Anda di halaman 1dari 1

L KAS S AS I 1 S

ER I
G

N
NE

GO
. 05 . 15

SAR I
SA A

SMK
Bubungan K .S SA
Genteng
KA . ALA
M A
L A N G
Talang dak

Jendela atas

Plat
SMKN 1 SINGOSARI
Roaster L K
KAB. MALANG JATIM
Pasangan
dinding

Kusen jendela
31 MEI 2023
L K

A A
L. S
Tangga
L K
PEKERJAAN
A AK A A AK SA K A AK SA KA A
SKALA 1 : 100 SKALA 1 : 100 SKALA 1 : 100

L. K A A PEMBANGUNAN
RUMAH TYPE 155/112

A
NAMA SISWA/XI-TKP1/15

L.
A B C A B C D A B C D

+11.50
35°

LANTAI 2
Bubungan beton +11.50 +8.00
Bubungan beton
Kuda kuda Kuda kuda Kuda kuda
(material baja ringan)

Reng Ikatan Angin Ikatan Angin


23 +4.00
(material baja ringan)

+9.20
Pasangan Bata
22 +382.19
Ringbalk
(ukuran 15x20)
Pasangan Bata Pasangan Bata
21 +365.19 T = 4.00
Plafond
(+3.50)
+8.50
Ringbalk

Plafond
Plafond +7.80
+7.78
Ringbalk
Plafond
Plafond +3.50
+3.50
20 +347.8
±0.00 t =17.39 KALISTA RIZKY RISYLLA
Plafond +7.80 Plafond +7.80

1 +17.39
l =28.22
19 +330.41
18 +313.02 2 +34.78
MENGETAHUI ORANG TUA
+1.45

17 +295.63 3 +52.17
Jumlah t = T/t=400/17.39 = 23buah
16 +278.24 4 +69.56
Balcon K. tidur
R. santai
+ 4.00
K.TIDUR
+ 4.00
K.TIDUR
+ 4.00
K.TIDUR
+ 4.00
Uk t = T/t = 400/ 22 =17.39 cm
Lantai 2 + 3.90 -0.10
+ 4.00 +4.00
+4.28 +4.28 15 +260.85 5 +86.95 Jumlah. l = Jumlah. t - 1 = 23-1 = 22 buah
(+0.00)
Pasangan Bata Pasangan Bata
+3.50 Merah Merah
Plafond +3.50 Plafond +3.50
Plafond +3.50
+3.50 +3.50
14 +243.46 6 +104.34 Kontrol = (2 x 17.39) + 28.22 = 63
Plafond +3.50
13 +226.07 7 +121.73
Kusen
12 +208.68 8 +139.12

+1.45
11 +191.29 9 +156.51
R.KERJA K.TIDUR
R. Tamu ± 0.00 ± 0.00
± 0.00 R. tamu R. keluarga
+0.47
Lantai 1 Dapur
- 0.55
± 0.00 ± 0.00 10
± 0.00 ± 0.00 -0.10
Sloof -0.55 Sloof -0.55

Pondasi Batu Kali

Anstamping -1.00
Pondasi Batu Kali

Anstamping -1.00
+173.9 YOEKRIS ABDUL KAMPION
Footplat Footplat

3.73 3.75 3.25 3.00 3.51 3.00 1.50 5.50 3.50 3.00 3.00
GURU MAPEL TKP
7.50 15.00 15.00

A A A A A
SKALA 1 : 100 SKALA 1 : 100 SKALA 1 : 100

ZAENAL MUSTAUFIQ, S.Pd, M. Si.


