Anda di halaman 1dari 1

NORTH

DINAS PERUMAHAN RAKYAT


KAWASAN PERMUKIMAN DAN PERTANAHAN
PROVINSI SULAWESI TENGGARA
PEKERJAAN :
2025 3600 4475
PERENCANAAN PENATAAN HALAMAN GEDUNG
1430 8670 KANTOR DINAS PERUMAHAN RAKYAT, KAWASAN
PERMUKIMAN DAN PERTANAHAN PROV. SULTRA

J K REVISI :
700

700
E
FFL +0.30

1420
B

600
A
MENGETAHUI/MENYETUJUI :
PENGGUNA ANGGARAN/
F KUASA PENGGUNA ANGGARAN
4440

K
3740

F L I

2500
2740
FFL +0.15 FFL +0.20 FFL +0.20
Muhammad Nurjaya, ST., MT
NIP. 19670106 199703 1 004

D DIPERIKSA :
PEJABAT PELAKSANA TEKNIS KEGIATAN

520
K C

400
Albert Rokky Palulungan, ST
NIP. 19831025 201101 1 006
KONSULTAN PERENCANA :

5650 4450 CV. MATRIX ENGINEERING CONSULTANT


10100 TEAM LEADER

Keterangan : SITE PLAN GEDUNG KANTOR DINAS PRKP&P Andi Afandi Ramme, ST
SKALA 1 : 350 Asisten Teknik Sipil Drafter CAD
A. Main Entrance F. Parkir Mobil Pegawai K. Taman
B. Side Entrance G. Parkir Motor Pengunjung L. Eksisting Gedung
Isran, ST Al Basri Hamubatungge, S.Ars
C. Side Entrance Kadis H. Parkir Motor Pegawai Kantor Dinas PRKP&P UKURAN KERTAS : NO LEMBAR :

D. Parkir Kadis I. Lapangan Upacara Prov. Sultra


E. Parkir Mobil Pengunjung J. Lapangan Badminton A3 JUMLAH LEMBAR :

Anda mungkin juga menyukai