surat keluar
1 1-Jan-22 Rp 7,325 Rp 8,950
2 21-Feb-22 Rp 7,250 Rp 8,950
3 2-Mar-22 Rp 7,750 Rp 9,450
4 4-Apr-22 Rp 8,900 Rp 10,650
5 29-Apr-22 Rp 9,250 Rp 11,050
6 1-Jun-22 Rp 9,850 Rp 11,450
7 1-Jul-22 Rp 10,850 Rp 12,650
8 1-Aug-22 Rp 10,750 Rp 12,550
Prediksi
n+1 1-Sep-22 Rp 11,638 Rp 13,443
n+2 1-Oct-22 Rp 12,228 Rp 14,050
n+3 1-Nov-22 . Rp 12,837 Rp 14,679
n+4 31-Dec-22 Rp 14,016 Rp 15,894
prediksi kenaikan harga aspal berdasarkan kenaikan hps terakhir 4 april 2022
1-Aug-22 11,332 27.33% 13,108 23.08%
status ket
hrs 18.34% stop
acwc 21.40% stop
acbc 21.99% stop
acbase 22.96% stop
ssa 22.01% stop
ssb 14.90% stop
acwc asb 26.22% stop
acbc asb 31.57% aman
asbase asb 29.79% aman
Ket
Rp16,000
###
###
###
###
###
###
###
###
###
###
###
###
Rp15,000
Realita
###
###
###
###
###
###
###
###
###
###
###
###
Rp14,000
###
###
###
###
###
###
###
###
Rp13,000
###
###
f(x) = 20.2607251903027 x + 8519.27649814974 Rp12,650 Rp12,550
###
### R² = 0.935152856407607
###
### Rp12,000
###
###
Rp11,450
Rp11,000 Rp11,050
f(x) = 19.64989236116 x + 6863.52415190443 Rp10,850 Rp10,750
Rp10,650
Rp10,000
Rp9,850
Rp9,450
Rp9,250
Rp9,000 Rp8,950 Rp8,950 Rp8,900
Rp8,000
Rp7,750
Rp7,325 Rp7,250
Rp7,000
mar
mei
jun
apr
Rp6,000
feb
jan
###
jul
Rp12,650 Rp12,550
11,450
Rp10,850 Rp10,750
9,850
nov
sep
des
ags
okt
JENIS PEKERJAAN HRS - WC
A. TENAGA
JUMLAH HARGA TENAGA
B. BAHAN
5 Aspal Kg 73.4400 12,958.20
JUMLAH HARGA BAHAN
JUMLAH HARGA PERALATAN
JENIS PEKERJAAN AC - WC
JENIS PEKERJAAN AC - BC
JENIS PEKERJAAN SS - A
JENIS PEKERJAAN SS - B
PERKIRAAN HARGA JUMLAH
NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)
JUMLAH
HARGA
(Rp.)
5,323.81
951,649.92 10,950
1,120,443.85 18.34%
467,037.07
1,592,804.72
238,920.71
1,831,725.43 1,662,121.22
1,831,725.43
JUMLAH
HARGA
(Rp.)
7,049.87
800,022.30 10,950
929,742.02 21.40%
586,560.57
1,523,352.46
228,502.87
1,751,855.33 1,589,646.33
1,751,855.14
JUMLAH
HARGA
8,172.00
776,608.69 10,950
903,553.33 21.99%
600,012.09
1,511,737.42
226,760.61
1,738,498.03 1,577,525.99
1,738,498.03
JUMLAH
HARGA
(Rp.)
8,092.15
727,865.33 10,950
868,438.18 22.96%
591,279.63
1,467,809.97
220,171.49
1,687,981.46 1,531,686.88
1,687,981.46
JUMLAH
HARGA
(Rp.)
11,446.66
885,799.65 10,950
1,072,550.90 22.01%
642,000.67
1,725,998.23
258,899.73
1,984,897.96 1,801,111.11
1,984,897.96
JUMLAH
HARGA
(Rp.)
3,557.01
1,209,016.85 10,950
1,389,625.90 14.90%
300,550.64
1,693,733.55
254,060.03
1,947,793.58 1,767,442.32
1,947,793.58
JUMLAH
HARGA
(Rp.)
19,868.63
679,517.66 13,250
986,990.16 26.22%
517,778.89
1,524,637.69
228,695.65
1,753,333.34 1,590,987.66
1,753,333.34
JUMLAH
HARGA
(Rp.)
23,373.82
584,000.30 13,250
887,369.04 31.57%
602,610.37
1,513,353.22
227,002.98
1,740,356.20 1,579,212.11
1,740,356.20
JUMLAH
HARGA
(Rp.)
21,707.53
592,457.78 13,250
899,729.21 29.79%
547,312.25
1,468,748.99
220,312.35
1,689,061.34 1,532,666.77
1,689,061.34
KEBUTUHAN PERKERASAAN ASPAL BINA MARGA 2022
KEBUTUH
Perkiraan Kebutuhan (Tonase)
11,165 12,089 1,278 2,026 170 397
No Satuan Kerja Nama Paket Pagu Konstruksi AC WC AC BC AC Base HRS SSA SSB
- AC-BC
DINAS PEKERJAAN UMUM DAN
262
PENATAAN RUANG
Peningkatan Jalan Tompak - Cepogo (BANKEU) 5,000,000,000 - AC-WC 623 942 ###
- Pas Batu Kali
DINAS PEKERJAAN UMUM DAN - LPA
337
PENATAAN RUANG
Peningkatan Kapasitas Struktur Jalan Bade - Batangan (DAK) 4,525,888,000
- AC -BC + HRS 862 409 ###
- Pelebaran Beton
DINAS PEKERJAAN UMUM DAN
263
PENATAAN RUANG
Peningkatan ruas jalan Mongkrong-Gilirejo (BANKEU) 3,000,000,000 - LPA 384 748 ###
- AC Base dan AC-WC
- Rigid Pavement
DINAS PEKERJAAN UMUM DAN
274
PENATAAN RUANG
Pelebaran Jalan Jrebeng - Repaking 2,925,000,000 - HRS+AC-WC 197 81 ###
- Pas Batu
DINAS PEKERJAAN UMUM DAN - Pelebaran Beton
283 PENATAAN RUANG Pelebaran Jalan Kuncen - Winong 2,445,000,000 - AC-BC + AC-WC 360 545 ###
- LPA
DINAS PEKERJAAN UMUM DAN
281
PENATAAN RUANG
Pelebaran Jalan Dukuhan - Jatirejo 1,955,000,000 - AC-WC 665 ###
- Pas Batu
- Tutup drainase
DINAS PEKERJAAN UMUM DAN 1,605,000,000 - Kanstin
315
PENATAAN RUANG
Penataan Alun-alun Utara Tahap 2
- Pas. Batu Kali 273 ###
- AC-WC
- Pelebaran Beton
DINAS PEKERJAAN UMUM DAN
273
PENATAAN RUANG
Pelebaran Jalan Metuk - Dlingo 960,000,000 - Bahu Jalan Beton 48 ###
- SSA
DINAS PEKERJAAN UMUM DAN - Pelebaran LPA
275 PENATAAN RUANG Pelebaran Jalan Brambang 960,000,000 - Lapen + SSB 391
- Pelebaran Beton
DINAS PEKERJAAN UMUM DAN
278
PENATAAN RUANG
Pelebaran Jalan Sambi - Wonogiri 960,000,000 - HRS 234 ###
- Pas Batu Kali