Anda di halaman 1dari 17

1500

AREA TENDANGAN SUDUT

00
10
5
10

10
0
AREA TENDANGAN SUDUT
SKALA 1 : 100

7320
75
2440

2440

GAWANG : JALA 10X10 CM


C

D
A A

B B

SITUASI AREA LAPANGAN BOLA


SALATIGA
KANT
O R PE
NGE
LO LA
T
STAR
+ 0.650
+ 0.700

A 280
650
280

R
0

O TO
+ 1.000 Paga
+ 1.000 r GI
dan

M
+ 0.950 BRC

PEDA
IR SE
PARK
+ 1.000
+ 0.650 + 1.000

+ 1.000

+ 0.700

LAPA UK AREA
+ 1.100
+ 1.100

N
NGA
S
N MA

N
+ 1.000

LATA

T
JALA

CEPA
N SE
+ 1.000

LARI
M)
TRIB

( 100
ASAN
+ 1.100

LINT
PINT
U MA

B + 0.9
50
SUK
+ 1.000 B
+ 1.000
+ 0.650 + 1.000
NA
ELAT

+ 0.950 + 1.100
UN S

+ 1.100
TRIB

+ 1.100
+ 0.700
+ 1.000
+ 1.100
+ 1.000
+ 1.100
R
OTO

+ 0.650 + 1.000
DA M

+ 1.000
SEPE

+ 1.000
+ 1.100
+ 0.700
IR
PARK

+ 0.950
+ 1.000

+ 1.000
+ 1.000

+ 1.050
+ 1.050
+ 1.100
MASTER PLAN + 1.000 + 1.000
SKALA 1 : 500 + 1.050
C

D
Bak Kontrol

Pipa PVC 4"

+ 0.350

446
+ 0.350 556

T
STAR

280
280 Bak Kontrol
650
0
+ 1.000 Paga
r BRC
dan
+ 0.950 Jarak Harm
o

R
Tia
ng 2 nika

OTO
80cm

DA M
SEPE
+ 0.350
+ 1.000

IR

251
+ 1.000

PARK
+ 0.350

LAPA UK AREA
+ 1.100
+ 0.350
N
NGA
S
N MA

+ 1.000

T
JALA

CEPA
+ 1.000

LARI
M)
( 100
ASAN
+ 0.350 + 1.100
5

LINT
1

1020
1007

350
+ 1.000
+ 1.000
+ 0.950 + 1.100

+ 1.100

+ 1.100
Kanstin

9991
+ 1.000

9400
OR

+ 1.000

9900
MOT

+ 0.350
+ 1.100
PEDA
IR SE
PARK

+ 0.350 + 1.000
+ 0.350
+ 1.000
+ 1.100

Bak Kontrol + 0.950

PAGAR BRC DAN HARMONIKA


+ 1.000
Di Pasang Panjang 214 m (Kanan
+ 1.000 100m, Depan 65 m, Belakang 49 m)

Saluran Kolektor Drainase


+ 1.050
1
+ 1.050 Bak Kontrol Pas. 2 bata dan tutup beton

+ 1.100
RENCANA TAHAP 1 704
7234 + 1.000
+ 0.350
SKALA 1 : 500 6008
+ 1.050
50
5000
50

70
90

5300
201

70
90
+ 0.0750

+ 0.3500
700 6009

TP1
+ 0.3500

+ 0.3500 + 0.3500
+ 0.3500

+ 0.3500

+ 0.3500

+ 0.3500

Sal. Drainase
+ 0.3500

+ 0.3500

+ 0.3500

0
+ 0.3500

1000
+ 0.3500
+ 0.3500 + 0.3500

+ 0.3500

+ 0.3500

700

+ 0.3500
+ +2.500

+ 0.3500
DETAIL PEMERATAAN LAHAN
SKALA 1 : 500
+ +2.500 + 0.3500
6015
Bidang Pers. + 545.00 m

Elevasi
Jarak

POTONGAN A-A

Bidang Pers. + 545.00 m

Elevasi
Jarak

POTONGAN B-B

Bidang Pers. + 545.00 m

Elevasi
Jarak

POTONGAN C-C

Bidang Pers. + 545.00 m

Elevasi
Jarak

POTONGAN D-D
Bidang Pers. + 545.00 m

Elevasi
Jarak

POTONGAN A-A

Bidang Pers. + 545.00 m

Elevasi
Jarak

POTONGAN B-B
LAPANGAN SEPAKBOLA KLUMPIT LAPANGAN SEPAKBOLA KLUMPIT

TAMPAK DEPAN TAMPAK DEPAN

Bid. Pers. + 545.00 m

Elevasi
Jarak

POTONGAN C-C

Bidang Pers. + 545.00 m

Elevasi
Jarak

POTONGAN D-D
Kanstin 5x10x30 Kanstin 5x10x30
Lintasan Lari
A Pipa Pervorated C
Pipa Penerima
900
700 Lintasan Lari
PEIL
cm

