Screenshot 2022-06-28 at 11.33.36
Screenshot 2022-06-28 at 11.33.36
Nama Project : CORE TEAM PERENCANAAN DAN PENGAWASAN PROVINSI ACEH (PAKET -11/2022) PROVINSI ACEH
Lokasi : N.039 LIPAT KAJANG - BATAS PROVINSI SUMATERA UTARA
Date : 09 Juni 2022
Drawing by : TEAM
BOR - 01
BOR - 01
Catatan :
SKETSA SITUASI LOKASI
Nama Project : CORE TEAM PERENCANAAN DAN PENGAWASAN PROVINSI ACEH (PAKET -11/2022) PROVINSI ACEH
Lokasi : N.020 SP. UNING (BATAS KOTA TAKENGON) - UWAQ (KM.379), PROVINSI ACEH
Date : 07 Juni 2022
Drawing by : TEAM
BOR - 02
BOR - 03
BOR - 02
BOR - 03
Catatan :
SKETSA SITUASI LOKASI
Nama Project : CORE TEAM PERENCANAAN DAN PENGAWASAN PROVINSI ACEH (PAKET -11/2022) PROVINSI ACEH
Lokasi : N.021 UWAQ (KM.379) - BATAS ACEH TENGAH/ GAYO LUES, PROVINSI ACEH
Date : 08 Juni 2022
Drawing by : TEAM
BOR - 04
BOR - 05
BOR - 04
BOR - 05
Catatan :
SKETSA SITUASI LOKASI
Nama Project : CORE TEAM PERENCANAAN DAN PENGAWASAN PROVINSI ACEH (PAKET -11/2022) PROVINSI ACEH
Lokasi : N.021 UWAQ (KM.379) - BATAS ACEH TENGAH/ GAYO LUES, PROVINSI ACEH
Date : 08 Juni 2022
Drawing by : TEAM
BOR - 06
BOR - 07
BOR - 06
BOR - 07
Catatan :
SKETSA SITUASI LOKASI
Nama Project : CORE TEAM PERENCANAAN DAN PENGAWASAN PROVINSI ACEH (PAKET -11/2022) PROVINSI ACEH
Lokasi : N. 043.1 BATAS BIREUEN/ BENER MERIAH - BATAS BENER MERIAH/ ACEH TENGAH, PROVINSI ACEH
Date : 10 Juni 2022
Drawing by : TEAM
HB - 01 S - 01
HB - 01
S - 01
Catatan :
SKETSA SITUASI LOKASI
Nama Project : CORE TEAM PERENCANAAN DAN PENGAWASAN PROVINSI ACEH (PAKET -11/2022) PROVINSI ACEH
Lokasi : N.037.2 KOTA SUBULUSSALAM - BATAS PROVINSI SUMATERA UTARA
Date : 14 Juni 2022
Drawing by : TEAM
S - 02 HB - 02
S - 02
HB - 02
Catatan :
SKETSA SITUASI LOKASI
Nama Project : CORE TEAM PERENCANAAN DAN PENGAWASAN PROVINSI ACEH (PAKET -11/2022) PROVINSI ACEH
Lokasi : N.044 GENTING GERBANG - CEULALA - BATAS ACEH TENGAH/ NAGA RAYA, PROVINSI ACEH
Date : 13 Juni 2022
Drawing by : TEAM
HB - 03
S - 03
S - 01
HB - 01
Catatan :
SKETSA SITUASI LOKASI
Nama Project : CORE TEAM PERENCANAAN DAN PENGAWASAN PROVINSI ACEH (PAKET -11/2022) PROVINSI ACEH
Lokasi : N.022 BATAS ACEH TENGAH/ GAYO LUES - BLANG KEJEREN, PROVINSI ACEH
Date : 11 Juni 2022
Drawing by : TEAM
S - 04 HB - 04
S - 01
HB - 01
Catatan :
SATKER P2JN PROV. ACEH GEOLOGIC DRILLING LOG
PROJECT : CORE TEAM PERENCANAAN DAN PENGAWASAN PROVINSI ACEH (PAKET -11/2022) PROVINSI ACEH
LOCATION : N.039 LIPAT KAJANG - BATAS PROVINSI SUMATERA UTARA BORE HOLE 01
COORDINATE : N : 2°19'51.24 / E : 98°06'08.64
BORING MACHINE : YBM S 01 NUMBER 29+385
START : 09 Juni 2022 DRILLING METHODE : WASHING Company Name
FINISH : 10 Juni 2022 DRILL MASTER : RAJA ADIGUNA S.
TOTAL DEPTH : 12,45 METER LOGGED BY : RAJA ADIGUNA S.
FINAL GWL : - METER CHECKED BY : PATUH SEMBIRING, S.T PT. ANUGERAH
KRIDAPRADANA KSO, PT.
END OF DEPTH
ROCK/SOIL (M)
N / 15 cm
N / 15 cm
N / 15 cm
SOIL SAMPLE
TICKNESS OF
NO.OF BLOW
BUANA ARCHICON KSO, PT.
DEPTH (M)
DEPTH (M)
G.W.L (m)
SOIL TYPE
GRAPH
DATE
CM
(m)
N1 N2 N3 10 20 30 40 50 60 70
PHOTO OF CORE
0,80
Timbunan Pasir Berlempung, Kuning Kecoklatan, 0
0,80
"01
0,20 1,00 Plastis Rendah. "01
Batuan Beton, Abu-abu Cerah. UDS
"02 "02
1 1 3 4
Sedang, Kekakuan Rendah, Kadar Air
"03 "03
2.40 3.40 Sedang.
"04 Pasir Berlempung, Kuning Keabu-abuan, Plastis "04
2 3 5 8
Rendah, Kepadatan Lepas, Kadar Air Rendah.
1.60 5.00
"05 "05
Pasir Berlanau, Abu-abu Cerah, Tidak
"06 Berplastis, Kepadatan Padat, Kadar Air 14 20 29
"06
49
2.00 7.00 Rendah.
"07 "07
"08 "08
18 29 31/2 ≥ 60
"09 "09
Pasir Halus, Abu-abu Cerah, Tidak
"10
Berplastis, Kepadatan Sangat Padat, Kadar "10
21 34 26/5 ≥ 60
Air Rendah.
