A PEKERJAAN BETON
1 Kolom K1 ( 30 x 30 ) cm
- Beton K-250 A.4.1.1.8 7,110 m³ - -
- Pembesian Besi A.4.1.1.17 723,401 kg - -
- Begisting 2 x pakai A.4.1.1.22 37,920 m² - -
2 Kolom K3 ( 20 x 20 ) cm
- Beton K-250 A.4.1.1.8 0,608 m³ - -
- Pembesian Besi A.4.1.1.17 80,173 kg - -
- Begisting 2 x pakai A.4.1.1.22 4,053 m² - -
3 Kolom Praktis / KP ( 15 x 15 ) cm
- Beton K-225 A.4.1.1.7 1,997 m³ - -
- Pembesian Besi A.4.1.1.17 295,431 kg - -
- Begisting 2 x pakai A.4.1.1.22 8,875 m² - -
4 Balok Latai ( 12 x 12 ) cm
- Beton K-225 A.4.1.1.7 1,125 m³ - -
- Pembesian Besi A.4.1.1.17 166,220 kg - -
- Begisting 2 x pakai A.4.1.1.23 6,667 m² - -
5 Ringbalk ( 15 x 25 ) cm
- Beton K-225 A.4.1.1.7 15,150 m³ - -
- Pembesian Besi A.4.1.1.17 2.621,475 kg - -
- Begisting 2 x pakai A.4.1.1.23 87,533 m² - -
6 Balok Induk B1A ( 30 x 70 ) cm
- Beton K-250 A.4.1.1.8 1,453 m³ - -
- Pembesian Besi A.4.1.1.17 204,834 kg - -
- Begisting A.4.1.1.23 12,191 m² - -
7 Balok Induk B1 ( 25 x 55 ) cm
- Beton K-250 A.4.1.1.8 7,428 m³ - -
- Pembesian Besi A.4.1.1.17 1.464,240 kg - -
- Begisting A.4.1.1.23 76,701 m² - -
8 Balok Induk B2 ( 25 x 45 ) cm
- Beton K-250 A.4.1.1.8 14,091 m³ - -
- Pembesian Besi A.4.1.1.17 2.707,139 kg - -
- Begisting A.4.1.1.23 155,428 m² - -
9 Balok Anak B3 ( 20 x 40 ) cm
- Beton K-250 A.4.1.1.8 2,724 m³ - -
- Pembesian Besi A.4.1.1.17 601,049 kg - -
- Begisting A.4.1.1.23 36,974 m² - -
10 Balok Anak B4 ( 15 x 30 ) cm
- Beton K-250 A.4.1.1.8 0,648 m³ - -
- Pembesian Besi A.4.1.1.17 246,589 kg - -
- Begisting A.4.1.1.23 12,240 m² - -
11 Plat Beton, T: 12 cm
- Beton K-250 A.4.1.1.8 54,019 m³ - -
- Pembesian Besi A.4.1.1.17 5.716,234 kg - -
- Begisting A.4.1.1.24 432,585 m² - -
12 Plat Tangga, Anak Tangga & Bordes
- Beton K-250 A.4.1.1.8 2,448 m³ - -
- Pembesian Besi A.4.1.1.17 735,086 kg - -
- Begisting A.4.1.1.24 22,200 m² - -
13 Plat Topi - Topi Depan
- Beton K-225 A.4.1.1.7 2,324 m³ - -
- Pembesian Besi A.4.1.1.17 257,685 kg - -
- Begisting 2 x pakai A.4.1.1.23 13,280 m² - -
SUB TOTAL -
" B. LANTAI 2 "
HARGA JUMLAH JUMLAH
NO URAIAN PEKERJAAN ANALISA VOLUME SATUAN HARGA BIAYA
Rp. Rp. Rp.
