SKETSA SITUASI LOKASI

Nama Project : CORE TEAM PERENCANAAN DAN PENGAWASAN PROVINSI ACEH (PAKET -11/2022) PROVINSI ACEH
Lokasi : N.039 LIPAT KAJANG - BATAS PROVINSI SUMATERA UTARA
Date : 09 Juni 2022
Drawing by : TEAM

BOR - 01

BOR - 01

Catatan :
SKETSA SITUASI LOKASI

Nama Project : CORE TEAM PERENCANAAN DAN PENGAWASAN PROVINSI ACEH (PAKET -11/2022) PROVINSI ACEH
Lokasi : N.020 SP. UNING (BATAS KOTA TAKENGON) - UWAQ (KM.379), PROVINSI ACEH
Date : 07 Juni 2022
Drawing by : TEAM

BOR - 02

BOR - 03

BOR - 02

BOR - 03

Catatan :
SKETSA SITUASI LOKASI

Nama Project : CORE TEAM PERENCANAAN DAN PENGAWASAN PROVINSI ACEH (PAKET -11/2022) PROVINSI ACEH
Lokasi : N.021 UWAQ (KM.379) - BATAS ACEH TENGAH/ GAYO LUES, PROVINSI ACEH
Date : 08 Juni 2022
Drawing by : TEAM

BOR - 04

BOR - 05

BOR - 04

BOR - 05

Catatan :
SKETSA SITUASI LOKASI

Nama Project : CORE TEAM PERENCANAAN DAN PENGAWASAN PROVINSI ACEH (PAKET -11/2022) PROVINSI ACEH
Lokasi : N.021 UWAQ (KM.379) - BATAS ACEH TENGAH/ GAYO LUES, PROVINSI ACEH
Date : 08 Juni 2022
Drawing by : TEAM

BOR - 06

BOR - 07

BOR - 06

BOR - 07

Catatan :
SKETSA SITUASI LOKASI

Nama Project : CORE TEAM PERENCANAAN DAN PENGAWASAN PROVINSI ACEH (PAKET -11/2022) PROVINSI ACEH
Lokasi : N. 043.1 BATAS BIREUEN/ BENER MERIAH - BATAS BENER MERIAH/ ACEH TENGAH, PROVINSI ACEH
Date : 10 Juni 2022
Drawing by : TEAM

HB - 01 S - 01

HB - 01

S - 01

Catatan :
SKETSA SITUASI LOKASI

Nama Project : CORE TEAM PERENCANAAN DAN PENGAWASAN PROVINSI ACEH (PAKET -11/2022) PROVINSI ACEH
Lokasi : N.037.2 KOTA SUBULUSSALAM - BATAS PROVINSI SUMATERA UTARA
Date : 14 Juni 2022
Drawing by : TEAM

S - 02 HB - 02

S - 02

HB - 02

Catatan :
SKETSA SITUASI LOKASI

Nama Project : CORE TEAM PERENCANAAN DAN PENGAWASAN PROVINSI ACEH (PAKET -11/2022) PROVINSI ACEH
Lokasi : N.044 GENTING GERBANG - CEULALA - BATAS ACEH TENGAH/ NAGA RAYA, PROVINSI ACEH
Date : 13 Juni 2022
Drawing by : TEAM

HB - 03

S - 03

S - 01

HB - 01

Catatan :
SKETSA SITUASI LOKASI

Nama Project : CORE TEAM PERENCANAAN DAN PENGAWASAN PROVINSI ACEH (PAKET -11/2022) PROVINSI ACEH
Lokasi : N.022 BATAS ACEH TENGAH/ GAYO LUES - BLANG KEJEREN, PROVINSI ACEH
Date : 11 Juni 2022
Drawing by : TEAM

S - 04 HB - 04

S - 01

HB - 01

Catatan :
SATKER P2JN PROV. ACEH GEOLOGIC DRILLING LOG
PROJECT : CORE TEAM PERENCANAAN DAN PENGAWASAN PROVINSI ACEH (PAKET -11/2022) PROVINSI ACEH
LOCATION : N.039 LIPAT KAJANG - BATAS PROVINSI SUMATERA UTARA BORE HOLE 01
COORDINATE : N : 2°19'51.24 / E : 98°06'08.64
BORING MACHINE : YBM S 01 NUMBER 29+385
START : 09 Juni 2022 DRILLING METHODE : WASHING Company Name
FINISH : 10 Juni 2022 DRILL MASTER : RAJA ADIGUNA S.
TOTAL DEPTH : 12,45 METER LOGGED BY : RAJA ADIGUNA S.
FINAL GWL : - METER CHECKED BY : PATUH SEMBIRING, S.T PT. ANUGERAH
KRIDAPRADANA KSO, PT.
END OF DEPTH
ROCK/SOIL (M)

N / 15 cm
N / 15 cm
N / 15 cm

SOIL SAMPLE
TICKNESS OF

NO.OF BLOW
BUANA ARCHICON KSO, PT.
DEPTH (M)

DEPTH (M)
G.W.L (m)

SOIL TYPE

GRAPH
DATE

DAYA CREASI MITRAYASA

CM
(m)

SOIL AND/OR ROCK DESCRIPTION N - VALUE

N1 N2 N3 10 20 30 40 50 60 70
PHOTO OF CORE
0,80
Timbunan Pasir Berlempung, Kuning Kecoklatan, 0
0,80
"01
0,20 1,00 Plastis Rendah. "01
Batuan Beton, Abu-abu Cerah. UDS

Lempung, Kuning Kecoklatan, Plastis


-

"02 "02
1 1 3 4
Sedang, Kekakuan Rendah, Kadar Air
"03 "03
2.40 3.40 Sedang.
"04 Pasir Berlempung, Kuning Keabu-abuan, Plastis "04
2 3 5 8
Rendah, Kepadatan Lepas, Kadar Air Rendah.
1.60 5.00
"05 "05
Pasir Berlanau, Abu-abu Cerah, Tidak
"06 Berplastis, Kepadatan Padat, Kadar Air 14 20 29
"06
49
2.00 7.00 Rendah.
"07 "07

"08 "08
18 29 31/2 ≥ 60

"09 "09
Pasir Halus, Abu-abu Cerah, Tidak
"10
Berplastis, Kepadatan Sangat Padat, Kadar "10
21 34 26/5 ≥ 60
Air Rendah.
"11 "11

"12 "12
5.45 12.45 30 48 12/10 ≥ 60

"13 "13
STOP BOR (12.45 m)
"14 "14
0 0 0

"15 "15

"16 "16
0 0 0

"17 "17

"18 "18
0 0 0

"19 "19

"20 "20
0 0 0

"21 "21

"22 "22
0 0 0

"23 "23

"24 "24
0 0 0

"25 "25

"26 "26
0 0 0

"27 "27

"28 "28
0 0 0

"29 "29

"30 "30
0 0 0

Legend :

Silt Undisturbed Sample (UDS)

Clay Disturbed Sample (DS)


Patuh Sembiring, ST. Ir. Endro Surastono
Sand SPT (Pelaksana Soil Test) (Team Leader Coreteam)
SATKER P2JN PROV. ACEH GEOLOGIC DRILLING LOG
PROJECT : CORE TEAM PERENCANAAN DAN PENGAWASAN PROVINSI ACEH (PAKET -11/2022) PROVINSI ACEH
LOCATION : N.020 SP. UNING (BATAS KOTA TAKENGON) - UWAQ (KM.379), PROVINSI ACEH BORE HOLE 02
COORDINATE : N : 4°24'31.57182" / E : 97°66'400.87"
BORING MACHINE : YBM S 01 STA 67+500
START : 06 Juni 2022 DRILLING METHODE : WASHING Company Name
FINISH : 07 Juni 2022 DRILL MASTER : JONI LASE
TOTAL DEPTH : 15,00 METER LOGGED BY : JONI LASE
FINAL GWL : 3,50 METER CHECKED BY : PATUH SEMBIRING, S.T PT. ANUGERAH
KRIDAPRADANA KSO, PT.
END OF DEPTH
ROCK/SOIL (M)

N / 15 cm
N / 15 cm
N / 15 cm

SOIL SAMPLE
TICKNESS OF

NO.OF BLOW
BUANA ARCHICON KSO, PT.
DEPTH (M)

DEPTH (M)
G.W.L (m)

SOIL TYPE

GRAPH
DATE

DAYA CREASI MITRAYASA

CM
(m)

SOIL AND/OR ROCK DESCRIPTION N - VALUE

N1 N2 N3 10 20 30 40 50 60 70
PHOTO OF CORE
0

"01 "01
Lempung, Coklat, Plastis Sedang, UDS

"02 Kekakuan Sedang, Kadar Air Sedang. "02


4 6 7 13
3,50

3.00 3.00
"03 "03

Lempung Napal, Abu-abu Gelap, Kekakuan


"04 "04
Sedang, Kadar Air Sedang. 8 14 18 32
2.00 5.00
"05 "05

"06 "06
20 21 33 54

"07 "07

"08 "08
22 23 35 58

"09 "09
Napal, Abu-abu Gelap, Tidak Berplastis,
"10 Kekakuan Sangat Keras, Kadar Air Sangat 20 22 38
"10
60
Keras.
"11 "11

"12 "12
35 60 - ≥ 60

"13 "13

"14 "14
60 - - ≥ 60
10.00 15.00
"15 "15

"16 STOP BOR (15.00 m) "16


0 0 0

"17 "17

"18 "18
0 0 0

"19 "19

"20 "20
0 0 0

"21 "21

"22 "22
0 0 0

"23 "23

"24 "24
0 0 0

"25 "25

"26 "26
0 0 0

"27 "27

"28 "28
0 0 0

"29 "29

"30 "30
0 0 0

Legend :

Silt Undisturbed Sample (UDS)

Clay Disturbed Sample (DS)


Patuh Sembiring, ST. Ir. Endro Surastono
Sand SPT (Pelaksana Soil Test) (Team Leader Coreteam)
SATKER P2JN PROV. ACEH GEOLOGIC DRILLING LOG
PROJECT : CORE TEAM PERENCANAAN DAN PENGAWASAN PROVINSI ACEH (PAKET -11/2022) PROVINSI ACEH
LOCATION : N.020 SP. UNING (BATAS KOTA TAKENGON) - UWAQ (KM.379), PROVINSI ACEH BORE HOLE 03
COORDINATE : N : 4°24'31.82303" / E : 96°65'20517"
BORING MACHINE : YBM S 01 NUMBER 67+500
START : 06 Juni 2022 DRILLING METHODE : WASHING Company Name
FINISH : 07 Juni 2022 DRILL MASTER : H. NABABAN
TOTAL DEPTH : 15,00 METER LOGGED BY : H. NABABAN
FINAL GWL : 2,50 METER CHECKED BY : PATUH SEMBIRING, S.T PT. ANUGERAH
KRIDAPRADANA KSO, PT.
END OF DEPTH
ROCK/SOIL (M)

N / 15 cm
N / 15 cm
N / 15 cm

SOIL SAMPLE
TICKNESS OF

NO.OF BLOW
BUANA ARCHICON KSO, PT.
DEPTH (M)

DEPTH (M)
G.W.L (m)

SOIL TYPE

GRAPH
DATE

DAYA CREASI MITRAYASA

CM
(m)

SOIL AND/OR ROCK DESCRIPTION N - VALUE

N1 N2 N3 10 20 30 40 50 60 70
PHOTO OF CORE
0

"01 "01
UDS
Lempung Kaku Berlanau, Coklat, Plastis Sedang,
"02 Kekakuan Kaku, Kadar Air Sedang. "02
25
6 10 15
2,50

"03 "03
3.50 3.50
"04 "04
13 25 29 54

"05 "05

"06 "06
28 42 18/7 ≥ 60

"07 "07

"08 "08
15 24 27 51
Napal, Abu-abu, Tidak Berplastis,
"09 "09
Kekakuang Sangat Keras, Kadar Air
"10 Rendah. "10
23 29 31 60

"11 "11

"12 "12
36 49 11/10 ≥ 60

"13 "13

"14 "14
41 60 - ≥ 60
11.50 15.00
"15 "15

"16 STOP BOR (15.00 m) "16


0 0 0

"17 "17

"18 "18
0 0 0

"19 "19

"20 "20
0 0 0

"21 "21

"22 "22
0 0 0

"23 "23

"24 "24
0 0 0

"25 "25

"26 "26
0 0 0

"27 "27

"28 "28
0 0 0

"29 "29

"30 "30
0 0 0

Legend :

Silt Undisturbed Sample (UDS)

Clay Disturbed Sample (DS)


Patuh Sembiring, ST. Ir. Endro Surastono
Sand SPT (Pelaksana Soil Test) (Team Leader Coreteam)
SATKER P2JN PROV. ACEH GEOLOGIC DRILLING LOG
PROJECT : CORE TEAM PERENCANAAN DAN PENGAWASAN PROVINSI ACEH (PAKET -11/2022) PROVINSI ACEH
LOCATION : N.021 UWAQ (KM.379) - BATAS ACEH TENGAH/ GAYO LUES, PROVINSI ACEH BORE HOLE 04
COORDINATE : N : 4°22'13.4279" / E : 97°7'31.39151"
BORING MACHINE : YBM S 01 NUMBER 75+500
START : 08 Juni 2022 DRILLING METHODE : WASHING Company Name
FINISH : 09 Juni 2022 DRILL MASTER : JONI LASE
TOTAL DEPTH : 15,00 METER LOGGED BY : JONI LASE
FINAL GWL : 4,00 METER CHECKED BY : PATUH SEMBIRING, S.T PT. ANUGERAH
KRIDAPRADANA KSO, PT.
END OF DEPTH
ROCK/SOIL (M)

