OWNER PEKERJAAN

A B C D E F G H
A
2730
Bapak Mulyadi
230 175 175 250 300 300 300 300 300 100 300
Semarang
3
-0.05
150 pantry

275
AREA PARKIR JALAN
naik -0.35 NAMA PEKERJAAN
DEPAN
AREA PARKIR AREA TOKO -0.25
2 550
BELAKANG +0.00 TERAS 690
715 -0.25 RUANG -0.05 B
Perencanaan Ruko 2 Lantai
275 SHOLAT
50 +0.05

75 50
1 KETERANGAN
225 125 50
165 133

DENAH LANTAI 1
SKALA 1 : 100

A B C D E F G H
A
2730
230 175 175 250 300 300 300 300 300 150 250

3
turun

275 R. SANTAI
+4.00 K. TIDUR K. TIDUR K. TIDUR K. TIDUR K. TIDUR 350
BALKON naik +4.00 +4.00 +4.00 +4.00 +4.00
+3.98
2 550 BALKON
+3.98
690
715 B
DAPUR
275 DAN
50 SELASAR
PANTRY 200
+4.00
75 +3.98 +3.98
50
1
50
125
165

DENAH LANTAI 2
SKALA 1 : 100

A B C D E F G H JUDUL GAMBAR
A
2730
230 175 175 250 300 300 300 300 300 150 250

3
turun
PERENCANA
275
Studio Arsitek E-archdesign
cp. 085727226721 / 5BD77F92
E-archdesign.com

2 550
BALKON R. SERBAGUNA 1 R. SERBAGUNA 2 BALKON email : dedyboomers@yahoo.com

+7.78 +7.80 +7.80 +7.78


690
715 B ARSITEK Ari Dedy Setiawan, ST

275 DRAFTER
50
CUCI ESTIMATOR

+7.78 +7.78
+7.78
75 50 STRUKTUR
1
DISETUJUI
50
125 133
165

DENAH LANTAI 3
SKALA 1 : 100 SKALA NO. GAMBAR

01
OWNER PEKERJAAN

Bapak Mulyadi
Semarang

NAMA PEKERJAAN

Perencanaan Ruko 2 Lantai

KETERANGAN

TAMPAK DEPAN TAMPAK KANAN


SKALA 1 : 100 SKALA 1 : 100

JUDUL GAMBAR

PERENCANA

Studio Arsitek E-archdesign


cp. 085727226721 / 5BD77F92
E-archdesign.com
email : dedyboomers@yahoo.com

ARSITEK Ari Dedy Setiawan, ST

DRAFTER

ESTIMATOR

STRUKTUR

DISETUJUI

TAMPAK BELAKANG TAMPAK KIRI


SKALA 1 : 100 SKALA 1 : 100

SKALA NO. GAMBAR

01
OWNER PEKERJAAN

Bapak Mulyadi
Semarang

NAMA PEKERJAAN

Perencanaan Ruko 2 Lantai

BUBUNGAN / NOK RING BALK GUNUNGAN BUBUNGAN / NOK KETERANGAN


RANGKA ATAP
BAJA RINGAN GUNUNGAN GUNUNGAN
GUNUNGAN +15.40 GUNUNGAN +15.40
RANGKA ATAP
BAJA RINGAN

DINDING BATA RINGAN

RING BALK
RING BALK
LISTPLANK GRC
20°
TALANG BETON
RING BALK +11.40 RING BALK +11.40
PLAFOND LANTAI 3 +11.10 RING BALK +11.15
PLAFOND LANTAI 3 +11.10
KANOPI LANTAI 3 +10.55 PLAFOND GYPSUM KANOPI LANTAI 3 +10.55 PLAFOND GYPSUM

PLAT LANTAI DINDING BATA RINGAN

BALOK STRUKTUR PLAT LANTAI

MUKA LANTAI 3 +7.80 MUKA LANTAI 3 +7.80


PLAFOND LANTAI 2 +7.40 PLAFOND LANTAI 2 +7.40
ROOSTER
PLAFOND GYPSUM
KANOPI LANTAI 2 +4.75 KANOPI LANTAI 2 +6.75 KUSEN
KUSEN

MUKA LANTAI 2 +4.00 KANOPI BETON MUKA LANTAI 2 +4.00

PLAFOND LANTAI 1 +3.40 PLAFOND LANTAI 1 +3.50


ROOSTER
KANOPI LANTAI 1 +2.75 KANOPI LANTAI 1 +2.75 FOLDING DOOR
PASANGAN LANTAI KOLOM PASANGAN
STRUKTUR
LANTAI

SLOOF SLOOF
ROLLAG BATA
PONDASI BATU BELAH PONDASI BATU BELAH
MUKA LANTAI 1 +0.00 PASIR URUG MUKA LANTAI 1 +0.00 PASIR URUG
-0.25 -0.25
FOOT PLATE FOOT PLATE
-1.05 -1.05
-1.10 -1.10
JUDUL GAMBAR

FOOT PLATE -2.25 FOOT PLATE -2.25


165 275 275
230 175 175 250 300 300 300 300 300 150 250
550
715 2730

A B C D E F G H PERENCANA
1 2 3
Studio Arsitek E-archdesign
cp. 085727226721 / 5BD77F92
E-archdesign.com
POTONGAN A-A POTONGAN B-B email : dedyboomers@yahoo.com

SKALA 1 : 100 SKALA 1 : 100 ARSITEK Ari Dedy Setiawan, ST

DRAFTER

ESTIMATOR

STRUKTUR

DISETUJUI

SKALA NO. GAMBAR

01