1 2 3 4 5 6 7
B PEKERJAAN PASANGAN & PLESTERAN
1 Pemasangan Dinding Bata Merah Tebal 1/2 Bata Camp. 1SP : 6PP A.4.4.1.11 476,338 m² - -
2 Pemasangan Plesteran 1 Pc : 6 Pp Tebal 15 mm A.4.4.2.6 952,676 m² - -
3 Pemasangan Acian A.4.4.2.27 952,676 m² - -
SUB TOTAL -
C PEKERJAAN PINTU, JENDELA ALUMINIUM
1 1 Unit Pekerjaan Pasang Pintu - Type ( PD1 ) Ksn. 1 1,000 unit - -
2 1 Unit Pekerjaan Pasang Pintu - Type ( P1 ) Ksn. 2 7,000 unit - -
3 1 Unit Pekerjaan Pasang Pintu - Type ( P2 ) Ksn. 3 3,000 unit - -
4 1 Unit Pekerjaan Pasang Pintu - Type ( P4 ) Ksn. 5 2,000 unit - -
5 1 Unit Pekerjaan Pasang Jendela - Type ( J1 ) Ksn. 7 8,000 unit - -
6 1 Unit Pekerjaan Pasang Jendela - Type ( J2 ) Ksn. 8 6,000 unit - -
7 1 Unit Pekerjaan Pasang Boven - Type ( BV ) Ksn. 9 2,000 unit - -
8 Pemasangan Rooster 20 x 20 Taksir 288,000 bh - -
SUB TOTAL -
D PEKERJAAN RANGKA & PENUTUP ATAP
1 Pemasangan Rangka Atap Bajaringan Taksir 423,440 m² - -
2 Pemasangan Atap Genteng Metal Lapis Pasir A.4.5.2.32 423,440 m² - -
3 Pemasangan Nok Genteng Metal A.4.5.2.36 55,900 m' - -
4 Pasang listplank Woodplank taksir 86,600 m' - -
5 Pasang talang vertikal dihitung 11,000 m' - -
SUB TOTAL -
E PEKERJAAN LANGIT - LANGIT
1 Memasang Plafond PVC + Rangka Hollo dan List Taksir 392,614 m² - -
SUB TOTAL -
F PEKERJAAN PENUTUP LANTAI & DINDING
1 Pemasangan Lantai Keramik 60 x 60 cm A.4.4.3.34m 313,944 m² - -
2 Pemasangan Lantai Keramik 25 x 25 cm A.4.4.3.36 8,416 m² - -
3 Pemasangan Dinding Keramik 25 x 40 cm A.4.4.3.54.c 35,720 m² - -
4 Memasang Stepnosing tangga 10 cm kasar garis garis Taksir 29,700 m' - -
SUB TOTAL -
G PEKERJAAN ELEKTRIKAL
a Pekerjaan Penerangan
1 Downlight Slim 20 watt Philips Taksir 36,000 bh - -
2 Exhaust fan type wall kap. 50 CFM Taksir 3,000 bh - -
3 Saklar Ganda Taksir 4,000 bh - -
4 Saklar Tunggal Taksir 12,000 bh - -
5 Titik Inst. Penerangan (NYM 3 X 2,5 mm²) dalam conduit high impact 20 mm Taksir 39,000 titik - -
PPn 11 % -
TOTAL -
PEMBULATAN -
……………………………………………………………………………………………………………………
Kota./Kab.,Tgl/Bln/Thn
Penawar,
PT./CV. ……………………
Nama Terang
Jabatan
DAFTAH HARGA BAHAN BANGUNAN DAN UPAH PEKERJA
HARGA
NO JENIS MATERIAL/TENAGA SAT
( Rp. )
1 2 3 4
JENIS MATERIAL
2 Bata Merah bh -
3 Bata Ringan Uk 60cmx20cmx10cm bh -
4 Bata Ringan Uk 60cmx20cmx07cm bh -
5 Kapur Pasang m3 -
6 Brangkal kg -
7 Batu Blonos m3 -
8 Batu Belah Manual m3 -
9 Batu Split Pecah Mesin 0,5/1 m3 -
10 Batu Split Pecah Mesin 1/1 m3 -
11 Batu Split Pecah Mesin 1/2 m3 -
12 Batu Split Pecah Mesin 2/3 m3 -
13 Batu Split Pecah Mesin 3/5 m3 -
14 Batu Split Pecah Mesin 5/7 m3 -
