Sungai Dodokan

Bend 45

45°
Sta. 12 + 450/ P.250

Washout
Sta. 12 + 550 / P.252

PENGGA
BENDUNGAN
Double Air Valve

Pompa

Sta 00 + 020/P.0
Water meter
Sta. 12 + 650 / P.253
JBT 1 L = 6.00 m
Akhir Pipa HDPE PN 10 Sta. 00 + 474.80 / P.9+13 m
Sta. 12 + 750 / P.256

Washout
Booster Pump Sta. 00 + 537 / P.10+37 m
Sta. 12 + 750 / P.255

Q = 200 l/dt
Awal Pipa GIP SIPhon 1 L = 91.40 m
Sta. 00 + 537 / P.11+13 m
Sta. 12 + 750 / P.256

Akhir Pipa GIP Bend 45

45°
Sta. 00 + 950/ P.19
Sta. 13+300 / P.267

L = 25.00 km
Awal Pipa HDPE PN 12.5 Chek Valve
Sta. 13+300 / P.267 Sta. 01 + 300 / P.26

Double Air Valve


Double Air Valve
Sta. 13 + 600 / P.273
Sta. 01 + 900 / P.38

PIPA HDPE TRANSMISI Ø 20"


Akhir Pipa HDPE PN 12.5
Sta. 14+300 / P.287 Akhir Pipa GIP
Sta. 01 + 900 / P.38

Awal Pipa HDPE PN 10


Sta. 14+300 / P.287 Awal Pipa HDPE PN 12.5
Sta. 01 + 900 / P.38

Double Air Valve


Sta. 15 + 250 / P.306
Bend 45

45°
Sta. 01 + 950/ P.39
Double Air Valve
Sta. 16 + 400 / P.329
Double Air Valve
Sta. 02 + 900 / P.59
Double Air Valve
Sta. 18 + 100 / P.363
Washout
Sta. 03 + 450 / P.69
Double Air Valve
Sta. 19 + 225 / P.385+25 m

Akhir Pipa HDPE PN 12.5

JARINGAN PIPA TRANSMISI


Bend 45 Sta. 01 + 900 / P.78
45°

Sta. 19 + 600 / P.393

SKEMA JARINGAN PIPA


BENDUNGAN PENGGA
Awal Pipa HDPE PN 10
Washout Sta. 01 + 900 / P.78
Sta. 19 + 850 / P.398

Double Air Valve


Sta. 04 + 200 / P.84
JBT 2 L = 18.00 m
Sta. 19 + 850 / P.398
Chek Valve
Sta. 04 + 750 / P.95
Double Air Valve
Sta. 20 + 250 / P.406
Bend 90
90°

Chek Valve Sta. 05 + 283 / P.105+33 m


Sta. 20 + 850 / P.418

Double Air Valve


Bend 45 Sta. 05 + 700 / P.114
45°

Sta. 21 + 300 / P.427

Double Air Valve


Double Air Valve Sta. 06 + 500 / P.130
Sta. 22 + 000 / P.428+25 m

Double Air Valve


Double Air Valve Sta. 06 + 950 / P.139
Sta. 22 + 300 / P.447

Washout
Double Air Valve Sta. 08 + 273 / P.165+25 m
Sta. 23 + 050 / P.462

Double Air Valve


Sta. 24 + 325 / P.487+25 m SIPhon 2 L = 63.94 m
Sta. 08 + 282 / P.165+32 m
Akhir Pipa HDPE PN 10
Sta. 24 + 450 / P.490
Double Air Valve
LEGENDA

Sta. 10 + 000 / P.200


Awal Pipa HDPE PN 12.5
Sta. 24 + 450 / P.490
Bend

Batas Pipa
Pipa HDPE PN 10
Pipa HDPE PN 12.5

Pipa GIP

Pipa Distribusi

Bendungan

Pompa
Ground Water

Chek Valve

Gate Valve

Syphon Pipa
Tank

Air Valve

Wash Out

Wash Out

Jembatan Pipa

WTP

Double Air Valve


Sta. 11 + 100 / P.222
Akhir Pipa HDPE PN 10
Sta. 25 + 000 / P.501
Bend 45
45°

Sta. 12 + 450/ P.250


PEKERJAAN :
KETERANGAN :

CROSS SECTION
JUDUL GAMBAR :
NO. GAMBAR

PEMBANGUNAN SISTEM PENYEDIAAN AIR BAKU


BENDUNGAN PENGGA UNTUK KEK MANDALIKA
PT. HILMI ANUGERAH - PT. IKA ADYA PERKASA

B A L A I W I L A Y A H S U N G A I N U S A T E N G G A R A I
D I R E K T O R A T J E N D E R A L S U M B E R D A Y A A I R
KEM ENT ERIA N PEK ERJAA N U MUM DA N PERU MAH AN RAK YAT
SATU AN KEGIATAN PENYEDIAAN AIR BAKU I SN VT PJPA NT. PROVINSI NTB
JL N. AIRL ANGG A NO. 32 MATA RAM TLP. ( 0370) 634127 FAX. (0370) 621644
PT. NINDYA KARYA (PERSERO)
Telp : +6221-8093276, Fax : +6221-8093105
Jl. Letjen Haryono Mt Kav. 22 Cawang, DKI Jakarta 13630
SKEMA JARINGAN PIPA
BENDUNGAN PENGGA
CATATAN

PT. MITRA UTAMA KENZO (KSO)

NIP. 19790212 201412 1 001

NIP. 19651125 200604 1 013


PT. NINDYA KARYA (PERSERO)

Pejabat Pembuat Komitmen

DI KAB. LOMBOK TENGAH

SHOP DRAWING
PROJECT MANAGER

Kontraktor Pelaksana

UZAEMI, ST, MT
AHMAD, ST, MT

SUHAMDAN, ST

Penyediaan Air Baku


Konsultan Supervisi
LOMBOK TENGAH

EDIL FITRI, ST

Pelaksana Teknis
JUMLAH LEMBAR

TEAM LEADER

DIPERIKSA :

DISETUJUI :
DIBUAT :
LOKASI

Karang Mumus
Samarinda

Jl. Pulau Banda No. 7


KODE GAMBAR

AS SHOWN

SKALA

Anda mungkin juga menyukai