ESTIMASI BIAYA PANGGUNG BAND GEREJA IMMANUEL KENDARI
NO. JENIS BIAYA JUMLAH (Rp.)
I. BIAYA BAHAN 23,667,750
II. BIAYA UPAH 2,500,000
JUMLAH 26,167,750 Dua Puluh Enam Juta Seratus Enam Puluh Tujuh Ribu Tujuh Ratus Lima TERBILANG : Puluh Rupiah
Mengetahui,
Ir.H. BENNY MANSJUR, MT
Nip. 19630403 199503 1 003 HARGA PERKIRAAN SEMENTARA
ESTIMASI BIAYA PANGGUNG BAND GEREJA IMMANUEL KENDARI
I. BIAYA BAHAN
HARGA SATUAN JUMLAH BIAYA
NO. JENIS TENAGA AHLI SATUAN VOLUME (Rp.) (Rp.) A. BAHAN 1 Pek. Lantai M² 14.40 850,000.00 12,240,000.00 2 Pek. Dinding M² 13.74 650,000.00 8,927,750.00 3 Aksesoris & Kelengkapan bh 1.00 2,500,000.00 2,500,000.00 Total 23,667,750.00
II. BIAYA PEKERJA
HARGA SATUAN JUMLAH BIAYA NO. JENIS TENAGA AHLI SATUAN VOLUME (Rp.) (Rp.) A. TUKANG DAN PEKERJA 1 Tukang Utk Lantai Oh 1.00 1,500,000.00 1,500,000.00 2 Tukang Utk Dinding Oh 1.00 1,000,000.00 1,000,000.00 Total 2,500,000.00