"11 "11
"12 "12
5.45 12.45 30 48 12/10 ≥ 60
"13 "13
STOP BOR (12.45 m)
"14 "14
0 0 0
"15 "15
"16 "16
0 0 0
"17 "17
"18 "18
0 0 0
"19 "19
"20 "20
0 0 0
"21 "21
"22 "22
0 0 0
"23 "23
"24 "24
0 0 0
"25 "25
"26 "26
0 0 0
"27 "27
"28 "28
0 0 0
"29 "29
"30 "30
0 0 0
Legend :
N / 15 cm
N / 15 cm
N / 15 cm
SOIL SAMPLE
TICKNESS OF
NO.OF BLOW
BUANA ARCHICON KSO, PT.
DEPTH (M)
DEPTH (M)
G.W.L (m)
SOIL TYPE
GRAPH
DATE
CM
(m)
N1 N2 N3 10 20 30 40 50 60 70
PHOTO OF CORE
0
"01 "01
Lempung, Coklat, Plastis Sedang, UDS
3.00 3.00
"03 "03
"06 "06
20 21 33 54
"07 "07
"08 "08
22 23 35 58
"09 "09
Napal, Abu-abu Gelap, Tidak Berplastis,
"10 Kekakuan Sangat Keras, Kadar Air Sangat 20 22 38
"10
60
Keras.
"11 "11
"12 "12
35 60 - ≥ 60
"13 "13
"14 "14
60 - - ≥ 60
10.00 15.00
"15 "15
"17 "17
"18 "18
0 0 0
"19 "19
"20 "20
0 0 0
"21 "21
"22 "22
0 0 0
"23 "23
"24 "24
0 0 0
"25 "25
"26 "26
0 0 0
"27 "27
"28 "28
0 0 0
"29 "29
"30 "30
0 0 0
Legend :
N / 15 cm
N / 15 cm
N / 15 cm
SOIL SAMPLE
TICKNESS OF
NO.OF BLOW
BUANA ARCHICON KSO, PT.
DEPTH (M)
DEPTH (M)
G.W.L (m)
SOIL TYPE
GRAPH
DATE
CM
(m)
N1 N2 N3 10 20 30 40 50 60 70
PHOTO OF CORE
0
"01 "01
UDS
Lempung Kaku Berlanau, Coklat, Plastis Sedang,
"02 Kekakuan Kaku, Kadar Air Sedang. "02
25
6 10 15
2,50
"03 "03
3.50 3.50
"04 "04
13 25 29 54
"05 "05
"06 "06
28 42 18/7 ≥ 60
"07 "07
"08 "08
15 24 27 51
Napal, Abu-abu, Tidak Berplastis,
"09 "09
Kekakuang Sangat Keras, Kadar Air
"10 Rendah. "10
23 29 31 60
"11 "11
"12 "12
36 49 11/10 ≥ 60
"13 "13
"14 "14
41 60 - ≥ 60
11.50 15.00
"15 "15
"17 "17
"18 "18
0 0 0
"19 "19
"20 "20
0 0 0
"21 "21
"22 "22
0 0 0
"23 "23
"24 "24
0 0 0
"25 "25
"26 "26
0 0 0
"27 "27
"28 "28
0 0 0
"29 "29
"30 "30
0 0 0
Legend :
N / 15 cm
N / 15 cm
N / 15 cm
SOIL SAMPLE
TICKNESS OF
NO.OF BLOW
BUANA ARCHICON KSO, PT.
DEPTH (M)
DEPTH (M)
G.W.L (m)
SOIL TYPE
GRAPH
DATE
CM
(m)
N1 N2 N3 10 20 30 40 50 60 70
PHOTO OF CORE
0
Lempung, Coklat Keabu-abuan, Plastis
4,00
"01 "01
Sedang, Kekakuan Sedang, Kadar Air UDS
"03 ` "03
3.50 6.00
"06 "06
14 14 18 32
"10 "10
30 28 32 60
"11 "11
"13 "13
"14 "14
60 - - ≥ 60
6.00 15.00
"15 "15
"17 "17
"18 "18
0 0 0
"19 "19
"20 "20
0 0 0
"21 "21
"22 "22
0 0 0
"23 "23
"24 "24
0 0 0
"25 "25
"26 "26
0 0 0
"27 "27
"28 "28
0 0 0
"29 "29
"30 "30
0 0 0
Legend :
N / 15 cm
N / 15 cm
N / 15 cm
SOIL SAMPLE
TICKNESS OF
NO.OF BLOW
BUANA ARCHICON KSO, PT.
DEPTH (M)
DEPTH (M)
G.W.L (m)
SOIL TYPE
GRAPH
DATE
CM
(m)
N1 N2 N3 10 20 30 40 50 60 70
PHOTO OF CORE
0
Batu Gampingan Berlanau, Coklat, Plastis
"01
1.60 1.60
Rendah, Kekakuan Sedang, Kadar Air Sedang. "01
UDS
"02 "02
Lempung Kaku, Coklat Keabu-abuan, 2 4 6 10
3,00
"03
Plastis Sedang ke Tinggi, Kekakuan Kaku, "03
Kadar Air Sedang.
2.40 4.00
"04 "04
10 14 24 38
"08 "08
19 25 31 56
"09 "09
"10 "10
22 28 32/4 ≥ 60
Napal, Abu-abu, Tidak Berplastis,
"11 "11
Kekakuan Sangat Keras, Kadar Air Rendah.
"12 "12
36 47 13/8 ≥ 60
"13 "13
"14 "14
41 60 - ≥ 60
8.00 15.00
"15 "15
"17 "17
"18 "18
0 0 0
"19 "19
"20 "20
0 0 0
"21 "21
"22 "22
0 0 0
"23 "23
"24 "24
0 0 0
"25 "25
"26 "26
0 0 0
"27 "27
"28 "28
0 0 0
"29 "29
"30 "30
0 0 0
Legend :
N / 15 cm
N / 15 cm
N / 15 cm
SOIL SAMPLE
TICKNESS OF
NO.OF BLOW
BUANA ARCHICON KSO, PT.