N / 15 cm
N / 15 cm
N / 15 cm

SOIL SAMPLE
TICKNESS OF

NO.OF BLOW
BUANA ARCHICON KSO, PT.
DEPTH (M)

DEPTH (M)
G.W.L (m)

SOIL TYPE

GRAPH
DATE

DAYA CREASI MITRAYASA

CM
(m)

SOIL AND/OR ROCK DESCRIPTION N - VALUE

N1 N2 N3 10 20 30 40 50 60 70
PHOTO OF CORE
0
Lempung, Coklat Keabu-abuan, Plastis
4,00

"01 "01
Sedang, Kekakuan Sedang, Kadar Air UDS

"02 Sedang. "02


2.50 2.50 4 4 8 12

"03 ` "03

Lempung, Coklat Keabu-abuan, Plastis


"04 "04
Sedang, Kekakuan Sedang, Kadar Air 12 12 16 28

"05 Sedang. "05

3.50 6.00
"06 "06
14 14 18 32

"07 Lempung Kaku, Kuning Keabu-abuan, "07

Plastis Sedang, Kekakuan Sangat Kaku, ke


"08 "08
Keras, Kadar Air Rendah. 20 22 32 54
3.00 9.00
"09 "09

"10 "10
30 28 32 60

"11 "11

Napal, Abu-abu Gelap, Tidak Berplastis,


"12 "12
Kekakuan Sangat Keras, Kadar Air Rendah. 40 60 - ≥ 60

"13 "13

"14 "14
60 - - ≥ 60
6.00 15.00
"15 "15

"16 STOP BOR (15.00 m) "16


0 0 0

"17 "17

"18 "18
0 0 0

"19 "19

"20 "20
0 0 0

"21 "21

"22 "22
0 0 0

"23 "23

"24 "24
0 0 0

"25 "25

"26 "26
0 0 0

"27 "27

"28 "28
0 0 0

"29 "29

"30 "30
0 0 0

Legend :

Silt Undisturbed Sample (UDS)

Clay Disturbed Sample (DS)


Patuh Sembiring, ST. Ir. Endro Surastono
Sand SPT (Pelaksana Soil Test) (Team Leader Coreteam)
SATKER P2JN PROV. ACEH GEOLOGIC DRILLING LOG
PROJECT : CORE TEAM PERENCANAAN DAN PENGAWASAN PROVINSI ACEH (PAKET -11/2022) PROVINSI ACEH
LOCATION : N.021 UWAQ (KM.379) - BATAS ACEH TENGAH/ GAYO LUES, PROVINSI ACEH BORE HOLE 05
COORDINATE : N : 4°22'13.71479" / E : 97°7'30.79783"
BORING MACHINE : YBM S 01 NUMBER 75+500
START : 08 Juni 2022 DRILLING METHODE : WASHING Company Name
FINISH : 09 Juni 2022 DRILL MASTER : H. NABABAN
TOTAL DEPTH : 15,00 METER LOGGED BY : H. NABABAN
FINAL GWL : 3,00 METER CHECKED BY : PATUH SEMBIRING, S.T PT. ANUGERAH
KRIDAPRADANA KSO, PT.
END OF DEPTH
ROCK/SOIL (M)

N / 15 cm
N / 15 cm
N / 15 cm

SOIL SAMPLE
TICKNESS OF

NO.OF BLOW
BUANA ARCHICON KSO, PT.
DEPTH (M)

DEPTH (M)
G.W.L (m)

SOIL TYPE

GRAPH
DATE

DAYA CREASI MITRAYASA

CM
(m)

SOIL AND/OR ROCK DESCRIPTION N - VALUE

N1 N2 N3 10 20 30 40 50 60 70
PHOTO OF CORE
0
Batu Gampingan Berlanau, Coklat, Plastis
"01
1.60 1.60
Rendah, Kekakuan Sedang, Kadar Air Sedang. "01
UDS

"02 "02
Lempung Kaku, Coklat Keabu-abuan, 2 4 6 10
3,00

"03
Plastis Sedang ke Tinggi, Kekakuan Kaku, "03
Kadar Air Sedang.
2.40 4.00
"04 "04
10 14 24 38

"05 Lempung Kaku Berlanau, Kuning Keabu- "05


UDS
abuan, Plastis Sedang, Kekakuan Keras,
"06 "06
Kadar Air Sedang. 14 19 28 47
3.00 7.00
"07 "07

"08 "08
19 25 31 56

"09 "09

"10 "10
22 28 32/4 ≥ 60
Napal, Abu-abu, Tidak Berplastis,
"11 "11
Kekakuan Sangat Keras, Kadar Air Rendah.
"12 "12
36 47 13/8 ≥ 60

"13 "13

"14 "14
41 60 - ≥ 60
8.00 15.00
"15 "15

"16 STOP BOR (15.00 m) "16


0 0 0

"17 "17

"18 "18
0 0 0

"19 "19

"20 "20
0 0 0

"21 "21

"22 "22
0 0 0

"23 "23

"24 "24
0 0 0

"25 "25

"26 "26
0 0 0

"27 "27

"28 "28
0 0 0

"29 "29

"30 "30
0 0 0

Legend :

Silt Undisturbed Sample (UDS)

Clay Disturbed Sample (DS)


Patuh Sembiring, ST. Ir. Endro Surastono
Sand SPT (Pelaksana Soil Test) (Team Leader Coreteam)
SATKER P2JN PROV. ACEH GEOLOGIC DRILLING LOG
PROJECT : CORE TEAM PERENCANAAN DAN PENGAWASAN PROVINSI ACEH (PAKET -11/2022) PROVINSI ACEH
LOCATION : N.022 BATAS ACEH TENGAH/ GAYO LUES - BLANG KEJEREN, PROVINSI ACEH BORE HOLE 06
COORDINATE : N : 4°8'24.20228 / E : 97°13'3.3901
BORING MACHINE : YBM S 01 NUMBER 32+215
START : 10 Juni 2022 DRILLING METHODE : WASHING Company Name
FINISH : 11 Juni 2022 DRILL MASTER : JONI LASE
TOTAL DEPTH : 15,00 METER LOGGED BY : JONI LASE
FINAL GWL : 5,00 METER CHECKED BY : PATUH SEMBIRING, S.T PT. ANUGERAH
KRIDAPRADANA KSO, PT.
END OF DEPTH
ROCK/SOIL (M)

N / 15 cm
N / 15 cm
N / 15 cm

SOIL SAMPLE
TICKNESS OF

NO.OF BLOW
BUANA ARCHICON KSO, PT.
DEPTH (M)

DEPTH (M)
G.W.L (m)

SOIL TYPE

GRAPH
DATE

DAYA CREASI MITRAYASA

CM
(m)

SOIL AND/OR ROCK DESCRIPTION N - VALUE

N1 N2 N3 10 20 30 40 50 60 70
PHOTO OF CORE
0
5,00

"01 "01
Batu Berpasir, Coklat Kehitaman, Plastis Sedang,
"02
Kepadatan Sangat Lepas, Kadar Air Sedang. "02
3 5 8 13
3.00 3.00
"03 "03
DS

"04 "04
4 6 10 16
Pasir Halus, Abu-abu Gelap, Tidak Berplastis,
"05 "05
Kepadatan Sedang, Kadar Air Sedang.
"06 "06
7 9 13 22
4.00 7.00
"07 "07

"08 "08
20 22 26 48

"09 "09

"10 "10
22 22 38 60
Pasir Halus, Abu-abu Gelap, Tidak Berplastis,
"11 Kepadatan Padat ke Sangat Padat, Kadar Air "11

Rendah.
"12 "12
23 24 36 60

"13 "13

"14 "14
40 60 - ≥ 60
8.00 15.00
"15 "15

"16
STOP BOR (15.00 m) "16
0 0 0

"17 "17

"18 "18
0 0 0

"19 "19

"20 "20
0 0 0

"21 "21

"22 "22
0 0 0

"23 "23

"24 "24
0 0 0

"25 "25

"26 "26
0 0 0

"27 "27

"28 "28
0 0 0

"29 "29

"30 "30
0 0 0

Legend :

Silt Undisturbed Sample (UDS)

Clay Disturbed Sample (DS)


Patuh Sembiring, ST. Ir. Endro Surastono
Sand SPT (Pelaksana Soil Test) (Team Leader Coreteam)
SATKER P2JN PROV. ACEH GEOLOGIC DRILLING LOG
PROJECT : CORE TEAM PERENCANAAN DAN PENGAWASAN PROVINSI ACEH (PAKET -11/2022) PROVINSI ACEH
LOCATION : N.022 BATAS ACEH TENGAH/ GAYO LUES - BLANG KEJEREN, PROVINSI ACEH BORE HOLE 07
COORDINATE : N : 4°8'24.37328 / E : 97°13'3.3726
BORING MACHINE : YBM S 01 NUMBER 32+215
START : 11 Juni 2022 DRILLING METHODE : WASHING Company Name
FINISH : 12 Juni 2022 DRILL MASTER : H. NABABAN
TOTAL DEPTH : 15,00 METER LOGGED BY : H. NABABAN
FINAL GWL : 3,00 METER CHECKED BY : PATUH SEMBIRING, S.T PT. ANUGERAH
KRIDAPRADANA KSO, PT.
END OF DEPTH
ROCK/SOIL (M)

N / 15 cm
N / 15 cm
N / 15 cm

SOIL SAMPLE
TICKNESS OF

NO.OF BLOW
BUANA ARCHICON KSO, PT.
DEPTH (M)

DEPTH (M)
G.W.L (m)

SOIL TYPE

GRAPH
DATE

DAYA CREASI MITRAYASA

CM
(m)

SOIL AND/OR ROCK DESCRIPTION N - VALUE

N1 N2 N3 10 20 30 40 50 60 70
PHOTO OF CORE
0
3,00

"01 Lempung Berlanau, Coklat, Plastis Sedang, "01


UDS
Kekakuan Rendah, Kadar Air Sedang.
"02 "02
2.45 2.45 2 3 5 8

"03 Pasir Kerikil, Coklat Keabu-abuan, Plastis Rendah, "03

Kepadatan Sedang, Kadar Air Sedang.


1.55 4.00
"04 "04
5 8 13 21

"05 "05

"06 Pasir Berlanau, Abu-abu, Plastis Rendah, Kepadatan "06


11 14 19 33
Sedang ke Padat, Kadar Air Tinggi.
"07 "07

"08 "08
4.45 8.45 15 17 28 45

"09 "09

"10 "10
17 34 26/8 ≥ 60

"11 "11
Pasir Halus Berlanau, Abu-abu, Tidak Berplastis,
"12 Kepadatan Sangat Padat, Kadar Air Rendah. "12
≥ 60
22 38 22/11

"13 "13

"14 "14
36 53 7/13 ≥ 60
6.55 15.00
"15 "15

"16
STOP BOR (15.00 m) "16
0 0 0

"17 "17

"18 "18
0 0 0

"19 "19

"20 "20
0 0 0

"21 "21

"22 "22
0 0 0

"23 "23

"24 "24
0 0 0

"25 "25

"26 "26
0 0 0

"27 "27

"28 "28
0 0 0

"29 "29

"30 "30
0 0 0

Legend :

Silt Undisturbed Sample (UDS)

Clay Disturbed Sample (DS)


Patuh Sembiring, ST. Ir. Endro Surastono
Sand SPT (Pelaksana Soil Test) (Team Leader Coreteam)
GENERALIZED SOIL PROFILE (SPT Value/blows)

Pukulan SPT (Value/Blows)

0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00


0.0

2.0

4.0

6.0

8.0
DEPTH ( m )

10.0

12.0

14.0

16.0

18.0

BH - 01

20.0

STA 29 + 385
GENERALIZED SOIL PROFILE (SPT Value/blows)

Pukulan SPT (Value/Blows)

0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00


0.0

2.0

4.0

6.0

8.0

10.0
DEPTH ( m )

12.0

14.0

16.0

18.0

20.0

22.0

BH - 02 BH - 03
24.0

STA 67 + 500
GENERALIZED SOIL PROFILE (SPT Value/blows)

Pukulan SPT (Value/Blows)

0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00


0.0

2.0

4.0

6.0

8.0
DEPTH ( m )

10.0

12.0

14.0

16.0

18.0

BH - 04 BH - 05

20.0

STA 75 + 500
GENERALIZED SOIL PROFILE (SPT Value/blows)

Pukulan SPT (Value/Blows)

0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00


0.0

2.0

4.0

6.0

8.0
DEPTH ( m )

10.0

12.0

14.0

16.0

18.0

BH - 06 BH - 07

20.0

STA 32 + 215
Grafik 4.1.1. : Daya Dukung Izin Pondasi Tiang Pancang dari Data SPT titik
BH - 01.

