Anda di halaman 1dari 41

REPUBLIK INDONESIA No.Paket 26/2013 Judul : No./ Jml.

Hal :
PERENCANAAN TEKNIK ( DED )
08 / 67
Digambar Oleh : Direncanakan Oleh : Disetujui Oleh :
Ruas Jalan GENTING GERBANG - PAMEU
JEMBATAN NASIONAL Skala :
Hor. 1:500
Ver. 1:100
LINTAS TENGAH II Nama Jembatan JEMBATAN LAOT JAYA
KM.SIMPANG UNING 48+300
PAKET 26/2013 Provinsi/ Kabupaten
( Ahsan Syadzilly, ST ) ( Rudiansyah Putra, ST, M.Si ) ( Ir. Taufiq Saidi, M.Eng ) Tanggal :
ACEH/ACEH TENGAH Operator CAD Bridge Engineering Team Leader

71 71 71
7.0 8.0 9.0

71
7 6.0
7 15
71 14.0.0

7050
Y =5 1 BM 1 3.0

7200
7700
X = 227147.000

X =2 2

X =2 2
Y = 517677.000
Z = +706.000 m
6950

7100
707
Y =5 1

7250
.0 708
7700 71
7711 2.0
710.4
Y =5 1
X =2 2

.0 88
709 7700190. .0.0 7750 718.6

X =2 2
706.0 .0 715.8 03
8.00 06

X =2 2
710 710.5
705.0 710.5 79
.0 70 33
770 8.
704.0 7 109.00 710.5
711
.0 713 71 11.0.0 707.8 711 28
710.1 710.7
70 712 2 96 .327
70 3.0 .0 .0 71 .0 88 60
701.02.0 3.0
710.8 711.1

7000
20 710.2 22
Y =5 1 86 71
0.56
710.1 7
75 10.18
7650 Y =5 1 710.0 2 0
7700 713.0 06
Y =5 1

X =2 2
710.1 709.1 70 .4
06
710.4 71 708.315 70 87 7089.0 02 7750
32 0.636 11 9.09 51
2 709.1
708.7 59
709.3 88 709.0
701.0 705.889 06
50 15
7
40 707.2 70078.7.722
705.4 84 708.9
702.0 708.9 97
710.1 43 708.6 62 710.3
78 708.9 17
703.0 93 708.7 86
P7076.465
704.0 708.7 78 709.2
72 708.8 708
Y =5 1 707.6
76 708.7 708.8 31708.80.725 708.8617 65
705.0 7650 705.1
97 37 4 08.8
89
7
709.2 09.084
67
706.6 707.5
708.8
97
708.8
90 110 708.8
10
54
709.4
706.0 2
707.14
P7 15
35
57048.836 708 708
708.7 .320 709.5
08

707.0
707.3
375
067.8 55.637 708.7
33
68
770089.27
04
0964.9
59 708.1 770099.1.1.617044 709.403
707.0 708.8 708.0 46 83
06 35 68
57038.867
704.4 704.8 707 706.6 710.0 71
705.8 42 .228 8.0
6950

43 26 33
706.1 59 704.7 706.4 7087.5
08.2 708.1 71
56 703.8 95 707.2 64 973 97 28 708.9 7.0
70 701.7 701.9 92 07.1 86
10 57 701.9 72
X =2 2

02 706.5 708.2
BM1

71 5.0
.0 701.0 704 706 706 706.783 04 708.4
708

6.0
702.3 .044 705.5 7.00050.979 .206
36
708.1 01

71 4.0
704.2 71
67 64 99 86

71 3.0
711.1
706.9 09

71 2.0
709.0 03
707.8 710.4

71 1.0
39 709 18
708 .913

71
.0 708.5 707.7
710 68 700.7 41 708.0
70 708.6 709.3.726
.0 29 18
711 715.8 52

UN
77 700.0 708.1
.0 53
712 Y =5 1 90 707.9
.0
713 7600

7300
702.1 97 708.6 7
706.2 8 09
.0 37 7086.9.180

IN
714 04 701.1 708.1
19 58
.0 710.1 78 700.9
715 18 31
P6 P5

X =2 2
71
717.8 70 701.0 708.0

G
703.7 1.259 704.0

0.0
.0 60 61 46
P4
704.3
716 77 68 703 704.5
50
708.9
720.3 703.5 .677
704.0 22 701.2
P3 61

G
30 718.6 73 78 706.4 705.8 97 707.7
18 15 7 702.1

AN
.0 50 701.5 95
717 703.8
04.9
42 81 703.3 7
0
.0 708.9 11 706.6 701.5 71 702.0 707.3

P
7189.0 715.4
93 30 60 701.647 703.6 95 49 709.0
70
73

M
71 0.0 703.8 704.106 703.2
719.9
B70M 19

GE
72 7042.91 54

70 08.0
718.7
40 716.0
28
5.97

7
9.0
9 706.1 706.0 82
718.6 2 18 705.5
P7
712.4 34 84 705.6
14 39 56 702.0 4
702.3 9 Y =5 1
722.8
11 712.9
709.6
53 706.0
05
39
67 P2 7700
79 706.0
705.5

70
716.0 26
42

8.0
706.2
715.7 83 709.9 50 704.6
1.0

70
03 91 707.4 706.0 33
72 0

7.0
0 56
72
2 712.8 707.8 8
P9
720.0 0 53
43 712.7 1

707
724.9
3.0 714.8 43

.0
72 27 709.8 701.5
97

7250
7 38
4.0 709.6 8 705.9 7 05.6
72 52 28 61
723.2 70 .7
7077.4
705.6
P1

706

X =2 2
03 713.7 17 49
11 14

.0
705.0 705.8
710.5 32 22
25
BM 2

705.0
704
703
702.0
701.0
X = 227134.960

.0
.0
720.0
90 706.2
719.1 0

701.0.0
Y =5 517643.905

702
59

703.0
704.0
P13

705.0
P12 716.1
Z = +705.978 m P8 Y =5 1
P14 P11 P10 59
7650

705.0
724.0

720.0

705.0
715.0

710.0
714.0 GE 714.0
MP
713.0 AN 713.0
G
712.0 712.0

711.0 711.0

710.0 710.0

709.0 UNING 709.0

708.0 708.0

707.0 707.0

706.0 706.0

705.0 M.A.B = +705.000 M 705.0

704.0 704.0

703.0 703.0

702.0 M.A.N = +702.000 M 702.0

701.0 701.0

700.0 700.0

699.0 699.0
RENCANA
ELEVASI
TANAH ASLI

718,618

716.018

712.979

709.991

707,853

706,056

706,084

706.450
705.000

704.000
701.000

700.729

701.000

704.000

705.000

706.000
707.000
707.228

707,115

707,465

708,788

708,986

708.810

708.986

709.180
702.000

703.000
ELEVASI

STA.
P14 P13 P12 P11 P10 P9 P8 P7 P6 P5 P4 P3 P2 P1
1.34
2.95
0.28
0.49
0.30

0.58
0.71
0.69
4.82

3.19
1.01
1.00

24.81 24.97 24.80 24.92 25.00 15.00 9.86 11.30 8.02 9.94 15.00 25.00 25.94 26.84 26.88 25.27
REPUBLIK INDONESIA No.Paket 26/2013 Judul : No./ Jml. Hal :
PERENCANAAN TEKNIK ( DED )
09 / 67
Digambar Oleh : Direncanakan Oleh : Disetujui Oleh :
Ruas Jalan GENTING GERBANG - PAMEU
JEMBATAN NASIONAL Skala :
Hor. 1:500
Ver. 1:100
LINTAS TENGAH II Nama Jembatan JEMBATAN LAOT JAYA
KM.SIMPANG UNING 48+300
PAKET 26/2013 Provinsi/ Kabupaten
( Ahsan Syadzilly, ST ) ( Rudiansyah Putra, ST, M.Si ) ( Ir. Taufiq Saidi, M.Eng ) Tanggal :
ACEH/ACEH TENGAH Operator CAD Bridge Engineering Team Leader

71 718 719
7. . .0
71 0 0
7 6.0
7 15
71 14.0.0

7050
Y =5 1 BM 1 3.0

7200
7700
X = 227147.000

X =2 2

X =2 2
Y = 517677.000
Z = +706.000 m
6950

7100
707
Y =5 1

7250
.0 708
7700 71
7711 2.0
710.4
Y =5 1
X =2 2

.0 88
709 7700190. .0.0 7750 718.6

X =2 2
706.0 .0 715.8 03
8.00 06

X =2 2
710 710.5
705.0 710.5 79
.0 70 33
770 8.
704.0 7 109.00 710.5
711
.0 713 71 11.0.0 707.8 711 28
710.1 710.7
70 712 2 96 .327
70 3.0 .0 .0 71 .0 88 60
701.02.0 3.0
710.8 711.1

7000
20 710.2 22
Y =5 1 86 71
0.56
710.1 7
75 10.18
7650 Y =5 1 710.0 2 0
7700 713.0 06
Y =5 1

X =2 2
710.1 709.1 70 .4
06
710.4 71 708.315 70 87 7089.0 02 7750
32 0.636 11 9.09 51
2
P5
708.7 709.1
88 59 709.0
709.3
701.0 705.889 06
50 15
7
40 707.2 70078.7.722
705.4 84 708.9
702.0 708.9 97
43
703.0
710.1
93
708.6
78 708.7 P7084.986 62 710.3
17

P7076.465
704.0 708.7 78 709.2
72 708.8708
Y =5 1 707.6
76 708.7 708.8 31708.80.725 708.8617 65
705.0 7650 705.1
97 37 4 08.8
89
7
709.2 09.084
67
706.6 708.8 708.8
90 110 P7083.810 54
706.0

707.0
2
707.14
P7 15
707.5
707.3
375
35

067.8
0964.9
59
57048.836 708
55.637 1 97

708.7
33
708
708.7 .320
68

708.0 708.1
709.4

770089.27
709.5
08
04
770099.1.1.617044 709.403
707.0 708.8 46 83
06 35 68
57038.867
704.4 704.8 707 706.6 710.0 71
705.8 42 .228 8.0
6950

43 26 33
706.1 59 704.7 706.4 7087.5
08.2 708.1 71
973 97
56 703.8
70 701.7
10
701.9
57 701.9
95 707.2
92 64 07.1
72
28
P7028.986 7.0
X =2 2

02 706.5 708.2
BM1

71 5.0
.0 701.0 704 706 706 706.783 04 708.4
708

6.0
702.3 .044 705.5 7.00050.979 .206
36
708.1 01

71 4.0
704.2 71
67 64 99 86

71 3.0
711.1

A
706.9 09

71 2.0
709.0 03
707.8 710.4

71 1.0
39 709 18

AN
708 .913

71
.0 708.5 707.7
710 68 700.7 41 708.0
70 708.6 709.3.726
.0 29 18
711 715.8 52

UN
77 700.0 708.1

NC
.0 53
712 Y =5 1 90 707.9
.0
713 7600 P1

7300
702.1 97 708.6 7
706.2 8 09
.0 37 7086.9.180

IN
714 04 701.1 708.1
19 58
.0 710.1 78 700.9
715
P6

RE
18 31
P5

X =2 2
71
717.8 70 701.0 708.0

G
703.7 1.259 704.0

0.0
.0 60 61 46
P4
704.3
716 77 68 703 704.5
50
708.9
720.3 703.5 .677
P7181.6418
704.0 22 701.2
P3 61

G
30 73 78 706.4 705.8 97 707.7
15 7 702.1

AN
.0 50 701.5

T.
95
717 703.8
04.9
42 81 703.3 7
0
.0 708.9 11 706.6 701.5 71 702.0 707.3

P
7189.0 715.4 30 60 701.647 703.6 95 49 709.0

JB
93 73 70

M
71 0.0 703.8 704.106 703.2
719.9
B70M 19

GE
72
P7161.0318 7042.91 54

70 08.0
718.7
40
P8 28
5.97

7
9.0
9 706.1 706.0 82
718.6 2 705.5
P7
712.4 34 84 705.6
14 39 56 702.0 4
702.3 9 Y =5 1
722.8 709.6 706.0
39
67 P2 7700
11 P7112.9279 53
706.0 05
705.5

70
26
716.0

2 42

8.0
706.2
1.0
715.7 83
P1191
709.9
P9
50 704.6

70
03 707.4 706.0 33
72 0

7.0
08 56
72
2
720.0
43
712.8
712.7 1
0 P7071.8053

707
724.9
3.0 714.8 43

.0
72 27 709.8 701.5
97

7250
7 38
4.0 709.6 8 705.9 7 05.6
72 52 28 61
723.2 70 .7
7077.4
705.6
P1

706

X =2 2
03 713.7 17 49
11 14

.0
705.0 705.8
710.5 32 22
25
BM 2

705.0
704
703
702.0
701.0
X = 227134.960

.0
.0
720.0
90 706.2
719.1 0

701.0.0
Y =5 517643.905

702
59

703.0
704.0
P13

705.0
P12 716.1
Z = +705.978 m P8 Y =5 1
P14 P11 P10 59
7650
P9

705.0
724.0

720.0

705.0
715.0

710.0
714.0 GE 714.0
MP
713.0 AN 713.0
G
712.0
50.00 10.00 40.00 10.00 50.00 712.0

711.0 711.0

710.0 710.0

709.0 UNING 709.0


+ 0.5 % 0% 0% + 0.5 %
708.0 708.0

707.0 707.0

706.0 706.0
ST CS SC TS TS SC CS ST
705.0 M.A.B = +705.000 M +9.1 KA 705.0
-9.3 KA
704.0 704.0

703.0 703.0

702.0 3% 2 M.A.N = +702.000 M 3% 1 3% 702.0

701.0 701.0

700.0 +9.3 KI -9.1 KI 700.0


+3 + 9.3 +3 +3 +3
-3 -3 -3 - 9.3 -3 -3 -3 -3 -3 -3 -3 -3 -3

699.0 699.0
0 + 9.3 0 0 + 9.1 + 9.1 0
-3 - 9.3 -3 -3 - 9.1 - 9.1 -3
712.979
718,618

