GAMBAR BANGUNAN
BALKON RUANG LOBY KAMAR 1 KAMAR 2 KAMAR 3 KAMAR 4 KAMAR 5 KAMAR 6 KAMAR 7 KAMAR 8 KAMAR 9 KAMAR 10 KAMAR 11
+ 3.50 + 3.50 + 3.50 + 3.50 + 3.50 + 3.50 + 3.50 + 3.50 + 3.50 + 3.50 + 3.50 + 3.50
+ 345
Balok 30/50 Balok 30/50 Balok 30/50 Balok 30/50 Balok 30/50 Balok 30/50 Balok 30/50 Balok 30/50 Balok 30/50 Balok 30/50 Balok 30/50 Balok 30/50 Balok 30/50 + 3.10
0.50
Slab Tebal 12 cm
Bordes tangga
+ 1.75
TGL DISAHKAN
3.00
KEPALA DPUPR KOTA PEKALONGAN
MUSHOLA
RESTO + 0.20 GUDANG
AREA PARKIR + 0.10
+ 0.05 + 0.00
HALAMAN SLOF 20/30 SLOF 20/30 SLOF 20/30 SLOF 20/30 SLOF 20/30 SLOF 20/30 SLOF 20/30 SLOF 20/30 SLOF 20/30 SLOF 20/30 SLOF 20/30 SLOF 20/30
TROTOAR
- 0.50
- 0.35
0.55
2.00
N M L J H F D B TGL DISETUJUI
KEPALA BIDANG PENATAAN RUANG,
JASA KONSTRUKSI DAN PERTANAHAN
POTONGAN 2-2
Skala 1 : 200
TGL DIPERIKSA
KEPALA SEKSI BANGUNAN GEDUNG
DAN JASA KONSTRUKSI
SIGIT DARMOYO, ST
NIP. 19751024 201001 1 008
TGL PEMOHON
MUHAMMAD HASSAN
KETERANGAN
: BANGUNAN BARU
: BANGUNAN DIREHAB
: BATAS TANAH
: TITIK LETAK BANGUNAN
: MASUK GSB/GSS