A242
REHABILITATION (PACKAGE 2)
WORKS FOR PASIGALA RAW
No. Kontrak :
SULAWESI TENGAH
P 595
SIGI
: 03
:
12 DESEMBER 2023
A241
Tanggal :
No. Register
Kabupaten :
No. Lembar
Pekerjaan :
Provinsi :
P 594
BM. AK 3
826487.634
9881653.320
+85.264
A240
ANTONIUS A. R TOAR GERUNG, ST., MT
P 592
KONSULTAN SUPERVISI RAW WATER ENGINEER
CP. AK3
826475.210
PPK AIR TANAH DAN AIR BAKU
PIYANATA
9881578.677
+85.559
OH
P 591
R
KP. SA MA
L U M
GAMBAR :
DE
MENGETAHUI
MENYETUJUI
DI PERIKSA
DISET.
BM. BGKN 24
826508.793
9881500.772
P 589+43
+85.021
DIRENC.
OLEH
CP. BM 24
826524.810
P 589
9881450.812
+85.034
P 588
P 587+10 TALANG AVOUR
SHOP DRAWING
P 587
HIDROTES 33
WO 2 P.EX (HDPE)
P 586
PIPE Ø800 MM HDPE
tgl 14
tgl 13
BT2.6
SIPON2
tgl 12
Tanah bwh 1
BT2.5
BT2.S4
tgl 11 Tanah bwh 2
BT2.S3
BT2.2 BT2.1
tgl 10
pohon
TH1
TGL.
tgl 9
TH2
tgl 8
P 585 tgl 7
TH3
TP 12
NO
tiang listrik
tgl 6
BT7
tgl 5
Tanah bwh 1
WO 5 (GIP)
BT6
tgl 4
Tanah bwh2
BT5
SIPON 1
BT.S2
BT.S1 Tanah bwh3
tgl 3 BT4
BT3
BT2
Tanah bwh4
tgl 2
Tanah bwh5
tgl 1
PIPE Ø800 MM HDPE
P 584 TRANSISI GIP KE HDPE #7
A239
PIPE Ø700 MM GIP
tiang listrik
5°
T2
A238 A
TP 11A
P 583
A238
7°
T2
AV 13
(GIP)
P 582
A237
5°
T2
DESA SIDONDO I
P 581 7°
A236
JALAN AKSES 6
A235 (CR14)
T2
A234 (CR14)
P 580 32°
A233
T5
16°
A232
T2
24°
P 579
T2
A231