716.018

707,882

707,665

706,084

706.450
705.000

704.000
701.000

700.729

701.000

704.000

705.000

706.000
707.000
707.228

707,115

706,526

708,397

709,073

708.810

708.986

709.180
702.000

703.000
RENCANA

709.991
ELEVASI
TANAH ASLI

718,618

716.018

712.979

709.991

707,853

706,056

706,084

706.450
705.000

704.000
701.000

700.729

701.000

704.000

705.000

706.000
707.000
707.228

707,115

707,465

708,788

708,986

708.810

708.986

709.180
702.000

703.000
ELEVASI

STA.
P14 P13 P12 P11 P10 P9 P8 P7 P6 P5 P4 P3 P2 P1
1.34
2.95
0.28
0.49
0.30

0.58
0.71
0.69
4.82

3.19
1.01
1.00

24.81 24.97 24.80 24.92 25.00 15.00 9.86 11.30 8.02 9.94 15.00 25.00 25.94 26.84 26.88 25.27
REPUBLIK INDONESIA No.Paket 26/2013 Judul : No./ Jml. Hal : 13 / 67
PERENCANAAN TEKNIK ( DED ) Digambar Oleh : Direncanakan Oleh : Disetujui Oleh :
Ruas Jalan GENTING GERBANG - PAMEU
JEMBATAN NASIONAL Skala : 1:100
LINTAS TENGAH II Nama Jembatan JEMBATAN LAOT JAYA POTONGAN P-4
KM.SIMPANG UNING 48+300
PAKET 26/2013 Provinsi/ Kabupaten
( Ahsan Syadzilly, ST ) ( Rudiansyah Putra, ST, M.Si ) ( Ir. Taufiq Saidi, M.Eng ) Tanggal :
ACEH/ACEH TENGAH Operator CAD Bridge Engineering Team Leader

716

715

11.00

7.00
2.00 3.50 3.50 2.00
BAHU JALAN BADAN JALAN BADAN JALAN BAHU JALAN
Ac-Wc (t=4cm)
Ac-Wc (t=4cm) CL
Ac-Bc (t=6cm)
LPA Kelas A (t=21cm) ELV. EXISTING. 709.073 LPA Kelas A (t=15cm)
LPA Kelas B (t=20cm) LPA Kelas B (t=20cm) Galian Tanah
710 Timbunan Pilihan (t=30cm) ELV. RECN. 708.986
Solid Line Timbunan Pilihan (t=30cm)
Dash Line
Solid Line
Guide Post +3% P4 +3% -3% -5%
1
145 2
100
Pasir Urug 100 Saluran Drainase
80 Bentuk U Type DS-1

120

705

bidang persamaan
reference level
700,00
709,318 709,318

707,725 707,725

708,986 709,073

708,814 708,901

708,051 708,850

709,402 708,815

710,760 710,760
ELEVASI RENCANA

ELEVASI TANAH ASLI


ORIGINAL GROUND LEVEL

JARAK (m)

0,94
9,30 3,10 6,80 2,04 7,99
DISTANCE (m)

POTONGAN P-4
Skala 1 : 100
REPUBLIK INDONESIA No.Paket 26/2013 Judul : No./ Jml. Hal : 14 / 67
PERENCANAAN TEKNIK ( DED ) Digambar Oleh : Direncanakan Oleh : Disetujui Oleh :
Ruas Jalan GENTING GERBANG - PAMEU
JEMBATAN NASIONAL Skala : 1:100
LINTAS TENGAH II Nama Jembatan JEMBATAN LAOT JAYA POTONGAN P-5
KM.SIMPANG UNING 48+300
PAKET 26/2013 Provinsi/ Kabupaten
( Ahsan Syadzilly, ST ) ( Rudiansyah Putra, ST, M.Si ) ( Ir. Taufiq Saidi, M.Eng ) Tanggal :
ACEH/ACEH TENGAH Operator CAD Bridge Engineering Team Leader

11.00

7.00
2.00 3.50 3.50 2.00
BAHU JALAN BADAN JALAN BADAN JALAN BAHU JALAN

Ac-Wc (t=4cm) Ac-Wc (t=4cm)


711 LPA Kelas A (t=21cm) Ac-Bc (t=6cm)
LPA Kelas B (t=20cm) LPA Kelas A (t=15cm) Galian Tanah
CL
Timbunan Pilihan (t=30cm) LPA Kelas B (t=20cm)
710 Solid Line Timbunan Pilihan (t=30cm)
Guide Post ELV. RECN. 708.788
Dash Line
Solid Line
P5
+9.1%
1
-9.1%
145 2

ELV. EXISTING. 708.709 100


80
Pasir Urug Saluran Drainase
100
120 Bentuk U Type DS-1

705

bidang persamaan
reference level
699,00
707,461 707,461

708,722 709,159

708,678 708,943

708,788 708,397

708,311 708,252

710,115 708,238

710,528 710,528

710,488 710,488
ELEVASI RENCANA

ELEVASI TANAH ASLI


ORIGINAL GROUND LEVEL

JARAK (m)
3,10 2,38 6,00 2,12 1,20 9,93 7,31
DISTANCE (m)

POTONGAN P-5
Skala 1 : 100
REPUBLIK INDONESIA No.Paket 26/2013 Judul : No./ Jml. Hal : 15 / 67
PERENCANAAN TEKNIK ( DED ) Digambar Oleh : Direncanakan Oleh : Disetujui Oleh :
Ruas Jalan GENTING GERBANG - PAMEU
JEMBATAN NASIONAL Skala : 1:100
LINTAS TENGAH II Nama Jembatan JEMBATAN LAOT JAYA POTONGAN P-6
KM.SIMPANG UNING 48+300
PAKET 26/2013 Provinsi/ Kabupaten
( Ahsan Syadzilly, ST ) ( Rudiansyah Putra, ST, M.Si ) ( Ir. Taufiq Saidi, M.Eng ) Tanggal :
ACEH/ACEH TENGAH Operator CAD Bridge Engineering Team Leader

11.00

7.00
711
2.00 3.50 3.50 2.00
BAHU JALAN BADAN JALAN BADAN JALAN BAHU JALAN
710
Ac-Wc (t=4cm)
Ac-Wc (t=4cm)
LPA Kelas A (t=21cm)
CL
Ac-Bc (t=6cm)
LPA Kelas A (t=15cm)
LPA Kelas B (t=20cm) LPA Kelas B (t=20cm)
Timbunan Pilihan (t=30cm) ELV. RECN. 707.465
Solid Line Timbunan Pilihan (t=30cm)
Guide Post Dash Line
Solid Line
P6
0% 0% -3% -5%
1
100 2
100
ELV. EXISTING. 707.426
80 Saluran Drainase
Pasir Urug 100 Bentuk U Type DS-1
120
705

700

bidang persamaan
reference level
696,00
706,610 706,610

706,894 707,465

707,535 707,535

707,465 706,526

705,443 705,443

705,840 705,840

709,389 709,389

710,006 710,006
ELEVASI RENCANA

ELEVASI TANAH ASLI


ORIGINAL GROUND LEVEL

JARAK (m)
5,15 4,44 6,35 4,66 2,44 1,19 6,64
DISTANCE (m)

POTONGAN P-6
Skala 1 : 100
REPUBLIK INDONESIA No.Paket 26/2013 Judul : No./ Jml. Hal : 16 / 67
PERENCANAAN TEKNIK ( DED ) Digambar Oleh : Direncanakan Oleh : Disetujui Oleh :
Ruas Jalan GENTING GERBANG - PAMEU
JEMBATAN NASIONAL Skala : 1:100
LINTAS TENGAH II Nama Jembatan JEMBATAN LAOT JAYA POTONGAN P-7
KM.SIMPANG UNING 48+300
PAKET 26/2013 Provinsi/ Kabupaten
( Ahsan Syadzilly, ST ) ( Rudiansyah Putra, ST, M.Si ) ( Ir. Taufiq Saidi, M.Eng ) Tanggal :
ACEH/ACEH TENGAH Operator CAD Bridge Engineering Team Leader

714

11.00

7.00
2.00 3.50 3.50 2.00
710 BAHU JALAN BADAN JALAN BADAN JALAN BAHU JALAN
Ac-Wc (t=4cm)
Ac-Wc (t=4cm)
CL
Ac-Bc (t=6cm)
LPA Kelas A (t=21cm) LPA Kelas A (t=15cm)
LPA Kelas B (t=20cm) ELV. RECN. 707,115 LPA Kelas B (t=20cm)
Timbunan Pilihan (t=30cm) Timbunan Pilihan (t=30cm) P7
Solid Line Dash Line
Guide Post Solid Line
-5% -3% -3% -5%

100
ELV. EXISTING. 706,767 Saluran Drainase
Pasir Urug 100 Bentuk U Type DS-1
705

700

bidang persamaan
reference level
698,00
796.959 797,014

796,736 797,099

706,583 707,071

706,464 706,989

707,006 707,006

707,115 707,115

706,624 706,624

705,167 705,167
ELEVASI RENCANA

ELEVASI TANAH ASLI


ORIGINAL GROUND LEVEL

JARAK (m)
4,63 1,13 3,25 4,21 5,91 2,04 2,51
DISTANCE (m)

POTONGAN P-7
Skala 1 : 100
REPUBLIK INDONESIA No.Paket 26/2013 Judul : No./ Jml. Hal : 17 / 67
PERENCANAAN TEKNIK ( DED ) Digambar Oleh : Direncanakan Oleh : Disetujui Oleh :
Ruas Jalan GENTING GERBANG - PAMEU
JEMBATAN NASIONAL Skala : 1:100
LINTAS TENGAH II Nama Jembatan JEMBATAN LAOT JAYA POTONGAN P-8
KM.SIMPANG UNING 48+300
PAKET 26/2013 Provinsi/ Kabupaten
( Ahsan Syadzilly, ST ) ( Rudiansyah Putra, ST, M.Si ) ( Ir. Taufiq Saidi, M.Eng ) Tanggal :
ACEH/ACEH TENGAH Operator CAD Bridge Engineering Team Leader

11.00

7.00
2.00 3.50 3.50 2.00
BAHU JALAN BADAN JALAN BADAN JALAN BAHU JALAN
Ac-Wc (t=4cm)
Ac-Wc (t=4cm)
CL Ac-Bc (t=6cm)
LPA Kelas A (t=21cm) LPA Kelas A (t=15cm)
LPA Kelas B (t=20cm) ELV. RECN. 707.280 LPA Kelas B (t=20cm)
Timbunan Pilihan (t=30cm) Timbunan Pilihan (t=30cm)
Solid Line Dash Line Solid Line
Guide Post -3% 0% -5%
-5%
707 1
P8
2
1 2
145
200
80
705
80 Timbunan Biasa (t=variabel) 120
120 ELV. EXISTING. 704.874

700

bidang persamaan
reference level
695,00

704,633 707,256

705,542 707,280

706,005 706,840

706,084 706,084

704,982 704,982

703,821 703,821
ELEVASI RENCANA

ELEVASI TANAH ASLI


ORIGINAL GROUND LEVEL

JARAK (m)
17,62 3,61 3,10 5,25 1,27 1,57
DISTANCE (m)

POTONGAN P-8
Skala 1 : 100
REPUBLIK INDONESIA No.Paket 26/2013 Judul : No./ Jml. Hal : 18 / 67
PERENCANAAN TEKNIK ( DED ) Digambar Oleh : Direncanakan Oleh : Disetujui Oleh :
Ruas Jalan GENTING GERBANG - PAMEU
JEMBATAN NASIONAL Skala : 1:100
LINTAS TENGAH II Nama Jembatan JEMBATAN LAOT JAYA POTONGAN P-9
KM.SIMPANG UNING 48+300
PAKET 26/2013 Provinsi/ Kabupaten
( Ahsan Syadzilly, ST ) ( Rudiansyah Putra, ST, M.Si ) ( Ir. Taufiq Saidi, M.Eng ) Tanggal :
ACEH/ACEH TENGAH Operator CAD Bridge Engineering Team Leader

11.00

7.00
2.00 3.50 3.50 2.00
BAHU JALAN BADAN JALAN BADAN JALAN BAHU JALAN

Ac-Wc (t=4cm)
Ac-Wc (t=4cm)
CL
Ac-Bc (t=6cm)
LPA Kelas A (t=21cm) LPA Kelas A (t=15cm)
LPA Kelas B (t=20cm) ELV. RECN. 707,380 LPA Kelas B (t=20cm)
Timbunan Pilihan (t=30cm) Timbunan Pilihan (t=30cm)
708 Solid Line Dash Line Solid Line
+9.3%
Guide Post
-9.3% 1
2
P9 200
1
2
200 Timbunan Biasa (t=variabel)
80
ELV. EXISTING. 705.967
705
120
80
120

bidang persamaan
reference level
706,205 706,205

705,032 705,032

705,649 706,931

705,928 705,158

706,056 707,665

706,250 706,250

705,556 705,556
ELEVASI RENCANA

ELEVASI TANAH ASLI


ORIGINAL GROUND LEVEL

JARAK (m)
7,06 2,72 2,45 7,89 1,93 7,09
DISTANCE (m)

POTONGAN P-9
Skala 1 : 100
REPUBLIK INDONESIA No.Paket 26/2013 Judul : No./ Jml. Hal : 19 / 67
PERENCANAAN TEKNIK ( DED ) Digambar Oleh : Direncanakan Oleh : Disetujui Oleh :
Ruas Jalan GENTING GERBANG - PAMEU
JEMBATAN NASIONAL Skala : 1:100
LINTAS TENGAH II Nama Jembatan JEMBATAN LAOT JAYA POTONGAN P-10
KM.SIMPANG UNING 48+300
PAKET 26/2013 Provinsi/ Kabupaten
( Ahsan Syadzilly, ST ) ( Rudiansyah Putra, ST, M.Si ) ( Ir. Taufiq Saidi, M.Eng ) Tanggal :
ACEH/ACEH TENGAH Operator CAD Bridge Engineering Team Leader

717

715

11.00
Galian tanah
7.00
1
1
2.00 3.50 3.50 2.00
BAHU JALAN BADAN JALAN BADAN JALAN BAHU JALAN
Ac-Wc (t=4cm)
710 Ac-Bc (t=6cm)
Ac-Wc (t=4cm)
LPA Kelas A (t=21cm) CL LPA Kelas A (t=15cm)
288 LPA Kelas
1
2
B (t=20cm) ELV. RECN. 707.895
LPA Kelas B (t=20cm)
Timbunan Pilihan (t=30cm) Solid Line Timbunan Pilihan (t=30cm)
Dash Line Solid Line P10
Guide Post Timbunan Pilihan (t=variasi)
-5% -3% 0% -5%