DEPTH (M)
DEPTH (M)
G.W.L (m)
SOIL TYPE
GRAPH
DATE
CM
(m)
N1 N2 N3 10 20 30 40 50 60 70
PHOTO OF CORE
0
5,00
"01 "01
Batu Berpasir, Coklat Kehitaman, Plastis Sedang,
"02
Kepadatan Sangat Lepas, Kadar Air Sedang. "02
3 5 8 13
3.00 3.00
"03 "03
DS
"04 "04
4 6 10 16
Pasir Halus, Abu-abu Gelap, Tidak Berplastis,
"05 "05
Kepadatan Sedang, Kadar Air Sedang.
"06 "06
7 9 13 22
4.00 7.00
"07 "07
"08 "08
20 22 26 48
"09 "09
"10 "10
22 22 38 60
Pasir Halus, Abu-abu Gelap, Tidak Berplastis,
"11 Kepadatan Padat ke Sangat Padat, Kadar Air "11
Rendah.
"12 "12
23 24 36 60
"13 "13
"14 "14
40 60 - ≥ 60
8.00 15.00
"15 "15
"16
STOP BOR (15.00 m) "16
0 0 0
"17 "17
"18 "18
0 0 0
"19 "19
"20 "20
0 0 0
"21 "21
"22 "22
0 0 0
"23 "23
"24 "24
0 0 0
"25 "25
"26 "26
0 0 0
"27 "27
"28 "28
0 0 0
"29 "29
"30 "30
0 0 0
Legend :
N / 15 cm
N / 15 cm
N / 15 cm
SOIL SAMPLE
TICKNESS OF
NO.OF BLOW
BUANA ARCHICON KSO, PT.
DEPTH (M)
DEPTH (M)
G.W.L (m)
SOIL TYPE
GRAPH
DATE
CM
(m)
N1 N2 N3 10 20 30 40 50 60 70
PHOTO OF CORE
0
3,00
"05 "05
"08 "08
4.45 8.45 15 17 28 45
"09 "09
"10 "10
17 34 26/8 ≥ 60
"11 "11
Pasir Halus Berlanau, Abu-abu, Tidak Berplastis,
"12 Kepadatan Sangat Padat, Kadar Air Rendah. "12
≥ 60
22 38 22/11
"13 "13
"14 "14
36 53 7/13 ≥ 60
6.55 15.00
"15 "15
"16
STOP BOR (15.00 m) "16
0 0 0
"17 "17
"18 "18
0 0 0
"19 "19
"20 "20
0 0 0
"21 "21
"22 "22
0 0 0
"23 "23
"24 "24
0 0 0
"25 "25
"26 "26
0 0 0
"27 "27
"28 "28
0 0 0
"29 "29
"30 "30
0 0 0
Legend :
2.0
4.0
6.0
8.0
DEPTH ( m )
10.0
12.0
14.0
16.0
18.0
BH - 01
20.0
STA 29 + 385
GENERALIZED SOIL PROFILE (SPT Value/blows)
2.0
4.0
6.0
8.0
10.0
DEPTH ( m )
12.0
14.0
16.0
18.0
20.0
22.0
BH - 02 BH - 03
24.0
STA 67 + 500
GENERALIZED SOIL PROFILE (SPT Value/blows)
2.0
4.0
6.0
8.0
DEPTH ( m )
10.0
12.0
14.0
16.0
18.0
BH - 04 BH - 05
20.0
STA 75 + 500
GENERALIZED SOIL PROFILE (SPT Value/blows)
2.0
4.0
6.0
8.0
DEPTH ( m )
10.0
12.0
14.0
16.0
18.0
BH - 06 BH - 07
20.0
STA 32 + 215
Grafik 4.1.1. : Daya Dukung Izin Pondasi Tiang Pancang dari Data SPT titik
BH - 01.
0
Dia. 20 cm
Dia. 30 cm
Dia. 40 cm
Dia. 50 cm
Dia. 60 cm
8
Kedalaman (m)
10
12
14
16
18
20
0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300 320 340
D = 20 cm D. = 30 cm D = 40 cm D. = 50 cm D. = 60 cm
Deth SPT Li Qp Qs Qi Qp Qs Qi Qp Qs Qi Qp Qs Qi Qp Qs Qi
(m) N Nk (m) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton)
2.00 4 4.00 1.00 38.01 0.50 12.77 85.53 0.75 28.66 152.05 1.01 50.89 237.58 1.26 79.45 342.12 1.51 114.34
4.00 8 6.00 3.00 45.49 2.26 15.62 102.35 3.39 34.80 181.96 4.52 61.56 284.31 5.65 95.90 409.41 6.79 137.83
6.00 49 20.33 5.00 50.47 12.78 19.38 113.57 19.16 41.69 201.90 25.55 72.41 315.47 31.94 111.54 454.27 38.33 159.09
8.00 60 30.25 7.00 50.47 26.61 22.15 113.57 39.91 45.84 201.90 53.22 77.94 315.47 66.52 118.46 454.27 79.83 167.39
10.00 60 36.20 9.00 59.56 40.94 28.04 134.02 61.41 56.96 238.26 81.88 95.80 372.28 102.35 144.56 536.08 122.82 203.26
12.00 60 40.17 11.00 71.94 55.52 35.09 161.87 83.28 70.61 287.77 111.04 118.13 449.64 138.81 177.64 647.48 166.57 249.14
Proyek : CORE TEAM PERENCANAAN DAN PENGAWASAN PROVINSI ACEH (PAKET -11/2022) PROVINSI ACEH
DDTSPT
Grafik 4.1.2. : Daya Dukung Izin Pondasi Tiang Pancang dari Data SPT titik
BH - 02.
