Anda di halaman 1dari 1

NAMA PROYEK

PROYEK ROTAVIRUS
GEDUNG 37
PT. BIO FARMA (PERSERO)

PEMBERI TUGAS

KANOPI DAK BETON


+3.650

JL. PASTEUR NO. 28 BANDUNG

E MANAJEMEN KONSTRUKSI

PP/EQ PP/EQK
37.L1.51
STAIRWELL 3
+6.450

PIT EKSISTING

PP/UP
37.L1.08 +6.300
DIRTY GOODS WASHING
+6.450

PP/LP
37.L1.06
DR

H 2500 x W 2100 x D 330

H 1000 x W 1000 x D 330


PROJECT MANAGER
+6.450 37.L1.46
MECHANICAL ROOM
+6.450 Ardo Muliana
SITE MANAGER

FCP- (GMS)
FCP- (BMS)
+4.860
37.L1.05
DR Moch. Rizal L.H
+6.450
TA. MEKANIKAL HVAC

37.L1.48 37.L1.47
WTP CONTROL ROOM UTILITY GAS Hasan Basir
PP/AHU PP/WTP +6.450 +6.450
CATATAN

D 37.L1.07
PR
+6.450
37.L1.41
37.L1.45 PHARMA CORRIDOR
+6.450
TECH PART WASHER
+6.450 SPLITTER FROM FCP- (GMS)
TO FCP- (BMS)
37.L1.15 37.L1.43
37.L1.14 37.L1.35 TECHNICAL
DR DR PR AUTOCLAVE DISINFEKSI
+6.450 +6.450
+6.450 +6.450

37.L1.54 KANOPI DAK BETON


BLACK CORRIDOR
37.L1.04 37.L1.17 37.L1.36 +6.450
37.L1.16 37.L1.34 UNLOADING
CLEAN GOODS HANDLING DR DR DESINFECTION ROOM
+6.450 +6.450
+6.450 +6.450 37.L1.29 +6.450 0,26

BSC ROOM
+6.450

37.L1.49 37.L1.40
37.L1.44 WOMEN'S MEN'S
37.L1.43
TECHNICAL PR LOCKER ROOM LOCKER ROOM THIS DRAWING IS THE SOLE PROPERTY OF PT. RAYAKONSULT.
AUTOCLAVE DISINFEKSI +6.450 +6.450 THE INFORMATION CONTAINED THEREIN SHALL NOT BE USED
+6.450 +6.450
OR COPIED IN ANY MANNER WITHOUT THE WRITTEN PERMISSION

C 37.L1.27
FROM PT. RAYAKONSULT.

VIRUS CULTURE 37.L1.41


+6.450 PHARMA CORRIDOR
37.L1.03 +6.450
37.L1.02 PR
DR +6.450
KANOPI DAK BETON

37.L1.42
+6.450 TECH AREA 37.L1.52
AUTOCLAVE STERILISASI AIR LOCK 37.L1.21
+6.450
+6.620 INCUBATOR ROOM
+3.650

+6.620

37.L1.01 37.L1.18
DR CELL CULTURE 37.L1.12
+6.450 +6.450 PURIFICATION
+6.450

37.L1.13 37.L1.30
STERILE MATERIAL STORAGE 37.L1.26
37.L1.41 DR IN DR OUT
+6.450
PHARMA CORRIDOR +6.450 +6.450
+6.450

B 37.L1.25
37.L1.31
DR OUT
37.L1.53
37.L1.09 DR IN AIR LOCK
+6.450
DR +6.450 +6.620
+6.450
37.L1.38
37.L1.19 FREEZING
BSC ROOM AND SEED ROOM
+6.450 37.L1.24 37.L1.32 37.L1.39
37.L1.20 DR OUT CIP/SIP +6.450
37.L1.50 37.L1.11 PR DR IN
37.L1.10 +6.450 +6.450 37.L1.28 +6.450
STAIRWELL 2 DR DR +6.450 INCUBATOR ROOM
+6.450 +6.450 +6.450 +6.620

37.L1.23 37.L1.33
37.L1.37 37.L1.22 DR OUT KONSULTAN PERENCANA
DR IN
CLASS C CORRIDOR PR +6.450 +6.450
+6.450 +6.450 pt
consulting services
JL.BABAKAN JERUK II NO 34
37.L1.41 TLP 62.22.2008100; FAX 62.22.2008600
PHARMA CORRIDOR BANDUNG 40163
+4.860 +6.450
KONTRAKTOR
A
DAK BETON
+3.350 SHOP DRAWING
JUDUL GAMBAR

GAMBAR PENEMPATAN
PANEL
LANTAI 1
PROJECT MANAGER

Ari Wibowo
DEPUTY PROJECT MANAGER

Arifin Suryo N.
PROJECT ENGINERING MANAGER

Desi Putri
JURU GAMBAR

Apriyano

REVISI

1 2 3 4 5 6 7 8 9 NO. TANGGAL KETERANGAN PARAF

GAMBAR PENEMPATAN PANEL LANTAI 1 TANGGAL

SKALA KODE PROYEK NO. GAMBAR NO. LEMBAR

SD-APG/
1 : 75 1 : 75
BF37-RTV BMSGMS- 1/1
HVAC.00.32