80
ELV. EXISTING. 707.781
120

705

bidang persamaan
reference level
710,525 706,956

707,414 707,781

707,717 707,804

707,853 707,882

707,408 707,844

706,026 706,026
ELEVASI RENCANA

ELEVASI TANAH ASLI


ORIGINAL GROUND LEVEL

JARAK (m)
0,90

10,14 2,67 7,67 1,76 4,29


DISTANCE (m)

POTONGAN P-10
Skala 1 : 100
REPUBLIK INDONESIA No.Paket 26/2013 Judul : No./ Jml. Hal : 24 / 67
PERENCANAAN TEKNIK ( DED ) Digambar Oleh : Direncanakan Oleh : Disetujui Oleh :
Ruas Jalan GENTING GERBANG - PAMEU
JEMBATAN NASIONAL DETAIL SALURAN Skala :
LINTAS TENGAH II Nama Jembatan JEMBATAN LAOT JAYA
KM.SIMPANG UNING 48+300
PAKET 26/2013 Provinsi/ Kabupaten
( Ahsan Syadzilly, ST ) ( Rudiansyah Putra, ST, M.Si ) ( Ir. Taufiq Saidi, M.Eng ) Tanggal :
ACEH/ACEH TENGAH Operator CAD Bridge Engineering Team Leader

70 70

15 15 40 15 15 15 15 40 15 15

Ø 12-150

MA MA

Beton K-250 Beton K-250


60

60
Type U DS-1 Type U DS-1
75

75
Ø 12-150

Ø 12-150
15

15
DS DS

Pasir Urug Pasir Urug


15

15
10

10
Ø 12-150

DETAIL SALURAN P=30 M


SKALA 1 : 20
REPUBLIK INDONESIA No.Paket 26/2013 Judul : No./ Jml. Hal : 23/55
PERENCANAAN TEKNIK ( DED ) Digambar Oleh : Direncanakan Oleh : Disetujui Oleh :
Ruas Jalan GENTING GERBANG - PAMEU
JEMBATAN NASIONAL Skala :
1 : 50
1 : 10
LINTAS TENGAH II Nama Jembatan JEMBATAN LAOT JAYA
KM.SIMPANG UNING 48+300
PAKET 26/2013 Provinsi/ Kabupaten
( Ahsan Syadzilly, ST ) ( Rudiansyah Putra, ST, M.Si ) ( Ir. Taufiq Saidi, M.Eng ) Tanggal :
ACEH/ACEH TENGAH Operator CAD Bridge Engineering Team Leader

A
25 Balok 25x35 cm

35

35
Kolom 25x35 cm

Pas. Batu Gunung


100-200

100-200
30-130

30-130
1
2
Pipa Drainase PVC Ø 75 mm

Sloof 30x35 cm

Angkur Ø 12 -1000
Pipa Drainase PVC Ø 75 mm Pipa Drainase PVC Ø 75 mm
35

35
Pipa Drainase PVC Ø 75 mm

Pas. Batu Gunung


80

80
20 80 20
120 A
25 300 25 300 25

POTONGAN A-A DETAIL TPT


Skala 1 : 50
Skala 1 : 50

2 D 16 125 A

Ø 10 - 150
35

35

B B
2 D 16 A
100-200

30-130

25
Pipa Drainase PVC Ø 75 mm Pipa Drainase PVC Ø 75 mm Pipa Drainase PVC Ø 75 mm

Ø 10-1250 Ø 10-1250 Ø 10-1250


C

DETAIL A-A (K-250)


35

Skala 1 : 10

Ø 12 - 1000 25 300 25 Ø 12 - 1000 300 25

2 D 16 2 D 16

Ø 10 - 200 Ø 10 - 200
35

35

DETAIL PEMBESIAN TPT P=175 M


Skala 1 : 50
2 D 16 2 D 16
CATATAN:
25 30
MUTU BETON K-250
DETAIL B-B (K-250) DETAIL C-C (K-250) MUTU BAJA fy -320
Skala 1 : 10 Skala 1 : 10
REPUBLIK INDONESIA No.Paket 26/2013 Judul : No./ Jml. Hal :
PERENCANAAN TEKNIK ( DED ) Digambar Oleh : Direncanakan Oleh : Disetujui Oleh :
Ruas Jalan GENTING GERBANG - PAMEU
JEMBATAN NASIONAL Skala : 1:100
LINTAS TENGAH II Nama Jembatan JEMBATAN LAOT JAYA TIPIKAL POTONGAN MELINTANG
KM.SIMPANG UNING 48+300
PAKET 26/2013 Provinsi/ Kabupaten
( Ahsan Syadzilly, ST ) ( Rudiansyah Putra, ST, M.Si ) ( Ir. Taufiq Saidi, M.Eng ) Tanggal :
ACEH/ACEH TENGAH Operator CAD Bridge Engineering Team Leader

11.00

7.00
2.00 3.50 3.50 2.00
BAHU JALAN BADAN JALAN BADAN JALAN BAHU JALAN
Ac-Wc (t=4cm)
Ac-Wc (t=4cm)
CL Ac-Bc (t=6cm)
Lapis Pondasi Agregat (LPA) Kelas A (t=21cm) Lapis Pondasi Agregat (LPA) Kelas A (t=15cm)
Lapis Pondasi Agregat (LPA) Kelas B (t=20cm) ELV. RECN. 709.198 Lapis Pondasi Agregat (LPA) Kelas B (t=20cm)
Timbunan Pilihan (t=30cm) Dash Line Timbunan Pilihan (t=30cm)
Solid Line Solid Line
Guide Post
-5% -3% -3% -5% Galian Tanah
1
100
145 2
ELV. EXISTING. 709.068 Saluran Drainase
Pasir Urug 100 Bentuk U Type DS-1
80
120

TIPIKAL POTONGAN MELINTANG


Skala 1 : 100
REPUBLIK INDONESIA No.Paket 26/2013 Judul : No./ Jml. Hal :
PERENCANAAN TEKNIK ( DED ) Digambar Oleh : Direncanakan Oleh : Disetujui Oleh :
Ruas Jalan GENTING GERBANG - PAMEU
JEMBATAN NASIONAL Skala :
Hor. 1:500
Ver. 1:100
LINTAS TENGAH II Nama Jembatan JEMBATAN LAOT JAYA
KM.SIMPANG UNING 48+300
PAKET 26/2013 Provinsi/ Kabupaten
( Ahsan Syadzilly, ST ) ( Rudiansyah Putra, ST, M.Si ) ( Ir. Taufiq Saidi, M.Eng ) Tanggal :
ACEH/ACEH TENGAH Operator CAD Bridge Engineering Team Leader

71 718 719
7. . .0
71 0 0
7 6.0
7 15
71 14.0.0

7050
Y =5 1 BM 1 3.0

7200
7700
X = 227147.000

X =2 2

X =2 2
Y = 517677.000
Z = +706.000 m
6950

7100
707
Y =5 1

7250
.0 708
7700 71
7711 2.0
710.4
Y =5 1
X =2 2

.0 88
709 7700190. .0.0 7750 718.6

X =2 2
706.0 .0 715.8 03
8.00 06

X =2 2
710 710.5
705.0 710.5 79
.0 70 33
770 8.
704.0 7 109.00 710.5
711
.0 713 71 11.0.0 707.8 711 28
710.1 710.7
70 712 2 96 .327
70 3.0 .0 .0 71 .0 88 60
701.02.0 3.0
710.8 711.1

7000
20 710.2 22
Y =5 1 86 71
0.56
710.1 7
75 10.18
7650 Y =5 1 710.0 2 0
7700 713.0 06
Y =5 1

X =2 2
710.1 709.1 70 .4
06
710.4 71 708.315 70 87 7089.0 02 7750
32 0.636 11 9.09 51
2
P5
708.7 709.1
88 59 709.0
709.3
701.0 705.889 06
50 15
7
40 707.2 70078.7.722
705.4 84 708.9
702.0 708.9 97
43
703.0
710.1
93
708.6
78 708.7 P7084.986 62 710.3
17

P7076.465
704.0 708.7 78 709.2
72 708.8708
Y =5 1 707.6
76 708.7 708.8 31708.80.725 708.8617 65
705.0 7650 705.1
97 37 4 08.8
89
7
709.2 09.084
67
706.6 708.8 708.8
90 110 P7083.810 54
706.0

707.0
2
707.14
P7 15
707.5
707.3
375
35

067.8
0964.9
59
57048.836 708
55.637 1 97

708.7
33
708
708.7 .320
68

708.0 708.1
709.4

770089.27
709.5
08
04
770099.1.1.617044 709.403
707.0 708.8 46 83
06 35 68
57038.867
704.4 704.8 707 706.6 710.0 71
705.8 42 .228 8.0
6950

43 26 33
706.1 59 704.7 706.4 7087.5
08.2 708.1 71
973 97
56 703.8
70 701.7
10
701.9
57 701.9
95 707.2
92 64 07.1
72
28
P7028.986 7.0
X =2 2

02 706.5 708.2
BM1

71 5.0
.0 701.0 704 706 706 706.783 04 708.4
708

6.0
702.3 .044 705.5 7.00050.979 .206
36
708.1 01

71 4.0
704.2 71
67 64 99 86

71 3.0
711.1

A
706.9 09

71 2.0
709.0 03
707.8 710.4

71 1.0
39 709 18

AN
708 .913

71
.0 708.5 707.7
710 68 700.7 41 708.0
70 708.6 709.3.726
.0 29 18
711 715.8 52

UN
77 700.0 708.1

NC
.0 53
712 Y =5 1 90 707.9
.0
713 7600 P1

7300
702.1 97 708.6 7
706.2 8 09
.0 37 7086.9.180

IN
714 04 701.1 708.1
19 58
.0 710.1 78 700.9
715
P6

RE
18 31
P5

X =2 2
71
717.8 70 701.0 708.0

G
703.7 1.259 704.0

0.0
.0 60 61 46
P4
704.3
716 77 68 703 704.5
50
708.9
720.3 703.5 .677
P7181.6418
704.0 22 701.2
P3 61

G
30 73 78 706.4 705.8 97 707.7
15 7 702.1

AN
.0 50 701.5

T.
95
717 703.8
04.9
42 81 703.3 7
0
.0 708.9 11 706.6 701.5 71 702.0 707.3

P
7189.0 715.4 30 60 701.647 703.6 95 49 709.0

JB
93 73 70

M
71 0.0 703.8 704.106 703.2
719.9
B70M 19

GE
72
P7161.0318 7042.91 54

70 08.0
718.7
40
P8 28
5.97

7
9.0
9 706.1 706.0 82
718.6 2 705.5
P7
712.4 34 84 705.6
14 39 56 702.0 4
702.3 9 Y =5 1
722.8 709.6 706.0
39
67 P2 7700
11 P7112.9279 53
706.0 05
705.5

70
26
716.0

2 42

8.0
706.2
1.0
715.7 83
P1191
709.9
P9
50 704.6

70
03 707.4 706.0 33
72 0

7.0
08 56
72
2
720.0
43
712.8
712.7 1
0 P7071.8053

707
724.9
3.0 714.8 43

.0
72 27 709.8 701.5
97

7250
7 38
4.0 709.6 8 705.9 7 05.6
72 52 28 61
723.2 70 .7
7077.4
705.6
P1

706

X =2 2
03 713.7 17 49
11 14

.0
705.0 705.8
710.5 32 22
25
BM 2

705.0
704
703
702.0
701.0
X = 227134.960

.0
.0
720.0
90 706.2
719.1 0

701.0.0
Y =5 517643.905

702
59

703.0
704.0
P13

705.0
P12 716.1
Z = +705.978 m P8 Y =5 1
P14 P11 P10 59
7650
P9

705.0
724.0

720.0

705.0
715.0

710.0
714.0 GE 714.0
MP
713.0 AN 713.0
G
712.0
50.00 10.00 40.00 10.00 50.00 712.0

711.0 711.0

710.0 710.0

709.0 UNING 709.0


+ 0.5 % 0% 0% + 0.5 %
708.0 708.0

707.0 707.0

706.0 706.0
ST CS SC TS TS SC CS ST
705.0 M.A.B = +705.000 M +9.1 KA 705.0
-9.3 KA
704.0 704.0

703.0 703.0

702.0 3% 2 M.A.N = +702.000 M 3% 1 3% 702.0

701.0 701.0

700.0 +9.3 KI -9.1 KI 700.0


+3 + 9.3 +3 +3 +3
-3 -3 -3 - 9.3 -3 -3 -3 -3 -3 -3 -3 -3 -3

699.0 699.0
0 + 9.3 0 0 + 9.1 + 9.1 0
-3 - 9.3 -3 -3 - 9.1 - 9.1 -3
(CENTER LINE - JALAN)

712.979
718,618

716.018

707,882

707,665

706,084

706.450
705.000

704.000
701.000

700.729

701.000

704.000

705.000

706.000
707.000
707.228

707,115

706,526

708,397

709,073

708.810

708.986

709.180
RENCANA

702.000

703.000
ELEVASI

709.991
TANAH ASLI

718,618

716.018

712.979

709.991

707,853

706,056

706,084

706.450
705.000

704.000
701.000

700.729

701.000

704.000

705.000

706.000
707.000
707.228

707,115

707,465

708,788

708,986

708.810

708.986

709.180
702.000

703.000
ELEVASI

STA.
P14 P13 P12 P11 P10 P9 P8 P7 P6 P5 P4 P3 P2 P1
1.34
2.95
0.28
0.49
0.30

0.58
0.71
0.69
4.82

3.19
1.01
1.00

24.81 24.97 24.80 24.92 25.00 15.00 9.86 11.30 8.02 9.94 15.00 25.00 25.94 26.84 26.88 25.27
REPUBLIK INDONESIA No.Paket 26/2013 Judul : No./ Jml. Hal :
Digambar Oleh : Direncanakan Oleh : Disetujui Oleh :
DIREKTORAT JENDERAL BINA MARGA PERENCANAAN TEKNIK ( DED ) Ruas Jalan GENTING GERBANG - PAMEU
Skala :
JEMBATAN LAOT JAYA DENAH JEMBATAN
JEMBATAN NASIONAL LINTAS TENGAH II Nama Jembatan
KM.SIMPANG UNING 48+300
PAKET 26/2013 ( Ahsan Syadzilly, ST ) ( Rudiansyah Putra, ST, M.Si )
POTONGAN MEMANJANG
Tanggal :
( Ir. Taufiq Saidi, M.Eng )
Provinsi/ Kabupaten ACEH/ACEH TENGAH Operator CAD
PROVINSI ACEH Bridge Engineering Team Leader

719 P14

GEMPANG
50.00
715

P12

P11
710

P10

705

bidang persamaan
reference level
699,00

709.991 709.991
712.979 712.979

707.853 707,882
ELEVASI RENCANA
(CENTER LINE - JALAN)

ELEVASI TANAH ASLI


ORIGINAL GROUND LEVEL

JARAK (m)
24,97
DISTANCE (m) 24.80 24.92 25.00

50.00

150

GEMPANG

1300 1100

150
10.00 40.00 10.00

+ 0.5 % 0% 0% + 1.6
L AO T JAYA L AO T JAYA

P7

P9 P8

1.00 M.A.B = +705.000 M

2X7 TITIK TIANG BOR PILE 2X7 TITIK TIANG BOR PILE
706.084 706,084 D 80 L= 21,5 M DARI BAWAH POER M.A.N = +702.000 M D 80 L= 21,5 M DARI BAWAH POER

706.450 707.420

705.000 707.420

707.420
707.420
707.420
707.420

700.729 707.420

701.000 707.420
702.000 707.420
703.000 707.420
704.000 707.420

704.000 707.420

706.000 707.420

707.000 707.420

707.228 707.420
706.056 707,665

707.115 707,115
704.000
703.000
702.000
701.000

1.01
1.34

1.00
.71
.28
.49
.30

.58

.69
15.00 9.86 2.95 11.30 8.02 4.82 3.19 9.94 15.00

10.00 10.00

CL Bearing

2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 CL Bearing
Pipa Sandaran Ø 75 mm

Trotoar

3.00
2.00 2.00 2.00 2.00 2.00 2.00 Trotoar 2.50 2.00 2.00 2.00 2.00 2.00 2.00 2.