0
Dia. 20 cm
Dia. 30 cm
Dia. 40 cm
Dia. 50 cm
Dia. 60 cm
8
Kedalaman (m)
10
12
14
16
18
20
0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300 320 340
0
Dia. 20 cm
Dia. 30 cm
Dia. 40 cm
Dia. 50 cm
4
Dia. 60 cm
10
Kedalaman (m)
12
14
16
18
20
0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300 320 340
D = 20 cm D. = 30 cm D = 40 cm D. = 50 cm D. = 60 cm
Deth SPT Li Qp Qs Qi Qp Qs Qi Qp Qs Qi Qp Qs Qi Qp Qs Qi
(m) N Nk (m) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton)
2.00 13 13.00 1.00 49.32 1.63 16.77 110.98 2.45 37.48 197.29 3.27 66.42 308.27 4.08 103.57 443.91 4.90 148.95
4.00 32 22.50 3.00 54.54 8.48 19.88 122.71 12.72 43.45 218.15 16.96 76.11 340.86 21.21 117.86 490.84 25.45 168.70
6.00 54 33.00 5.00 58.01 20.73 23.49 130.53 31.10 49.73 232.06 41.47 85.65 362.59 51.84 131.23 522.13 62.20 186.48
8.00 58 39.25 7.00 60.50 34.53 27.07 136.12 51.79 55.73 241.99 69.05 94.47 378.11 86.32 143.30 544.48 103.58 202.21
10.00 60 43.40 9.00 67.86 49.08 32.44 152.68 73.63 65.62 271.43 98.17 110.11 424.12 122.71 165.91 610.73 147.25 233.03
12.00 60 46.17 11.00 73.39 63.82 37.23 165.12 95.72 74.19 293.55 127.63 123.38 458.67 159.54 184.80 660.49 191.45 258.45
14.00 60 48.14 13.00 74.77 78.65 40.65 168.23 117.97 79.67 299.08 157.30 131.15 467.31 196.62 195.09 672.93 235.94 271.50
Proyek : CORE TEAM PERENCANAAN DAN PENGAWASAN PROVINSI ACEH (PAKET -11/2022) PROVINSI ACEH
Lokasi : N.020 SP. UNING (BATAS KOTA TAKENGON) - UWAQ (KM.379), PROVINSI ACEH
DDTSPT
Tabel - 4.1.4. : Daya Dukung Izin Pondasi Tiang Pancang Dari Data SPT titik BH - 03.
D = 20 cm D. = 30 cm D = 40 cm D. = 50 cm D. = 60 cm
Deth SPT Li Qp Qs Qi Qp Qs Qi Qp Qs Qi Qp Qs Qi Qp Qs Qi
(m) N Nk (m) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton)
2.00 25 25.00 1.00 59.69 3.14 20.53 134.30 4.71 45.71 238.76 6.28 80.84 373.06 7.85 125.93 537.21 9.42 180.96
4.00 54 39.50 3.00 62.83 14.89 23.92 141.37 22.34 51.59 251.33 29.78 89.73 392.70 37.23 138.35 565.49 44.67 197.43
6.00 60 46.33 5.00 64.93 29.11 27.46 146.08 43.67 57.43 259.70 58.22 98.21 405.79 72.78 149.82 584.34 87.34 212.25
8.00 51 47.50 7.00 66.42 41.78 30.50 149.45 62.67 62.35 265.69 83.57 105.28 415.14 104.46 159.27 597.80 125.35 224.34
10.00 60 50.00 9.00 72.26 56.55 35.40 162.58 84.82 71.16 289.03 113.10 118.96 451.60 141.37 178.81 650.31 169.65 250.70
12.00 60 51.67 11.00 73.14 71.42 38.66 164.56 107.13 76.28 292.55 142.84 126.08 457.10 178.55 188.08 658.23 214.26 262.26
14.00 60 52.86 13.00 72.57 86.35 41.46 163.28 129.52 80.33 290.28 172.70 131.30 453.57 215.87 194.36 653.14 259.05 269.52
Proyek : CORE TEAM PERENCANAAN DAN PENGAWASAN PROVINSI ACEH (PAKET -11/2022) PROVINSI ACEH
Lokasi : N.020 SP. UNING (BATAS KOTA TAKENGON) - UWAQ (KM.379), PROVINSI ACEH
DDTSPT
Grafik 4.1.4. : Daya Dukung Izin Pondasi Tiang Pancang dari Data SPT titik
BH - 04.
0
Dia. 20 cm
Dia. 30 cm
Dia. 40 cm
Dia. 50 cm
Dia. 60 cm
8
Kedalaman (m)
10
12
14
16
18
20
0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300 320 340
0
Dia. 20 cm
Dia. 30 cm
Dia. 40 cm
Dia. 50 cm
4
Dia. 60 cm
10
Kedalaman (m)
12
14
16
18
20
0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300 320 340
D = 20 cm D. = 30 cm D = 40 cm D. = 50 cm D. = 60 cm
Deth SPT Li Qp Qs Qi Qp Qs Qi Qp Qs Qi Qp Qs Qi Qp Qs Qi
(m) N Nk (m) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton)
2.00 12 12.00 1.00 39.58 1.51 13.50 89.06 2.26 30.14 158.34 3.02 53.38 247.40 3.77 83.22 356.26 4.52 119.66
4.00 28 20.00 3.00 46.75 7.54 17.09 105.18 11.31 37.32 186.99 15.08 65.35 292.17 18.85 101.16 420.72 22.62 144.76
6.00 32 24.00 5.00 51.52 15.08 20.19 115.92 22.62 43.17 206.09 30.16 74.73 322.01 37.70 114.88 463.70 45.24 163.61
8.00 54 31.50 7.00 54.93 27.71 23.85 123.60 41.56 49.51 219.73 55.42 84.33 343.33 69.27 128.30 494.40 83.13 181.42
10.00 60 37.20 9.00 61.58 42.07 28.94 138.54 63.11 58.80 246.30 84.14 98.93 384.85 105.18 149.32 554.18 126.22 209.97
12.00 60 41.00 11.00 66.85 56.67 33.62 150.42 85.01 67.14 267.41 113.35 111.81 417.83 141.69 167.61 601.68 170.02 234.56
14.00 60 43.71 13.00 73.51 71.41 38.79 165.40 107.12 76.56 294.05 142.83 126.58 459.46 178.53 188.86 661.62 214.24 263.39
Proyek : CORE TEAM PERENCANAAN DAN PENGAWASAN PROVINSI ACEH (PAKET -11/2022) PROVINSI ACEH
Lokasi : N.021 UWAQ (KM.379) - BATAS ACEH TENGAH/ GAYO LUES, PROVINSI ACEH
DDTSPT
Tabel - 4.1.6. : Daya Dukung Izin Pondasi Tiang Pancang Dari Data SPT titik BH - 05.
