Anda di halaman 1dari 1

NATIONAL SLUM

UPGRADING PROGRAM
Pas. Batu Kali Cor Beton K-175
( NSUP )
A

25

50 100

25 PROVINSI:
SUMATERA BARAT

KABUPATEN :
350 AGAM

NAGARI :
TIKU SELATAN

A
300 300 300 300 300 300 300 TANGGAL :

DIBUAT OLEH :
DENAH TAMPAK ATAS STA 0+000-0+050
FASILITATOR TEKNIK
SKALA 1 : 100

Cor Beton Lama


Sirtu Sirtu

( H.DONNY ASMADI, MT )

50 250 50 DIPERIKSA:
ASKOT INFRASTRUKTUR
350

KONDISI EXSISTING STA 0+000-0+050


SKALA 1 : 20

Cor Beton Lama Cor Beton K-175

( IRMA GUSWITA, ST )
25 50 25
12
DISETUJUI OLEH :
TIM TEKNIS PPK PROVINSI SUMATERA BARAT

50
Acian 60
Plesteran 1 : 4
Pas. Batu Kali 1 : 4
Cor Lantai Saluran 10
50 250 50
( .......................................................................... )
30 40 30
NIP.
350 100 NAMA GAMBAR : SKALA :
TAMPAK ATAS 1:100
POTONGAN A - A STA 0+000-0+050
SKALA 1 : 20 KONDISI EXSISTING 1:20

POTONGAN A-A 1:20


NO. GAMBAR JML GAMBAR

01 27

Anda mungkin juga menyukai