40.00
50.00

UNING
6% P5 P4 P3

P6
707.465 706,526

708.788 708,397

708.986 709,073

708.810 708.810
25.00 25.94 26.84

POTONGAN MEMANJANG
SKALA 1 : 200

50.00

UNING

2.00 2.00 2.00

DENAH JEMBATAN
SKALA 1 : 200
REPUBLIK INDONESIA No.Paket 26/2013 Judul : No./ Jml. Hal : 27 / 67
PERENCANAAN TEKNIK ( DED ) Digambar Oleh : Direncanakan Oleh : Disetujui Oleh :
Ruas Jalan GENTING GERBANG - PAMEU
JEMBATAN NASIONAL Skala :
LINTAS TENGAH II Nama Jembatan JEMBATAN LAOT JAYA
KM.SIMPANG UNING 48+300
DATA BORING TANAH
PAKET 26/2013 Provinsi/ Kabupaten
( Ahsan Syadzilly, ST ) ( Rudiansyah Putra, ST, M.Si ) ( Ir. Taufiq Saidi, M.Eng ) Tanggal :
ACEH/ACEH TENGAH Operator CAD Bridge Engineering Team Leader

DATA BORING - I DATA BORING - II


REPUBLIK INDONESIA No.Paket 26/2013 Judul : No./ Jml. Hal :
PERENCANAAN TEKNIK ( DED ) Digambar Oleh : Direncanakan Oleh : Disetujui Oleh :
Ruas Jalan GENTING GERBANG - PAMEU
JEMBATAN NASIONAL DENAH JEMBATAN Skala :
LINTAS TENGAH II Nama Jembatan JEMBATAN LAOT JAYA
KM.SIMPANG UNING 48+300
PAKET 26/2013 Provinsi/ Kabupaten
( Ahsan Syadzilly, ST ) ( Rudiansyah Putra, ST, M.Si ) ( Ir. Taufiq Saidi, M.Eng ) Tanggal :
ACEH/ACEH TENGAH Operator CAD Bridge Engineering Team Leader

Tembok Pengarah

CL Bearing

2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 CL Bearing

1.00
150 200 300 300 300 300 300 150
Pipa Galvanis Ø 100 mm
Jarak 75 cm, Panjang 150 cm

5.00
GEMPANG Plat Injak Rencana UNING
7.00
Plat Injak Rencana
Expantion Joint Melintang

150 200 300 300 300 300 300 150

1.00
200

200 250 Girder Rangka Baja 250


Rangka Baja Trotoar Rencana
300 Tiang Sandaran 300
Abutment
40.00

DENAH JEMBATAN
SKALA 1 : 100
REPUBLIK INDONESIA No.Paket 26/2013 Judul : No./ Jml. Hal : 27-b/56
PERENCANAAN TEKNIK ( DED ) Digambar Oleh : Direncanakan Oleh : Disetujui Oleh :
Ruas Jalan GENTING GERBANG - PAMEU
JEMBATAN NASIONAL Skala :
LINTAS TENGAH II Nama Jembatan JEMBATAN LAOT JAYA POTONGAN MEMANJANG
KM.SIMPANG UNING 48+300
PAKET 26/2013 Provinsi/ Kabupaten
( Ahsan Syadzilly, ST ) ( Rudiansyah Putra, ST, M.Si ) ( Ir. Taufiq Saidi, M.Eng ) Tanggal :
ACEH/ACEH TENGAH Operator CAD Bridge Engineering Team Leader

40.00
Rangka Baja

Timbunan Pilihan Timbunan Pilihan


GEMPANG

LAO T JAYA LAO T JAYA


K M . S . UNI NG48 +300 K M . S . UNI NG48 +300
T H. 2013 T H. 2013

UNING

1.00 M.A.B = +705.000 M

2X7 TITIK TIANG BOR PILE 2X7 TITIK TIANG BOR PILE
D 80 L= 21,5 M DARI BAWAH POER M.A.N = +702.000 M D 80 L= 21,5 M DARI BAWAH POER

POTONGAN MEMANJANG
SKALA 1 : 150
REPUBLIK INDONESIA No.Paket 26/2013 Judul : No./ Jml. Hal :
PERENCANAAN TEKNIK ( DED )
28 / 67
Digambar Oleh : Direncanakan Oleh : Disetujui Oleh :
Ruas Jalan GENTING GERBANG - PAMEU
JEMBATAN NASIONAL DETAIL DAN DENAH ABUTMENT Skala :
LINTAS TENGAH II Nama Jembatan JEMBATAN LAOT JAYA POTONGAN A DAN B
KM.SIMPANG UNING 48+300
PAKET 26/2013 Provinsi/ Kabupaten
( Ahsan Syadzilly, ST ) ( Rudiansyah Putra, ST, M.Si ) ( Ir. Taufiq Saidi, M.Eng ) Tanggal :
ACEH/ACEH TENGAH Operator CAD Bridge Engineering Team Leader

1100

100 700 100

300 A
250
℄ Bearing CL Abutment

500
B LA NG P OLEM

3
KM. S. UNING 55 +000

PLAT INJAK
TH. 2013

Aspal T= 4 cm

30 65
30 65 30
200
200 DETAIL-I 85
90 43
130
200 350
40 Galvanis ∅ 75 mmP=150 cm ,L=300 cm Galvanis ∅ 75 mmP=150 cm ,L=300 cm
937 100
70 60
80 30
30
70 70 70
B 10 10

2150 2150
2X7 TITIK TIANG BOR PILE
2X7 TITIK TIANG BOR PILE
D 80 L=21,5 M DARI BAWAH POER
D 80 L=21,5 M DARI BAWAH POER

100 150 150 150 150 150 150 100

DETAIL DIMENSI ABUTMENT 1100


SKALA 1 : 100
CL Abutment
POTONGAN A-A
SKALA 1 : 50
1100
60 140 700 140 60
CL Abutment

200

50 75
PLAT INJAK
500

230 200
300 2X7 TITIK TIANG BOR PILE 200 350
D 80 L=21 CM DARI BAWAH POER

50
100 75
100 100

200 180 100 150 150 150 150 150 150 100

1100

100
Elastomeric Elastomeric
Uk. 560x400x110 mm Uk. 560x400x110 mm

937 POTONGAN B-B


1100
SKALA 1 : 50

DENAH ABUTMENT
SKALA 1 : 50
REPUBLIK INDONESIA No.Paket 26/2013 Judul : No./ Jml. Hal :
PERENCANAAN TEKNIK ( DED ) Digambar Oleh : Direncanakan Oleh : Disetujui Oleh :
Ruas Jalan GENTING GERBANG - PAMEU
JEMBATAN NASIONAL Skala :
LINTAS TENGAH II Nama Jembatan JEMBATAN LAOT JAYA DETAIL PENULANGAN ABUTMENT
KM.SIMPANG UNING 48+300
PAKET 26/2013 Provinsi/ Kabupaten
( Ahsan Syadzilly, ST ) ( Rudiansyah Putra, ST, M.Si ) ( Ir. Taufiq Saidi, M.Eng ) Tanggal :
ACEH/ACEH TENGAH Operator CAD Bridge Engineering Team Leader

DAFTAR PEMBESIAN ABUTMENT


BENTUK TULANGAN
200
50 20 30 40 110 40 60 1-a 22 1-b 62 2 42
3 192
4
8 D 16 139 71 24
8
68 187
339 273
D 16 - 200 1-b 103
61 56
D 13 - 150 50
65

10 30
5 7
3 D 16 - 200 6 64 63
192
187 57 104 342

150
Ø 10 - 200/400 50
17
1090
8
D 16 - 200 CL
1-a
1090
9
D 16 - 200 D 13 - 100
2 9
1090
10
185

D 16 - 200 4
D 13 - 150 1090
15 11

40
D 13 - 150 11
D 16 - 200 12
1090
5
D 13 - 150/300
18 1090
13
D 13 - 150 20
13 D 16 - 200 1090

72
14
D 25 - 300 6
1090
15
D 13 - 200/300 19
30

1090

18
20

D 16 - 200 21
D 13 - 200 52 192 101 42
16 16 17
1 D 16 12
70

70
192 − 233 100
18 21

19
10

10
147
D 25 - 300
7 D 16 - 200
14 70 − 93

496
22 15 24 596
13

23 15 25
496 24

2X7 TITIK TIANG BOR PILE 500


70 20
D 80 L=21.5 M
D 19 − 250 D 13 − 500/500
25

30
22

65

30
5 D 13 − 250
D 16 - 200 24
3
D 19 − 250
23
20 24 D 13 − 250 23
D 19 − 250

75 200 75

350

DETAIL PENULANGAN ABUTMENT


SKALA 1 : 25

DETAIL PENULANGAN PLAT INJAK


SKALA 1 : 20
REPUBLIK INDONESIA No.Paket 26/2013 Judul : No./ Jml. Hal : 30 / 67
PERENCANAAN TEKNIK ( DED ) Digambar Oleh : Direncanakan Oleh : Disetujui Oleh :
Ruas Jalan GENTING GERBANG - PAMEU
JEMBATAN NASIONAL Skala : 1 : 50
LINTAS TENGAH II Nama Jembatan JEMBATAN LAOT JAYA DETAIL PENULANGAN
KM.SIMPANG UNING 48+300
PAKET 26/2013
WING WALL ABUTMENT
( Ahsan Syadzilly, ST ) ( Rudiansyah Putra, ST, M.Si ) ( Ir. Taufiq Saidi, M.Eng ) Tanggal :
Provinsi/ Kabupaten ACEH/ACEH TENGAH Operator CAD Bridge Engineering Team Leader

W DAFTAR PEMBESIAN WING WALL


60 300
BENTUK TULANGAN
40
250
1
10 3
290
192
10 290 10 10
50
2 8

12 D 13 - 300
10
3a 50

100 4 261 8

D 13 - 300 D 13 - 300 12 290 10 290

11 30 10

10 5

3 D 16 3 D 16 4a 380

1
8 8 10

1
30

25 25
290
10 8
5a 50
8
6
30 362 ~ 190
380

3a 2 D 13 2 D 16
3 30 10 50
20 10

3 2 D 13 30
10
6a
3a 85

2 D 16
8 8 8

7a

℄ Bearing

200 ~ 270

200 ~ 270
362 ~ 190

4a D 13 - 150
7

D 16 - 300 D 13 - 150
200 4 200
50

4a 4 D 16 - 150
20 10
8 10

∅ 10 8 85 8
- 300/300 10

10 8a
10
2 2 D 16
8

280

280
30

130

130
6 6
9a 9
D 13 - 150 D 16 - 150 5 D 13 - 150
5a 5 5a
7 D 13 - 150
30 10 8

7a D 16 - 150
8 10 97 60
12
D 16 - 150
D 13 - 150
135 135
11
D 13 - 150 D 16 - 150 6 6 6a
80 6a 80 D 16 - 150
8
240
8
8 8

8a 8 D 13 - 150 D 13 - 150 30
D 16 - 150 9 9a
D 16 - 150
80 40 80 70

10

POTONGAN W-W
SKALA 1 : 50
2X7 TITIK TIANG BOR PILE
D 80 L=21.5 M DARI BAWAH POER
300 60
2100
250 10 40 10

10 10
5 5
30 cm LAOT JAYA
KM. S. UNING 48 +300
TH. 2013

8 cm 85 85
8 cm

75 200 75 25
350 30 30
20 cm

LAOT JAYA
2 cm

30 35
KM. S. UNING 48 +300
1.5 CM

TH. 2013 500

DETAIL PENULANGAN WING WALL ABUTMENT


SKALA 1 : 50
TEMBOK PENGARAH SISI
DETAIL PAPAN NAMA JEMBATAN SKALA 1 : 20
20 40

SKALA 1:25
REPUBLIK INDONESIA No.Paket 26/2013 Judul : No./ Jml. Hal : 31 / 67
PERENCANAAN TEKNIK ( DED ) Digambar Oleh : Direncanakan Oleh : Disetujui Oleh :
Ruas Jalan GENTING GERBANG - PAMEU
JEMBATAN NASIONAL DETAIL TIANG PANCANG BORE PILE Skala : 1 : 20
LINTAS TENGAH II Nama Jembatan JEMBATAN LAOT JAYA D = 80 CM, L = 6.5 M
KM.SIMPANG UNING 48+300
PAKET 26/2013 Provinsi/ Kabupaten
( Ahsan Syadzilly, ST ) ( Rudiansyah Putra, ST, M.Si ) ( Ir. Taufiq Saidi, M.Eng ) Tanggal :
ACEH/ACEH TENGAH Operator CAD Bridge Engineering Team Leader