D = 20 cm D. = 30 cm D = 40 cm D. = 50 cm D. = 60 cm
Deth SPT Li Qp Qs Qi Qp Qs Qi Qp Qs Qi Qp Qs Qi Qp Qs Qi
(m) N Nk (m) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton)
2.00 10 10.00 1.00 47.44 1.26 16.06 106.74 1.88 35.96 189.75 2.51 63.75 296.49 3.14 99.46 426.94 3.77 143.07
4.00 38 24.00 3.00 53.03 9.05 19.49 119.32 13.57 42.49 212.12 18.10 74.33 331.44 22.62 115.00 477.27 27.14 164.52
6.00 47 31.67 5.00 56.76 19.90 22.90 127.71 29.85 48.54 227.03 39.79 83.64 354.74 49.74 128.19 510.82 59.69 182.21
8.00 56 37.75 7.00 59.42 33.21 26.45 133.70 49.81 54.53 237.68 66.41 92.51 371.38 83.02 140.40 534.79 99.62 198.19
10.00 60 42.20 9.00 67.23 47.73 31.96 151.27 71.59 64.74 268.92 95.45 108.73 420.19 119.32 163.93 605.07 143.18 230.33
12.00 60 45.17 11.00 71.13 62.43 36.20 160.03 93.65 72.07 284.50 124.87 119.81 444.54 156.08 179.40 640.13 187.30 250.84
14.00 60 47.29 13.00 74.14 77.25 40.16 166.82 115.87 78.78 296.57 154.49 129.75 463.38 193.12 193.09 667.27 231.74 268.77
Proyek : CORE TEAM PERENCANAAN DAN PENGAWASAN PROVINSI ACEH (PAKET -11/2022) PROVINSI ACEH
Lokasi : N.021 UWAQ (KM.379) - BATAS ACEH TENGAH/ GAYO LUES, PROVINSI ACEH
DDTSPT
Grafik 4.1.6. : Daya Dukung Izin Pondasi Tiang Pancang dari Data SPT titik
BH - 06.
0
Dia. 20 cm
Dia. 30 cm
Dia. 40 cm
Dia. 50 cm
Dia. 60 cm
8
Kedalaman (m)
10
12
14
16
18
20
0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300 320 340
0
Dia. 20 cm
Dia. 30 cm
Dia. 40 cm
Dia. 50 cm
4
Dia. 60 cm
10
Kedalaman (m)
12
14
16
18
20
0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300 320 340
D = 20 cm D. = 30 cm D = 40 cm D. = 50 cm D. = 60 cm
Deth SPT Li Qp Qs Qi Qp Qs Qi Qp Qs Qi Qp Qs Qi Qp Qs Qi
(m) N Nk (m) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton)
2.00 13 13.00 1.00 31.10 1.63 10.69 69.98 2.45 23.82 124.41 3.27 42.12 194.39 4.08 65.61 279.92 4.90 94.29
4.00 16 14.50 3.00 39.96 5.47 14.41 89.91 8.20 31.61 159.84 10.93 55.47 249.76 13.67 85.99 359.65 16.40 123.16
6.00 22 17.00 5.00 45.87 10.68 17.43 103.20 16.02 37.60 183.47 21.36 65.43 286.67 26.70 100.90 412.81 32.04 144.01
8.00 48 24.75 7.00 50.09 21.77 21.05 112.69 32.66 44.10 200.34 43.54 75.49 313.04 54.43 115.23 450.77 65.31 163.32
10.00 60 31.80 9.00 55.71 35.96 25.76 125.35 53.95 52.57 222.84 71.93 88.67 348.19 89.91 134.05 501.40 107.89 188.71
12.00 60 36.50 11.00 62.83 50.45 31.03 141.37 75.68 62.26 251.33 100.91 103.96 392.70 126.13 156.13 565.49 151.36 218.77
14.00 60 39.86 13.00 71.63 65.11 36.90 161.16 97.67 73.25 286.51 130.22 121.55 447.68 162.78 181.78 644.65 195.34 253.95
Proyek : CORE TEAM PERENCANAAN DAN PENGAWASAN PROVINSI ACEH (PAKET -11/2022) PROVINSI ACEH
Lokasi : N.022 BATAS ACEH TENGAH/ GAYO LUES - BLANG KEJEREN, PROVINSI ACEH
DDTSPT
Tabel - 4.1.8. : Daya Dukung Izin Pondasi Tiang Pancang Dari Data SPT titik BH - 07.
D = 20 cm D. = 30 cm D = 40 cm D. = 50 cm D. = 60 cm
Deth SPT Li Qp Qs Qi Qp Qs Qi Qp Qs Qi Qp Qs Qi Qp Qs Qi
(m) N Nk (m) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton)
2.00 8 8.00 1.00 33.62 1.01 11.41 75.63 1.51 25.51 134.46 2.01 45.22 210.09 2.51 70.53 302.54 3.02 101.45
4.00 21 14.50 3.00 41.97 5.47 15.08 94.44 8.20 33.12 167.89 10.93 58.15 262.32 13.67 90.17 377.75 16.40 129.19
6.00 33 20.67 5.00 47.54 12.99 18.44 106.97 19.48 39.55 190.17 25.97 68.58 297.14 32.46 105.54 427.88 38.96 150.42
8.00 45 26.75 7.00 51.52 23.53 21.88 115.92 35.30 45.70 206.09 47.06 78.11 322.01 58.83 119.10 463.70 70.59 168.68
10.00 60 33.40 9.00 58.43 37.77 27.03 131.48 56.66 55.16 233.73 75.55 93.02 365.21 94.44 140.62 525.90 113.32 197.97
12.00 60 37.83 11.00 64.84 52.30 32.07 145.90 78.45 64.32 259.37 104.59 107.38 405.27 130.74 161.24 583.58 156.89 225.91
14.00 60 41.00 13.00 70.69 66.98 36.96 159.04 100.47 73.11 282.74 133.96 121.04 441.79 167.45 180.75 636.17 200.94 252.24
Proyek : CORE TEAM PERENCANAAN DAN PENGAWASAN PROVINSI ACEH (PAKET -11/2022) PROVINSI ACEH
Lokasi : N.022 BATAS ACEH TENGAH/ GAYO LUES - BLANG KEJEREN, PROVINSI ACEH
DDTSPT
Elevation : m
HAND BORE DRILLING LOG Total Length of Drill : 05,00 m
Bore Master : OLO B. TAMPUBOLON
Thickness
Depth
Gound of
Scala
Symbol
Scala
Water Description sample
Level UDS
(m) (m) (m) (m) DS (m)
0 0
2 2
Lempung, Kuning Kemerahan, Plastis Sedang, Kekakuan
Sedang, Kadar Air Sedang.
