KEGIATAN :
MANHOLE KEGIATAN PENYELENGGARAAN PENATAAN BANGUNAN DAN
A 500x600 B C A LINGKUNGAN DI KAWASAN STRATEGIS DAERAH
PROVINSI BALI DAN LINTAS DAERAH KABUPATEN / KOTA
PEKERJAAN :
1100
2200
SBG 3
1100
PEMATANGAN LAHAN TAHAP II
5500
3300
KAWASAN PUSAT KEBUDAYAAN BALI
DI KABUPATEN KLUNGKUNG
1100
2200
SBG 2
1100
NAMA GAMBAR
3300
JEMBATAN TUKAD UNDA 60 M
GENERAL ARRANGEMENT DRAWING
DENAH DAN POTONGAN MEMANJANG
1100
2200
SBG 1
1100
NO CATATAN PARAF
A B C A
1000 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 1000 NO. LMB JML LMB SKALA
11000 2000 10000 2000 10000 2000 10000 2000 11000 BA127-22-BBE-01 (1 of 1) NTS
61032.5
END SEGMEN INTERMEDIET SEGMEN MIDDLE SEGMEN INTERMEDIET SEGMEN END SEGMEN
STUD BOLT 3Ø25x200 @ 200 STUD BOLT 3Ø25x200 @ 200 STUD BOLT 3Ø25x200 @ 200 STUD BOLT 3Ø25x200 @ 200 STUD BOLT 3Ø25x200 @ 200 LIFTING EYE
6000 PL30mm
Ir. Achmad Zamachsari Ateng Jaenuri Ihsan, ST
(TYP) TEAM LEADER BRIDGE ENGINEER
DIPERIKSA OLEH :
KONSULTAN MK
BINA - TATA - NARADA, KSO
2700
640