00
10
5
10
10
0
AREA TENDANGAN SUDUT
SKALA 1 : 100
7320
75
2440
2440
D
A A
B B
A 280
650
280
R
0
O TO
+ 1.000 Paga
+ 1.000 r GI
dan
M
+ 0.950 BRC
PEDA
IR SE
PARK
+ 1.000
+ 0.650 + 1.000
+ 1.000
+ 0.700
LAPA UK AREA
+ 1.100
+ 1.100
N
NGA
S
N MA
N
+ 1.000
LATA
T
JALA
CEPA
N SE
+ 1.000
LARI
M)
TRIB
( 100
ASAN
+ 1.100
LINT
PINT
U MA
B + 0.9
50
SUK
+ 1.000 B
+ 1.000
+ 0.650 + 1.000
NA
ELAT
+ 0.950 + 1.100
UN S
+ 1.100
TRIB
+ 1.100
+ 0.700
+ 1.000
+ 1.100
+ 1.000
+ 1.100
R
OTO
+ 0.650 + 1.000
DA M
+ 1.000
SEPE
+ 1.000
+ 1.100
+ 0.700
IR
PARK
+ 0.950
+ 1.000
+ 1.000
+ 1.000
+ 1.050
+ 1.050
+ 1.100
MASTER PLAN + 1.000 + 1.000
SKALA 1 : 500 + 1.050
C
D
Bak Kontrol
+ 0.350
446
+ 0.350 556
T
STAR
280
280 Bak Kontrol
650
0
+ 1.000 Paga
r BRC
dan
+ 0.950 Jarak Harm
o
R
Tia
ng 2 nika
OTO
80cm
DA M
SEPE
+ 0.350
+ 1.000
IR
251
+ 1.000
PARK
+ 0.350
LAPA UK AREA
+ 1.100
+ 0.350
N
NGA
S
N MA
+ 1.000
T
JALA
CEPA
+ 1.000
LARI
M)
( 100
ASAN
+ 0.350 + 1.100
5
LINT
1
1020
1007
350
+ 1.000
+ 1.000
+ 0.950 + 1.100
+ 1.100
+ 1.100
Kanstin
9991
+ 1.000
9400
OR
+ 1.000
9900
MOT
+ 0.350
+ 1.100
PEDA
IR SE
PARK
+ 0.350 + 1.000
+ 0.350
+ 1.000
+ 1.100
+ 1.100
RENCANA TAHAP 1 704
7234 + 1.000
+ 0.350
SKALA 1 : 500 6008
+ 1.050
50
5000
50
70
90
5300
201
70
90
+ 0.0750
+ 0.3500
700 6009
TP1
+ 0.3500
+ 0.3500 + 0.3500
+ 0.3500
+ 0.3500
+ 0.3500
+ 0.3500
Sal. Drainase
+ 0.3500
+ 0.3500
+ 0.3500
0
+ 0.3500
1000
+ 0.3500
+ 0.3500 + 0.3500
+ 0.3500
+ 0.3500
700
+ 0.3500
+ +2.500
+ 0.3500
DETAIL PEMERATAAN LAHAN
SKALA 1 : 500
+ +2.500 + 0.3500
6015
Bidang Pers. + 545.00 m
Elevasi
Jarak
POTONGAN A-A
Elevasi
Jarak
POTONGAN B-B
Elevasi
Jarak
POTONGAN C-C
Elevasi
Jarak
POTONGAN D-D
Bidang Pers. + 545.00 m
Elevasi
Jarak
POTONGAN A-A
Elevasi
Jarak
POTONGAN B-B
LAPANGAN SEPAKBOLA KLUMPIT LAPANGAN SEPAKBOLA KLUMPIT
Elevasi
Jarak
POTONGAN C-C
Elevasi
Jarak
POTONGAN D-D
Kanstin 5x10x30 Kanstin 5x10x30
Lintasan Lari
A Pipa Pervorated C
Pipa Penerima
900
700 Lintasan Lari
PEIL
cm
+ 0.75 + 0.7500
+ 0.75
+ 0.7500
BATA TUMBUK
+ 0.65
Tanah Urug
B B
700
900
PASIR URUG
+ 0.40
500
+ 0.50
PASIR MURNI
+ 0.7500
+ 0.25
KERIKIL 2 - 10 mm
+ 0.25
1100
KERIKIL 10 - 20 mm
400
1 :4
A C
1 :4
600
400
- 0.15
100 100
900
Tampak Atas
POTONGAN C - C
Sambungan
antar blok
saling
mengunci
900 Pipa Pervorated
PEIL
cm 700
70 1000
30 + 0.75 50
+ 0.75 + 0.75
50
250
100
150
+ 0.40 + 0.40
500
500
+ 0.50
700
+ 0.25 + 0.25
+ 0.25
1100
1100
300
400
400
1:4
1:4
AANSTAMPING
1:4
600
600
- 0.15
- 0.15 SIRTU
100 100
100 100
- 0.25
400
- 0.25
7.5
- 0.35 - 0.35
700
250.6210
900
1100 POTONGAN B -B
POTONGAN A - A
DETAIL BAK KONTROL DAN
DIMENSI SAL. DRAINASE
Kanstin 5x10x30
300
200100
A 40.40.4 12D12 - 50 D12 - 400
300
100 200
400
100 200100
B B