3 3
3,80 2,60
4 4
Lempung, Coklat Keputih-putihan, Plastis Sedang, Kekakuan
Sedang, Kadar Air Sedang.
5,00 1,20
5 5
6 6
7 7
8 8
9 9
10 10
:: :: Sand
Elevation : m
HAND BORE DRILLING LOG Total Length of Drill : 05,00 m
Bore Master : OLO B. TAMPUBOLON
Thickness
Depth
Gound of
Scala
Symbol
Scala
Water Description sample
Level UDS
(m) (m) (m) (m) DS (m)
0 0
2 2
2,50 2,50
3 3
Lempung, Abu-abu, Plastis Sedang, Kekakuan Sedang, Kadar
Air Sedang.
4 4
4,50 2,00
6 6
7 7
8 8
9 9
10 10
:: :: Sand
Elevation : m
HAND BORE DRILLING LOG Total Length of Drill : 05,00 m
Bore Master : OLO B. TAMPUBOLON
Thickness
Depth
Gound of
Scala
Symbol
Scala
Water Description sample
Level UDS
(m) (m) (m) (m) DS (m)
0 0
2 2
2,30 2,30
3 3
5,00 2,70
5 5
6 6
7 7
8 8
9 9
10 10
:: :: Sand
Elevation : m
HAND BORE DRILLING LOG Total Length of Drill : 05,00 m
Bore Master : OLO B. TAMPUBOLON
Thickness
Depth
Gound of
Scala
Symbol
Scala
Water Description sample
Level UDS
(m) (m) (m) (m) DS (m)
0 0
Lempung, Kuning, Plastis Sedang, Kekakuan Sedang, Kadar
0,80 0,80
Air Sedang.
1 1
UDS
3 3
3,20 2,40
6 6
7 7
8 8
9 9
10 10
:: :: Sand
PT. ANUGERAH KRIDAPRADANA KSO, PT.
BUANA ARCHICON KSO, PT. DAYA CREASI GRAPHIC SONDERING TEST
MITRAYASA
Test No. : S-01/ STA 26+940 Koordinat : N : 4°49'30.00" / E : 96°44'41.56"
Date : 10 JUNI 2022 Sondering Capacity : 2.50 ton.
GWL (m) : - Tested by : OLO B. TAMPUBOLON
TSF (Kg/Cm)
1
Max Depth
GWL
2
4
Depth (m)
10
0 200 400 600 800 1000 1200 1400 1600 1800 2000 22000 2400 2600
Total Skin Friction (TSF) Kg/Cm
CORE TEAM PERENCANAAN DAN PENGAWASAN N. 043.1 BATAS BIREUEN/ BENER MERIAH - BATAS
PROVINSI ACEH (PAKET -11/2022) PROVINSI ACEH BENER MERIAH/ ACEH TENGAH, PROVINSI ACEH
PT. ANUGERAH KRIDAPRADANA KSO,
PT. BUANA ARCHICON KSO, PT. DAYA SONDERING TEST
CREASI MITRAYASA
Test No. : S-01/ STA 26+940 Koordinat : N : 4°49'30.00" / E : 96°44'41.56"
Date : 10 JUNI 2022 Sondering Capacity : 2.50 ton.
GWL (m) :- Tested by : OLO B. TAMPUBOLON
Cone Total Skin Skin Total Skin Local Skin
Resistant Resistant Friction Friction Friction Friction
Depth
(CR) (TR) (SF) x 20/10 (TSF) (LSF)
(M) Kg/Cm2 Kg/Cm2 Kg/Cm2 Kg/Cm Kg/Cm Kg/Cm
0.00 0 0 0 0 0 0.00
0.20 6 8 2 4 4 0.20
0.40 10 12 2 4 8 0.20
0.60 24 28 4 8 16 0.40
0.80 32 37 5 10 26 0.50
1.00 36 41 5 10 36 0.50
1.20 40 44 4 8 44 0.40
1.40 43 48 5 10 54 0.50
1.60 49 54 5 10 64 0.50
1.80 53 60 7 14 78 0.70
2.00 62 69 7 14 92 0.70
2.20 74 82 8 16 108 0.80
2.40 78 86 8 16 124 0.80
2.60 84 93 9 18 142 0.90
2.80 88 97 9 18 160 0.90
3.00 120 134 14 28 188 1.40
3.20 131 145 14 28 216 1.40
3.40 142 156 14 28 244 1.40
3.60 148 163 15 30 274 1.50
3.80 152 166 14 28 302 1.40
4.00 158 172 14 28 330 1.40
4.20 162 174 12 24 354 1.20
4.40 170 184 14 28 382 1.40
4.60 175 190 15 30 412 1.50
4.80 180 195 15 30 442 1.50
5.00 183 198 15 30 472 1.50
5.20 186 201 15 30 502 1.50
5.40 188 203 15 30 532 1.50
5.60 192 207 15 30 562 1.50
5.80 196 211 15 30 592 1.50
6.00 203 218 15 30 622 1.50
6.20 208 223 15 30 652 1.50
6.40
6.60
6.80
7.00
7.20
7.40
7.60
7.80
8.00
8.20
8.40
8.60
8.80
9.00
9.20
9.40
9.60
9.80
10.00
Project : Location : Page :
CORE TEAM PERENCANAAN DAN N. 043.1 BATAS BIREUEN/ BENER MERIAH -
PENGAWASAN PROVINSI ACEH (PAKET - BATAS BENER MERIAH/ ACEH TENGAH,
11/2022) PROVINSI ACEH PROVINSI ACEH
Grafik 4.1. - Daya Dukung Izin Pondasi Tiang Pancang
Dari Data Sondir S-01/ STA 26+940
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 250
0
Dia. 20 cm
Dia. 30 cm
1 Dia. 40 cm
Dia. 50 cm
Dia. 60 cm
2
4
Depth (m)
10
DDT. Sondir
Tabel 4.1. - Daya Dukung Izin Pondasi Tiang Pancang Dari Data Sondir S-01/ STA 26+940
Project : CORE TEAM PERENCANAAN DAN PENGAWASAN PROVINSI ACEH (PAKET -11/2022) PROVINSI ACEH
Location : N. 043.1 BATAS BIREUEN/ BENER MERIAH - BATAS BENER MERIAH/ ACEH TENGAH, PROVINSI ACEH
DDT Sondir
Tabel 4.2. - Daya Dukung Izin Pondasi Dangkal Dari Hasil Pengujian Sondir
TSF (Kg/Cm)
1
Max Depth
GWL
2
4
Depth (m)
10
0 200 400 600 800 1000 1200 1400 1600 1800 2000 22000 2400 2600
Total Skin Friction (TSF) Kg/Cm
CORE TEAM PERENCANAAN DAN PENGAWASAN N.037.2 KOTA SUBULUSSALAM - BATAS PROVINSI
PROVINSI ACEH (PAKET -11/2022) PROVINSI ACEH SUMATERA UTARA
PT. ANUGERAH KRIDAPRADANA KSO,
PT. BUANA ARCHICON KSO, PT. DAYA SONDERING TEST
CREASI MITRAYASA
Test No. : S-02/ STA 10+900 Koordinat : N : 2°60'40.8652" / E : 98°10'00.913"
Date : 14 JUNI 2022 Sondering Capacity : 2.50 ton.