15 Batu Split Pecah Mesin 7/10 m3 -
16 Sirtu m3 -
17 Pasir Beton / Pasang m3 -
18 Pasir Urug m3 -
19 Tanah Urug m3 -
20 Abu batu mesin m3 -
1 Semen Pc kg -
2 Mortar bata ringan kg -
3 Semen Warna kg -
4 Semen Putih kg -
5 Sikatop Sika Top Seal 107 Semen Waterproofing Anti Bocor kg -
1 Besi Beton kg -
2 Besi Beton Ulir kg -
3 Baja Profil kg -
4 Besi Siku kg -
5 Besi Plat kg -
6 Baja Strip (0,2x2) cm kg -
7 Plat Strip kg -
8 Mur/baud biasa 4 s/d 6 cm bh -
9 Hollow galvanis 20 x 40 mm btg -
10 Hollow galvanis 40 x 40 mm btg -
11 Hollow besi hitam 20 x 40 mm btg -
12 Hollow besi hitam 40 x 40 mm btg -
1 Kayu Kelas I -
Kaso m3 -
Balok m3 -
Papan m3 -
2 Kayu Kelas II -
Kaso m3 -
Balok m3 -
Papan m3 -
3 Kayu Kelas III -
Kaso m3 -
Balok m3 -
Papan m3 -
4 Kayu Kelas Iv -
Kaso m3 -
Balok m3 -
Papan m3 -
HARGA
NO JENIS MATERIAL/TENAGA SAT
( Rp. )
1 2 3 4
5 Bambu btg -
6 Kayu Reng 3/4 Kruing 3 m btg -
7 Kayu Dolken diameter 8 - 10 / 400 cm btg -
8 Kayu Bakar m3 -
9 Kayu Taun m3 -
1 Kusen Alumunium. 3" m -
2 Kusen Alumunium. 4" Cassemen m -
3 Kusen Alumunium. 4" m -
3 Rangka Jendela Alumunium CA m -
4 Rangka Jendela Alumunium. PC m -
5 Rangka Pintu Alumunium. CA m -
6 Rangka Pintu Alumuniym. PC m -
7 Kusen & Pintu PVC toilet unit -
Profil Kusen UPVC m -
Ambang Pintu / Jendela UPVC m -
Panel UPVC m -
8 Folding Gate 0,4 mm m2 -
9 Engsel 3" bh -
10 Engsel 4" bh -
11 Engsel 4" Besi bh -
12 Rel Pintu Lipat 4 Pintu Zinkalume Lokal unit -
13 Handle Pintu bh -
14 Handle Pintu termasuk kunci set -
15 Pull Handle Pintu bh -
16 Ring Kunci bh -
17 Handle pintu type HRE 75.01 bh -
18 Selinder CISA type 08510 bh -
19 Door Stoper bh -
20 Door Closer bh -
21 Espagnolet bh -
22 Kait Angin bh -
23 Engsel Pintu Biasa bh -
24 Engsel Jendela Biasa bh -
25 Grendel Pintu bh -
26 Grendel Jendela bh -
27 Handel Knob kunci bh -
28 Pull Handle Pintu set -
29 Slot 2x putar bh -
30 Karet lis kaca m -
31 Kunci/ Grandel Tanam bh -
1 Triplex t.3 mm lbr -
2 Triplex t.4 mm lbr -
3 Triplex t.6mm lbr -
4 Triplex t.9mm lbr -
5 Triplex t.12mm lbr -
6 Teakwood t.3mm lbr -
7 Multiplex t.6mm lbr -
8 Multiplex t.9mm lbr -
9 Multiplex t.12mm lbr -
10 Multiplex t.18mm lbr -
11 MDF 18 lbr -
12 Teakblock t18mm lbr -
13 Lis plank fiber semen lbr -
1 Keramik 20/20 cm m2 -
Keramik 25/25 cm m2 -
2 Kermik 30/30 cm m2 -
3 Keramik 40/40 cm m2 -
4 Keramik 60/60 cm m2 -
HARGA
NO JENIS MATERIAL/TENAGA SAT
( Rp. )
1 2 3 4
5 Keramik dinding 20/20 cm m2 -
6 Keramik dinding 20/25 cm m2 -
7 Keramik dinding 25/40 cm m2 -
8 Granit Tile 40/40 cm Polish m2 -
9 Granit Tile 60/60 cm Polish m2 -
