128
A12
116 120 120 100 S sanyo A9
A11
LAMPU TERAS OUTBOW. 1 UNIT B1
Pas.Herbel A10
B2
B15
LAMPU FITING STANDART INBOW. 1 UNIT TIPE :
120
B2a B14
360
B16
B4 B13
LAVENDER
36
64
64
LAMPU DOWNLIGHT. 5 UNIT B17
35 65
36
36
15 20
15 20
B5 B12 B18
45 60 60 60 60 60 60 60 60 55 60 60 60 PROYEK :
BOX MCB. 1 UNIT B6 B11 B19
B7 B10 B20
Pas. Herbel 8,23
8
275
B9
8
8
823
C1
800
C12
C2 a GRAND
SAKLAR TUNGGAL. 3 UNIT
340
340
D1 D26
C14
E11 C3 TANJUNG PRIOK
E10 C4 C15 D2 D25
SAKLAR GANDA. 2 UNIT
200
C5 C16 D2a D24
E5
150
Sloof 10/20 E9 LOKASI :
C17 D
100
C6 4 D23
STOPKONTAK STANDART. 4 UNIT E4
108
Dapur KAMAR TIDUR 1 Ruang Tamu
Kmwc E8 C18
N
440
C31 C D5
±0,00 D22 Jl. PELABUHAN
sanyo
- 0,05 ±0,00 ±0,00 E2a 7
E7 C30 C19
STOPKONTAK SANYO. 1 UNIT E2
C8 D6 D21 TANJUNG PRIOK - SUKUN
140 E6 C29 C9 C20
D7 D20
KOTA MALANG
E1
S SUMUR BOR. 1 UNIT E15 C28 C1
0
C21
C22 D8
D19 W E
200
Tanah Urug Tanah Urug Sloof 10/20 Tanah Urug E14 C27 C11
E13 C23 D9 D18 LUAS TANAH :
70 50 Tulangan Footplat 50/50 70
Tulangan Footplat 70/70 70 70 Tulangan Footplat 70/70 70 50 Tulangan Footplat 50/50 C12
80 60 Galian Footplat 60/60 80 Galian Footplat 80/80 80 80 Galian Footplat 80/80 80 60 Galian Footplat 60/60
E12
C24 D1
0 D17 65
120 430 250 200 495 128 C25 D
11 D16 S
800 823 C26
D12 D15 TYPE :
Pembesian Footplat 70/70
Kedalaman Tergantung Daya 250 250 300 D14 36
Dukung Tanah D12
800 a
bak kontrol
128
S
120
360
Pipa air Bersih ke Pipa air kotor Pipa air Bersih ke
shower 21 '' bawah tanah Uk. 3''
kran sink 21 ''
275
823
800
Pipa air
talang 2.5''
100
108
440
150
150
150
Kran taman depan 1
''
140
2
823 800
200
Lubang Kurasan
Septictank 4''
TAMPAK DEPAN TAMPAK SAMPING KIRI TAMPAK BELAKANG TAMPAK SAMPING KANAN
SKALA 1:100 SKALA 1:100 SKALA 1:100 SKALA 1:100
250 250 300
800
Wuwung Tepi
800 800 47
0
KETERANGAN
800 47
0
14
120 430 250 120 430 250 7
SIMBOL KETERANGAN
320
Wuwung tengah segitiga Pas.Herbel Pipa PVC Air Bersih 0,5" Ex. Maspion D / Setara
23
5
13
0 Pipa Air Kotor 2,5 " Ex. Maspion D / Setara
FP. 1
15
PASANGAN ROLLAG
128
128
110
FP. 1
S S 70X70
0
FP. 1 FP. 2 Pipa Air Kotor 3 " Ex. Maspion D / Setara
A A
FP. 2
50X50 70X70
Teras 70X70 50X50
Pipa Air Limbah 4 " Ex. Maspion D / Setara
65
Kmwc - 0,05
120
65 35
36
36
15 20
15 20
660
- 0, 0 5 Kran Air Bersih 1/2 " Ex Onda / Setara
60 60 60 55 60 60 60 60 60 60 60 60 45
Kamar Tidur 1
120
120
FP. 2 FP. 2 Shower Mandi 1 Set ( Hand Shower & Kran Double ) Ex Wasser/ Setara
360
360
410
Penutup Genteng Cor Flat
120
FP. 1
SKALA 1:100 20
Wuwung tengah segitiga
FP. 1 70X70
633
20
70X70 SLOOF
PERMUKAAN TANAH PERMUKAAN TANAH
15
120
275
275
Ø6-150
15
Kamar Tidur 2 Ruang Tamu
823
823
823
Ø8
FP. 1 FP. 1 Wuwungan Tepi
15
800
800
800
80
50
± 0,00 ± 0,00 70X70 70X70 70 70 Ø6-150
15
Space 5 cm
100
Pipa Angin 1/2 "
17.5 17.5 17.5 17.5
Kuda-Kuda Baja Ringan Penutup Beton Bertulang
15
Ø8 - 150
15
Ø8 - 150
Pipa 3" Untuk Kurasan
Wuwung tengah segitiga
Ø8 - 150
Ø8 - 150
Wuwungan Tepi
Ø8 - 150
Ø8 - 150
Ø8 - 150
Ø8 - 150
Ø8 - 150
15
Dengan Tutup Dop
80
70
70
80
70
70
Carport FP. 1 FP. 1
Ø8 - 150
D15 -150
240
FP. 1
5
50
100
100
10
PASIR URUG DIPADATKAN
Teras - 0, 2 0 70X70 70X70 70X70
108
Ø8 - 150
100
440
200
Pasangan
150
Dinding
180
PASANGAN ROLLAG
Bata Putih
Kedap Air
220
250 250 300 250 250 300 800 Plat Lantai
30
Rabat Beton
Mutu Betok
800 800 INPUT AIR LIMBAH
OUTPUT KE DRAINASE
MENGGUNAKAN PIPA 3" K-175
120
100
120
110
DARI CLOSED 4" SEPTICTANK RESAPAN