049 18.633 -14.049 18.933 -13.600 27.531


27.901

21.853
21.993
-32.684 19.129

ELEVASI DESAIN
Distribusi Kepada : Status Dok Tanggal
-12.100

23.900
25.900
13.600

31.078
12.100
0.000

JARAK DARI CL
19.064

19.043

19.453
19.347

19.347
-42.623 18.792

-17.996 18.795 -17.996 19.095

19.059
19.066

19.056

19.326
18.751

-40.389 19.219
-36.205 19.138

19.169
Catatan
ELEVASI TANAH ASLI
-Data Eksisting menggunakan data OGL Trimble
-43.351

33.694

40.307
42.936
44.951
36.703
-0.719

10.930
12.164
0.000
0.705

JARAK DARI CL
18.764

18.743
-32.684 18.829

18.759
18.766

18.756

19.104
ELEVASI CLEARING
-0.719

10.930

31.078
12.164
0.000
0.705

JARAK DARI CL
Skala No Gambar Lembar Ke Jumlah Lbr
Potongan Melintang - STA 37+625
127
1:250 INF2/PS4/H01-127
Tgl: 14.07.2021
Nama Proyek :
PEMBANGUNAN JALAN TOL
PASURUAN - PROBOLINGGO
STA. 31+300 - STA. 43+756
RUANG MILIK JALAN
291 2443 150 1170 80 1170 150 2020 231 Status Gambar :
PENAMBAHAN 300 2@360=720 150 150 2@360=720 300 PENAMBAHAN

32
LAHAN
BAHU
LUAR
JALUR LALU LINTAS
( 2 JALUR )
MEDIAN
BAHU BAHU
DALAM DALAM
JALUR LALU LINTAS
( 2 JALUR )
BAHU
LUAR
LAHAN
SHOP DRAWING
30 Rounding

Judul Gambar
Common Borrow
28 Material POTONGAN MELINTANG
2 Rigid Pavement T=30cm
2
26 200 1 1
200 STA 37+650 - STA 37+675

500
Lean Concrete T=10cm

500
DS-8A DS-8A
24 ROW ROW
+10%
Drainage Layer T=15cm ROW ROW
+10%
22 Galian Galian
20 DS-6a DS-6a Tanggal
Acuan Gambar No :
Datum: 16.000 18 ELEVASI = 17.810 ELEVASI = 18.100 Legenda :
16

27.437
-25.900 22.525
-24.516 18.697 -24.516 18.997 -23.900 22.385

-13.406 18.786 -13.406 19.086 -13.600 27.535


-12.100 27.905

27.007

19.409
27.671
-32.478 18.936 -32.865 19.248 -32.478 19.236

21.857
21.997
ELEVASI DESAIN Pemilik Proyek :

23.900
25.900
13.600

31.077
12.100
0.000
JARAK DARI CL PT. TRANS-JAWA PASPRO JALAN TOL
Diketahui Oleh :

19.424
-43.038 18.754

19.436
-39.479 18.953

19.413
19.197
19.199

19.215

19.197
ELEVASI TANAH ASLI

44.423
40.802
43.357
33.676
12.417
0.000
1.571
Ir. WACHYUDI PRATOMO
JARAK DARI CL Pimpinan Proyek
Konsultan :

-29.393 18.844

18.946
18.897
18.899

18.915

19.109
ELEVASI CLEARING

15.706

31.077
12.417
0.000
1.571
Diperiksa dan Disetujui Oleh :
JARAK DARI CL

Potongan Melintang - STA 37+650


Ir. SLAMET ADI
Resident Engineer
Geodetic Highway Structure Quantity Drainage ME
Engineer. Engineer. Engineer. Engineer. Engineer. Engineer.

Kontraktor Pelaksana :

PT. WASKITA KARYA (Persero). Tbk


INFRA II DIVISION
Dibuat dan Diajukan Oleh :

RUANG MILIK JALAN


206 2508 150 1170 80 1170 150 1977 273
PENAMBAHAN 300 2@360=720 150 150 2@360=720 300 PENAMBAHAN
LAHAN LAHAN
32 BAHU JALUR LALU LINTAS MEDIAN
BAHU BAHU JALUR LALU LINTAS BAHU ANDESIT KRISNA ADITYA, ST, MT.
LUAR ( 2 JALUR ) ( 2 JALUR ) LUAR
DALAM DALAM Project Manager
30 Rounding ℄
HEAD OF
DRAFTER QUANTITY SURVEYOR
Common Borrow ENGINEERING
28 Material
2 2
26 200 1
Rigid Pavement T=30cm 1
200
500

Lean Concrete T=10cm

500
DS-8A DS-8A
24 ROW ROW
+10%
Drainage Layer T=15cm ROW ROW
+10%
22 Galian Galian Kronologis Gambar
20 DS-6a
DS-6a Revisi Tanggal Uraian Paraf

Datum: 16.000 18
ELEVASI = 17.777 ELEVASI = 18.066
16
-26.093 18.570 -26.093 18.870 -25.900 22.495

27.407
-23.644 18.601 -23.644 18.901 -23.900 22.355

-13.600 27.505
-12.100 27.875

26.977
27.641

21.827
21.967

19.541
-32.647 18.822 -32.488 19.122 -32.647 19.122

ELEVASI DESAIN
Distribusi Kepada : Status Dok Tanggal

23.900
25.900

30.752
13.600
12.100
0.000

JARAK DARI CL
-42.882 18.757

-32.127 18.804 -29.809 18.992

19.253

19.288

19.268

19.562

19.533
19.502
19.471
19.513

19.512
-36.499 19.114

Catatan
ELEVASI TANAH ASLI -Data Eksisting menggunakan data OGL Trimble
-16.051

34.562

43.739
17.234

42.163
25.271
18.917
0.000

3.831

JARAK DARI CL
-29.518 18.682

18.953

18.988

18.968

19.241
19.213

19.212
19.171

ELEVASI CLEARING
-16.051

30.752
17.234

25.271
18.917
0.000

3.831

JARAK DARI CL
Skala No Gambar Lembar Ke Jumlah Lbr

Potongan Melintang - STA 37+675 128


1:250 INF2/PS4/H01-128
Tgl: 14.07.2021

Anda mungkin juga menyukai