0
Dia. 20 cm

Dia. 30 cm

Dia. 40 cm

Dia. 50 cm

Dia. 60 cm

8
Kedalaman (m)

10

12

14

16

18

20
0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300 320 340

Daya Dukung Izin Pondasi Tiang Pancang ( ton)


Tabel - 4.1.2. : Daya Dukung Izin Pondasi Tiang Pancang Dari Data SPT titik BH - 01.

D = 0.20 m 0.30 m 0.40 m 0.50 m 0.60 m

Ap = 0.031 m2 0.071 m2 0.126 m2 0.196 m2 0.283 m2

Ak = 0.628 m 0.942 m 1.257 m 1.571 m 1.885 m

D = 20 cm D. = 30 cm D = 40 cm D. = 50 cm D. = 60 cm

Deth SPT Li Qp Qs Qi Qp Qs Qi Qp Qs Qi Qp Qs Qi Qp Qs Qi

(m) N Nk (m) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton)
2.00 4 4.00 1.00 38.01 0.50 12.77 85.53 0.75 28.66 152.05 1.01 50.89 237.58 1.26 79.45 342.12 1.51 114.34

4.00 8 6.00 3.00 45.49 2.26 15.62 102.35 3.39 34.80 181.96 4.52 61.56 284.31 5.65 95.90 409.41 6.79 137.83

6.00 49 20.33 5.00 50.47 12.78 19.38 113.57 19.16 41.69 201.90 25.55 72.41 315.47 31.94 111.54 454.27 38.33 159.09

8.00 60 30.25 7.00 50.47 26.61 22.15 113.57 39.91 45.84 201.90 53.22 77.94 315.47 66.52 118.46 454.27 79.83 167.39

10.00 60 36.20 9.00 59.56 40.94 28.04 134.02 61.41 56.96 238.26 81.88 95.80 372.28 102.35 144.56 536.08 122.82 203.26

12.00 60 40.17 11.00 71.94 55.52 35.09 161.87 83.28 70.61 287.77 111.04 118.13 449.64 138.81 177.64 647.48 166.57 249.14

Proyek : CORE TEAM PERENCANAAN DAN PENGAWASAN PROVINSI ACEH (PAKET -11/2022) PROVINSI ACEH

Lokasi : N.039 LIPAT KAJANG - BATAS PROVINSI SUMATERA UTARA

DDTSPT
Grafik 4.1.2. : Daya Dukung Izin Pondasi Tiang Pancang dari Data SPT titik
BH - 02.

0
Dia. 20 cm

Dia. 30 cm

Dia. 40 cm

Dia. 50 cm

Dia. 60 cm

8
Kedalaman (m)

10

12

14

16

18

20
0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300 320 340

Daya Dukung Izin Pondasi Tiang Pancang ( ton)


Grafik 4.1.3. : Daya Dukung Izin Pondasi Tiang Pancang dari Data SPT titik
BH - 03.

0
Dia. 20 cm

Dia. 30 cm

Dia. 40 cm

Dia. 50 cm
4

Dia. 60 cm

10
Kedalaman (m)

12

14

16

18

20
0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300 320 340

Daya Dukung Izin Pondasi Tiang Pancang ( ton)


Tabel - 4.1.3. : Daya Dukung Izin Pondasi Tiang Pancang Dari Data SPT titik BH - 02.

D = 0.20 m 0.30 m 0.40 m 0.50 m 0.60 m

Ap = 0.031 m2 0.071 m2 0.126 m2 0.196 m2 0.283 m2

Ak = 0.628 m 0.942 m 1.257 m 1.571 m 1.885 m

D = 20 cm D. = 30 cm D = 40 cm D. = 50 cm D. = 60 cm

Deth SPT Li Qp Qs Qi Qp Qs Qi Qp Qs Qi Qp Qs Qi Qp Qs Qi

(m) N Nk (m) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton)
2.00 13 13.00 1.00 49.32 1.63 16.77 110.98 2.45 37.48 197.29 3.27 66.42 308.27 4.08 103.57 443.91 4.90 148.95

4.00 32 22.50 3.00 54.54 8.48 19.88 122.71 12.72 43.45 218.15 16.96 76.11 340.86 21.21 117.86 490.84 25.45 168.70

6.00 54 33.00 5.00 58.01 20.73 23.49 130.53 31.10 49.73 232.06 41.47 85.65 362.59 51.84 131.23 522.13 62.20 186.48

8.00 58 39.25 7.00 60.50 34.53 27.07 136.12 51.79 55.73 241.99 69.05 94.47 378.11 86.32 143.30 544.48 103.58 202.21

10.00 60 43.40 9.00 67.86 49.08 32.44 152.68 73.63 65.62 271.43 98.17 110.11 424.12 122.71 165.91 610.73 147.25 233.03

12.00 60 46.17 11.00 73.39 63.82 37.23 165.12 95.72 74.19 293.55 127.63 123.38 458.67 159.54 184.80 660.49 191.45 258.45

14.00 60 48.14 13.00 74.77 78.65 40.65 168.23 117.97 79.67 299.08 157.30 131.15 467.31 196.62 195.09 672.93 235.94 271.50

Proyek : CORE TEAM PERENCANAAN DAN PENGAWASAN PROVINSI ACEH (PAKET -11/2022) PROVINSI ACEH

Lokasi : N.020 SP. UNING (BATAS KOTA TAKENGON) - UWAQ (KM.379), PROVINSI ACEH

DDTSPT
Tabel - 4.1.4. : Daya Dukung Izin Pondasi Tiang Pancang Dari Data SPT titik BH - 03.

D = 0.20 m 0.30 m 0.40 m 0.50 m 0.60 m

Ap = 0.031 m2 0.071 m2 0.126 m2 0.196 m2 0.283 m2


Ak = 0.628 m 0.942 m 1.257 m 1.571 m 1.885 m

D = 20 cm D. = 30 cm D = 40 cm D. = 50 cm D. = 60 cm

Deth SPT Li Qp Qs Qi Qp Qs Qi Qp Qs Qi Qp Qs Qi Qp Qs Qi

(m) N Nk (m) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton)
2.00 25 25.00 1.00 59.69 3.14 20.53 134.30 4.71 45.71 238.76 6.28 80.84 373.06 7.85 125.93 537.21 9.42 180.96

4.00 54 39.50 3.00 62.83 14.89 23.92 141.37 22.34 51.59 251.33 29.78 89.73 392.70 37.23 138.35 565.49 44.67 197.43

6.00 60 46.33 5.00 64.93 29.11 27.46 146.08 43.67 57.43 259.70 58.22 98.21 405.79 72.78 149.82 584.34 87.34 212.25

8.00 51 47.50 7.00 66.42 41.78 30.50 149.45 62.67 62.35 265.69 83.57 105.28 415.14 104.46 159.27 597.80 125.35 224.34

10.00 60 50.00 9.00 72.26 56.55 35.40 162.58 84.82 71.16 289.03 113.10 118.96 451.60 141.37 178.81 650.31 169.65 250.70

12.00 60 51.67 11.00 73.14 71.42 38.66 164.56 107.13 76.28 292.55 142.84 126.08 457.10 178.55 188.08 658.23 214.26 262.26

14.00 60 52.86 13.00 72.57 86.35 41.46 163.28 129.52 80.33 290.28 172.70 131.30 453.57 215.87 194.36 653.14 259.05 269.52

Proyek : CORE TEAM PERENCANAAN DAN PENGAWASAN PROVINSI ACEH (PAKET -11/2022) PROVINSI ACEH

Lokasi : N.020 SP. UNING (BATAS KOTA TAKENGON) - UWAQ (KM.379), PROVINSI ACEH

DDTSPT
Grafik 4.1.4. : Daya Dukung Izin Pondasi Tiang Pancang dari Data SPT titik
BH - 04.

0
Dia. 20 cm

Dia. 30 cm

Dia. 40 cm

Dia. 50 cm

Dia. 60 cm

8
Kedalaman (m)

10

12

14

16

18

20
0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300 320 340

Daya Dukung Izin Pondasi Tiang Pancang ( ton)


Grafik 4.1.5 : Daya Dukung Izin Pondasi Tiang Pancang dari Data SPT titik
BH - 05.

0
Dia. 20 cm

Dia. 30 cm

Dia. 40 cm

Dia. 50 cm
4

Dia. 60 cm

10
Kedalaman (m)

12

14

16

18

20
0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300 320 340

Daya Dukung Izin Pondasi Tiang Pancang ( ton)


Tabel - 4.1.5. : Daya Dukung Izin Pondasi Tiang Pancang Dari Data SPT titik BH - 04.

D = 0.20 m 0.30 m 0.40 m 0.50 m 0.60 m

Ap = 0.031 m2 0.071 m2 0.126 m2 0.196 m2 0.283 m2

Ak = 0.628 m 0.942 m 1.257 m 1.571 m 1.885 m

D = 20 cm D. = 30 cm D = 40 cm D. = 50 cm D. = 60 cm

Deth SPT Li Qp Qs Qi Qp Qs Qi Qp Qs Qi Qp Qs Qi Qp Qs Qi

(m) N Nk (m) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton)
2.00 12 12.00 1.00 39.58 1.51 13.50 89.06 2.26 30.14 158.34 3.02 53.38 247.40 3.77 83.22 356.26 4.52 119.66

4.00 28 20.00 3.00 46.75 7.54 17.09 105.18 11.31 37.32 186.99 15.08 65.35 292.17 18.85 101.16 420.72 22.62 144.76

6.00 32 24.00 5.00 51.52 15.08 20.19 115.92 22.62 43.17 206.09 30.16 74.73 322.01 37.70 114.88 463.70 45.24 163.61

8.00 54 31.50 7.00 54.93 27.71 23.85 123.60 41.56 49.51 219.73 55.42 84.33 343.33 69.27 128.30 494.40 83.13 181.42

10.00 60 37.20 9.00 61.58 42.07 28.94 138.54 63.11 58.80 246.30 84.14 98.93 384.85 105.18 149.32 554.18 126.22 209.97

12.00 60 41.00 11.00 66.85 56.67 33.62 150.42 85.01 67.14 267.41 113.35 111.81 417.83 141.69 167.61 601.68 170.02 234.56

14.00 60 43.71 13.00 73.51 71.41 38.79 165.40 107.12 76.56 294.05 142.83 126.58 459.46 178.53 188.86 661.62 214.24 263.39

Proyek : CORE TEAM PERENCANAAN DAN PENGAWASAN PROVINSI ACEH (PAKET -11/2022) PROVINSI ACEH

Lokasi : N.021 UWAQ (KM.379) - BATAS ACEH TENGAH/ GAYO LUES, PROVINSI ACEH

DDTSPT
Tabel - 4.1.6. : Daya Dukung Izin Pondasi Tiang Pancang Dari Data SPT titik BH - 05.

D = 0.20 m 0.30 m 0.40 m 0.50 m 0.60 m

Ap = 0.031 m2 0.071 m2 0.126 m2 0.196 m2 0.283 m2


Ak = 0.628 m 0.942 m 1.257 m 1.571 m 1.885 m

D = 20 cm D. = 30 cm D = 40 cm D. = 50 cm D. = 60 cm

Deth SPT Li Qp Qs Qi Qp Qs Qi Qp Qs Qi Qp Qs Qi Qp Qs Qi

(m) N Nk (m) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton)
2.00 10 10.00 1.00 47.44 1.26 16.06 106.74 1.88 35.96 189.75 2.51 63.75 296.49 3.14 99.46 426.94 3.77 143.07

4.00 38 24.00 3.00 53.03 9.05 19.49 119.32 13.57 42.49 212.12 18.10 74.33 331.44 22.62 115.00 477.27 27.14 164.52

6.00 47 31.67 5.00 56.76 19.90 22.90 127.71 29.85 48.54 227.03 39.79 83.64 354.74 49.74 128.19 510.82 59.69 182.21

8.00 56 37.75 7.00 59.42 33.21 26.45 133.70 49.81 54.53 237.68 66.41 92.51 371.38 83.02 140.40 534.79 99.62 198.19

10.00 60 42.20 9.00 67.23 47.73 31.96 151.27 71.59 64.74 268.92 95.45 108.73 420.19 119.32 163.93 605.07 143.18 230.33

12.00 60 45.17 11.00 71.13 62.43 36.20 160.03 93.65 72.07 284.50 124.87 119.81 444.54 156.08 179.40 640.13 187.30 250.84

14.00 60 47.29 13.00 74.14 77.25 40.16 166.82 115.87 78.78 296.57 154.49 129.75 463.38 193.12 193.09 667.27 231.74 268.77

Proyek : CORE TEAM PERENCANAAN DAN PENGAWASAN PROVINSI ACEH (PAKET -11/2022) PROVINSI ACEH

Lokasi : N.021 UWAQ (KM.379) - BATAS ACEH TENGAH/ GAYO LUES, PROVINSI ACEH

DDTSPT
Grafik 4.1.6. : Daya Dukung Izin Pondasi Tiang Pancang dari Data SPT titik
BH - 06.

0
Dia. 20 cm

Dia. 30 cm

Dia. 40 cm

Dia. 50 cm

Dia. 60 cm

8
Kedalaman (m)

10

12

14

16

18

20
0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300 320 340

Daya Dukung Izin Pondasi Tiang Pancang ( ton)


Grafik 4.1.7. : Daya Dukung Izin Pondasi Tiang Pancang dari Data SPT titik
BH - 07.