Granit Tile 60/60 cm Un Polish m2 -
10 Plint Keramik 8/30 cm bh -
11 Plint Granitetile (stepnosing) 10/40cm bh -
12 Ornamen Profil (cetak) bh -
13 Roster Beton Uk. 15/30 cm bh -
14 Roster Beton Uk. 20/20 cm bh -
15 Roster Kerawang bh -
16 Glass Blok 20/20 bh -
17 Kanstin 10 K300 m1 -
28 Pafing Blok Tidak Berwana Lokal t.6cm m2 -
29 Pafing Blok Tidak Berwana Magelang t.6cm m2 -
30 Pafing Blok Berwarna Magelang m2 -
31 Keramik difabel 30 x 30 cm m -
32 Tegel difabel 30 x 30 m2 -
1 Waterproofing Coating Ltr -
2 Waterproofing Membrane Bakar m2 -
1 Genteng Keramik bh -
2 Genteng Glazur bh -
3 Genteng Pres Kebumen bh -
4 Genteng Pres Lokal bh -
5 Genteng Kodok Kebumen bh -
6 Genteng Beton bh -
7 Nok Genteng Keramik bh -
8 Nok Genteng Glazur bh -
9 Nok Genteng Pres Kebumen bh -
10 Nok Genteng Pres Lokal bh -
11 Nok Genteng Kodok Kebumen bh -
12 Nok Genteng Beton bh -
13 Seng Plat BJLS 30 m' -
14 Seng Gelombang BJLS lbr -
15 Asbes Gel.besar uk. 180x102x5 mm lbr -
16 Asbes Gel.kecil uk 180x105x4 mm lbr -
17 Nok gel besar 1.102 cm pcs -
18 Nok gel kecil 1.105 cm pcs -
19 Genteng Metal 2 x 4 (Uk. 80 x 77 cm) lbr -
20 Genteng Metal Pasir 2 x 4 (Uk. 80 x 77 cm) lbr -
21 Nok Genteng Metal pcs -
22 Nok Genteng Metal Pasir pcs -
23 Atap Galfalum m' -
24 Atap Gelombang UPVC Semi Transparan m' -
25 Nok Atap Gelombang UPVC pcs -
26 Atap Bitumen Onduline m2 -
27 Atap Bitumen Bergelombang H : 40 mm lbr -
28 Atap Bitumen Onduvilla m2 -
29 Nok Atap Bitumen Onduline m' -
30 Nok / Ridge Onduline lbr -
31 Alumunium foil bubble foam m' -
Atap Alderon m2 -
Nok Atap Alderon m' -
1 Kawat Beton kg -
2 Ram Kawat Nyamuk/Kasa Logam m2 -
3 Kawat GI-4 mm kg -
HARGA
NO JENIS MATERIAL/TENAGA SAT
( Rp. )
1 2 3 4
4 Kawat Harmonika m2 -
5 Kawat Bronjong Ø 4 mm kg -
6 Bronjong 2 x 1 x 0,5 m, dia 2,7 mm bh -
7 Bronjong 2 x 1 x 0,5 m, dia 3,0 mm bh -
8 Wiremesh M8 uk.2,1 x 5,4 m lbr -
9 Wiremesh M10 uk. 2,1 x 5,4 m lbr -
1 Kaca Bening 5 mm m2 -
2 Kaca Bening 3 mm m2 -
Kaca Bening 8 mm m2 -
3 Kaca Raybend 5 mm m2 -
4 Kaca Raybend 3 mm m2 -
5 Kaca Buram 5 mm m2 -
6 Kaca Buram 3 mm m2 -
7 Kaca Cermin 2 mm lbr -
Kaca Tempered 12 mm m2 -
Kaca One Way 8 mm m2 -
Akrilik Tebal 3 mm -
8 Akrilik Tebal 5 mm lbr -
1 Paku 1 s/d 3 cm kg -
2 Paku 4 s/d 7 cm kg -
3 Paku 8 s/d 12 cm kg -
4 Paku Skrup 6 x 1" isi 900 pcs dus -
5 Paku Asbes/seng kg -
6 Paku ripet bh -
7 Skrup fixer bh -
8 Paku Payung 5 cm kg -
Paku roofing kg -
9 Paku Kait bh -
Paku Skrup Beton kg -
1 Dempul Besi/Kayu Kg -
2 Cat Kayu/Besi Kg -
3 Plamir Kg -
4 Meni kayu Kg -
5 Wood Filler Kg -