KETERANGAN
NO NAMA STRUKTUR MUTU BETON SELIMUT BETON MUTU BAJA
1. ABUTMENT K- 250 (f'c =20 MPa) t = 5 cm
2. TIANG SANDARAN K- 225 (f'c =18 MPa) t = 5 cm
3. PLAT LANTAI K- 350 (f'c =30 MPa) t = 5 cm
℄ Bearing 5. WING WALL K- 250 (f'c =20 MPa) t = 5 cm fy= 390 MPa (D>12)
6. PLAT INJAK K- 350 (f'c =30 MPa) t = 5 cm fy= 240 MPa ( < 12)
7. BORE PILE K- 250 (f'c =20 MPa) t = 5 cm
8. TIANG SANDARAN K- 225 (f'c =18 MPa) t = 5 cm
9. TROTOAR K- 225 (f'c =18 MPa) t = 5 cm

ABUTMENT BETON K - 250

80

8 D 19
40

40
10 20

80
BETON K - 250

LANTAI KERJA MUTU BETON K-175 TULANGAN SPIRAL 1 Ø 10 - 150

TULANGAN SPIRAL 1 Ø 10 -150


POTONGAN TIANG BORE PILE
SKALA 1 : 20
TULANGAN 8 D 19
BETON K - 250

CL PERLETAKAN

43
2150

13 13

22.5
CL PERLETAKAN
50

40
BETON K - 250

TUMPUAN KARET
TULANGAN SPIRAL 1 Ø 10 -150 Uk. 280x400X46 MM

28 GROUTING

TULANGAN 8 D 19
ELASTOMER (280 x 400 x 46)
SKALA 1 : 20
80 80
200
REPUBLIK INDONESIA No.Paket 26/2013 Judul : No./ Jml. Hal : 32 / 67
PERENCANAAN TEKNIK ( DED ) Digambar Oleh : Direncanakan Oleh : Disetujui Oleh :
Ruas Jalan GENTING GERBANG - PAMEU
JEMBATAN NASIONAL Skala
LINTAS TENGAH II Nama Jembatan JEMBATAN LAOT JAYA Daftar berat Rangka Baja :

KM.SIMPANG UNING 48+300


PAKET 26/2013 Provinsi/ Kabupaten
( Ahsan Syadzilly, ST ) ( Rudiansyah Putra, ST, M.Si ) ( Ir. Taufiq Saidi, M.Eng ) Tanggal :
ACEH/ACEH TENGAH Operator CAD Bridge Engineering Team Leader

Kelas A: Lebar jembatan 7.0 m,Trotoar 2 x1.0 m, Vertical clearance 5.10 m


Daftar berat Rangka Baja Lantai Jembatan Beton Bertulang

Dimensi Berat Total Dimensi Berat Total Panjang Lebar Tebal (cm) Volume Berat
Frame Panjang Frame Panjang No.
Profil Profil (m) (m) Tepi Tengah rata-rata (m3) (Kg)
No. (mm) (m) (kg/m) (kg) No. (mm) (m) (kg/m) (kg)
1 40.00 7.00 22.0 29.0 25.5 71.40 171.360
1 BSB 1 300X300-16/22 4.996 136.52 682.1 16 BSD 1 300X300-16/25 6.700 149.97 1.004.8
2 BSB 2 300X300-16/22 4.996 136.52 682.1 17 BSD 2 300X300-16/19 6.700 123.07 824.6 Total 171.360
3 BSB 3 300X300-16/22 4.996 136.52 682.1 18 BSD 3 300X300-16/19 6.700 123.07 824.6
4 BSB 4 300X300-16/22 4.996 136.52 682.1 19 BSD 4 300X300- 9/12 6.700 76.44 512.1 Trotoar Jembatan Beton Bertulang
5 BSB 5 300X300-16/22 4.996 136.52 682.1 20 BSD 5 300X300- 9/12 6.700 76.44 512.1
6 BSB 6 300X300-16/22 4.996 136.52 682.1 21 BSD 6 300X300- 9/12 6.700 76.44 512.1 Panjang Lebar Tebal Volume Berat
7 BSB 7 300X300-16/22 4.996 136.52 682.1 22 BSD 7 300X300- 9/12 6.700 76.44 512.1 No.
(m) (m) (cm) (m3) (Kg)
8 BSB 8 300X300-16/22 4.996 136.52 682.1 23 BSD 8 300X300- 9/12 6.700 76.44 512.1
24 BSD 9 300X300- 9/12 6.700 76.44 512.1 1 40.00 2.00 52 41.60 99.840
25 BSB 10 300X300- 9/12 6.700 76.44 512.1
26 BSD 11 300X300- 9/12 6.700 76.44 512.1 Total 99.840
9 BSA 1 300X300-16/19 4.996 123.07 614.9 27 BSD 12 300X300- 9/12 6.700 76.44 512.1
10 BSA 2 300X300-16/19 4.996 123.07 614.9 28 BSB 13 300X300- 9/12 6.700 76.44 512.1 Trapezoid Stell Sheets
11 BSA 3 300X300-16/25 4.996 149.97 749.3 29 BSD 14 300X300-16/19 6.700 123.07 824.6
12 BSA 4 300X300-16/25 4.996 149.97 749.3 30 BSD 15 300X300-16/19 6.700 123.07 824.6 Berat/satuan
No. Panjang (m) Lebar (m) Total (kg)
13 BSA 5 300X300-16/25 4.996 149.97 749.3 31 BSB 16 300X300-16/25 6.700 149.97 1.004.8
14 BSA 6 300X300-16/19 4.996 123.07 614.9 1 40.00 9.130 51.28 m2 18.720
15 BSA 7 300X300-16/19 4.996 123.07 614.9
Total 18.720

Overlay Asphalt Concrete


Sub Total 10.429.4
Total 20.593.0 No. Panjang Lebar Tebal Volume Berat
Sub Total 10.163.6 (m) (m) (cm) (m3) (Kg)

1 40.00 7.00 5 14.00 32.200


Total 32.200

Rangka Batang Untuk Deck (Lantai Jembatan)


Berat Total Bangunan Atas Jembatan Rangka Baja
Frame Dimensi Jumlah Panjang Berat Total
Profil Berat
No. (mm) (bh) (m) (kg/m) (kg)
No. Komponen Utama Jembatan
(ton)
1 GMT 900X350-12/19 7.0 9.130 186.63 11.976.0
2 GP 450X200-9/16 40.0 4.877 80.39 15.680.9
3 GMU 750X350-12/25 2.0 9.130 204.42 3.732.7 I Jembatan Rangka Baja
1 Rangka Baja Batang Samping 41.2
Total 31.286.6 2 Rangka Baja Batang Lantai Jembatan 31.3
3 Rangka Baja Batang Ikatan Angin 5.6
Rangka Batang Untuk Top Bracing (Ikatan Angin) 4 Handrail 4.0
5 Baut 3.1
Frame Dimensi Jumlah Panjang Berat Total
Profil 6 Plat Buhul , dll 9.4
No. (mm) (bh) (m) (kg/m) (kg)
Sub Total 94.6
1 BIU 300X200-12/19 2.0 9.130 84.80 1.548.4 II L antai dan trotoar Jembatan
2 BIA 150X150-6/6 14.0 10.408 27.56 4.015.8 1 L antai Jembatan Beton Bertulang 171.4
2 Trotoar Jembatan Beton Bertulang 99.8
Total 5.564.3 3 Trapezoid Stell Sheets 18.7
4 Overlay Asphalt Concrete 32.2
Handrail Sub Total 322.1
Frame Dimensi Jumlah Panjang Berat Total
Profil (mm) (bh) (m) (kg/m) Total 416.8
No. (kg)

1 Kanal 200X75 4.0 40.000 25.30 4.048.0

Total 4.048.0
REPUBLIK INDONESIA No.Paket 26/2013 Judul : No./ Jml. Hal : 33 / 67
PERENCANAAN TEKNIK ( DED ) Digambar Oleh : Direncanakan Oleh : Disetujui Oleh :
Ruas Jalan GENTING GERBANG - PAMEU
JEMBATAN NASIONAL DENAH IKATAN ANGIN ATAS Skala :
LINTAS TENGAH II Nama Jembatan JEMBATAN LAOT JAYA TAMPAK SAMPING
KM.SIMPANG UNING 48+300 DENAH SUSUNAN LANTAI
PAKET 26/2013 Provinsi/ Kabupaten
( Ahsan Syadzilly, ST ) ( Rudiansyah Putra, ST, M.Si ) ( Ir. Taufiq Saidi, M.Eng ) Tanggal :
ACEH/ACEH TENGAH Operator CAD Bridge Engineering Team Leader POTONGAN MELINTANG

LUBANG Ø 26
(TYP)

40.00
400
500 500 500 500 500 500 500
H 300X300 H 300X300 H 300X300 H 300X300 H 300X300 H 300X300 H 300X300
(BSA 1) (BSA 2) (BSA 3) (BSA 4) (BSA 5) (BSA 6) (BSA 7)

9130
DET-19 DET-17 DET-16 100 700 100
DET-20
DET-15 (009)
(009) (009) (009)
CL JEMBATAN

TYP(009)

0
0

0
15
15

15
0
0
15
0

0X

15
0X

15

0
0
15

0X
15
15
0X

0X
15
0X
15

0
0X

15
15

0X
0X
15

15
15

H
15
H

H
0X

15
15
H

H
H
H

15

H
H

H
DET-18 DET-14 DET-18

6370
(009) TYP(009) (009)
0
15

0
15

0
0X

15
0X
15

0X
15
H

15
H
H 300X300

H
H 300X300 H 300X300 H 300X300 H 300X300 H 300X300 H 300X300
(BSA 1) (BSA 2) (BSA 3) (BSA 4) (BSA 5) (BSA 6) (BSA 7)

750

750
A
DET-15 DET-19
DET-16 DET-17 (009)
TYP(009)
(009) (009)

DENAH IKATAN ANGIN ATAS POTONGAN MELINTANG

40.00

500 500 500 500 500 500 500

DET 2 DET 4 DET 6 DET 8 DET 8 DET 6 DET 4 DET 2


(002) (002) (002) (002) (002) (002) (002) (002)
0 33 57 71 76 71 57 33 0
H 300X300 H 300X300 H 300X300 H 300X300 H 300X300 H 300X300 H 300X300
(BSA 1) (BSA 2) (BSA 3) (BSA 4) (BSA 5) (BSA 6) (BSA 7)

DIAGRAM LAWAN LENDUT


H 3 D 2)

H 3 D 4)

H 3 D 6)

H 3 D 8)

H 3 D 10)

H 3 D 1 2)

H 3 D 1 4)

H 3 D 1 6)
(BS
(BS X300

(BS X300

(BS 0X300
(BS X300

(BS X300

(BS X350

(BS X300

(BS X300
(BS
00X

(BS
00X

(BS

(BS

(BS

(BS

(BS
50X

3)

5)
1)
00X
)

00X

00X

00X

00X
D1

D3

D5

D7

D9

D1

D1
D1
300

300
00

00
00

00

50

00

00
350

6370
300

0
300

300

300

300
H3

H3

H3
H3

H3

H3

H3

H3

800
1070
H 300X300 H 300X300 H 300X300 H 300X300 H 300X300 H 300X300 H 300X300 H 300X300
(BSB 1) (BSB 2) (BSB 3) (BSB 4) (BSB 5) (BSB 6) (BSB 7) (BSB 8)

DET 1 DET 3 DET 5 DET 7 DET 9 DET 7 DET 5 DET 3 DET 1


(002) (002) (002) (002) (002) (002) (002) (002) (002)
500 500 500 500 500 500 500 500

12

19
TAMPAK SAMPING 9 16

300

300
LUBANG Ø 26
(TYP)
300 300

40.00
400
H 300X300-9/12 H 300X300-16/19
4996.5 4996.5 4996.5 4996.5 4996.5 4996.5 4996.5 4996.5
H 300X300 H 300X300 H H 300X300 H 300X300 H 300X300 H 300X300 H 300X300 H 300X300
(BSB 1) (BSB 2) (BSB 3) (BSB 4) (BSB 5) (BSB 6) (BSB 7) (BSB 8)

L 60X60X6 L 60X60X6 L 60X60X6 L 60X60X6 L 60X60X6 L 60X60X6 L 60X60X6 L 60X60X6

25
19
12

300
H 450X200 H 450X200 H 450X200 H 450X200 H 450X200 H 450X200 H 450X200 H 450X200

300
CL JEMBATAN

16
H 450X200 H 450X200 H 450X200 H 450X200 H 450X200 H 450X200 H 450X200 H 450X200
300 300
GMU
GMU

H 450X200 H 450X200 H 450X200 H 450X200 H 450X200 H 450X200 H 450X200 H 450X200

H 450X200 H 450X200 H 450X200 H 450X200 H 450X200 H 450X200 H 450X200 H 450X200


H 300X300-16/22 H 300X300-16/25
H 450X200 H 450X200 H 450X200 H 450X200 H 450X200 H 450X200 H 450X200 H 450X200

L 60X60X6 L 60X60X6 L 60X60X6 L 60X60X6 L 60X60X6 L 60X60X6 L 60X60X6 L 60X60X6

H 300X300 H 300X300 H H 300X300 H 300X300 H 300X300 H 300X300 H 300X300 H 300X300


(BSB 1) (BSB 2) (BSB 3) (BSB 4) (BSB 5) (BSB 6) (BSB 7) (BSB 8)

DENAH SUSUNAN LANTAI


REPUBLIK INDONESIA No.Paket 26/2013 Judul : No./ Jml. Hal : 36 / 67
PERENCANAAN TEKNIK ( DED ) Digambar Oleh : Direncanakan Oleh : Disetujui Oleh :
Ruas Jalan GENTING GERBANG - PAMEU
JEMBATAN NASIONAL DETAIL- 3 Skala :
LINTAS TENGAH II Nama Jembatan JEMBATAN LAOT JAYA
KM.SIMPANG UNING 48+300
PAKET 26/2013 Provinsi/ Kabupaten
( Ahsan Syadzilly, ST ) ( Rudiansyah Putra, ST, M.Si ) ( Ir. Taufiq Saidi, M.Eng ) Tanggal :
ACEH/ACEH TENGAH Operator CAD Bridge Engineering Team Leader

