Anda di halaman 1dari 1

Layout Pipa Air Utama DETAIL PEMASANGAN PIPA UTAMA

Update : 17 Nov 2023


Top level

Tanah Urug

80
100
Pasir

Pipa Utama

700

700

20
MUSHOLLA

GUDANG TURUN
DARI LT.2

VENDOR TOILET PRIA


700 SECURITY

ENGINEERING

TOILET WANITA

VENDOR
PARKIR

VENDOR
HOUSE KEEPING

1 2 3 4 5 6

700
NAIK
KE LT.2

KANTIN

180.0000
700

700

700

700
500
RE
04
RE
04

700
DT
03
04
NI
04
NI

2000
04
NI
04
NI

100000 230000

75000

DR
02

300 140 120


300 140

140 300
120 140 300

1950 385
74

342 150 1500

312
300

600
300

600

1300
300
800

1170

100
300
208

120

700 411
200
318
Ladder Ladder

Hall Button
Hall Button

RUANG
POMPA

GATE VALVE 700


NAIK

700
RUANG
GENSET
550

PIPA HDPE ∅75 mm


700

BLIND FLANGE

PIPA HDPE ∅25mm


700

1000
800
1000

TANGKI
BULANAN
10.000 LITER
CLAMP SADLLE
100 mm x 25 mm

500
6320 GATE VALVE
PIPA HDPE ∅75 mm PIPA HDPE ∅100mm

PIPA HDPE ∅75mm GATE VALVE


PIPA HDPE ∅100mm
GROUND WATER TANK
50.000 LITER

REDUCE 100 x 75 PIPA HDPE ∅100mm

PIPA HDPE ∅100mm


GWT 50 m3

300
METER BOX PDAM

PIPA HDPE ∅100mm


dari PDAM