0
Dia. 20 cm

Dia. 30 cm

Dia. 40 cm

Dia. 50 cm
4

Dia. 60 cm

10
Kedalaman (m)

12

14

16

18

20
0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300 320 340

Daya Dukung Izin Pondasi Tiang Pancang ( ton)


Tabel - 4.1.7. : Daya Dukung Izin Pondasi Tiang Pancang Dari Data SPT titik BH - 06.

D = 0.20 m 0.30 m 0.40 m 0.50 m 0.60 m

Ap = 0.031 m2 0.071 m2 0.126 m2 0.196 m2 0.283 m2

Ak = 0.628 m 0.942 m 1.257 m 1.571 m 1.885 m

D = 20 cm D. = 30 cm D = 40 cm D. = 50 cm D. = 60 cm

Deth SPT Li Qp Qs Qi Qp Qs Qi Qp Qs Qi Qp Qs Qi Qp Qs Qi

(m) N Nk (m) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton)
2.00 13 13.00 1.00 31.10 1.63 10.69 69.98 2.45 23.82 124.41 3.27 42.12 194.39 4.08 65.61 279.92 4.90 94.29

4.00 16 14.50 3.00 39.96 5.47 14.41 89.91 8.20 31.61 159.84 10.93 55.47 249.76 13.67 85.99 359.65 16.40 123.16

6.00 22 17.00 5.00 45.87 10.68 17.43 103.20 16.02 37.60 183.47 21.36 65.43 286.67 26.70 100.90 412.81 32.04 144.01

8.00 48 24.75 7.00 50.09 21.77 21.05 112.69 32.66 44.10 200.34 43.54 75.49 313.04 54.43 115.23 450.77 65.31 163.32

10.00 60 31.80 9.00 55.71 35.96 25.76 125.35 53.95 52.57 222.84 71.93 88.67 348.19 89.91 134.05 501.40 107.89 188.71

12.00 60 36.50 11.00 62.83 50.45 31.03 141.37 75.68 62.26 251.33 100.91 103.96 392.70 126.13 156.13 565.49 151.36 218.77

14.00 60 39.86 13.00 71.63 65.11 36.90 161.16 97.67 73.25 286.51 130.22 121.55 447.68 162.78 181.78 644.65 195.34 253.95

Proyek : CORE TEAM PERENCANAAN DAN PENGAWASAN PROVINSI ACEH (PAKET -11/2022) PROVINSI ACEH

Lokasi : N.022 BATAS ACEH TENGAH/ GAYO LUES - BLANG KEJEREN, PROVINSI ACEH

DDTSPT
Tabel - 4.1.8. : Daya Dukung Izin Pondasi Tiang Pancang Dari Data SPT titik BH - 07.

D = 0.20 m 0.30 m 0.40 m 0.50 m 0.60 m

Ap = 0.031 m2 0.071 m2 0.126 m2 0.196 m2 0.283 m2


Ak = 0.628 m 0.942 m 1.257 m 1.571 m 1.885 m

D = 20 cm D. = 30 cm D = 40 cm D. = 50 cm D. = 60 cm

Deth SPT Li Qp Qs Qi Qp Qs Qi Qp Qs Qi Qp Qs Qi Qp Qs Qi

(m) N Nk (m) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton)
2.00 8 8.00 1.00 33.62 1.01 11.41 75.63 1.51 25.51 134.46 2.01 45.22 210.09 2.51 70.53 302.54 3.02 101.45

4.00 21 14.50 3.00 41.97 5.47 15.08 94.44 8.20 33.12 167.89 10.93 58.15 262.32 13.67 90.17 377.75 16.40 129.19

6.00 33 20.67 5.00 47.54 12.99 18.44 106.97 19.48 39.55 190.17 25.97 68.58 297.14 32.46 105.54 427.88 38.96 150.42

8.00 45 26.75 7.00 51.52 23.53 21.88 115.92 35.30 45.70 206.09 47.06 78.11 322.01 58.83 119.10 463.70 70.59 168.68

10.00 60 33.40 9.00 58.43 37.77 27.03 131.48 56.66 55.16 233.73 75.55 93.02 365.21 94.44 140.62 525.90 113.32 197.97

12.00 60 37.83 11.00 64.84 52.30 32.07 145.90 78.45 64.32 259.37 104.59 107.38 405.27 130.74 161.24 583.58 156.89 225.91

14.00 60 41.00 13.00 70.69 66.98 36.96 159.04 100.47 73.11 282.74 133.96 121.04 441.79 167.45 180.75 636.17 200.94 252.24

Proyek : CORE TEAM PERENCANAAN DAN PENGAWASAN PROVINSI ACEH (PAKET -11/2022) PROVINSI ACEH

Lokasi : N.022 BATAS ACEH TENGAH/ GAYO LUES - BLANG KEJEREN, PROVINSI ACEH

DDTSPT
Elevation : m
HAND BORE DRILLING LOG Total Length of Drill : 05,00 m
Bore Master : OLO B. TAMPUBOLON

Hand Bore No. : HB - 01/ STA 26+940 Description By : OLO B. TAMPUBOLON

Beginning : 10 JUNI 2022 Checked By : PATUH , ST


Ending : 10 JUNI 2022 Drilling Type : IWAN AUGER
Koordinat : N : 4°49'30.00" / E : 96°44'41.56"
Project : CORE TEAM PERENCANAAN DAN PENGAWASAN PROVINSI ACEH (PAKET -11/2022) PROVINSI ACEH
Location : N. 043.1 BATAS BIREUEN/ BENER MERIAH - BATAS BENER MERIAH/ ACEH TENGAH, PROVINSI ACEH
Methode
Thickness

Thickness
Depth

Gound of
Scala

Symbol

Scala
Water Description sample
Level UDS
(m) (m) (m) (m) DS (m)
0 0

Lempung, Kuning, Plastis Sedang, Kekakuan Rendah, Kadar


1 Air Sedang. 1
1,20 1,20 UDS

2 2
Lempung, Kuning Kemerahan, Plastis Sedang, Kekakuan
Sedang, Kadar Air Sedang.
3 3
3,80 2,60
4 4
Lempung, Coklat Keputih-putihan, Plastis Sedang, Kekakuan
Sedang, Kadar Air Sedang.
5,00 1,20
5 5

6 6

7 7

8 8

9 9

10 10

Legend : === Clay Undisturbed Sample (UDS)


===
vv vv Silt Disturbed Sample (DS)

:: :: Sand
Elevation : m
HAND BORE DRILLING LOG Total Length of Drill : 05,00 m
Bore Master : OLO B. TAMPUBOLON

Hand Bore No. : HB - 02/ STA 10+900 Description By : OLO B. TAMPUBOLON

Beginning : 27 JUNI 2022 Checked By : PATUH , ST


Ending : 27 JUNI 2022 Drilling Type : IWAN AUGER
Koordinat : N : 2°60'40.8652" / E : 98°10'00.913"
Project : CORE TEAM PERENCANAAN DAN PENGAWASAN PROVINSI ACEH (PAKET -11/2022) PROVINSI ACEH
Location : N.037.2 KOTA SUBULUSSALAM - BATAS PROVINSI SUMATERA UTARA
Methode
Thickness

Thickness
Depth

Gound of
Scala

Symbol

Scala
Water Description sample
Level UDS
(m) (m) (m) (m) DS (m)
0 0

1 Lempung, Kuning, Plastis Sedang, Kekakuan Sedang, Kadar 1


UDS
Air Sedang.

2 2
2,50 2,50

3 3
Lempung, Abu-abu, Plastis Sedang, Kekakuan Sedang, Kadar
Air Sedang.
4 4
4,50 2,00

Lempung, Putih Keabu-abuan, Plastis Rendah, Kekakuan


5 5
Sedang, Kadar Air Rendah.

6 6

7 7

8 8

9 9

10 10

Legend : === Clay Undisturbed Sample (UDS)


===
vv vv Silt Disturbed Sample (DS)

:: :: Sand
Elevation : m
HAND BORE DRILLING LOG Total Length of Drill : 05,00 m
Bore Master : OLO B. TAMPUBOLON

Hand Bore No. : HB - 03/ STA 15+050 Description By : OLO B. TAMPUBOLON

Beginning : 13 JUNI 2022 Checked By : PATUH , ST


Ending : 13 JUNI 2022 Drilling Type : IWAN AUGER
Koordinat : N : 4°31'53.67" / E : 96°40'18.53"
Project : CORE TEAM PERENCANAAN DAN PENGAWASAN PROVINSI ACEH (PAKET -11/2022) PROVINSI ACEH
Location : N.044 GENTING GERBANG - CEULALA - BATAS ACEH TENGAH/ NAGA RAYA, PROVINSI ACEH
Methode
Thickness

Thickness
Depth

Gound of
Scala

Symbol

Scala
Water Description sample
Level UDS
(m) (m) (m) (m) DS (m)
0 0

1 Lempung, Kuning, Plastis Sedang, Kekakuan Sedang, Kadar 1


UDS
Air Sedang.

2 2
2,30 2,30

3 3

Lempung, Abu-abu, Plastis Sedang, Kekakuan Sedang, Kadar


4 Air Sedang. 4

5,00 2,70
5 5

6 6

7 7

8 8

9 9

10 10

Legend : === Clay Undisturbed Sample (UDS)


===
vv vv Silt Disturbed Sample (DS)

:: :: Sand
Elevation : m
HAND BORE DRILLING LOG Total Length of Drill : 05,00 m
Bore Master : OLO B. TAMPUBOLON

Hand Bore No. : HB - 04/ STA 50+460 Description By : OLO B. TAMPUBOLON

Beginning : 11 JUNI 2022 Checked By : PATUH , ST


Ending : 11 JUNI 2022 Drilling Type : IWAN AUGER
Koordinat : N : 4°03'42.22" / E : 97°19'38.14"
Project : CORE TEAM PERENCANAAN DAN PENGAWASAN PROVINSI ACEH (PAKET -11/2022) PROVINSI ACEH
Location : N.022 BATAS ACEH TENGAH/ GAYO LUES - BLANG KEJEREN, PROVINSI ACEH
Methode
Thickness

Thickness
Depth

Gound of
Scala

Symbol

Scala
Water Description sample
Level UDS
(m) (m) (m) (m) DS (m)
0 0
Lempung, Kuning, Plastis Sedang, Kekakuan Sedang, Kadar
0,80 0,80
Air Sedang.
1 1
UDS

2 Lempung Bercampur Batu Apung, Kuning, Plastis Sedang, 2


Kekakuan Sedang, Kadar Air Sedang.

3 3
3,20 2,40

4 Lempung Bercampur Grepel, Abu-abu Gelap, Plastis Rendah, 4


Kekakuan Sedang, Kadar Air Sedang.
5,00 1,80
5 5

6 6

7 7

8 8

9 9

10 10

Legend : === Clay Undisturbed Sample (UDS)


===
vv vv Silt Disturbed Sample (DS)

:: :: Sand
PT. ANUGERAH KRIDAPRADANA KSO, PT.
BUANA ARCHICON KSO, PT. DAYA CREASI GRAPHIC SONDERING TEST
MITRAYASA
Test No. : S-01/ STA 26+940 Koordinat : N : 4°49'30.00" / E : 96°44'41.56"
Date : 10 JUNI 2022 Sondering Capacity : 2.50 ton.
GWL (m) : - Tested by : OLO B. TAMPUBOLON

Cone Resistant (CR) Kg/Cm2

0 20 40 60 80 100 120 140 160 180 200 220


0 GWL
CR (Kg/Cm2)

TSF (Kg/Cm)
1

Max Depth

GWL
2

4
Depth (m)

10
0 200 400 600 800 1000 1200 1400 1600 1800 2000 22000 2400 2600
Total Skin Friction (TSF) Kg/Cm

Project : Location : Page :