A B
DIAGONAL DIAGONAL DIAGONAL
300 300 DIAGONAL
H 300X300 H 300X300 H 300X300 H 300X300

18 BAUT M-24X80 (8.8) 18 BAUT M-24X100 (8.8)


18 LUBANG Ø 26 18 LUBANG Ø 26
(DALAM DAN LUAR) (DALAM DAN LUAR)

PLAT BUHUL DALAM PLAT BUHUL DALAM


DIAPH-3
T=15 MM T=15 MM

554
14 BAUT M-24X80 (8.8)
14 LUBANG Ø 26 (DALAM )
PLAT BUHUL LUAR
DIAPH-3

14 BAUT M-24X 65 (8.8)

480
480

480
T=15 MM

DIAPH-3
14 LUBANG Ø 26 (LUAR )
750

750
900

900
703

703
BATANG BAWAH BATANG BAWAH
H 300X300 H 300X300
PLAT BUHUL LUAR PLAT BUHUL LUAR
BATANG BAWAH T=15 MM T=15 MM BATANG BAWAH
H 300X300
C C H 300X300

A
300

300
300
150

150
KONSTAN SAMBUNG PLAT BADAN SAMBUNG PLAT BADAN KONSTAN
GELAGAR MELINTANG TENGAH GELAGAR MELINTANG TENGAH
300 T:12 MM
279 279
T:12 MM 300 15 100

8 BAUT M-24X100 (8.8)


PLAT SAMBUNG SAYAP 8 BAUT M-24X100 (8.8) 558 PLAT SAMBUNG SAYAP
18 LUBANG Ø 26
T:12 MM
A
8 LUBANG Ø 26
(DALAM DAN LUAR) (DALAM DAN LUAR) A T:12 MM

A B
POTONGAN D-D POTONGAN B-B
DETAIL- 3

350

GELAGAR MELINTANG TENGAH

PLAT BUHUL DALAM 6 BAUT M-24X 100 (8.8)


T=15 MM 6 LUBANG Ø 26
6 BAUT M-24X100 (8.8) BATANG BAWAH
6 LUBANG Ø 26 H 300X300

200
A
210

300

L=480
BATANG BAWAH
H 300X300 235 235
SAMBUNG PLAT BADAN DIAPH-3
T:12 MM
PLAT BUHUL LUAR SAMBUNG PLAT SAYAP
T=15 MM T:12 MM

POTONGAN C-C
REPUBLIK INDONESIA No.Paket 26/2013 Judul : No./ Jml. Hal : 38 / 67
PERENCANAAN TEKNIK ( DED ) Digambar Oleh : Direncanakan Oleh : Disetujui Oleh :
Ruas Jalan GENTING GERBANG - PAMEU
JEMBATAN NASIONAL DETAIL- 5 Skala :
LINTAS TENGAH II Nama Jembatan JEMBATAN LAOT JAYA
KM.SIMPANG UNING 48+300
PAKET 26/2013 Provinsi/ Kabupaten
( Ahsan Syadzilly, ST ) ( Rudiansyah Putra, ST, M.Si ) ( Ir. Taufiq Saidi, M.Eng ) Tanggal :
ACEH/ACEH TENGAH Operator CAD Bridge Engineering Team Leader

D E
300 300
DIAGONAL DIAGONAL
DIAGONAL H 300X300 H 300X300 DIAGONAL
H 300X300 H 300X300

14 BAUT M-24X65 (8.8) 14 BAUT M-24X80 (8.8)


14 LUBANG Ø 26 14 LUBANG Ø 26
(DALAM DAN LUAR) (DALAM DAN LUAR)

PLAT BUHUL DALAM DIAPH-3 PLAT BUHUL DALAM


T=15 MM T=15 MM

435
435
14 BAUT M-24X80 (8.8)
14 LUBANG Ø 26 (DALAM )
14 BAUT M-24X 65 (8.8) PLAT BUHUL LUAR

480
T=15 MM
480

480
14 LUBANG Ø 26 ( LUAR )

DIAPH-3
DIAPH-3
750

750
900

900
BATANG BAWAH

708

708
H 300X300 BATANG BAWAH
H 300X300
PLAT BUHUL LUAR PLAT BUHUL LUAR
BATANG BAWAH T=15 MM T=15 MM BATANG BAWAH
H 300X300
F F
H 300X300
300

300
A

300
150

150
KONSTAN SAMBUNG PLAT BADAN SAMBUNG PLAT BADAN 300
GELAGAR MELINTANG TENGAH 300 T:12 MM 337 337 T:12 MM KONSTAN GELAGAR MELINTANG TENGAH

PLAT SAMBUNG SAYAP


T:18 MM D 674
E PLAT SAMBUNG SAYAP
T:18 MM
A 10 BAUT M-24X1 20 (8.8)
12 LUBANG Ø 26
10 BAUT M-24X120 (8.8)
12 LUBANG Ø 26
A
(DALAM DAN LUAR) (DALAM DAN LUAR)

POTONGAN D-D POTONGAN E-E


DETAIL- 5

350

GELAGAR MELINTANG TENGAH

PLAT BUHUL DALAM 6 BAUT M-24X100 (8.8)


T=15 MM 6 LUBANG Ø 26
6 BAUT M-24X80 (8.8)
BATANG BAWAH
6 LUBANG Ø 26
H 300X300

200
A
210

300

L=480
BATANG BAWAH
H 300X300 SAMBUNG PLAT BADAN
235 235 T:12 MM
SAMBUNG PLAT SAYAP
DIAPH-3
PLAT BUHUL LUAR T:18 MM
T=15 MM

POTONGAN F-F
REPUBLIK INDONESIA No.Paket 26/2013 Judul : No./ Jml. Hal : 40 / 67
PERENCANAAN TEKNIK ( DED ) Digambar Oleh : Direncanakan Oleh : Disetujui Oleh :
Ruas Jalan GENTING GERBANG - PAMEU
JEMBATAN NASIONAL DETAIL- 7 Skala :
LINTAS TENGAH II Nama Jembatan JEMBATAN LAOT JAYA
KM.SIMPANG UNING 48+300
PAKET 26/2013 Provinsi/ Kabupaten
( Ahsan Syadzilly, ST ) ( Rudiansyah Putra, ST, M.Si ) ( Ir. Taufiq Saidi, M.Eng ) Tanggal :
ACEH/ACEH TENGAH Operator CAD Bridge Engineering Team Leader

A B
DIAGONAL DIAGONAL
DIAGONAL H 300X300 H 300X300 DIAGONAL
H 300X300 H 300X300

12 BAUT M-24X65 (8.8) 12 BAUT M-24X65 (8.8)


14 LUBANG Ø 26 12 LUBANG Ø 26
(DALAM DAN LUAR) (DALAM DAN LUAR)

PLAT BUHUL DALAM DIAPH-3 PLAT BUHUL DALAM


T=15 MM T=15 MM

380

380
14 BAUT M-24X80 (8.8)
14 LUBANG Ø 26 (DALAM )

DIAPH-3
14 BAUT M-24X 65 (8.8) PLAT BUHUL LUAR

480
T=15 MM
480

480
14 LUBANG Ø 26 (LUAR )
DIAPH-3
750

750
BATANG BAWAH
900

900
708

708
H 300X300 BATANG BAWAH
H 300X300
PLAT BUHUL LUAR PLAT BUHUL LUAR
BATANG BAWAH
H 300X300
T=15 MM
C C
T=15 MM BATANG BAWAH
H 300X300

300
300

300
A
150

150
KONSTAN KONSTAN
PLAT SAMBUNG BADAN PLAT SAMBUNG BADAN GELAGAR MELINTANG TENGAH
GELAGAR MELINTANG TENGAH 300 T:20 MM 395 395 T:20 MM 300
PLAT SAMBUNG SAYAP
T:18 MM A 790 B PLAT SAMBUNG SAYAP
T:18 MM
12 BAUT M-24X120 (8.8)
12 LUBANG Ø 26
12 BAUT M-24X1 00 (8.8)
14 LUBANG Ø 26
A
(DALAM DAN LUAR) (DALAM DAN LUAR)

POTONGAN B-A POTONGAN B-B


DETAIL- 7
350

GELAGAR MELINTANG TENGAH

PLAT BUHUL DALAM


10 BAUT M-24X 120 (8.8)
T=15 MM
10 LUBANG Ø 26
6 BAUT M-24X 120 (8.8)
6 LUBANG Ø 26 BATANG BAWAH
H 300X300

210

200
BATANG BAWAH 300
H 300X300 SAMBUNG PLAT BADAN
235 235 T:12 MM L=480
SAMBUNG PLAT SAYAP
PLAT BUHUL LUAR
T=15 MM
T:18 MM
DIAPH-3

POTONGAN C-C
REPUBLIK INDONESIA No.Paket 26/2013 Judul : No./ Jml. Hal : 42 / 67
PERENCANAAN TEKNIK ( DED ) Digambar Oleh : Direncanakan Oleh : Disetujui Oleh :
Ruas Jalan GENTING GERBANG - PAMEU
JEMBATAN NASIONAL DETAIL- 9 Skala :
LINTAS TENGAH II Nama Jembatan JEMBATAN LAOT JAYA
KM.SIMPANG UNING 48+300
PAKET 26/2013 Provinsi/ Kabupaten
( Ahsan Syadzilly, ST ) ( Rudiansyah Putra, ST, M.Si ) ( Ir. Taufiq Saidi, M.Eng ) Tanggal :
ACEH/ACEH TENGAH Operator CAD Bridge Engineering Team Leader

D E

DIAGONAL DIAGONAL DIAGONAL DIAGONAL


H 300X300 H 300X300 H 300X300 H 300X300

10 BAUT M-24X65 (8.8) 10 BAUT M-24X65 (8.8)


10 LUBANG Ø 26 10 LUBANG Ø 26
(DALAM DAN LUAR) (DALAM DAN LUAR)

PLAT BUHUL DALAM PLAT BUHUL DALAM


DIAPH-3
T=15 MM T=15 MM

322
322
14 BAUT M-24X80 (8.8)

DIAPH-3
14 LUBANG Ø 26 (DALAM )
14 BAUT M-24X 65 (8.8) PLAT BUHUL LUAR

480
T=15 MM

480

480
14 LUBANG Ø 26 (LUAR )
750

750
925

925
703

703
BATANG BAWAH BATANG BAWAH

BATANG BAWAH
PLAT BUHUL LUAR
T=15 MM
F H 300X300 H 300X300
F PLAT BUHUL LUAR
T=15 MM
BATANG BAWAH
H 300X300 H 300X300

300
300
A

300
175

175
PLAT SAMBUNG BADAN PLAT SAMBUNG BADAN
T:25 MM T:25 MM
GELAGAR MELINTANG TENGAH 300 300 GELAGAR MELINTANG TENGAH
PLAT SAMBUNG SAYAP
T:20 MM
KONSTAN
D 453 453
E KONSTAN PLAT SAMBUNG SAYAP
T:20 MM

A 14 BAUT M-24X120 (8.8)


14 LUBANG Ø 26
906 14 BAUT M-24X1 00 (8.8)
14 LUBANG Ø 26
A
(DALAM DAN LUAR) (DALAM DAN LUAR)

POTONGAN D-D
DETAIL- 9 POTONGAN E-E

350

PLAT BUHUL DALAM GELAGAR MELINTANG TENGAH


T=15 MM
12 BAUT M-24X 120 (8.8)
12 LUBANG Ø 26
10 BAUT M-24X 120 (8.8)
10 LUBANG Ø 26 BATANG BAWAH
H 300X300

200
A

210
300

BATANG BAWAH L=480


H 300X300
365 430 PLATSAMBUNG BADAN
PLAT BUHUL LUAR T:25 MM DIAPH-3
T=15 MM
SAMBUNG PLAT SAYAP
T:20 MM

POTONGAN F-F
REPUBLIK INDONESIA No.Paket 26/2013 Judul : No./ Jml. Hal : 44 / 67
PERENCANAAN TEKNIK ( DED ) Digambar Oleh : Direncanakan Oleh : Disetujui Oleh :
Ruas Jalan GENTING GERBANG - PAMEU
JEMBATAN NASIONAL DETAIL BALOK MELINTANG Skala :
LINTAS TENGAH II Nama Jembatan JEMBATAN LAOT JAYA
KM.SIMPANG UNING 48+300
PAKET 26/2013 Provinsi/ Kabupaten
( Ahsan Syadzilly, ST ) ( Rudiansyah Putra, ST, M.Si ) ( Ir. Taufiq Saidi, M.Eng ) Tanggal :
ACEH/ACEH TENGAH Operator CAD Bridge Engineering Team Leader

24 T16x185
100

A B
295 24 T16x185

A B

2 T16x185 2 T16x65 2 T16x65 2 T16x185 2 T16x185 4 T16x65 4 T16x65 2 T16x185

A B A B

CGY3
100 CGY4
295
24 T16x185
CGY3
A
A B

24 T16x185

SDY2 A
SDY2

8 T16x65

11 T16x65

12 x SDY2
POTONGAN A-A

DET. 1

CGY3 STY7 CGY4


12 x SDY2 4 T16x65

CGY3 STY8 CGY4

DETAIL 1

11 T16x65
REPUBLIK INDONESIA No.Paket 26/2013 Judul : No./ Jml. Hal :
PERENCANAAN TEKNIK ( DED )
45 / 67
Digambar Oleh : Direncanakan Oleh : Disetujui Oleh :
Ruas Jalan GENTING GERBANG - PAMEU
JEMBATAN NASIONAL Skala :
LINTAS TENGAH II Nama Jembatan JEMBATAN LAOT JAYA DETAIL METODE PERANGKAIAN RANGKA BAJA
KM.SIMPANG UNING 48+300
PAKET 26/2013 Provinsi/ Kabupaten
( Ahsan Syadzilly, ST ) ( Rudiansyah Putra, ST, M.Si ) ( Ir. Taufiq Saidi, M.Eng ) Tanggal :
ACEH/ACEH TENGAH Operator CAD Bridge Engineering Team Leader

