Detail Box Traffic
Detail Box Traffic
DELATASI 3D16
W1
3D16
W1
1234
515
300
W5
W4
W2
W3
D16-150
D16-150
D16-150
D16-150
D13-150 W5
D16-150
2805
W4
KEGIATAN :
W2 D13-150
W3 D16-150
KEGIATAN PENYELENGGARAAN PENATAAN BANGUNAN DAN
3400
LINGKUNGAN DI KAWASAN STRATEGIS DAERAH
5215
PROVINSI BALI DAN LINTAS DAERAH KABUPATEN / KOTA
PEKERJAAN :
8977
750
8977
1000
NAMA GAMBAR
1000 50
3969
DETAIL PENULANGAN
BOX UNDERPASS
NO CATATAN PARAF
LC= 50MM
GRANULAR/SIRTU
NOTE :
218
8900
450 8000 450
D19-100 D19-100 D19-100
D19-200 D19-200
D16-200 2450 2450
Ir. Achmad Zamachsari Ateng Jaenuri Ihsan, ST
80 80 80 80 D19-100 D19-100 D19-100 TEAM LEADER BRIDGE ENGINEER
80 80
DIPERIKSA OLEH :
550
KONSULTAN MK
D13-300/600
1500
D22-100
D19-100
300 D22-100
D19-100
D19-100
Ir. Endang Hadiyat
D13-300/600
D13-300/600
D19-100 D19-100
D19-100 D19-100
D19-100
4200
D16-150
D16-150
D16-150
D16-150
DISETUJUI OLEH :
5350
D19-100
D19-100 D19-100
D19-100 D19-100
D19-100
KONSULTAN MK
BINA - TATA - NARADA, KSO
D25-100
D19-100
D19-100
750
80
MENGETAHUI :
600
80