CORE TEAM PERENCANAAN DAN PENGAWASAN N. 043.1 BATAS BIREUEN/ BENER MERIAH - BATAS
PROVINSI ACEH (PAKET -11/2022) PROVINSI ACEH BENER MERIAH/ ACEH TENGAH, PROVINSI ACEH
PT. ANUGERAH KRIDAPRADANA KSO,
PT. BUANA ARCHICON KSO, PT. DAYA SONDERING TEST
CREASI MITRAYASA
Test No. : S-01/ STA 26+940 Koordinat : N : 4°49'30.00" / E : 96°44'41.56"
Date : 10 JUNI 2022 Sondering Capacity : 2.50 ton.
GWL (m) :- Tested by : OLO B. TAMPUBOLON
Cone Total Skin Skin Total Skin Local Skin
Resistant Resistant Friction Friction Friction Friction
Depth
(CR) (TR) (SF) x 20/10 (TSF) (LSF)
(M) Kg/Cm2 Kg/Cm2 Kg/Cm2 Kg/Cm Kg/Cm Kg/Cm
0.00 0 0 0 0 0 0.00
0.20 6 8 2 4 4 0.20
0.40 10 12 2 4 8 0.20
0.60 24 28 4 8 16 0.40
0.80 32 37 5 10 26 0.50
1.00 36 41 5 10 36 0.50
1.20 40 44 4 8 44 0.40
1.40 43 48 5 10 54 0.50
1.60 49 54 5 10 64 0.50
1.80 53 60 7 14 78 0.70
2.00 62 69 7 14 92 0.70
2.20 74 82 8 16 108 0.80
2.40 78 86 8 16 124 0.80
2.60 84 93 9 18 142 0.90
2.80 88 97 9 18 160 0.90
3.00 120 134 14 28 188 1.40
3.20 131 145 14 28 216 1.40
3.40 142 156 14 28 244 1.40
3.60 148 163 15 30 274 1.50
3.80 152 166 14 28 302 1.40
4.00 158 172 14 28 330 1.40
4.20 162 174 12 24 354 1.20
4.40 170 184 14 28 382 1.40
4.60 175 190 15 30 412 1.50
4.80 180 195 15 30 442 1.50
5.00 183 198 15 30 472 1.50
5.20 186 201 15 30 502 1.50
5.40 188 203 15 30 532 1.50
5.60 192 207 15 30 562 1.50
5.80 196 211 15 30 592 1.50
6.00 203 218 15 30 622 1.50
6.20 208 223 15 30 652 1.50
6.40
6.60
6.80
7.00
7.20
7.40
7.60
7.80
8.00
8.20
8.40
8.60
8.80
9.00
9.20
9.40
9.60
9.80
10.00
Project : Location : Page :
CORE TEAM PERENCANAAN DAN N. 043.1 BATAS BIREUEN/ BENER MERIAH -
PENGAWASAN PROVINSI ACEH (PAKET - BATAS BENER MERIAH/ ACEH TENGAH,
11/2022) PROVINSI ACEH PROVINSI ACEH
Grafik 4.1. - Daya Dukung Izin Pondasi Tiang Pancang
Dari Data Sondir S-01/ STA 26+940

Daya Dukung Izin Tiang (Qi) ton

0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 250
0
Dia. 20 cm

Dia. 30 cm

1 Dia. 40 cm

Dia. 50 cm

Dia. 60 cm
2

4
Depth (m)

10

DDT. Sondir
Tabel 4.1. - Daya Dukung Izin Pondasi Tiang Pancang Dari Data Sondir S-01/ STA 26+940

D = 0.20 m D = 0.30 m D = 0.40 m D = 0.50 m D = 0.60 m


Ap = 0.031 m2 Ap = 0.071 m2 Ap = 0.126 m2 Ap = 0.196 m2 Ap = 0.283 m2
Ak = 0.628 m Ak = 0.942 m Ak = 1.257 m Ak = 1.571 m Ak = 1.885 m
S-01/ STA 26+940
Keda D = 20 cm D = 30 cm D = 40 cm D = 50 cm D = 60 cm
laman CR TSF CR-r QP Qs Qi CR-r QP Qs Qi CR-r QP Qs Qi CR-r QP Qs Qi CR-r QP Qs Qi
(m) (Kg/Cm2) (Kg/Cm) (Kg/Cm2) (ton) (ton) (ton) (Kg/Cm2) (ton) (ton) (ton) (Kg/Cm2) (ton) (ton) (ton) (Kg/Cm2) (ton) (ton) (ton) (Kg/Cm2) (ton) (ton) (ton)
0.00 0 0 - - - - - - - - - - - - - - - - - - - -
0.20 6 4 - - - - - - - - - - - - - - - - - - - -
0.40 10 8 - - - - - - - - - - - - - - - - - - - -
0.60 24 16 - - - - - - - - - - - - - - - - - - - -
0.80 32 26 - - - - - - - - - - - - - - - - - - - -
1.00 36 36 42.00 13.19 0.63 4.52 47.17 33.34 0.94 11.30 54.38 68.33 1.26 23.03 60.70 119.18 1.57 40.04 71.50 202.16 1.88 67.76
1.20 40 44 41.13 12.92 1.13 4.53 44.75 31.63 1.70 10.88 48.19 60.55 2.26 20.64 52.55 103.18 2.83 34.96 58.17 164.46 3.39 55.50
1.40 43 54 44.88 14.10 1.76 5.05 48.92 34.58 2.64 12.05 52.19 65.58 3.52 22.56 58.10 114.08 4.40 38.91 63.67 180.01 5.28 61.06
1.60 49 64 49.58 15.58 2.39 5.67 53.17 37.58 3.58 13.24 57.83 72.68 4.78 25.18 63.88 125.43 5.97 43.01 69.04 195.21 7.16 66.50
1.80 53 78 54.38 17.08 3.27 6.35 57.58 40.70 4.90 14.55 64.13 80.58 6.53 28.17 70.00 137.44 8.17 47.45 74.75 211.35 9.80 72.41
2.00 62 92 60.38 18.97 4.15 7.15 64.27 45.43 6.22 16.39 70.79 88.95 8.29 31.31 76.05 149.32 10.37 51.85 80.39 227.30 12.44 78.26
2.20 74 108 66.38 20.85 5.15 7.98 71.50 50.54 7.73 18.39 77.65 97.57 10.30 34.59 82.33 161.66 12.88 56.46 86.38 244.22 15.46 84.50
2.40 78 124 76.00 23.88 6.16 9.19 80.33 56.78 9.24 20.78 84.44 106.11 12.32 37.83 88.65 174.06 15.39 61.10 92.50 261.54 18.47 90.87
2.60 84 142 86.25 27.10 7.29 10.49 89.33 63.15 10.93 23.24 91.13 114.51 14.58 41.09 94.94 186.41 18.22 65.78 98.44 278.33 21.87 97.15
2.80 88 160 97.38 30.59 8.42 11.88 98.42 69.57 12.63 25.71 99.00 124.41 16.84 44.84 101.13 198.57 21.05 70.40 104.21 294.64 25.26 103.27
3.00 120 188 108.13 33.97 10.18 13.36 107.50 75.99 15.27 28.38 107.13 134.62 20.36 48.94 107.25 210.58 25.45 75.28 109.81 310.48 30.54 109.60
3.20 131 216 117.88 37.03 11.94 14.73 116.58 82.41 17.91 31.05 115.38 144.98 23.88 53.10 114.60 225.02 29.85 80.97 115.34 326.11 35.81 115.87
3.40 142 244 127.88 40.17 13.70 16.13 125.58 88.77 20.55 33.70 123.56 155.27 27.39 57.24 121.90 239.35 34.24 86.63 120.58 340.94 41.09 121.87
3.60 148 274 137.63 43.24 15.58 17.53 134.00 94.72 23.37 36.25 131.69 165.48 31.16 61.39 129.15 253.59 38.96 92.32 127.25 359.79 46.75 129.28
3.80 152 302 147.88 46.46 17.34 18.95 142.50 100.73 26.01 38.78 139.44 175.22 34.68 65.34 136.30 267.62 43.35 97.88 134.04 378.99 52.02 136.74
4.00 158 330 154.75 48.62 19.10 20.03 150.75 106.56 28.65 41.25 146.56 184.18 38.20 69.03 143.45 281.66 47.75 103.44 140.92 398.43 57.30 144.27
4.20 162 354 160.88 50.54 20.61 20.97 158.92 112.33 30.91 43.63 153.69 193.13 41.22 72.62 150.50 295.51 51.52 108.81 146.61 414.54 61.83 150.55
4.40 170 382 166.00 52.15 22.37 21.86 164.58 116.34 33.55 45.49 160.69 201.93 44.74 76.26 157.20 308.66 55.92 114.07 152.34 430.74 67.10 157.00
4.60 175 412 170.75 53.64 24.25 22.73 169.67 119.93 36.38 47.25 167.88 210.96 48.51 80.02 162.81 319.67 60.63 118.68 157.85 446.30 72.76 163.32
4.80 180 442 175.25 55.06 26.14 23.58 174.17 123.11 39.21 48.88 173.38 217.87 52.28 83.08 168.30 330.46 65.35 123.22 163.00 460.87 78.41 169.31
5.00 183 472 179.50 56.39 28.02 24.40 178.75 126.35 42.03 50.52 177.29 222.80 56.05 85.47 173.76 341.17 70.06 127.74 168.11 475.31 84.07 175.25
5.20 186 502 183.75 57.73 29.91 25.22 183.42 129.65 44.86 52.19 180.75 227.14 59.82 87.68 177.80 349.11 74.77 131.32 173.13 489.50 89.72 181.11
5.40 188 532 187.88 59.02 31.79 26.03 186.70 131.97 47.69 53.53 184.08 231.32 63.59 89.82 181.50 356.37 79.48 134.69 178.16 503.73 95.38 186.99
5.60 192 562 192.00 60.32 33.68 26.84 190.04 134.33 50.52 54.88 187.50 235.62 67.36 92.01 184.98 363.20 84.19 137.90 182.17 515.06 101.03 191.89
5.80 196 592 194.79 61.20 35.56 27.51 193.17 136.54 53.34 56.18 190.92 239.91 71.13 94.20 188.47 370.05 88.91 141.13 186.00 525.90 106.69 196.64
6.00 203 622 198.00 62.20 37.45 28.22 196.50 138.90 56.17 57.53 194.63 244.57 74.90 96.50 192.25 377.48 93.62 144.55 189.83 536.74 112.34 201.38
6.20 208 652 201.38 63.26 39.33 28.95 199.67 141.14 59.00 58.85 197.94 248.74 78.67 98.64 195.75 384.35 98.33 147.78 193.38 546.75 118.00 205.85

Project : CORE TEAM PERENCANAAN DAN PENGAWASAN PROVINSI ACEH (PAKET -11/2022) PROVINSI ACEH

Location : N. 043.1 BATAS BIREUEN/ BENER MERIAH - BATAS BENER MERIAH/ ACEH TENGAH, PROVINSI ACEH

DDT Sondir
Tabel 4.2. - Daya Dukung Izin Pondasi Dangkal Dari Hasil Pengujian Sondir

S-01/ STA 26+940


Kedalaman
CR Qi
(m) (Kg/Cm2) (T/m2)
0.00 0 0.00
0.20 6 2.00
0.40 10 3.33
0.60 24 8.00
0.80 32 10.67
1.00 36 12.00
1.20 40 13.33
1.40 43 14.33
1.60 49 16.33
1.80 53 17.67
2.00 62 20.67
2.20 74 24.67
2.40 78 26.00
2.60 84 28.00
2.80 88 29.33
3.00 120 40.00
3.20 131 43.67
3.40 142 47.33
3.60 148 49.33
3.80 152 50.67
4.00 158 52.67
4.20 162 54.00
4.40 170 56.67
4.60 175 58.33
4.80 180 60.00
5.00 183 61.00
PT. ANUGERAH KRIDAPRADANA KSO, PT.
BUANA ARCHICON KSO, PT. DAYA CREASI GRAPHIC SONDERING TEST
MITRAYASA
Test No. : S-02/ STA 10+900 Koordinat : N : 2°60'40.8652" / E : 98°10'00.913"
Date : 14 JUNI 2022 Sondering Capacity : 2.50 ton.
GWL (m) : - Tested by : OLO B. TAMPUBOLON

Cone Resistant (CR) Kg/Cm2

0 20 40 60 80 100 120 140 160 180 200 220


0 GWL
CR (Kg/Cm2)

TSF (Kg/Cm)
1

Max Depth

GWL
2

4
Depth (m)

10
0 200 400 600 800 1000 1200 1400 1600 1800 2000 22000 2400 2600
Total Skin Friction (TSF) Kg/Cm

Project : Location : Page :

CORE TEAM PERENCANAAN DAN PENGAWASAN N.037.2 KOTA SUBULUSSALAM - BATAS PROVINSI
PROVINSI ACEH (PAKET -11/2022) PROVINSI ACEH SUMATERA UTARA
PT. ANUGERAH KRIDAPRADANA KSO,
PT. BUANA ARCHICON KSO, PT. DAYA SONDERING TEST
CREASI MITRAYASA
Test No. : S-02/ STA 10+900 Koordinat : N : 2°60'40.8652" / E : 98°10'00.913"
Date : 14 JUNI 2022 Sondering Capacity : 2.50 ton.
GWL (m) :- Tested by : OLO B. TAMPUBOLON
Cone Total Skin Skin Total Skin Local Skin
Resistant Resistant Friction Friction Friction Friction
Depth
(CR) (TR) (SF) x 20/10 (TSF) (LSF)
(M) Kg/Cm2 Kg/Cm2 Kg/Cm2 Kg/Cm Kg/Cm Kg/Cm
0,00 0 0 0 0 0 0,00
0,20 2 3 1 2 2 0,10
0,40 6 8 2 4 6 0,20
0,60 10 13 3 6 12 0,30
0,80 15 18 3 6 18 0,30
1,00 22 26 4 8 26 0,40
1,20 30 36 6 12 38 0,60
1,40 41 47 6 12 50 0,60
1,60 55 61 6 12 62 0,60
1,80 60 66 6 12 74 0,60
2,00 88 106 18 36 110 1,80
2,20 98 110 12 24 134 1,20
2,40 102 114 12 24 158 1,20
2,60 106 120 14 28 186 1,40
2,80 115 127 12 24 210 1,20
3,00 121 133 12 24 234 1,20
3,20 128 140 12 24 258 1,20
3,40 134 146 12 24 282 1,20
3,60 140 152 12 24 306 1,20
3,80 143 155 12 24 330 1,20
4,00 161 175 14 28 358 1,40
4,20 165 179 14 28 386 1,40
4,40 172 186 14 28 414 1,40
4,60 182 197 15 30 444 1,50
4,80 191 206 15 30 474 1,50
5,00 205 220 15 30 504 1,50
5,20 210 225 15 30 534 1,50
5,40
5,60
5,80
6,00
6,20
6,40
6,60
6,80
7,00
7,20
7,40
7,60
7,80
8,00
8,20
8,40
8,60
8,80
9,00
9,20
9,40
9,60
9,80
10,00
Project : Location : Page :
CORE TEAM PERENCANAAN DAN N.037.2 KOTA SUBULUSSALAM - BATAS
PENGAWASAN PROVINSI ACEH (PAKET -
PROVINSI SUMATERA UTARA
11/2022) PROVINSI ACEH
Dept
Grafik 4.1. - Daya Dukung Izin Pondasi Tiang Pancang
0,00
Dari Data Sondir S-02/ STA 10+900
0,20
0,40
Daya Dukung Izin Tiang (Qi) ton
0,60
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 250 0,80
0
1,00
Dia. 20 cm
1,20