WIND BRACING
WIND BRACING SPLICE PLATE
WB° WB°

WIND BRACING CONNECTION FILL PLATE FLANGE


FILL PLATE WEB WB° DIAPHRAGM FF°
FW° WIND BRACING CONNECTION WIND BRACING DF° OUTER CUSSET PLATE
TOP CHORD
WB° WB° TC° CP°
SPLICE PLATE FLANGE FILL PLATE FLANGE
SF° FF°
TOP CHORD
TC° WIND BRACING FILL PLATE FLANGE
WB° FF°
WIND BRACING
SPLICE PLATE WIND BRACING CONNECTION FILL PLATE
WIND BRACING CONNECTION FD°
WB° WB° FILL PLATE
FILL PLATE FLANGE WB° DETAIL - F WIND BRACING
FD°
FF° DETAIL - B
INNER CUSSET PLATE WB°
FILL PLATE
FD°
CP° DETAIL - F CAP FOR BOLTS
FILL PLATE MC°
FD°

TOP CHORD END PORTAL BEAM


TC° EP° INNER CUSSET PLATE
OUTER CUSSET PLATE DIAGONAL MEMBER
CP° DIAGONAL MEMBER
CP° DG°
DG°
DIAGONAL MEMBER
DG° DIAGONAL MEMBER
DG° DETAIL - D DETAIL - B
DETAIL - D

DETAIL - A DIAGONAL MEMBER


DIAPHRAGM
E DG°
ET DF°
N CR
CO OK
BL
ET HANDRAILS
SIL
RL°

HANDRAILS CLAMP OUTER CUSSET PLATE


RL° CP°
BORDER LSHAPE
ST° BOTTOM CHORD
BC° BEARING LSHAPE
STRINGERS BP°
ST°
DETAIL - C CAP FOR BOLTS
LSHAPE FILL PLATE
BORDER LSHAPE MC°
STRINGERS CONNECTION ST°
ST° LSHAPE CONNECTION
HANDRILS CLAMP ST°
LSHAPE CONNECTION ST°
RL°
HANDRAIL FILL PLATE ST°
INTERNAL CROSS ORDER DETAIL - E SBISMIC BUFFER CONNECTION
RL°
DIAGONAL MEMBER DIAPHRAGM HANDRAILS CG° CP°
RL° STRINGERS
DG° DF° STRINGERS CONNECTION
LSHAPE FILL PLATE ST°
ST° ST°
STRINGERS CONNECTION
SEISMIC BUFFER
ST° SB°
STRINGERS INNER CUSSET PLATE
CP° ELASTOMERIC BEARING
ST° BP°
END CROSS GIRDER
BOTTOM CHORD BEARING LSHAPE CG°
BC° INNER CUSSET PLATE END CROSS GIRDER BP°
CP° CG°
FILL PLATE FILL PLATE FLANGE
BORDER LSHAPE DETAIL - A
ST°
FD° FF°
FILL PLATE
DIAGONAL MEMBER
FD°
DG°

LATERAL STOP
SB°
OUTER CUSSET PLATE LATERAL STOP CONNECTION
BOTTOM CHORD
CP° SB° SB°
BC°
FILL PLATE FLANGE
FF°
DETAIL - E
SPLICE PLATE FLANGE FILL PLATE WEB

SF° FW°
SPLICE PLATE WEB
SW°

DETAIL - C
REPUBLIK INDONESIA No.Paket 26/2013 Judul : No./ Jml. Hal :
PERENCANAAN TEKNIK ( DED )
46 / 67
Digambar Oleh : Direncanakan Oleh : Disetujui Oleh :
Ruas Jalan GENTING GERBANG - PAMEU
JEMBATAN NASIONAL DETAIL PLAT LANTAI Skala :
LINTAS TENGAH II Nama Jembatan JEMBATAN LAOT JAYA
KM.SIMPANG UNING 48+300
PAKET 26/2013 Provinsi/ Kabupaten
( Ahsan Syadzilly, ST ) ( Rudiansyah Putra, ST, M.Si ) ( Ir. Taufiq Saidi, M.Eng ) Tanggal :
ACEH/ACEH TENGAH Operator CAD Bridge Engineering Team Leader

R-7
R-6
R-3 R-3 R-5 R-6 R-4

100 700 100

DETAIL 3 R-5
R-5 R-1
R-2 R-4
2% 2%
100
2% 2%

R-8

R-4

POTONGAN MELINTANG

R-7 R-2 R - 5 DAN R-6


R-9
R-1
B R-3
B
700 15 15
725
R1 2% 2% D 16 - 200

79

28 24
R2 D 13 - 200
R-1 15 15

533
DETAIL 1 R3 8 D 16 - 200

R4 550 D 16 - 200
A A
100 533
D 13 - 200
R5 41

550
R-7 R6 D 13 - 200
PLAN
500
DETAIL 1
R-7 R-2 R-3 R - 5 DAN R-6 35 D 13 - 200
R7
16
R-1
DETAIL 2
500
VARIASI 52-50
R8 35 D 16 - 200
16

POTONGAN A-A
R-2 R - 5 DAN R-6 R9 15 884 15 2 D 16 - 200
R-8
DETAIL 2 500 R-1
R-3
R-1

VARIASI 30-18

R - 3 DAN R-4
R-9

DETAIL 3

500

POTONGAN B-B
REPUBLIK INDONESIA No.Paket 26/2013 Judul : No./ Jml. Hal : 47 / 67
PERENCANAAN TEKNIK ( DED ) Digambar Oleh : Direncanakan Oleh : Disetujui Oleh :
Ruas Jalan GENTING GERBANG - PAMEU
JEMBATAN NASIONAL DETAIL BESI PENGAMAN Skala :
1:200
LINTAS TENGAH II Nama Jembatan JEMBATAN LAOT JAYA DETAIL METODE PERANGKAIAN RANGKA BAJA 1:20
KM.SIMPANG UNING 48+300
PAKET 26/2013 Provinsi/ Kabupaten
( Ahsan Syadzilly, ST ) ( Rudiansyah Putra, ST, M.Si ) ( Ir. Taufiq Saidi, M.Eng ) Tanggal :
ACEH/ACEH TENGAH Operator CAD Bridge Engineering Team Leader

DETAIL 3

DETAIL 2

673
DETAIL 4 DETAIL 5

DETAIL 1
4000

DETAIL 1
TAMPAK MEMANJANG SKALA 1:20

Skala 1 : 200

A A

RLY- RLY1 RLY1 RLY-


RLY4
RLS- RLS1 RLS1 RLS-
RLS4

RLY1

RLY-
A (TYP) A

DETAIL 2 TAMPAK A-A DETAIL 3


SKALA 1:20 SKALA 1:20 SKALA 1:20

RLY3 RLY2
RLS3 RLS2

DETAIL 4 DETAIL 5
SKALA 1:20 SKALA 1:20
REPUBLIK INDONESIA No.Paket 26/2013 Judul : No./ Jml. Hal : 48 / 67
PERENCANAAN TEKNIK ( DED ) Digambar Oleh : Direncanakan Oleh : Disetujui Oleh :
Ruas Jalan GENTING GERBANG - PAMEU
JEMBATAN NASIONAL Skala :
1:400
1:20
LINTAS TENGAH II Nama Jembatan JEMBATAN LAOT JAYA DETAIL PLAT LANTAI 1:10
KM.SIMPANG UNING 48+300
PAKET 26/2013 Provinsi/ Kabupaten
( Ahsan Syadzilly, ST ) ( Rudiansyah Putra, ST, M.Si ) ( Ir. Taufiq Saidi, M.Eng ) Tanggal :
ACEH/ACEH TENGAH Operator CAD Bridge Engineering Team Leader

3997.2
499.65
C

100
DETAIL 2

350

BUB. 650*300*10*20

BUB. 790*300*10*20

BUB. 790*300*10*20

BUB. 790*300*10*20

BUB. 790*300*10*20

BUB. 790*300*10*20

BUB. 790*300*10*20

BUB. 790*300*10*20

BUB. 790*300*10*20
953

900
B B

350
50

DETAIL 3 C

DETAIL 4
TAMPAK MEMANJANG
L 10x10x1 cm

Skala 1 : 200
5 10 3 10 5

DETAIL 1 32
700
16 16
PIPA GALVANIS Ø 75 mm, P=150 cm.L=300 cm
50 300 300 50
2% AC 2%
L 10x10x1 cm
-3 % -3 %

5 10 3 10 5

AC
20

Ø 5x0.5x15 cm

POTONGAN MELINTANG
SKALA 1:100

50 100 100 50 50 100 100 50


-3 % -3 % Ø 5x0.5x15 cm
DETAIL 2 DECK SEAR POTONGAN B-B
SKALA 1:10 SKALA 1:10
5
10
GELAGAR MELINTANG
12 8x33.5 20 DETAIL 4
L 10x10x1 cm SKALA 1:10

100
L 10x10x1 cm
22.5

POTONGAN C-C 2%
AC-WC T=4 CM

SKALA 1:100
22.5
-3 % 30 900
30
2
10
20
100
5
E
7.5 7.5 60 10
150 22.5

3 STUD Ø 16x75
22.5
ASTMA 108
LANTAI JEMBATAN

7.5 22.5
PIPA GALVANIS Ø 75 mm, P=150 cm.L=300 cm
3 STUD Ø 1.6x7.5 30
3
2

ABUTMENT DETAIL 1
SKALA 1:20
DETAIL 3
0.8 1
SKALA 1:20
POTONGAN A-A 0.2

SKALA 1:10
REPUBLIK INDONESIA No.Paket 26/2013 Judul : No./ Jml. Hal :
PERENCANAAN TEKNIK ( DED ) Digambar Oleh : Direncanakan Oleh : Disetujui Oleh :
49 / 67
Ruas Jalan GENTING GERBANG - PAMEU
JEMBATAN NASIONAL Skala : 1:400
LINTAS TENGAH II JEMBATAN LAOT JAYA DETAIL BESI PENGAMAN
Nama Jembatan 1:20
KM.SIMPANG UNING 48+300
PAKET 26/2013 Provinsi/ Kabupaten
( Ahsan Syadzilly, ST ) ( Rudiansyah Putra, ST, M.Si ) ( Ir. Taufiq Saidi, M.Eng ) Tanggal :
ACEH/ACEH TENGAH Operator CAD Bridge Engineering Team Leader

CATATAN
SEMAU UKURAN DALAM MILIMETER PERLETAKAN ELASTOMER
VERTIKAL
PEREDAM GEMPA MELINTANG

4 LUBANG Ø 14

30

POTONGAN ABUTMEN PADA BETON


Skala 1 : 400
35

38.5
43

35

23
4 LUBANG Ø 14
VARIAN VARIAN
27
29
43 25 86 25 43 8 MM TEBAL =20 MM

4 TUTUP PERLETAKAN

DETAIL 1
560X400X110
16 BAUT M-24X100 (10.9) PLAT ALAS

A 16 LUBANG Ø 26

PLAT DASAR

11
56

33.5 33.5
PEREDAM GEMPA MELINTANG (235X235X45) POTONGAN B-B
Skala 1 : 20 Skala 1 : 20

PERLETAKAN ELASTOMER VERTIKAL (560X400X110)


Skala 1 : 20

80.5
57
59
4 LUBANG M-24X80 (10.9)
10 10 4 CELAH LUBANG

400
7

15
D 3 MM

30

16

15
59

7
30 6 33.5 33.5 6

ALAS PLAT
TEBAL= 6 MM TEBAL= 20 MM
STIFENIR T=10
2

29 5 MM Skala 1 : 20
2

41.5

2 POTONGAN E-E
4.5
24

E E Skala 1 : 20 76
39.5

PENGHALUS
T=10 MM
29

12 57
PLAT ALAS ELASTOMER 4 LUBANG Ø 22
11 11
55 16 CELAH LUBANG

45
37
POTONGAN C-C POTONGAN D-D
Skala 1 : 20 Skala 1 : 20 ELASTOMER T=11 MM 3 MM
PLAT BAJA T= 4 MM
6 UNIT 7 UNIT

DETAIL 1 PLAT DASAR


Skala 1 : 20 Skala 1 : 20
REPUBLIK INDONESIA No.Paket 26/2013 Judul : No./ Jml. Hal : 34 / 67
PERENCANAAN TEKNIK ( DED ) Digambar Oleh : Direncanakan Oleh : Disetujui Oleh :
Ruas Jalan GENTING GERBANG - PAMEU
JEMBATAN NASIONAL Skala :
LINTAS TENGAH II Nama Jembatan JEMBATAN LAOT JAYA DETAIL -1
KM.SIMPANG UNING 48+300
PAKET 26/2013 Provinsi/ Kabupaten
( Ahsan Syadzilly, ST ) ( Rudiansyah Putra, ST, M.Si ) ( Ir. Taufiq Saidi, M.Eng ) Tanggal :
ACEH/ACEH TENGAH Operator CAD Bridge Engineering Team Leader

A
DIAGONAL
H 300X300
2 BAUT M-24X65 (8,8)
(DALAM DAN LUAR) PENUTUP BAUT
H 300X300
DIAGONAL 18 BAUT M-24X100 (8.8)
18 LUBANG Ø 26
PLAT BUHUL DALAM (DALAM DAN LUAR)
T=18 MM
6 LUBANG Ø 26

GELAGAR MELINTANG UJUNG PLAT BUHUL LUAR


H 750X350 T=18 MM

PLAT BUHUL LUAR 20 BAUT M-24X 60 (8.8)


T=18 MM 20 LUBANG Ø 26 (DALAM)
20 BAUT M-24X 65 (8.8)
20 LUBANG Ø 26 (LUAR)

300
DIAPH-1

8 BAUT M-24X100 (8.8)


300 4 BAUT M-24X100 (8.9) 8 LUBANG Ø 26
L=540 4 LUBANG Ø 26 (DALAM DANLUAR)
(DALAM DAN LUAR)

DIAPH - 1
B
PENGAKU
T=10 MM
PENGAKU
T=10 MM
B
160

190 400 190


10

PLAT 390X380X20
BATANG BAWAH
KONSTAN
BATANG BAWAH H 400X400
4 LUBANG Ø 26 H 400X400 4 BAUT M-24X120 (8.8)
4 LUBANG Ø 26 (DALAM) 2 LUBANG Ø 26 PENGAKU

190
4 LUBANG Ø 26 4 BAUT M-24X100 (8.8) T=10 MM
POTONGAN B-A 4 LUBANG Ø 26 (LUAR)

