Anda di halaman 1dari 1

N

B
1320 1320

A A KETERANGAN GAMBAR

VISIBLE LINE
2200

1320
HIDDEN LINE

CONCRETE

LUMPUR
1100

TANAH

TUGAS BESAR SDB


JUDUL GAMBAR
TAMPAK ATAS B
Segmen

SKALA 1:50 GAMBAR TEKNIK TANGKI SEPTIK


Ø25
TAMPAK ATAS, POTONGAN A-A, POTONGAN B-B

570
NUMBER DRAWING SHEET NO.

120
KEL3A/05/8/2023 1
REFERENCE DRAWING SCALE
440

110
1 : 50

80
Ø110
230 110

UNIT REVISE

120 760
Ø110

110
Milimeter 0

580

2000
MATA KULIAH
TL 3202 SEWERAGE DAN DRAINASE
PROGRAM STUDI TEKNIK LINGKUNGAN
FAKULTAS TEKNIK SIPIL DAN LINGKUNGAN

800
INSTITUT TEKNOLOGI BANDUNG

CHECKED BY : DATE APPROVED BY : DATE

2933 1347 KELOMPOK/GROUP TUGAS

120
4400 2200 KELOMPOK 3
GROUP A

POTONGAN A-A POTONGAN B-B CHECKED BY : DATE APPROVED BY : DATE

SKALA 1:50 SKALA 1:50


ASISTEN

Koordinator Asisten : Faiz Hasan, S. T.


Asisten Kelompok : Nur Latifa Ristiaramdani, S. T.

DRAWN BY : DATE CHECKED BY : DATE

DAFFA A W 21-02-2022