Anda di halaman 1dari 1

DESIGNER

T B

H G F E D C B A

1650
650 1000
400 200 400
GSB
488 162 100 100 200 100 100 100 100 200 PROJECT
1
SHOWER
IPAL

85 115
- 0.08
RUMAH 2 LANTAI

200
DAPUR
300

BIOTANK R. TIDUR UTAMA R. TIDUR ANAK TOILET ± 0.00


+ 0.08 + 0.08 - 0.08

2
LOCATION
500

100
R. MAKAN + TV

300
PAVILIUN KEL. UZTAD
750

CAPORT - PAVING ± 0.00


+ 0.08

200
- 0.15
300

TAMAN BATU
- 0.10

KANTOR 3 OWNER
1100

1100
750
100
+ 0.08
NK
250

250
SELASAR AREA DUDUK
150

150
- 0.05 ± 0.00

GSB 4
100

100
TAMAN BATU KORAL TAMAN SRAH
- 0.15 HIDROPONIK AREA
- 0.45.
CATATAN

350
350

250

250
KOLAM IKAN
- 0.

BATAS TANAH 5
( SALURAN GOT ) DINDING PAGAR

( PONDASI TURAP BATU KALI )


362 800
( PIPA AIR KOTOR + PENUTUP KAWAT )

DRAWING TITLE

Skala 1:100
NUMBER SHEET
OF SHEETS NUMBER
DENAH LANTAI 1(Elv 0.00)
1 : 100 SKALA
..

Anda mungkin juga menyukai