NIP. 196506271989021004

PENGAJAR TKP
C-C
B-B

8 7 6 5 8 7 6 5

7.50 7.50 7.50 7.50 7.50 7.50 7.50


1.75 2.25 3.50 1.75 2.25 3.50 1.75 2.25 3.50 1.75 2.25 3.50 1.75 2.25 3.50 1.75 2.25 3.50 7.50
1.75 2.25 3.50
E F E F
1.75 2.25 3.50
tandon
TAMAN air
1.50

1.50
1.50

JEMURAN
1.50

KM
1.50

1.50
KM
1.50

-0.05 +3.95 T.CUCI


-0.05

1.50
TERAS K.TIDUR + 3.95 PASANGAN
K. TIDUR ROLLAG
3.00

3.00

3.00

3.00
3.00

3.00
-0.05 ± 0.00
3.00

D E + 4.00

3.00
R. KELUARGA
± 0.00 G G

LANTAI 2 LANTAI 2 LANTAI 2 LANTAI 2


LANTAI 2

LANTAI 2
23 +4.00 R.KERJA
ANA SRI WAHYUNI, S.Pd. M.T
3.00

3.00

3.00

3.00
3.00

3.00
K. TIDUR
3.00

22 +382.19 ± 0.00 + 4.00

3.00
7.25

7.25

7.25
21 +365.19
7.25
7.25

7.25
7.25

±0.00 ±0.00 ±0.00 ±0.00 ±0.00


20 +347.8

NIP. 19650627191004

7.25
19 +330.41 1 +17.39 ±0.00

18 +313.02 2 +34.78
17 +295.63 3 +52.17
H H
12.75

12.75
16 +278.24 4 +69.56
-0.40

-0.45

-0.50

12.75
15 +260.85 5 +86.95

14 +243.46

13 +226.07
6 +104.34

7 +121.73 R.MAKAN
-0.55 KAPROLI TKP
15.00

15.00

15.00
15.00
12 +208.68 8 +139.12
A-A A-A
3.50

3.50

3.50
3.50
K.TIDUR
3.50

350

350
11 +191.29 9 +156.51
+ 4.00

350
10

+173.9 BORDES BORDES BORDES BORDES

DAPUR
100

C B BORDES
-0.55
100
I I
0.30
3.00

3.00

3.00
R. SANTAI
3.00
3.00

3.00
0.80
3.00

R. TAMU + 4.00
± 0.00

3.00
1.00

B CARPOT
1.00

1.00

1.00
1.00
5.50

5.50

5.50
5.50
1.00

1.00
5.50

-0.60
1.00

FOOTPLAT
-0.40
-0.50

TERAS BALKON 100x100 BALKON

1.00
-0.05 + 3.90 + 3.90 BALKON
A
+ 3.90

SUPRIYANTO, S.Pd.
septictank

TAMAN PASANGAN
2.25

2.25

2.25
2.25

1 2 3 4 ROLLAG
2.25

-0.10

NIP. 196505271989021003
sp

A J
7.50 7.50 7.50 7.50

1 2
7.50
3 4 JUDUL GAMBAR SKALA
C-C
B-B

DENAH RUMAH TYPE 155/112 1 : 100


DENAH L.1 TYPE 155/112 DENAH L.2 TYPE 155/122 RENCANA PONDASI RENCANA ATAP RENCANA SANITASI L.1 RENCANA SANITASI L.2 RENCANA INSTALASI L.1 RENCANA INSTALASI L.2
TAMPAK DEPAN 1 : 100
TAMPAK SAMPING KANAN 1 : 100
SKALA 1 : 100 SKALA 1 : 100 SKALA 1 : 100 SKALA 1 : 100 SKALA 1 : 100 SKALA 1 : 100 SKALA 1 : 100 SKALA 1 : 100
TAMPAK SAMPING KIRI 1 : 100
POTONGAN A-A 1 : 100
POTONGAN B-B 1 : 100
KETERANGAN KETERANGAN POTONGAN C-C 1 : 100
LAMPU RENCANA PONDASI 1 : 100
SALURAN AIR BERSIH SAKLAR TUNGGAL
SALURAN AIR KOTOR SAKLAR GANDA
SEKRING
KABEL
RENCANA ATAP 1 : 100
SALURAN SEPTICTANK STOP KONTAK RENCANA SANITASI 1 : 100
BOX METERAN
R. INSTALASI LISTRIK 1 : 100
LOKASI / SITUASI 1 : 100

Anda mungkin juga menyukai