6 Sending Sealer Kg -
7 Wood Stan Kg -
8 Clear Melamik Kg -
9 Thinner Ltr -
10 Amplas Kayu Lbr -
11 Kwas cat 4" bh -
1 Cat Dasar Emulsion Warna Putih Kg -
2 Cat Akhir Emulsion Warna Standard Kg -
3 Cat Wheather Coat Warna Standard Kg -
4 Cat Dasar Emulsion Kg -
5 Cat Akhir Emulsion Kg -
6 Cat Wheather Coat Kg -
7 Plamir Tembok Kg -
1 Lem Kayu 0,6 kg -
2 Seal Tape bh -
3 Kawat Las Listrik dus -
4 Sealent (300 ml) tb -
5 Minyak Bekisting Ltr -
6 Pasangan Ijuk kg -
7 Teer Ltr -
8 Lem/Sarplass PVC bh -
9 Alat Bantu set -
10 Minyak Tanah/Bkar Ltr -
11 Solar Industri Ltr -
HARGA
NO JENIS MATERIAL/TENAGA SAT
( Rp. )
1 2 3 4
12 Oli Ltr -
13 Stenvet kg -
1 Wastafel Komplit Kran & acc unit -
2 Kloset Duduk Komplit & acc unit -
3 Kloset Jongkok type CE 6 unit -
4 Urinoir komplit unit -
5 Shower Set type TX 423 SZ unit -
6 Shower Spray unit -
Jet Shower Original Toto / TX403SMCRB / Jet Shower Chrome unit -
7 Floor Drain bh -
8 Tempat Sabun Keramik bh -
9 Keran bh -
Kran Cuci Piring Stainless & Fleksibel Kran Sink bh -
10 Kran Zink Type T 30 AR13NV7N bh -
11 Kitchenzink stainless steel 1 lubang unit -
12 Kran dinding type T 23 B13V7N bh -
1 Gypsumboard t.9 mm ex Jayaboard lbr -
2 Calsyboard lbr -
3 List Pofil 5 mm Gypsum m' -
4 List Kayu Profil m' -
8 Plafon gyptile akustik lbr -
9 Alumunium Composite lbr -
1 Aspal Drum Segel kg -
2 Aspal Curah kg -
Kota./Kab.,Tgl/Bln/Thn
Penawar,
PT./CV. ……………………
Nama Terang
Jabatan
DAFTAR HARGA SATUAN PEKERJAAN
DAERAH : KABUPATEN PURBALINGGA
HARGA SATUAN
NO. KODE URAIAN PEKERJAAN SAT PEKERJAAN
( Rp )
Penawar,
PT./CV. ……………………
Nama Terang
Jabatan
DAFTAR ANALISA HARGA SATUAN PEKERJAAN
DAERAH : KABUPATEN PURBALINGGA
HARGA
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN BAHAN/UPAH JUMLAH
Rp Rp
A A.2.3.1 HARGA SATUAN PEKERJAAN TANAH
2 A.2.3.1.9 1 m³ Pengurugan Kembali ( di hitung dari 1/3 kali koefisien Pekerjaan galian ) -
A TENAGA -
L.01 0,50 OH Pekerja - -
L.04 0,050 OH Mandor - -
B BAHAN
C PERALATAN
D Jumlah A + B + C -
E Overhead & Profit ……………..% -
F Harga Satuan Pekerjaan (D+E) -
1 A.4.4.1.11 1 m² Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 6PP -
A Tenaga -
L.01 0,30 OH Pekerja - -
L.02 0,1 OH Tukang Batu - -
L.03 0,01 OH Kepala Tukang - -
L.04 0,015 OH Mandor - -
B Bahan -
70 Buah Bata Merah Panggisari - -
8,32 Kg Portland Semen - -
0,049 m3 Pasir Pasang - -
C PERALATAN
D Jumlah A + B + C -
E Overhead & Profit ……………..% -
F Harga Satuan Pekerjaan (D+E) -
HARGA
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN BAHAN/UPAH JUMLAH
Rp Rp
D A.4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN
1 A.4.1.1.5 1 m³ Membuat Beton mutu f'c=14,5 MPa (K175), slum (12±2)cm, w/c = 0,66 -
A Tenaga -
L.01 1,65 OH Pekerja - -
L.02 0,275 OH Tukang Batu - -
L.03 0,028 OH Kepala Tukang - -
L.04 0,083 OH Mandor - -
B Bahan -
326,00 Kg Portland Semen - -
0,48 kg Pasir Beton - -
0,71 kg Kerikil (maksimum 30 mm) - -
215,00 ltr Air - -
C PERALATAN
D Jumlah A + B + C -
E Overhead & Profit ……………..% -
F Harga Satuan Pekerjaan (D+E) -
2 A.4.1.1.7 1 m³ Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58 -
A Tenaga -
L.01 1,650 OH Pekerja - -
L.02 0,275 OH Tukang Batu - -
L.03 0,028 OH Kepala Tukang - -
L.04 0,083 OH Mandor - -
B Bahan -
371,00 Kg Portland Semen - -
0,44 kg Pasir Beton - -
0,72 kg Kerikil (maksimum 30 mm) - -
215,00 ltr Air - -
C PERALATAN
D Jumlah A + B + C -
E Overhead & Profit ……………..% -
F Harga Satuan Pekerjaan (D+E) -
3 A.4.1.1.8 1 m³ Membuat Beton mutu f'c=21,7 MPa (K250), slum (12±2)cm, w/c = 0,56 -
A Tenaga -
L.01 1,650 OH Pekerja - -
L.02 0,275 OH Tukang Batu - -
L.03 0,028 OH Kepala Tukang - -
L.04 0,083 OH Mandor - -
B Bahan -
384,00 Kg Portland Semen - -
0,43 kg Pasir Beton - -
0,72 kg Kerikil (maksimum 30 mm) - -
215,00 ltr Air - -
C PERALATAN
D Jumlah A + B + C -
E Overhead & Profit ……………..% -
F Harga Satuan Pekerjaan (D+E) -
HARGA
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN BAHAN/UPAH JUMLAH
Rp Rp
4 A.4.1.1.17 1 Kg Pembesian dg Besi Polos -
A Tenaga -
L.01 0,0070 OH Pekerja - -
L.02 0,0070 OH Tukang Besi - -
L.03 0,0007 OH Kepala Tukang - -
L.04 0,0004 OH Mandor - -
B Bahan -
1,05 Kg Besi Beton (polos) - -
0,015 Kg Kawat Beton - -
C PERALATAN
D Jumlah A + B + C -
E Overhead & Profit ……………..% -
F Harga Satuan Pekerjaan (D+E) -
1 A.5.1.1.1 1 Unit Memasang Closet Duduk / Mono Blok+ Komplit & acc -
A Tenaga -
L.01 3,3 OH Pekerja - -
L.02 1,1 OH Tukang Batu - -
L.03 0,001 OH Kepala Tukang - -
L.04 0,16 OH Mandor - -
B Bahan -
1 Buah Kloset Duduk / Monoblok - -
1 Buah Shower Spray - -
0,06 Kelengkapan 6% dari harga Kloset - -
C PERALATAN
D Jumlah A + B + C -
E Overhead & Profit ……………..% -
F Harga Satuan Pekerjaan (D+E) -
1 A.4.7.1.10 1 m² Pengecat Tembok Baru / dalam (1lap.Plamir, 1lap Cat Dasar, 2 lap. Cat Penutup) -
A Tenaga -
L.01 0,02 OH Pekerja - -
L.02 0,063 OH Tukang Cat - -
L.03 0,0063 OH Kepala Tukang - -
L.04 0,0030 OH Mandor - -
B Bahan -
0,1 Kg Plamir - -
0,1 Kg Cet Dasar - -
0,26 Kg Cat Penutup 2 kali ( sek. Mowilex / dalam ) - -
C PERALATAN
D Jumlah A + B + C -
E Overhead & Profit ……………..% -
F Harga Satuan Pekerjaan (D+E) -
ANALISA KUSEN, PINTU & JENDELA
TAHUN 2024