Anda di halaman 1dari 1

POT. MELINTANG P.

0+250

34.00

33.00
Pipa Existing
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
P. 0+300 DIREKTORAT JENDERAL SUMBER DAYA AIR
32.00 PUSAT PENGENDALIAN LUMPUR SIDOARJO
2.394 SNVT PENGENDALIAN LUMPUR SIDOARJO
JL. GAYUNG KEBONSARI NO. 26-28, SURABAYA - 60235 TELP. (031) 8299665 FAX. (031) 8290997

0.550
31.00 Tanah

1.000

0.936
0.450
30.00 1.500

SHOP DRAWING
BIDANG PERSAMAAN 29.00
REFERENCE LEVEL PEKERJAAN:
+28.00 M

30.222

30.540

30.563

30.453
29.993

29.938

31.063

31.281

31.546

32.239
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL PENINGKATAN KAPASITAS
DRAINASE KE KALI PORONG
JARAK/ DISTANCE 11.510 2.716 1.527 2.767 3.321 4.031 2.055

POT. MELINTANG P.0+300 KONTRAKTOR PELAKSANA :

KONSULTAN SUPERVISI :
34.00

33.00
CV. JATI UTAMA
Pipa Existing
32.00 P. 0+350
1.549

31.00 DIBUAT:

0.550
Tanah

1.000

0.936
CV. JAYA ABADI

0.450
30.00 1.500

BIDANG PERSAMAAN 29.00


REFERENCE LEVEL
ANDY HERU KURNIAWAN, A.Md
+28.00 M
DIREKTUR
30.381

30.441

30.441

30.441

30.441
30.441

30.441

30.441

31.118

31.238

32.008
ELEVASI TANAH ASLI DIPERIKSA:
ORIGINAL GROUND LEVEL
CV. JATI UTAMA
JARAK/ DISTANCE 7.707 1.831 5.857 5.857 5.857 3.552 2.784 5.857

POT. MELINTANG P.0+350 DAFID IRAWAN


TEAM LEADER

MENYETUJUI:

DIREKSI PEKERJAAN

LUKMAN HARIYANTO ST., MT.


34.00 NIP. 19850620 201012 1 004

MENGETAHUI:
33.00
PPK OPERASI DAN PEMELIHARAAN DAN PENGALIRAN
Pipa Existing LUMPUR
32.00
P. 0+400
2.101

31.00
0.550

Tanah
ARIF FIRMANTO, S. ST., MT.
1.000

0.936
NIP. 19880203 201012 1 002
0.450

30.00 1.500

JUDUL GAMBAR:

BIDANG PERSAMAAN 29.00


POTONGAN MELINTANG P.0+300 - P. 0+400
REFERENCE LEVEL
+28.00 M
30.552

30.581

30.385

30.175

30.201

31.257

31.242

31.171

31.797
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL

DIGAMBAR: SKALA:
JARAK/ DISTANCE 4.682 8.500 4.750 1.294 1.171 2.034 3.784 2.090

SAIFUL ANWAR
POT. MELINTANG P.0+400 TANGGAL: NO. REVISI:

0 1 2 3 4 5 0 1 2 3 4 5
NO. PROYEK: NO. GAMBAR:
Skala Vertikal 1:10 Skala Horisontal 1:10

Anda mungkin juga menyukai