GWL (m) :- Tested by : OLO B. TAMPUBOLON
Cone Total Skin Skin Total Skin Local Skin
Resistant Resistant Friction Friction Friction Friction
Depth
(CR) (TR) (SF) x 20/10 (TSF) (LSF)
(M) Kg/Cm2 Kg/Cm2 Kg/Cm2 Kg/Cm Kg/Cm Kg/Cm
0,00 0 0 0 0 0 0,00
0,20 2 3 1 2 2 0,10
0,40 6 8 2 4 6 0,20
0,60 10 13 3 6 12 0,30
0,80 15 18 3 6 18 0,30
1,00 22 26 4 8 26 0,40
1,20 30 36 6 12 38 0,60
1,40 41 47 6 12 50 0,60
1,60 55 61 6 12 62 0,60
1,80 60 66 6 12 74 0,60
2,00 88 106 18 36 110 1,80
2,20 98 110 12 24 134 1,20
2,40 102 114 12 24 158 1,20
2,60 106 120 14 28 186 1,40
2,80 115 127 12 24 210 1,20
3,00 121 133 12 24 234 1,20
3,20 128 140 12 24 258 1,20
3,40 134 146 12 24 282 1,20
3,60 140 152 12 24 306 1,20
3,80 143 155 12 24 330 1,20
4,00 161 175 14 28 358 1,40
4,20 165 179 14 28 386 1,40
4,40 172 186 14 28 414 1,40
4,60 182 197 15 30 444 1,50
4,80 191 206 15 30 474 1,50
5,00 205 220 15 30 504 1,50
5,20 210 225 15 30 534 1,50
5,40
5,60
5,80
6,00
6,20
6,40
6,60
6,80
7,00
7,20
7,40
7,60
7,80
8,00
8,20
8,40
8,60
8,80
9,00
9,20
9,40
9,60
9,80
10,00
Project : Location : Page :
CORE TEAM PERENCANAAN DAN N.037.2 KOTA SUBULUSSALAM - BATAS
PENGAWASAN PROVINSI ACEH (PAKET -
PROVINSI SUMATERA UTARA
11/2022) PROVINSI ACEH
Dept
Grafik 4.1. - Daya Dukung Izin Pondasi Tiang Pancang
0,00
Dari Data Sondir S-02/ STA 10+900
0,20
0,40
Daya Dukung Izin Tiang (Qi) ton
0,60
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 250 0,80
0
1,00
Dia. 20 cm
1,20
Dia. 30 cm 1,40
1,60
1 Dia. 40 cm
1,80
2,00
Dia. 50 cm
2,20
Dia. 60 cm 2,40
2 2,60
2,80
3,00
3,20
3 3,40
3,60
3,80
4,00
4 4,20
4,40
4,60
Depth (m)
4,80
5,00
5
5,20
10
DDT. Sondir
Tabel 4.1. - Daya Dukung Izin Pondasi Tiang Pancang Dari Data Sondir S-02/ STA 10+900
Project : CORE TEAM PERENCANAAN DAN PENGAWASAN PROVINSI ACEH (PAKET -11/2022) PROVINSI ACEH
DDT Sondir
Tabel 4.2. - Daya Dukung Izin Pondasi Dangkal Dari Hasil Pengujian Sondir
TSF (Kg/Cm)
1
Max Depth
GWL
2
4
Depth (m)
10
0 200 400 600 800 1000 1200 1400 1600 1800 2000 22000 2400 2600
Total Skin Friction (TSF) Kg/Cm
CORE TEAM PERENCANAAN DAN PENGAWASAN N.044 GENTING GERBANG - CEULALA - BATAS
PROVINSI ACEH (PAKET -11/2022) PROVINSI ACEH ACEH TENGAH/ NAGA RAYA, PROVINSI ACEH
PT. ANUGERAH KRIDAPRADANA KSO,
PT. BUANA ARCHICON KSO, PT. DAYA SONDERING TEST
CREASI MITRAYASA
Test No. : S-03/ STA 15+050 Koordinat : N : 4°31'53.67" / E : 96°40'18.53"
Date : 12 JUNI 2022 Sondering Capacity : 2.50 ton.