+ 0.75 + 0.7500
+ 0.75
+ 0.7500
BATA TUMBUK
+ 0.65
Tanah Urug
B B

700
900
PASIR URUG
+ 0.40

500
+ 0.50

PASIR MURNI
+ 0.7500
+ 0.25
KERIKIL 2 - 10 mm
+ 0.25
1100

KERIKIL 10 - 20 mm
400

1 :4
A C
1 :4

600

400
- 0.15
100 100

- 0.25 DETAIL SAL. DRAINASE


- 0.35
500
DETAIL BAK KONTROL
700

900

Tampak Atas
POTONGAN C - C

Sambungan
antar blok
saling
mengunci
900 Pipa Pervorated
PEIL
cm 700
70 1000
30 + 0.75 50
+ 0.75 + 0.75

50
250
100

150
+ 0.40 + 0.40
500

500
+ 0.50
700

+ 0.25 + 0.25
+ 0.25
1100
1100

PAS. BATU KALI


300

300
400

400

1:4
1:4

AANSTAMPING
1:4
600

600

- 0.15
- 0.15 SIRTU
100 100
100 100

- 0.25
400

- 0.25
7.5
- 0.35 - 0.35
700
250.6210
900

1100 POTONGAN B -B
POTONGAN A - A
DETAIL BAK KONTROL DAN
DIMENSI SAL. DRAINASE
Kanstin 5x10x30

300
200100
A 40.40.4 12D12 - 50 D12 - 400
300
100 200
400
100 200100

B B

700

500
Pipa Penerima

300 1450 400 1450 300

3500

Kanstin 5x10x30 A TAMPAK ATAS


Pipa Penerima Lintasan
Pipa Penerima
Lari
40.40.4 12D12 - 50
PEIL D12 - 400
40.40.4 cm 300 300
12D12 - 50 100 400
200100 100 200
+ 0.75 50 50 + 0.75 100 200100 + 0.75
BATA TUMBUK
+ 0.75
+ 0.65
Tanah Urug
D12 - 400
PASIR URUG
500

+ 0.50

PASIR MURNI
+ 0.22 + 0.22 + 0.22 + 0.22 + 0.22
KERIKIL 2 - 10 mm
+ 0.25
1100

KERIKIL 10 - 20 mm
400

1:4

0.00
600

400

- 0.15
100 100

- 0.25
- 0.35
500

700 300 1450 400 1450 300

900 3500

POTONGAN A - A POTONGAN B - B

POTONGAN GRILL DRAINASE JALAN MASUK


0 25 50 75 100 125 cm
RUMPUT BERMUDA

LAPISAN PASIR TANAM

LAPISAN SIRTU PADAT


LAPISAN BATU SPLIT

As outlet drain
BATA TUMBUK
ditempatkan antara As outlet drain
elev. +25 sd. +45 ditempatkan antara
PASIR URUG elev. +25 sd. +45
Lintasan Dasar rumput
Lari Cepat
+ 1.00 7000 + 1.00
+ 0.25 + 0.90
+ 0.00 + 0.00 + 0.00
+ 0.30
- 0.45 - 0.45
+ 0.75
- 0.75
4'' 4'' 4''

Bid. Persamaan - 0.50 m


Collector
sub drain

B.02

B.04

B.06

B.10

B.12
B.08

B.14

B.16

B.18

B.20

B.22
No. Patok

Jarak (m) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00
12.00
4.00

40.00

44.00

48.00
8.00

20.00

24.00

28.00

32.00

36.00

52.00

56.00

60.00
16.00

Jarak
Kumulatif (m)
+ 1.000

+ 1.020

+ 1.040

+ 1.060

+ 1.080

+ 1.100

+ 1.100

+ 1.100

+ 1.080

+ 1.060

+ 1.040

+ 1.020

+ 1.000
+1.000

+1.000

Elevasi
Dasar (m)

POTONGAN URUGAN DAN SALURAN PENERIMA (POTONGAN A-A)

HORIZONTAL
0 2 4 8 12 16 meter

VERTIKAL
0 1 2 meter
PIPA PVC

t = 2 mm

PIPA PVC

t = 2 mm

DETAIL PIPA PERVORASI (PERVORATE PIPES)