Dia. 30 cm 1,40
1,60
1 Dia. 40 cm
1,80
2,00
Dia. 50 cm
2,20

Dia. 60 cm 2,40
2 2,60
2,80
3,00
3,20
3 3,40
3,60
3,80
4,00

4 4,20
4,40
4,60
Depth (m)

4,80
5,00
5
5,20

10

DDT. Sondir
Tabel 4.1. - Daya Dukung Izin Pondasi Tiang Pancang Dari Data Sondir S-02/ STA 10+900

D = 0,20 m D = 0,30 m D = 0,40 m D = 0,50 m D = 0,60 m


Ap = 0,031 m2 Ap = 0,071 m2 Ap = 0,126 m2 Ap = 0,196 m2 Ap = 0,283 m2
Ak = 0,628 m Ak = 0,942 m Ak = 1,257 m Ak = 1,571 m Ak = 1,885 m
S-02/ STA 10+900
Keda D = 20 cm D = 30 cm D = 40 cm D = 50 cm D = 60 cm
laman CR TSF CR-r QP Qs Qi CR-r QP Qs Qi CR-r QP Qs Qi CR-r QP Qs Qi CR-r QP Qs Qi
(m) (Kg/Cm2) (Kg/Cm) (Kg/Cm2) (ton) (ton) (ton) (Kg/Cm2) (ton) (ton) (ton) (Kg/Cm2) (ton) (ton) (ton) (Kg/Cm2) (ton) (ton) (ton) (Kg/Cm2) (ton) (ton) (ton)
0,00 0 0 - - - - - - - - - - - - - - - - - - - -
0,20 2 2 - - - - - - - - - - - - - - - - - - - -
0,40 6 6 - - - - - - - - - - - - - - - - - - - -
0,60 10 12 - - - - - - - - - - - - - - - - - - - -
0,80 15 18 - - - - - - - - - - - - - - - - - - - -
1,00 22 26 37,00 11,62 0,50 3,98 49,33 34,87 0,75 11,77 62,00 77,91 1,01 26,17 71,70 140,78 1,26 47,18 80,50 227,61 1,51 76,17
1,20 30 38 34,25 10,76 1,26 3,84 42,00 29,69 1,88 10,27 47,25 59,38 2,51 20,29 51,80 101,71 3,14 34,53 55,92 158,10 3,77 53,45
1,40 41 50 43,50 13,67 2,01 4,96 50,00 35,34 3,02 12,38 54,56 68,57 4,02 23,66 58,70 115,26 5,03 39,42 62,50 176,71 6,03 60,11
1,60 55 62 53,13 16,69 2,76 6,12 57,92 40,94 4,15 14,48 62,06 77,99 5,53 27,10 65,85 129,30 6,91 44,48 69,25 195,80 8,29 66,93
1,80 60 74 62,00 19,48 3,52 7,20 65,92 46,59 5,28 16,59 69,63 87,49 7,04 30,57 73,10 143,53 8,80 49,60 76,67 216,77 10,56 74,37
2,00 88 110 72,50 22,78 5,78 8,75 73,30 51,81 8,67 19,01 76,55 96,20 11,56 34,38 79,55 156,20 14,45 54,96 83,34 235,64 17,34 82,02
2,20 98 134 83,13 26,11 7,29 10,16 80,50 56,90 10,93 21,15 83,67 105,14 14,58 37,96 87,07 170,96 18,22 60,63 90,71 256,47 21,87 89,86
2,40 102 158 93,13 29,26 8,80 11,51 89,83 63,50 13,19 23,81 89,96 113,04 17,59 41,20 93,89 184,36 21,99 65,85 97,68 276,20 26,39 97,34
2,60 106 186 102,25 32,12 10,56 12,82 99,00 69,98 15,83 26,49 96,50 121,27 21,11 44,64 100,25 196,84 26,39 70,89 104,25 294,76 31,67 104,59
2,80 115 210 111,50 35,03 12,06 14,09 107,50 75,99 18,10 28,95 105,44 132,50 24,13 48,99 106,49 209,10 30,16 75,73 110,82 313,33 36,19 111,68
3,00 121 234 118,00 37,07 13,57 15,07 116,33 82,23 20,36 31,48 114,31 143,65 27,14 53,31 112,70 221,29 33,93 80,55 117,18 331,33 40,72 118,59
3,20 128 258 123,63 38,84 15,08 15,96 125,08 88,42 22,62 34,00 123,13 154,72 30,16 57,61 121,85 239,25 37,70 87,29 121,32 343,02 45,24 123,39
3,40 134 282 131,00 41,15 16,59 17,04 132,08 93,36 24,88 36,10 131,63 165,40 33,18 61,77 130,85 256,92 41,47 93,93 125,40 354,56 49,76 128,14
3,60 140 306 138,38 43,47 18,10 18,11 139,08 98,31 27,14 38,20 140,69 176,79 36,19 66,17 137,52 270,01 45,24 99,05 132,08 373,46 54,29 135,34
3,80 143 330 145,50 45,71 19,60 19,16 146,50 103,55 29,41 40,40 148,31 186,37 39,21 69,97 143,91 282,57 49,01 103,99 138,81 392,48 58,81 142,59
4,00 161 358 153,13 48,11 21,36 20,31 154,75 109,39 32,04 42,87 153,67 193,11 42,73 72,91 150,61 295,72 53,41 109,25 145,61 411,69 64,09 150,05
4,20 165 386 161,00 50,58 23,12 21,48 162,67 114,98 34,68 45,26 159,25 200,12 46,24 75,96 156,15 306,60 57,81 113,76 151,92 429,53 69,37 157,05
4,40 172 414 169,88 53,37 24,88 22,77 168,58 119,16 37,32 47,19 165,19 207,58 49,76 79,15 161,75 317,60 62,20 118,31 158,54 448,27 74,64 164,35
4,60 182 444 178,63 56,12 26,77 24,06 174,75 123,52 40,15 49,20 171,25 215,20 53,53 82,44 167,75 329,38 66,92 123,18 164,54 465,23 80,30 171,14
4,80 191 474 186,00 58,43 28,65 25,21 181,25 128,12 42,98 51,30 177,56 223,13 57,30 85,84 174,05 341,75 71,63 128,24 170,54 482,20 85,95 177,92
5,00 205 504 192,50 60,48 30,54 26,27 188,25 133,07 45,80 53,52 184,25 231,54 61,07 89,39 180,60 354,61 76,34 133,47 177,00 500,46 91,61 185,14
5,20 210 534 198,75 62,44 32,42 27,30 194,67 137,60 48,63 55,59 189,94 238,68 64,84 92,53 186,05 365,31 81,05 137,98 182,38 515,65 97,26 191,34

Project : CORE TEAM PERENCANAAN DAN PENGAWASAN PROVINSI ACEH (PAKET -11/2022) PROVINSI ACEH

Location : N.037.2 KOTA SUBULUSSALAM - BATAS PROVINSI SUMATERA UTARA

DDT Sondir
Tabel 4.2. - Daya Dukung Izin Pondasi Dangkal Dari Hasil Pengujian Sondir

S-02/ STA 10+900


Kedalaman
CR Qi
(m) (Kg/Cm2) (T/m2)
0,00 0 0,00
0,20 2 0,67
0,40 6 2,00
0,60 10 3,33
0,80 15 5,00
1,00 22 7,33
1,20 30 10,00
1,40 41 13,67
1,60 55 18,33
1,80 60 20,00
2,00 88 29,33
2,20 98 32,67
2,40 102 34,00
2,60 106 35,33
2,80 115 38,33
3,00 121 40,33
3,20 128 42,67
3,40 134 44,67
3,60 140 46,67
3,80 143 47,67
4,00 161 53,67
4,20 165 55,00
4,40 172 57,33
4,60 182 60,67
4,80 191 63,67
5,00 205 68,33
PT. ANUGERAH KRIDAPRADANA KSO, PT.
BUANA ARCHICON KSO, PT. DAYA CREASI GRAPHIC SONDERING TEST
MITRAYASA
Test No. : S-03/ STA 15+050 Koordinat : N : 4°31'53.67" / E : 96°40'18.53"
Date : 12 JUNI 2022 Sondering Capacity : 2.50 ton.
GWL (m) : - Tested by : OLO B. TAMPUBOLON

Cone Resistant (CR) Kg/Cm2

0 20 40 60 80 100 120 140 160 180 200 220


0 GWL
CR (Kg/Cm2)

TSF (Kg/Cm)
1

Max Depth

GWL
2

4
Depth (m)

10
0 200 400 600 800 1000 1200 1400 1600 1800 2000 22000 2400 2600
Total Skin Friction (TSF) Kg/Cm

Project : Location : Page :

CORE TEAM PERENCANAAN DAN PENGAWASAN N.044 GENTING GERBANG - CEULALA - BATAS
PROVINSI ACEH (PAKET -11/2022) PROVINSI ACEH ACEH TENGAH/ NAGA RAYA, PROVINSI ACEH
PT. ANUGERAH KRIDAPRADANA KSO,
PT. BUANA ARCHICON KSO, PT. DAYA SONDERING TEST
CREASI MITRAYASA
Test No. : S-03/ STA 15+050 Koordinat : N : 4°31'53.67" / E : 96°40'18.53"
Date : 12 JUNI 2022 Sondering Capacity : 2.50 ton.
GWL (m) :- Tested by : OLO B. TAMPUBOLON
Cone Total Skin Skin Total Skin Local Skin
Resistant Resistant Friction Friction Friction Friction
Depth
(CR) (TR) (SF) x 20/10 (TSF) (LSF)
(M) Kg/Cm2 Kg/Cm2 Kg/Cm2 Kg/Cm Kg/Cm Kg/Cm
0,00 0 0 0 0 0 0,00
0,20 10 13 3 6 6 0,30
0,40 15 18 3 6 12 0,30
0,60 21 25 4 8 20 0,40
0,80 28 33 5 10 30 0,50
1,00 38 43 5 10 40 0,50
1,20 41 46 5 10 50 0,50
1,40 47 52 5 10 60 0,50
1,60 52 59 7 14 74 0,70
1,80 56 63 7 14 88 0,70
2,00 60 68 8 16 104 0,80
2,20 65 73 8 16 120 0,80
2,40 70 78 8 16 136 0,80
2,60 75 83 8 16 152 0,80
2,80 84 92 8 16 168 0,80
3,00 97 107 10 20 188 1,00
3,20 106 116 10 20 208 1,00
3,40 118 128 10 20 228 1,00
3,60 132 146 14 28 256 1,40
3,80 138 152 14 28 284 1,40
4,00 143 158 15 30 314 1,50
4,20 147 162 15 30 344 1,50
4,40 152 166 14 28 372 1,40
4,60 160 174 14 28 400 1,40
4,80 174 188 14 28 428 1,40
5,00 182 196 14 28 456 1,40
5,20 196 211 15 30 486 1,50
5,40 202 217 15 30 516 1,50
5,60 206 221 15 30 546 1,50
5,80
6,00
6,20
6,40
6,60
6,80
7,00
7,20
7,40
7,60
7,80
8,00
8,20
8,40
8,60
8,80
9,00
9,20
9,40
9,60
9,80
10,00
Project : Location : Page :
CORE TEAM PERENCANAAN DAN N.044 GENTING GERBANG - CEULALA -
PENGAWASAN PROVINSI ACEH (PAKET - BATAS ACEH TENGAH/ NAGA RAYA,
11/2022) PROVINSI ACEH PROVINSI ACEH
Dept
Grafik 4.1. - Daya Dukung Izin Pondasi Tiang Pancang
0,00
Dari Data Sondir S-03/ STA 15+050
0,20
0,40
Daya Dukung Izin Tiang (Qi) ton
0,60
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 250 0,80
0
1,00
Dia. 20 cm
1,20

Dia. 30 cm 1,40
1,60
1 Dia. 40 cm
1,80
2,00
Dia. 50 cm
2,20

Dia. 60 cm 2,40
2 2,60
2,80
3,00
3,20
3 3,40
3,60
3,80
4,00

4 4,20
4,40
4,60
Depth (m)