GWL (m) :- Tested by : OLO B. TAMPUBOLON
Cone Total Skin Skin Total Skin Local Skin
Resistant Resistant Friction Friction Friction Friction
Depth
(CR) (TR) (SF) x 20/10 (TSF) (LSF)
(M) Kg/Cm2 Kg/Cm2 Kg/Cm2 Kg/Cm Kg/Cm Kg/Cm
0,00 0 0 0 0 0 0,00
0,20 10 13 3 6 6 0,30
0,40 15 18 3 6 12 0,30
0,60 21 25 4 8 20 0,40
0,80 28 33 5 10 30 0,50
1,00 38 43 5 10 40 0,50
1,20 41 46 5 10 50 0,50
1,40 47 52 5 10 60 0,50
1,60 52 59 7 14 74 0,70
1,80 56 63 7 14 88 0,70
2,00 60 68 8 16 104 0,80
2,20 65 73 8 16 120 0,80
2,40 70 78 8 16 136 0,80
2,60 75 83 8 16 152 0,80
2,80 84 92 8 16 168 0,80
3,00 97 107 10 20 188 1,00
3,20 106 116 10 20 208 1,00
3,40 118 128 10 20 228 1,00
3,60 132 146 14 28 256 1,40
3,80 138 152 14 28 284 1,40
4,00 143 158 15 30 314 1,50
4,20 147 162 15 30 344 1,50
4,40 152 166 14 28 372 1,40
4,60 160 174 14 28 400 1,40
4,80 174 188 14 28 428 1,40
5,00 182 196 14 28 456 1,40
5,20 196 211 15 30 486 1,50
5,40 202 217 15 30 516 1,50
5,60 206 221 15 30 546 1,50
5,80
6,00
6,20
6,40
6,60
6,80
7,00
7,20
7,40
7,60
7,80
8,00
8,20
8,40
8,60
8,80
9,00
9,20
9,40
9,60
9,80
10,00
Project : Location : Page :
CORE TEAM PERENCANAAN DAN N.044 GENTING GERBANG - CEULALA -
PENGAWASAN PROVINSI ACEH (PAKET - BATAS ACEH TENGAH/ NAGA RAYA,
11/2022) PROVINSI ACEH PROVINSI ACEH
Dept
Grafik 4.1. - Daya Dukung Izin Pondasi Tiang Pancang
0,00
Dari Data Sondir S-03/ STA 15+050
0,20
0,40
Daya Dukung Izin Tiang (Qi) ton
0,60
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 250 0,80
0
1,00
Dia. 20 cm
1,20
Dia. 30 cm 1,40
1,60
1 Dia. 40 cm
1,80
2,00
Dia. 50 cm
2,20
Dia. 60 cm 2,40
2 2,60
2,80
3,00
3,20
3 3,40
3,60
3,80
4,00
4 4,20
4,40
4,60
Depth (m)
4,80
5,00
5
5,20
5,40
5,60
10
DDT. Sondir
Tabel 4.1. - Daya Dukung Izin Pondasi Tiang Pancang Dari Data Sondir S-03/ STA 15+050
Project : CORE TEAM PERENCANAAN DAN PENGAWASAN PROVINSI ACEH (PAKET -11/2022) PROVINSI ACEH
Location : N.044 GENTING GERBANG - CEULALA - BATAS ACEH TENGAH/ NAGA RAYA, PROVINSI ACEH
DDT Sondir
Tabel 4.2. - Daya Dukung Izin Pondasi Dangkal Dari Hasil Pengujian Sondir
TSF (Kg/Cm)
1
Max Depth
GWL
2
4
Depth (m)
10
0 200 400 600 800 1000 1200 1400 1600 1800 2000 22000 2400 2600
Total Skin Friction (TSF) Kg/Cm
CORE TEAM PERENCANAAN DAN PENGAWASAN N.022 BATAS ACEH TENGAH/ GAYO LUES - BLANG
PROVINSI ACEH (PAKET -11/2022) PROVINSI ACEH KEJEREN, PROVINSI ACEH
PT. ANUGERAH KRIDAPRADANA KSO,
PT. BUANA ARCHICON KSO, PT. DAYA SONDERING TEST
CREASI MITRAYASA
Test No. : S-04/ STA 50+460 Koordinat : N : 4°03'42.22" / E : 97°19'38.14"
Date : 11 JUNI 2022 Sondering Capacity : 2.50 ton.
GWL (m) :- Tested by : OLO B. TAMPUBOLON
Cone Total Skin Skin Total Skin Local Skin
Resistant Resistant Friction Friction Friction Friction
Depth
(CR) (TR) (SF) x 20/10 (TSF) (LSF)
(M) Kg/Cm2 Kg/Cm2 Kg/Cm2 Kg/Cm Kg/Cm Kg/Cm
0.00 0 0 0 0 0 0.00
0.20 6 8 2 4 4 0.20
0.40 18 24 6 12 16 0.60
0.60 36 41 5 10 26 0.50
0.80 48 54 6 12 38 0.60
1.00 72 80 8 16 54 0.80
1.20 80 88 8 16 70 0.80
1.40 86 95 9 18 88 0.90
1.60 94 103 9 18 106 0.90
1.80 110 121 11 22 128 1.10
2.00 118 128 10 20 148 1.00
2.20 125 135 10 20 168 1.00
2.40 130 141 11 22 190 1.10
2.60 137 148 11 22 212 1.10
2.80 150 162 12 24 236 1.20
3.00 156 168 12 24 260 1.20
3.20 163 175 12 24 284 1.20
3.40 172 185 13 26 310 1.30
3.60 176 188 12 24 334 1.20
3.80 182 196 14 28 362 1.40
4.00 189 203 14 28 390 1.40
4.20 191 206 15 30 420 1.50
4.40 195 210 15 30 450 1.50
4.60 206 218 12 24 474 1.20
4.80 210 225 15 30 504 1.50
5.00
5.20
5.40
5.60
5.80
6.00
6.20
6.40
6.60
6.80
7.00
7.20
7.40
7.60
7.80
8.00
8.20
8.40
8.60
8.80
9.00
9.20
9.40
9.60
9.80
10.00
Project : Location : Page :
CORE TEAM PERENCANAAN DAN N.022 BATAS ACEH TENGAH/ GAYO LUES -
PENGAWASAN PROVINSI ACEH (PAKET - BLANG KEJEREN, PROVINSI ACEH
11/2022) PROVINSI ACEH
Grafik 4.1. - Daya Dukung Izin Pondasi Tiang Pancang
Dari Data Sondir S-04/ STA 50+460
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 250
0
Dia. 20 cm
Dia. 30 cm
1 Dia. 40 cm
Dia. 50 cm
Dia. 60 cm
2
4
Depth (m)
10
DDT. Sondir
Tabel 4.1. - Daya Dukung Izin Pondasi Tiang Pancang Dari Data Sondir S-04/ STA 50+460
Project : CORE TEAM PERENCANAAN DAN PENGAWASAN PROVINSI ACEH (PAKET -11/2022) PROVINSI ACEH
Location : N.022 BATAS ACEH TENGAH/ GAYO LUES - BLANG KEJEREN, PROVINSI ACEH
DDT Sondir
Tabel 4.2. - Daya Dukung Izin Pondasi Dangkal Dari Hasil Pengujian Sondir