Anda di halaman 1dari 1

5000

1500 4200 SHOP DRAWING


10000
6000 5000 5000
600 1000 4000
13000
6250 2750 925
16000
14150 925 5500
11000
5500 925
16000
14150 925 1000 600 +3.10
1000 600

1000 600
TERAS TERAS
I
SLIDING DOOR PINTU LIPAT
3000

SLIDING DOOR TOOLS & SLIDING DOOR


TOILET 6x6m

1000
+0.05 12x15m OTHERS 12x15m
6000

6000
OFFICE 4P CRANE 5T (2 HOOK)
3000

+0.10
ABRASIVE TANK H
BLOCK x8 BLAST SPOT
BLOCK
D

14000
DEHUMIDIFIER MACHINE
A.2 A.4
6000

6000
+0.10
POSISI MENYESUAIKAN
PAINTING ROOM
+0.10 WORK PLACE WORK PLACE
11000

+0.10 +0.10
COMPRESSOR MACHINE

2000
+0.10

BLOCK Nama Pekerjaan :


5000

3000
A.1 RECEIVER TANK

3000
F.1
700

TERAS

TERAS
& OTHERS
BLASTING MACHINE ROOM

36000
8000
F

5000
HALL 1 BLAST / PAINT ROOM HALL 2 BLAST / PAINT ROOM
+0.10

+0.10 +0.10
6300

CONTAINER PINTU LIPAT

2000
E.1
PEKERJAAN RANCANG DAN BANGUN
13000

BLASTING
E

7000
ROOM
DUST COLLECTION PLAN

POSISI MENYESUAIKAN POSISI MENYESUAIKAN


KONSTRUKSI GEDUNG SUB FACTORY

BLASTING PAINTING TOOL ROOM PAINTING MATERIAL STORAGE

7000

RUANG PANEL
+0.10

5000
+0.10

1500 4200
6000

10000
6000 5000 5000 FASILITAS KAPAL SELAM
1275
+3.10

(GAMBAR ARSITEKTUR BANGUNAN C)

1000
+0.10
2150
D

BLOCK
+0.10

3000
7000
PAINTING MATERIAL STORAGE
RUANG PANEL
BLASTING PAINTING TOOL ROOM

+0.10
6000
6000

UNLOADING SPACE SHELTER PAINTING OUTFITTING SPACE +0.10

A.3 +0.10
4960

+0.10 +0.10
+0.10

3000
SLIDING DOOR
6x6m
C
Lokasi Proyek :
600 1000

600 1000
TERAS TERAS

600 1000 4000 5500 3500 4000 4000 8000 5500 5500 4000 4000 4000 4000 1000 600

3000
13000 16000 11000 16000
56000 +0.10
+3.10

1000
1 2 2.A 3 3.A 4 5 6 6.A 7 8 +5.10 D
BENGKEL KAPAL SELAM

3000
7000
+5.10
TOILET

6000
SHOWER

+5.05

LOCKER ROOM 20 PERSON


MUSHOLLA
+5.30

SHOWER

+5.10

3000
+5.10

SHOWER

4000 4000 4000 4000


C
Diperiksa Oleh :
16000

9 9.A 10 10A 11 11A12 12.A 13

C MANAJEMEN KONSTRUKSI &


KONSULTAN PENGAWAS

600 1000
TERAS

4000 4000 4000 4000 1000 600 Teguh Prakoso, ST


Team Leader
INST. PENERANGAN BLOCK A.5 LT.1 Agus Sujoko, ST
SKALA 1:100 TA. Sipil & Struktur Dermaga

16000 Adji Dwipawarman H, ST, M.T


Tenaga Ahli Arsitektur

Ir. Sanusi Subiyono, ST., MBA


+0.10 Tenaga Ahli MEP
+3.10

1000
Disusun Oleh :

+5.10 D KONTRAKTOR

3000
7000
+5.10

6000
TOILET
SHOWER

+5.05
+0.05

Dr. Ir. Koespiadi, MT

LOCKER ROOM 20 PERSON


MUSHOLLA

Project Manager

+5.10
+5.30

SHOWER

Ir. Iman Santoso


+0.05

3000
Site Manager 1
+5.10

Adjinoto
SHOWER
+0.05

Site Manager 2

Saklar Tunggal +150cm


C Sry Widodo, S.T.
Tenaga Ahli Struktur

Saklar Ganda +150cm 4000 4000 4000 4000 AlfatedoYoga Pratama, S.T
Lampu Highbay 100watt Tenaga Ahli Arsitektur

Lampu Phillips TCW 2x18watt


16000
Ir. Achmad Syahid
Lampu downlight led 12watt Tenaga Ahli MEP

Lampu dinding 2x36watt 9 9.A 10 10A 11 11A12 12.A 13 NAMA GAMBAR : SKALA :

Exhaust fan INST. PENERANGAN


GEDUNG A5 1:100
LANTAI 1 & 2
NYM 2.5 mm conduit HI 20 mm

PANEL CONTROL PUSH BUTTON


INST. PENERANGAN BLOCK A.5 LT.2 KODE : NO. LBR : JML. LBR : REV :
SKALA 1:100 MEP-A-01.06 R0

Anda mungkin juga menyukai