Anda di halaman 1dari 1

WATER TRANSMISSION SYSTEM

A242
REHABILITATION (PACKAGE 2)
WORKS FOR PASIGALA RAW

No. Kontrak :
SULAWESI TENGAH

P 595
SIGI

: 03
:

12 DESEMBER 2023

A241
Tanggal :
No. Register
Kabupaten :

No. Lembar
Pekerjaan :
Provinsi :

P 594
BM. AK 3
826487.634
9881653.320
+85.264
A240
ANTONIUS A. R TOAR GERUNG, ST., MT

HARIADY INDRA MANTONG, ST. M.Sc


DIPERIKSA : Ir. DWI WINARSO, ST
DIGAMBAR : IMAM SUANDY, ST

P 593 TRANSISI HDPE KE GIP #8


WAHYU PRASETYO, ST
SITE PLAN TEST POINT

ADHI - NINDYA - BASUKI, KSO

P 592
KONSULTAN SUPERVISI RAW WATER ENGINEER

KONSULTAN SUPERVISI TEAM LEADER

CP. AK3
826475.210
PPK AIR TANAH DAN AIR BAKU
PIYANATA

9881578.677
+85.559
OH

P 591
R
KP. SA MA
L U M

GAMBAR :
DE

MENGETAHUI
MENYETUJUI
DI PERIKSA

DISET.
BM. BGKN 24
826508.793
9881500.772

P 589+43
+85.021

DIRENC.
OLEH
CP. BM 24
826524.810

P 589
9881450.812
+85.034
P 588
P 587+10 TALANG AVOUR

SHOP DRAWING
P 587
HIDROTES 33
WO 2 P.EX (HDPE)
P 586
PIPE Ø800 MM HDPE

tgl 14
tgl 13
BT2.6
SIPON2
tgl 12
Tanah bwh 1
BT2.5
BT2.S4
tgl 11 Tanah bwh 2
BT2.S3
BT2.2 BT2.1
tgl 10
pohon
TH1

TGL.
tgl 9
TH2
tgl 8
P 585 tgl 7

TH3
TP 12

NO
tiang listrik
tgl 6
BT7
tgl 5
Tanah bwh 1
WO 5 (GIP)
BT6
tgl 4
Tanah bwh2
BT5
SIPON 1
BT.S2
BT.S1 Tanah bwh3
tgl 3 BT4
BT3
BT2
Tanah bwh4
tgl 2
Tanah bwh5
tgl 1
PIPE Ø800 MM HDPE
P 584 TRANSISI GIP KE HDPE #7
A239
PIPE Ø700 MM GIP
tiang listrik

PIPE Ø700 MM GIP


T2
A238 A
TP 11A
P 583
A238


T2
AV 13
(GIP)
P 582
A237


T2
DESA SIDONDO I
P 581 7°
A236
JALAN AKSES 6
A235 (CR14)

T2
A234 (CR14)
P 580 32°
A233
T5
16°
A232

T2
24°
P 579

T2
A231

Anda mungkin juga menyukai