4,80
5,00
5
5,20
5,40
5,60

10

DDT. Sondir
Tabel 4.1. - Daya Dukung Izin Pondasi Tiang Pancang Dari Data Sondir S-03/ STA 15+050

D = 0,20 m D = 0,30 m D = 0,40 m D = 0,50 m D = 0,60 m


Ap = 0,031 m2 Ap = 0,071 m2 Ap = 0,126 m2 Ap = 0,196 m2 Ap = 0,283 m2
Ak = 0,628 m Ak = 0,942 m Ak = 1,257 m Ak = 1,571 m Ak = 1,885 m
S-03/ STA 15+050
Keda D = 20 cm D = 30 cm D = 40 cm D = 50 cm D = 60 cm
laman CR TSF CR-r QP Qs Qi CR-r QP Qs Qi CR-r QP Qs Qi CR-r QP Qs Qi CR-r QP Qs Qi
(m) (Kg/Cm2) (Kg/Cm) (Kg/Cm2) (ton) (ton) (ton) (Kg/Cm2) (ton) (ton) (ton) (Kg/Cm2) (ton) (ton) (ton) (Kg/Cm2) (ton) (ton) (ton) (Kg/Cm2) (ton) (ton) (ton)
0,00 0 0 - - - - - - - - - - - - - - - - - - - -
0,20 10 6 - - - - - - - - - - - - - - - - - - - -
0,40 15 12 - - - - - - - - - - - - - - - - - - - -
0,60 21 20 - - - - - - - - - - - - - - - - - - - -
0,80 28 30 - - - - - - - - - - - - - - - - - - - -
1,00 38 40 44,50 13,98 0,63 4,79 49,00 34,64 0,94 11,73 53,63 67,39 1,26 22,71 58,80 115,45 1,57 38,80 65,92 186,37 1,88 62,50
1,20 41 50 43,50 13,67 1,26 4,81 45,75 32,34 1,88 11,16 48,13 60,48 2,51 20,66 51,35 100,83 3,14 34,24 55,29 156,33 3,77 52,87
1,40 47 60 46,63 14,65 1,88 5,26 48,92 34,58 2,83 12,09 51,56 64,80 3,77 22,35 55,35 108,68 4,71 37,17 59,83 169,17 5,65 57,52
1,60 52 74 50,13 15,75 2,76 5,80 52,50 37,11 4,15 13,20 55,94 70,29 5,53 24,54 60,15 118,10 6,91 40,75 64,88 183,43 8,29 62,80
1,80 56 88 53,63 16,85 3,64 6,34 56,42 39,88 5,47 14,39 60,56 76,11 7,29 26,83 65,40 128,41 9,11 44,63 69,92 197,68 10,93 68,08
2,00 60 104 58,25 18,30 4,65 7,03 60,98 43,11 6,97 15,76 65,59 82,42 9,30 29,33 70,65 138,72 11,62 48,57 74,86 211,66 13,95 73,34
2,20 65 120 63,63 19,99 5,65 7,79 65,92 46,59 8,48 17,23 71,19 89,46 11,31 32,08 75,90 149,03 14,14 52,50 79,79 225,61 16,96 78,59
2,40 70 136 69,88 21,95 6,66 8,65 72,58 51,31 9,99 19,10 76,89 96,63 13,32 34,87 81,14 159,32 16,65 56,44 84,89 240,03 19,98 84,01
2,60 75 152 76,63 24,07 7,67 9,56 80,17 56,67 11,50 21,19 82,63 103,83 15,33 37,68 86,41 169,67 19,16 60,39 90,40 255,59 23,00 89,80
2,80 84 168 84,38 26,51 8,67 10,57 87,75 62,03 13,01 23,28 89,44 112,39 17,34 40,93 91,85 180,35 21,68 64,45 96,04 271,55 26,01 95,72
3,00 97 188 93,38 29,33 9,93 11,76 95,33 67,39 14,89 25,44 96,38 121,11 19,85 44,34 97,75 191,93 24,82 68,94 102,11 288,70 29,78 102,19
3,20 106 208 102,50 32,20 11,18 12,97 102,92 72,75 16,78 27,60 103,44 129,98 22,37 47,80 104,95 206,07 27,96 74,28 108,22 305,98 33,55 108,71
3,40 118 228 111,63 35,07 12,44 14,18 110,58 78,17 18,66 29,79 111,06 139,57 24,88 51,50 112,70 221,29 31,10 79,98 114,21 322,92 37,32 115,10
3,60 132 256 120,63 37,90 14,20 15,47 118,50 83,76 21,30 32,18 118,94 149,46 28,40 55,50 120,45 236,50 35,50 85,93 119,56 338,06 42,60 121,21
3,80 138 284 129,13 40,57 15,96 16,71 127,17 89,89 23,94 34,75 127,44 160,14 31,92 59,76 128,15 251,62 39,90 91,85 125,08 353,66 47,88 127,46
4,00 143 314 137,00 43,04 17,84 17,92 136,08 96,19 26,77 37,42 136,00 170,90 35,69 64,11 134,03 263,16 44,61 96,64 130,65 369,41 53,53 133,84
4,20 147 344 145,50 45,71 19,73 19,18 145,42 102,79 29,59 40,18 144,50 181,58 39,46 68,42 140,09 275,06 49,32 101,55 136,35 385,53 59,19 140,35
4,40 152 372 153,50 48,22 21,49 20,37 154,17 108,97 32,23 42,77 151,17 189,97 42,98 71,92 146,36 287,37 53,72 106,53 142,32 402,39 64,47 147,02
4,60 160 400 161,50 50,74 23,25 21,56 162,50 114,86 34,87 45,26 157,90 198,42 46,50 75,44 152,93 300,28 58,12 111,72 148,63 420,23 69,74 154,02
4,80 174 428 169,50 53,25 25,01 22,75 168,67 119,22 37,51 47,24 164,50 206,72 50,01 78,91 159,85 313,86 62,52 117,13 155,25 438,96 75,02 161,32
5,00 182 456 177,38 55,72 26,77 23,93 174,42 123,29 40,15 49,13 171,00 214,88 53,53 82,33 166,60 327,12 66,92 122,42 161,83 457,57 80,30 168,58
5,20 196 486 184,17 57,86 28,65 25,02 180,50 127,59 42,98 51,12 177,42 222,95 57,30 85,78 173,27 340,21 71,63 127,73 168,71 477,01 85,95 176,19
5,40 202 516 191,00 60,00 30,54 26,11 186,25 131,65 45,80 53,05 182,75 229,65 61,07 88,76 179,10 351,66 76,34 132,49 174,71 493,98 91,61 182,98
5,60 206 546 197,25 61,97 32,42 27,14 191,83 135,60 48,63 54,93 187,75 235,93 64,84 91,61 184,30 361,87 81,05 136,83 180,08 509,17 97,26 189,18

Project : CORE TEAM PERENCANAAN DAN PENGAWASAN PROVINSI ACEH (PAKET -11/2022) PROVINSI ACEH

Location : N.044 GENTING GERBANG - CEULALA - BATAS ACEH TENGAH/ NAGA RAYA, PROVINSI ACEH

DDT Sondir
Tabel 4.2. - Daya Dukung Izin Pondasi Dangkal Dari Hasil Pengujian Sondir

S-03/ STA 15+050


Kedalaman
CR Qi
(m) (Kg/Cm2) (T/m2)
0,00 0 0,00
0,20 10 3,33
0,40 15 5,00
0,60 21 7,00
0,80 28 9,33
1,00 38 12,67
1,20 41 13,67
1,40 47 15,67
1,60 52 17,33
1,80 56 18,67
2,00 60 20,00
2,20 65 21,67
2,40 70 23,33
2,60 75 25,00
2,80 84 28,00
3,00 97 32,33
3,20 106 35,33
3,40 118 39,33
3,60 132 44,00
3,80 138 46,00
4,00 143 47,67
4,20 147 49,00
4,40 152 50,67
4,60 160 53,33
4,80 174 58,00
5,00 182 60,67
PT. ANUGERAH KRIDAPRADANA KSO, PT.
BUANA ARCHICON KSO, PT. DAYA CREASI GRAPHIC SONDERING TEST
MITRAYASA
Test No. : S-04/ STA 50+460 Koordinat : N : 4°03'42.22" / E : 97°19'38.14"
Date : 11 JUNI 2022 Sondering Capacity : 2.50 ton.
GWL (m) : - Tested by : OLO B. TAMPUBOLON

Cone Resistant (CR) Kg/Cm2

0 20 40 60 80 100 120 140 160 180 200 220


0 GWL
CR (Kg/Cm2)

TSF (Kg/Cm)
1

Max Depth

GWL
2

4
Depth (m)

10
0 200 400 600 800 1000 1200 1400 1600 1800 2000 22000 2400 2600
Total Skin Friction (TSF) Kg/Cm

Project : Location : Page :

CORE TEAM PERENCANAAN DAN PENGAWASAN N.022 BATAS ACEH TENGAH/ GAYO LUES - BLANG
PROVINSI ACEH (PAKET -11/2022) PROVINSI ACEH KEJEREN, PROVINSI ACEH
PT. ANUGERAH KRIDAPRADANA KSO,
PT. BUANA ARCHICON KSO, PT. DAYA SONDERING TEST
CREASI MITRAYASA
Test No. : S-04/ STA 50+460 Koordinat : N : 4°03'42.22" / E : 97°19'38.14"
Date : 11 JUNI 2022 Sondering Capacity : 2.50 ton.
GWL (m) :- Tested by : OLO B. TAMPUBOLON
Cone Total Skin Skin Total Skin Local Skin
Resistant Resistant Friction Friction Friction Friction
Depth
(CR) (TR) (SF) x 20/10 (TSF) (LSF)
(M) Kg/Cm2 Kg/Cm2 Kg/Cm2 Kg/Cm Kg/Cm Kg/Cm
0.00 0 0 0 0 0 0.00
0.20 6 8 2 4 4 0.20
0.40 18 24 6 12 16 0.60
0.60 36 41 5 10 26 0.50
0.80 48 54 6 12 38 0.60
1.00 72 80 8 16 54 0.80
1.20 80 88 8 16 70 0.80
1.40 86 95 9 18 88 0.90
1.60 94 103 9 18 106 0.90
1.80 110 121 11 22 128 1.10
2.00 118 128 10 20 148 1.00
2.20 125 135 10 20 168 1.00
2.40 130 141 11 22 190 1.10
2.60 137 148 11 22 212 1.10
2.80 150 162 12 24 236 1.20
3.00 156 168 12 24 260 1.20
3.20 163 175 12 24 284 1.20
3.40 172 185 13 26 310 1.30
3.60 176 188 12 24 334 1.20
3.80 182 196 14 28 362 1.40
4.00 189 203 14 28 390 1.40
4.20 191 206 15 30 420 1.50
4.40 195 210 15 30 450 1.50
4.60 206 218 12 24 474 1.20
4.80 210 225 15 30 504 1.50
5.00
5.20
5.40
5.60
5.80
6.00
6.20
6.40
6.60
6.80
7.00
7.20
7.40
7.60
7.80
8.00
8.20
8.40
8.60
8.80
9.00
9.20
9.40
9.60
9.80
10.00
Project : Location : Page :
CORE TEAM PERENCANAAN DAN N.022 BATAS ACEH TENGAH/ GAYO LUES -
PENGAWASAN PROVINSI ACEH (PAKET - BLANG KEJEREN, PROVINSI ACEH
11/2022) PROVINSI ACEH
Grafik 4.1. - Daya Dukung Izin Pondasi Tiang Pancang
Dari Data Sondir S-04/ STA 50+460

Daya Dukung Izin Tiang (Qi) ton

0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 250
0
Dia. 20 cm

Dia. 30 cm

1 Dia. 40 cm

Dia. 50 cm

Dia. 60 cm
2

4
Depth (m)

10

DDT. Sondir
Tabel 4.1. - Daya Dukung Izin Pondasi Tiang Pancang Dari Data Sondir S-04/ STA 50+460