2 LUBANG Ø 26
350 190
DETAIL -1 A
GELAGAR MELINTANG UJUNG

2 LUBANG Ø 26

F
21 LUBANG Ø 26

T: 20 MM
PENGAKU
T=15 MM
256

4 BAUT M-24X80 (8.8)

388
388

BATANG BAWAH

300
4 LUBANG Ø 26 H 300X300

413

390
PENUTUP BAUT PENGAKU
POTONGAN F-F F
T=10 MM PLAT BUHUL LUAR
T=16 MM
95 160 95
2 LUBANG Ø 26
POTONGAN B-B
REPUBLIK INDONESIA No.Paket 26/2013 Judul : No./ Jml. Hal : 35 / 67
PERENCANAAN TEKNIK ( DED ) Digambar Oleh : Direncanakan Oleh : Disetujui Oleh :
Ruas Jalan GENTING GERBANG - PAMEU
JEMBATAN NASIONAL Skala :
LINTAS TENGAH II Nama Jembatan JEMBATAN LAOT JAYA DETAIL - 2
KM.SIMPANG UNING 48+300
PAKET 26/2013 Provinsi/ Kabupaten
( Ahsan Syadzilly, ST ) ( Rudiansyah Putra, ST, M.Si ) ( Ir. Taufiq Saidi, M.Eng ) Tanggal :
ACEH/ACEH TENGAH Operator CAD Bridge Engineering Team Leader

3 BAUT M-24X100 (8.8)


C DIAPH-2
D 3 LUBANG Ø 26
(DALAM DAN LUAR)
L=480 MM
BATANG ATAS
1454 H 300X300 350
300 727 727 KONSTAN

KONSTAN 200 BATANG ATAS


H 300X300

E E

150
PENUTUP BAUT PENUTUP BAUT

300
2 BAUT M-24X65 (8.8)
(DALAM DAN LUAR)
PLAT BUHUL LUAR
PORTAL UJUNG T=18 MM
4 BAUT M-24X 100 (8.8) 15 BAUT M-24X100 (8.8)
4 LUBANG Ø 26 (DALAM) DIAPH-2
15 LUBANG Ø 26
L=480 MM
DIAPH-2 4 BAUT M-24X65 (8.8) (DALAM DAN LUAR)
L=480 MM 4 LUBANG Ø 26 (LUAR)

2 BAUT M-24X65 (8.8)


PLAT BUHUL DALAM 2 LUBANG Ø 26
T=18 MM

554
(DALAM DAN LUAR)

554
PLAT BUHUL LUAR PLAT BUHUL DALAM
T=18 MM T=18 MM
18 BAUT M-24X100 (8.8) 18 BAUT M-24X100 (8.8)
18 LUBANG Ø 26 18 LUBANG Ø 26
(DALAM DAN LUAR) (DALAM DAN LUAR)

300 300

DIAGONAL DIAGONAL DIAGONAL DIAGONAL


H 300X300 H 300X300 H 300X300 H 300X300

C DETAIL- 2 D
POTONGAN C-C
POTONGAN D-D
124.3
300

PLAT BUHUL DALAM


T=18 MM

200
300
BATANG ATAS
H 300X300
L=480

DIAPH-2
300
332

PLAT BUHUL LUAR


T=18 MM
727

POTONGAN E-E
REPUBLIK INDONESIA No.Paket 26/2013 Judul : No./ Jml. Hal : 37 / 67
PERENCANAAN TEKNIK ( DED ) Digambar Oleh : Direncanakan Oleh : Disetujui Oleh :
Ruas Jalan GENTING GERBANG - PAMEU
JEMBATAN NASIONAL DETAIL- 4 Skala :
LINTAS TENGAH II Nama Jembatan JEMBATAN LAOT JAYA
KM.SIMPANG UNING 48+300
PAKET 26/2013 Provinsi/ Kabupaten
( Ahsan Syadzilly, ST ) ( Rudiansyah Putra, ST, M.Si ) ( Ir. Taufiq Saidi, M.Eng ) Tanggal :
ACEH/ACEH TENGAH Operator CAD Bridge Engineering Team Leader

C D
2 BAUT M-24X120 (8.8)
2 LUBANG Ø 26 (DALAM) 2 BAUT M-24X 120 (8.8)
300 2 LUBANG Ø 26 (DALAM)
2 BAUT M-24X 100 (8.8) 582 300
SAMBUNG PLAT BADAN KONSTAN 2 LUBANG Ø 26 (LUAR) 2 BAUT M-24X100 (8.8) SAMBUNG PLAT SAYAP
2 LUBANG Ø 26 (LUAR) KONSTAN
T:15 MM BATANG ATAS 291 291 BATANG ATAS
T:15 MM
SAMBUNG PLAT SAYAP H 300X300 SAMBUNG PLAT SAYAP
T:12 MM H 300X300 T:12 MM
E E
150

150
300

300
300
BATANG ATAS BATANG ATAS
H 300X300 PLAT BUHUL LUAR PLAT BUHUL LUAR
H 300X300
T=15 MM T=15 MM

6 BAUT M-24X100 (8.8) 6 BAUT M-24X 100 (8.8)


PLAT BUHUL DALAM 6 LUBANG Ø 26 10 LUBANG Ø 26 PLAT BUHUL DALAM
T=15 MM (DALAM DAN LUAR) (DALAM DAN LUAR) T=15 MM

438

438
14 BAUT M-24X80 (8.8)
14 LUBANG Ø 26
(DALAM DAN LUAR)

14 BAUT M-24X100 (8.8)


14 LUBANG Ø 26
(DALAM DAN LUAR)

DIAGONAL DIAGONAL DIAGONAL


H 300X300 DIAGONAL H 300X300
H 300X300
H 300X300

PLAT BUHUL LUAR


T=15 MM
C D
Daftar berat Rangka Baja
POTONGAN B-A POTONGAN B-B
DETAIL- 4

PLAT BUHUL DALAM


T=15 MM 8 BAUT M-24X100 (8.8)
8 LUBANG Ø 26

6 BAUT M-24X100 (8.8) BATANG ATAS


6 LUBANG Ø 26 H 300X300

210 SAMBUNG PLAT SAYAP


BATANG ATAS T:15 MM
H 300X300 325 300 SAMBUNG PLAT SAYAP
T:12 MM
PLAT BUHUL LUAR
T=15 MM

POTONGAN C-C
REPUBLIK INDONESIA No.Paket 26/2013 Judul : No./ Jml. Hal : 39 / 67
PERENCANAAN TEKNIK ( DED ) Digambar Oleh : Direncanakan Oleh : Disetujui Oleh :
Ruas Jalan GENTING GERBANG - PAMEU
JEMBATAN NASIONAL DETAIL- 6 Skala :
LINTAS TENGAH II Nama Jembatan JEMBATAN LAOT JAYA
KM.SIMPANG UNING 48+300
PAKET 26/2013 Provinsi/ Kabupaten
( Ahsan Syadzilly, ST ) ( Rudiansyah Putra, ST, M.Si ) ( Ir. Taufiq Saidi, M.Eng ) Tanggal :
ACEH/ACEH TENGAH Operator CAD Bridge Engineering Team Leader

D E
SAMBUNGAN PLAT BADAN SAMBUNGAN PLAT BADAN
T:18 MM T:18 MM
2 BAUT M-24X120 (8.8) 2 BAUT M-24X120 (8.8)
2 LUBANG Ø 26 (DALAM) 2 LUBANG Ø 26 (DALAM)
300 814 300
2 BAUT M-24X100 (8.8) 2 BAUT M-24X 100 (8.8)
KONSTAN SAMBUNGAN PLAT SAYAP
2 LUBANG Ø 26 (LUAR) 407 407 2 LUBANG Ø 26 (LUAR) SAMBUNGAN PLAT SAYAP KONSTAN
T:18 MM T:18 MM
210 210
F F
150

150
142
300
BATANG ATAS BATANG ATAS

300

300
H 300X300 H 300X300

457

457
BATANG ATAS PLAT BUHUL LUAR 10 BAUT M-24X100 (8.8) PLAT BUHUL LUAR BATANG ATAS
H 300X300 T=15 MM 10 BAUT M-24X 100 (8.8) 12 LUBANG Ø 26 T=15 MM H 300X300
10 LUBANG Ø 26 (DALAM DAN LUAR)
(DALAM DAN LUAR)
PLAT BUHUL DALAM PLAT BUHUL DALAM
T=15 MM T=15 MM

380

380
12 BAUT M-24X80 (8.8)
18 LUBANG Ø 26
(DALAM DAN LUAR)

12 BAUT M-24X65 (8.8)


12 LUBANG Ø 26
(DALAM DAN LUAR)

DIAGONAL DIAGONAL
H 300X300 H 300X300 DENAH IKATAN ANGIN ATAS
DIAGONAL DIAGONAL
H 300X300 TAMPAK
H 300X300 SAMPING
300 300 DENAH SUSUNAN LANTAI
PLAT BUHUL LUAR POTONGAN MELINTANG
T=15 MM

D D
POTONGAN D-D POTONGAN E-E
DETAIL- 6

PLAT BUHUL DALAM


T=15 MM

6 BAUT M-24X100 (8.8) 10 BAUT M-24X 100 (8.8)


6 LUBANG Ø 26 10 LUBANG Ø 26

BATANG ATAS
H 300X300

210
BATANG ATAS SAMBUNG PLAT SAYAP
H 300X300 T:18 MM
SAMBUNG PLAT SAYAP
PLAT BUHUL LUAR 300 365 T:18 MM
T=15 MM

POTONGAN F-F
REPUBLIK INDONESIA No.Paket 26/2013 Judul : No./ Jml. Hal : 41 / 67
PERENCANAAN TEKNIK ( DED ) Digambar Oleh : Direncanakan Oleh : Disetujui Oleh :
Ruas Jalan GENTING GERBANG - PAMEU
JEMBATAN NASIONAL Skala :
LINTAS TENGAH II Nama Jembatan JEMBATAN LAOT JAYA DETAIL- 8
KM.SIMPANG UNING 48+300
PAKET 26/2013 Provinsi/ Kabupaten
( Ahsan Syadzilly, ST ) ( Rudiansyah Putra, ST, M.Si ) ( Ir. Taufiq Saidi, M.Eng ) Tanggal :
ACEH/ACEH TENGAH Operator CAD Bridge Engineering Team Leader

A B
2 BAUT M-24X120 (8.8) 2 BAUT M-24X120 (8.8)
2 LUBANG Ø 26 2 LUBANG Ø 26
300 950 300
SAMBUNGAN PLAT BADAN (DALAM DAN LUAR) (DALAM DAN LUAR) SAMBUNGAN PLAT BADAN
KONSTAN
T:25 MM KONSTAN SAMBUNGAN PLAT SAYAP
BATANG ATAS 475 475 SAMBUNGAN PLAT SAYAP T:25 MM
T:20 MM T:20 MM
H 300X300
210
C C 210

175
150

150
300
300

300
BATANG ATAS
H 300X300

471

471
BATANG ATAS BATANG ATAS
PLAT BUHUL LUAR 12 BAUT M-24X120 (8.8) PLAT BUHUL LUAR
H 300X300 H 350X350
T=15 MM 12 LUBANG Ø 26 T=15 MM
(DALAM DAN LUAR) 12 BAUT M-24X120 (8.8)
PLAT BUHUL DALAM 14 LUBANG Ø 26 PLAT BUHUL DALAM
T=15 MM (DALAM DAN LUAR) T=15 MM

322

322
10 BAUT M-24X80 (8.8)
12 LUBANG Ø 26
(DALAM DAN LUAR)

10 BAUT M-24X65 (8.8)


10 LUBANG Ø 26
(DALAM DAN LUAR)

DIAGONAL DIAGONAL DIAGONAL


DIAGONAL
H 300X300 H 300X300 H 300X300
H 300X300

300
PLAT BUHUL LUAR 300
T=15 MM

POTONGAN B-A
A B POTONGAN B-B
DETAIL- 8

10 BAUT M-24X120 (8.8)


10 LUBANG Ø 26 12 BAUT M-24X120 (8.8)
12 LUBANG Ø 26
PLAT BUHUL DALAM
T=15 MM BATANG ATAS
H 300X300

210

BATANG ATAS SAMBUNGAN PLAT BADAN


H 300X300 T:25 MM
PLAT BUHUL LUAR
T=15 MM 365 430

POTONGAN C-C
REPUBLIK INDONESIA No.Paket 26/2013 Judul : No./ Jml. Hal : 43 / 67
PERENCANAAN TEKNIK ( DED ) Digambar Oleh : Direncanakan Oleh : Disetujui Oleh :
Ruas Jalan GENTING GERBANG - PAMEU
JEMBATAN NASIONAL IKATAN ANGIN PELAT SAMBUNG Skala :
LINTAS TENGAH II Nama Jembatan JEMBATAN LAOT JAYA
DETAIL- 17
KM.SIMPANG UNING 48+300
PAKET 26/2013 Provinsi/ Kabupaten
( Ahsan Syadzilly, ST ) ( Rudiansyah Putra, ST, M.Si ) ( Ir. Taufiq Saidi, M.Eng ) Tanggal :
ACEH/ACEH TENGAH Operator CAD Bridge Engineering Team Leader

BATANG ATAS

SAMBUNGAN IKATAN ANGIN

8 LUBANG ø18

IKATAN ANGIN
H 150 X 150
PENGAKU 130 x 120 x 8

IKATAN ANGIN PELAT SAMBUNG

POTONGAN F - F

SAMBUNGAN IKATAN ANGIN


IKATAN ANGIN T ; 8MM
T ; 8MM
8 BAUT M - 16 x 40 (8.8)
IKATAN ANGIN
4 LUBANG ø26
H 150 X 150
IKATAN TENGAH
IKATAN ANGIN
H 150 X 150
IKATAN ANGIN
PENGAKU 130 x 120 x 8
H 150 X 150

POTONGAN B- A

16 BAUT M - 16 X 40 SAMBUNGAN IKATAN ANGIN


BATANG ATAS
16 LUBANG 16
LIHAT DETAIL

DETAIL 18
DETAIL 17

DETAIL- 5

4 LUBANG ø26
IKATAN TENGAH
AXIS 163 163

LOKASI LUBANG POTONGAN G - G

Anda mungkin juga menyukai