0 1 2 3 4 5 10 15 cm
RUMPUT

LAPISAN PASIR MEDIA TANAM


KONSTRUKSI LAPANGAN
LAPISAN PASIR URUG skala 1:25

LAPISAN BATU SPLIT


500
1000
2000

KONSTRUKSI LAPANGAN
skala 1:25
1000
1500

500 500 500

2000
PIPA DRAINASE
KORAL 2-3CM skala 1:25

PLAT BETON 5X10X25


DIAMETER
TIPE PIPA JUMLAH
(INCHI)

PVC - 4m 4 1500
4"
DIAMETER
TIPE FITTING BENTUK JUMLAH
(INCHI)
Sock Lurus
4" - 4"
Sock Lurus 4-4 350

4" Keni 4" 4 50

Penutup/Dop 4" 4 50
25 m
20
15
10
5
0
START
50
+ 0.3
50
+ 0.3
00
+ 0.3
50 + 1.0 00
+ 1.0
50
+ 0.3
50
+ 0.9

RENCANA URUGAN SIRTU, PASIR, & TANAH


00
+ 1.0
00
+ 1.1 + 1.0
00
50
+ 0.3
50
+ 0.3
JALAN MASUK AREA

00
LINTASAN LARI CEPAT

+ 1.0
LAPANGAN

00 00
+ 1.1 + 1.0
( 100 M )

50 00
+ 0.3 + 1.0 00 00
+ 1.1
00
+ 1.1 + 1.1 + 1.0
00
50
+ 0.9
50
+ 0.3
00
+ 1.1
00
00 + 1.0
+ 1.0
50
+ 0.3
00
+ 1.1
00
+ 1.0
00
+ 1.0
50
+ 0.3
50 50
+ 0.3 + 0.9
50
+ 0.3
00
+ 1.0 50 00
+ 1.0 + 1.0
50 00 50
+ 1.0 + 1.1 + 1.0
50
+ 0.3
+ 0.3
+ 0.3

+ 0.3
+ 0.3
+ 0.3

50
50

50
50
50

+ 0.3
+ 0.3
+ 0.3
+ 0.3

50
50
50
50
+ 0.3
50

+ 0.3
+ 0.3

+ 0.3
+ 0.3
50
50

50
50

START
LINTASAN LARI CEPAT
( 100 M )

6029
Lubang Kontrol Resapan
Tutup Dop PVC 4 IN

400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400
9900
Pipa PVC p : 4m

A
Jarak Antar Pipa 4m

RENCANA PIPA PERESAPAN / DRAINASE

0 5 10 15 20 25 m
+ 0.350

+ 0.350

T
STAR

280
280
650
0
Paga
r BRC
dan
Jarak Harm
Tia
ng 2
80c
o nika
m

+ 0.350

T
CEPA
LARI
M)
( 100
ASAN
5

LINT
1020

350

Kanstin

0
1000
PAGAR BRC DAN HARMONIKA
Di Pasang Panjang 214 m (Kanan
100m, Depan 65 m, Belakang 49 m)

DENAH PAGAR 4900


SKALA 1 : 500
Pipa Medium 1.5"
Kawat Harmoni Pipa Medium 1.5"
3000

Pipa Medium 2"

200
2500

2500

4600
Socked besi dilas
overloop 2 - 4"
100

2700

4000
2500

Panjang 10 cm untuk
2000 penyambungan
1700
1500

pipa 4"
2000

Socked besi dilas

200

400
150

1000
400

50 150
300
800
1000

RENCANA PAGAR TAMPAK SAMPING

Pipa Medium 1.5"

400
150 2700 150
3000 3000
400

TAMPAK ATAS
Renovasi Pagar Besi BRC Sisi Utara Lapangan Sepakbola
Panjang 75 m (27 Unit panil pagar @ 2.50 x 1.50 m2)
- Tiang Pagar GIP 4 inc,
- Panil Pagar BRC,
- Pasang pagar Kawat Harmonika @ 2.50 x 2.50 m2 diatas pagar BRC
- Perlindungan pagar besi dengan cat dasar.

0 50 100 300 cm
POTONGAN MEMANJANG SALURAN PENERIMA SAMPING

POTONGAN MEMANJANG SALURAN PENERIMA BELAKANG

Kanstin 5x10x30 LINTASAN LARI CEPAT

40.40.4 12D12 - 50 D12 - 400


6000

5000

Pipa Penerima

3000 14500 4000 14500 3000

35000

DETAIL GRILL PINTU MASUK LAPANGAN

Anda mungkin juga menyukai