700
500
Pipa Penerima
3500
+ 0.50
PASIR MURNI
+ 0.22 + 0.22 + 0.22 + 0.22 + 0.22
KERIKIL 2 - 10 mm
+ 0.25
1100
KERIKIL 10 - 20 mm
400
1:4
0.00
600
400
- 0.15
100 100
- 0.25
- 0.35
500
900 3500
POTONGAN A - A POTONGAN B - B
As outlet drain
BATA TUMBUK
ditempatkan antara As outlet drain
elev. +25 sd. +45 ditempatkan antara
PASIR URUG elev. +25 sd. +45
Lintasan Dasar rumput
Lari Cepat
+ 1.00 7000 + 1.00
+ 0.25 + 0.90
+ 0.00 + 0.00 + 0.00
+ 0.30
- 0.45 - 0.45
+ 0.75
- 0.75
4'' 4'' 4''
B.02
B.04
B.06
B.10
B.12
B.08
B.14
B.16
B.18
B.20
B.22
No. Patok
Jarak (m) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00
12.00
4.00
40.00
44.00
48.00
8.00
20.00
24.00
28.00
32.00
36.00
52.00
56.00
60.00
16.00
Jarak
Kumulatif (m)
+ 1.000
+ 1.020
+ 1.040
+ 1.060
+ 1.080
+ 1.100
+ 1.100
+ 1.100
+ 1.080
+ 1.060
+ 1.040
+ 1.020
+ 1.000
+1.000
+1.000
Elevasi
Dasar (m)
HORIZONTAL
0 2 4 8 12 16 meter
VERTIKAL
0 1 2 meter
PIPA PVC
t = 2 mm
PIPA PVC
t = 2 mm
0 1 2 3 4 5 10 15 cm
RUMPUT
KONSTRUKSI LAPANGAN
skala 1:25
1000
1500
2000
PIPA DRAINASE
KORAL 2-3CM skala 1:25
PVC - 4m 4 1500
4"
DIAMETER
TIPE FITTING BENTUK JUMLAH
(INCHI)
Sock Lurus
4" - 4"
Sock Lurus 4-4 350
Penutup/Dop 4" 4 50
25 m
20
15
10
5
0
START
50
+ 0.3
50
+ 0.3
00
+ 0.3
50 + 1.0 00
+ 1.0
50
+ 0.3
50
+ 0.9
00
LINTASAN LARI CEPAT
+ 1.0
LAPANGAN
00 00
+ 1.1 + 1.0
( 100 M )
50 00
+ 0.3 + 1.0 00 00
+ 1.1
00
+ 1.1 + 1.1 + 1.0
00
50
+ 0.9
50
+ 0.3
00
+ 1.1
00
00 + 1.0
+ 1.0
50
+ 0.3
00
+ 1.1
00
+ 1.0
00
+ 1.0
50
+ 0.3
50 50
+ 0.3 + 0.9
50
+ 0.3
00
+ 1.0 50 00
+ 1.0 + 1.0
50 00 50
+ 1.0 + 1.1 + 1.0
50
+ 0.3
+ 0.3
+ 0.3
+ 0.3
+ 0.3
+ 0.3
50
50
50
50
50
+ 0.3
+ 0.3
+ 0.3
+ 0.3
50
50
50
50
+ 0.3
50
+ 0.3
+ 0.3
+ 0.3
+ 0.3
50
50
50
50
START
LINTASAN LARI CEPAT
( 100 M )
6029
Lubang Kontrol Resapan
Tutup Dop PVC 4 IN
400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400
9900
Pipa PVC p : 4m
A
Jarak Antar Pipa 4m
0 5 10 15 20 25 m
+ 0.350
+ 0.350
T
STAR
280
280
650
0
Paga
r BRC
dan
Jarak Harm
Tia
ng 2
80c
o nika
m
+ 0.350
T
CEPA
LARI
M)
( 100
ASAN
5
LINT
1020
350
Kanstin
0
1000
PAGAR BRC DAN HARMONIKA
Di Pasang Panjang 214 m (Kanan
100m, Depan 65 m, Belakang 49 m)
200
2500
2500
4600
Socked besi dilas
overloop 2 - 4"
100
2700
4000
2500
Panjang 10 cm untuk
2000 penyambungan
1700
1500
pipa 4"
2000
200
400
150
1000
400
50 150
300
800
1000
400
150 2700 150
3000 3000
400
TAMPAK ATAS
Renovasi Pagar Besi BRC Sisi Utara Lapangan Sepakbola
Panjang 75 m (27 Unit panil pagar @ 2.50 x 1.50 m2)
- Tiang Pagar GIP 4 inc,
- Panil Pagar BRC,
- Pasang pagar Kawat Harmonika @ 2.50 x 2.50 m2 diatas pagar BRC
- Perlindungan pagar besi dengan cat dasar.
0 50 100 300 cm
POTONGAN MEMANJANG SALURAN PENERIMA SAMPING
5000
Pipa Penerima
35000