D = 0.20 m D = 0.30 m D = 0.40 m D = 0.50 m D = 0.60 m


Ap = 0.031 m2 Ap = 0.071 m2 Ap = 0.126 m2 Ap = 0.196 m2 Ap = 0.283 m2
Ak = 0.628 m Ak = 0.942 m Ak = 1.257 m Ak = 1.571 m Ak = 1.885 m
S-04/ STA 50+460
Keda D = 20 cm D = 30 cm D = 40 cm D = 50 cm D = 60 cm
laman CR TSF CR-r QP Qs Qi CR-r QP Qs Qi CR-r QP Qs Qi CR-r QP Qs Qi CR-r QP Qs Qi
(m) (Kg/Cm2) (Kg/Cm) (Kg/Cm2) (ton) (ton) (ton) (Kg/Cm2) (ton) (ton) (ton) (Kg/Cm2) (ton) (ton) (ton) (Kg/Cm2) (ton) (ton) (ton) (Kg/Cm2) (ton) (ton) (ton)
0.00 0 0 - - - - - - - - - - - - - - - - - - - -
0.20 6 4 - - - - - - - - - - - - - - - - - - - -
0.40 18 16 - - - - - - - - - - - - - - - - - - - -
0.60 36 26 - - - - - - - - - - - - - - - - - - - -
0.80 48 38 - - - - - - - - - - - - - - - - - - - -
1.00 72 54 83.00 26.08 1.01 8.89 93.33 65.97 1.51 22.29 101.88 128.02 2.01 43.08 110.20 216.38 2.51 72.63 118.42 334.82 3.02 112.21
1.20 80 70 82.25 25.84 2.01 9.02 87.08 61.56 3.02 21.12 91.00 114.35 4.02 38.92 95.30 187.12 5.03 63.38 99.38 280.98 6.03 94.87
1.40 86 88 89.00 27.96 3.14 9.95 93.25 65.91 4.71 22.91 97.38 122.37 6.28 42.04 101.45 199.20 7.85 67.97 105.38 297.94 9.42 101.20
1.60 94 106 95.54 30.02 4.27 10.86 99.17 70.10 6.41 24.65 103.42 129.96 8.55 45.03 107.42 210.91 10.68 72.44 111.04 313.96 12.82 107.22
1.80 110 128 101.88 32.00 5.65 11.80 105.67 74.69 8.48 26.59 109.56 137.68 11.31 48.16 113.35 222.56 14.14 77.01 116.83 330.34 16.96 113.51
2.00 118 148 110.00 34.56 6.91 12.90 112.20 79.31 10.37 28.51 116.14 145.94 13.82 51.41 119.65 234.93 17.28 81.77 122.91 347.52 20.73 119.99
2.20 125 168 118.75 37.31 8.17 14.07 118.42 83.70 12.25 30.35 122.23 153.60 16.34 54.47 125.67 246.75 20.42 86.33 128.58 363.56 24.50 126.09
2.40 130 190 127.50 40.06 9.55 15.26 126.75 89.59 14.33 32.73 128.05 160.92 19.10 57.46 131.23 257.67 23.88 90.66 134.22 379.50 28.65 132.23
2.60 137 212 136.13 42.76 10.93 16.44 134.75 95.25 16.40 35.03 133.75 168.08 21.87 60.40 136.49 267.99 27.33 94.80 139.56 394.60 32.80 138.09
2.80 150 236 143.88 45.20 12.44 17.55 142.75 100.90 18.66 37.37 141.19 177.42 24.88 64.12 141.89 278.60 31.10 99.09 143.34 405.29 37.32 142.56
3.00 156 260 151.13 47.48 13.95 18.62 150.67 106.50 20.92 39.68 148.38 186.45 27.90 67.73 147.10 288.83 34.87 103.25 147.10 415.92 41.85 147.01
3.20 163 284 158.25 49.72 15.46 19.66 157.42 111.27 23.18 41.73 155.88 195.88 30.91 71.48 152.86 300.13 38.64 107.77 150.74 426.20 46.37 151.34
3.40 172 310 165.63 52.03 17.09 20.76 163.83 115.81 25.64 43.73 163.13 204.99 34.18 75.17 158.51 311.24 42.73 112.29 154.27 436.19 51.27 155.65
3.60 176 334 172.38 54.15 18.60 21.77 170.58 120.58 27.90 45.77 168.29 211.49 37.20 77.93 164.11 322.22 46.50 116.71 159.73 451.63 55.79 161.70
3.80 182 362 178.00 55.92 20.36 22.71 177.25 125.29 30.54 47.87 173.31 217.79 40.72 80.74 169.60 333.01 50.89 121.18 165.13 466.88 61.07 167.84
4.00 189 390 184.25 57.88 22.12 23.72 182.35 128.90 33.18 49.60 178.23 223.96 44.23 83.50 174.55 342.73 55.29 125.30 170.48 482.01 66.35 173.94
4.20 191 420 190.13 59.73 24.00 24.71 186.75 132.01 36.00 51.20 183.06 230.04 48.00 86.28 179.25 351.96 60.00 129.32 175.58 496.45 72.01 179.88
4.40 195 450 194.08 60.97 25.89 25.50 191.25 135.19 38.83 52.83 188.02 236.27 51.77 89.11 184.13 361.54 64.72 133.46 180.54 510.47 77.66 185.69
4.60 206 474 198.63 62.40 27.39 26.28 196.08 138.60 41.09 54.42 193.00 242.53 54.79 91.80 189.55 372.18 68.49 137.76 185.92 525.67 82.18 191.66
4.80 210 504 202.63 63.66 29.28 27.07 199.92 141.31 43.92 55.89 197.13 247.71 58.56 94.28 194.00 380.92 73.20 141.61 190.29 538.04 87.84 196.91

Project : CORE TEAM PERENCANAAN DAN PENGAWASAN PROVINSI ACEH (PAKET -11/2022) PROVINSI ACEH

Location : N.022 BATAS ACEH TENGAH/ GAYO LUES - BLANG KEJEREN, PROVINSI ACEH

DDT Sondir
Tabel 4.2. - Daya Dukung Izin Pondasi Dangkal Dari Hasil Pengujian Sondir

S-04/ STA 50+460


Kedalaman
CR Qi
(m) (Kg/Cm2) (T/m2)
0.00 0 0.00
0.20 6 2.00
0.40 18 6.00
0.60 36 12.00
0.80 48 16.00
1.00 72 24.00
1.20 80 26.67
1.40 86 28.67
1.60 94 31.33
1.80 110 36.67
2.00 118 39.33
2.20 125 41.67
2.40 130 43.33
2.60 137 45.67
2.80 150 50.00
3.00 156 52.00
3.20 163 54.33
3.40 172 57.33
3.60 176 58.67
3.80 182 60.67
4.00 189 63.00
4.20 191 63.67
4.40 195 65.00
4.60 206 68.67
4.80 210 70.00
5.00
DOCUMENTATIONS
PROJECT : CORE TEAM PERENCANAAN DAN PENGAWASAN PROVINSI ACEH (PAKET -11/2022) PROVINSI ACEH
LOCATION : STA 29+385 N.039 LIPAT KAJANG - BATAS PROVINSI SUMUT
PROVINSI : ACEH
DOCUMENTATIONS
PROJECT : CORE TEAM PERENCANAAN DAN PENGAWASAN PROVINSI ACEH (PAKET -11/2022) PROVINSI ACEH
LOCATION : STA 29+385 N.039 LIPAT KAJANG - BATAS PROVINSI SUMUT
PROVINSI : ACEH
DOCUMENTATIONS
PROJECT : CORE TEAM PERENCANAAN DAN PENGAWASAN PROVINSI ACEH (PAKET -11/2022) PROVINSI ACEH
LOCATION : STA 29+385 N.039 LIPAT KAJANG - BATAS PROVINSI SUMUT
PROVINSI : ACEH
DOCUMENTATIONS
PROJECT : CORE TEAM PERENCANAAN DAN PENGAWASAN PROVINSI ACEH (PAKET -11/2022) PROVINSI ACEH
LOCATION : STA 67+500 N.020 SIMPANG UNING ( BATAS. KOTA TAKENGON ) UWAQ (KM.379)
PROVINSI : ACEH
DOCUMENTATIONS
PROJECT : CORE TEAM PERENCANAAN DAN PENGAWASAN PROVINSI ACEH (PAKET -11/2022) PROVINSI ACEH
LOCATION : STA 67+500 N.020 SIMPANG UNING ( BATAS. KOTA TAKENGON ) UWAQ (KM.379)
PROVINSI : ACEH
DOCUMENTATIONS
PROJECT : CORE TEAM PERENCANAAN DAN PENGAWASAN PROVINSI ACEH (PAKET -11/2022) PROVINSI ACEH
LOCATION : STA 67+500 N.020 SIMPANG UNING ( BATAS. KOTA TAKENGON ) UWAQ (KM.379)
PROVINSI : ACEH
DOCUMENTATIONS
PROJECT : CORE TEAM PERENCANAAN DAN PENGAWASAN PROVINSI ACEH (PAKET -11/2022) PROVINSI ACEH
LOCATION : STA 67+500 N.020 SIMPANG UNING ( BATAS. KOTA TAKENGON ) UWAQ (KM.379)
PROVINSI : ACEH
DOCUMENTATIONS
PROJECT : CORE TEAM PERENCANAAN DAN PENGAWASAN PROVINSI ACEH (PAKET -11/2022) PROVINSI ACEH
LOCATION : STA 67+500 N.020 SIMPANG UNING ( BATAS. KOTA TAKENGON ) UWAQ (KM.379)
PROVINSI : ACEH
DOCUMENTATIONS
PROJECT : CORE TEAM PERENCANAAN DAN PENGAWASAN PROVINSI ACEH (PAKET -11/2022) PROVINSI ACEH
LOCATION : STA 67+500 N.020 SIMPANG UNING ( BATAS. KOTA TAKENGON ) UWAQ (KM.379)
PROVINSI : ACEH
DOCUMENTATIONS
PROJECT : CORE TEAM PERENCANAAN DAN PENGAWASAN PROVINSI ACEH (PAKET -11/2022) PROVINSI ACEH
LOCATION : STA 75+500 N.201. UWAQ (KM.379) - BATAS ACEH TENGAH/GAYO LUES
PROVINSI : ACEH
DOCUMENTATIONS
PROJECT : CORE TEAM PERENCANAAN DAN PENGAWASAN PROVINSI ACEH (PAKET -11/2022) PROVINSI ACEH
LOCATION : STA 75+500 N.201. UWAQ (KM.379) - BATAS ACEH TENGAH/GAYO LUES
PROVINSI : ACEH
DOCUMENTATIONS
PROJECT : CORE TEAM PERENCANAAN DAN PENGAWASAN PROVINSI ACEH (PAKET -11/2022) PROVINSI ACEH
LOCATION : STA 75+500 N.201. UWAQ (KM.379) - BATAS ACEH TENGAH/GAYO LUES
PROVINSI : ACEH
DOCUMENTATIONS
PROJECT : CORE TEAM PERENCANAAN DAN PENGAWASAN PROVINSI ACEH (PAKET -11/2022) PROVINSI ACEH
LOCATION : STA 75+500 N.201. UWAQ (KM.379) - BATAS ACEH TENGAH/GAYO LUES
PROVINSI : ACEH
DOCUMENTATIONS
PROJECT : CORE TEAM PERENCANAAN DAN PENGAWASAN PROVINSI ACEH (PAKET -11/2022) PROVINSI ACEH
LOCATION : STA 75+500 N.201. UWAQ (KM.379) - BATAS ACEH TENGAH/GAYO LUES
PROVINSI : ACEH
DOCUMENTATIONS
PROJECT : CORE TEAM PERENCANAAN DAN PENGAWASAN PROVINSI ACEH (PAKET -11/2022) PROVINSI ACEH
LOCATION : STA 75+500 N.201. UWAQ (KM.379) - BATAS ACEH TENGAH/GAYO LUES
PROVINSI : ACEH
DOCUMENTATIONS
PROJECT : CORE TEAM PERENCANAAN DAN PENGAWASAN PROVINSI ACEH (PAKET -11/2022) PROVINSI ACEH
LOCATION : STA 32+215 N.022 BATAS ACEH TENGAH/GAYO LUES - BLANGKEJEREN
PROVINSI : ACEH
DOCUMENTATIONS
PROJECT : CORE TEAM PERENCANAAN DAN PENGAWASAN PROVINSI ACEH (PAKET -11/2022) PROVINSI ACEH
LOCATION : STA 32+215 N.022 BATAS ACEH TENGAH/GAYO LUES - BLANGKEJEREN
PROVINSI : ACEH
DOCUMENTATIONS
PROJECT : CORE TEAM PERENCANAAN DAN PENGAWASAN PROVINSI ACEH (PAKET -11/2022) PROVINSI ACEH
LOCATION : STA 32+215 N.022 BATAS ACEH TENGAH/GAYO LUES - BLANGKEJEREN
PROVINSI : ACEH
DOCUMENTATIONS
PROJECT : CORE TEAM PERENCANAAN DAN PENGAWASAN PROVINSI ACEH (PAKET -11/2022) PROVINSI ACEH
LOCATION : STA 32+215 N.022 BATAS ACEH TENGAH/GAYO LUES - BLANGKEJEREN
PROVINSI : ACEH
DOCUMENTATIONS
PROJECT : CORE TEAM PERENCANAAN DAN PENGAWASAN PROVINSI ACEH (PAKET -11/2022) PROVINSI ACEH
LOCATION : STA 32+215 N.022 BATAS ACEH TENGAH/GAYO LUES - BLANGKEJEREN
PROVINSI : ACEH
DOCUMENTATIONS
PROJECT : CORE TEAM PERENCANAAN DAN PENGAWASAN PROVINSI ACEH (PAKET -11/2022) PROVINSI ACEH
LOCATION : STA 32+215 N.022 BATAS ACEH TENGAH/GAYO LUES - BLANGKEJEREN
PROVINSI : ACEH
DOCUMENTATIONS
PROJECT : CORE TEAM PERENCANAAN DAN PENGAWASAN PROVINSI ACEH (PAKET -11/2022) PROVINSI ACEH
LOCATION : STA 26+940 N.043 BATAS BIREUN/BENER MERIAH - BATAS BENER MERIAH/ACEH TENGAH
PROVINSI : ACEH
DOCUMENTATIONS
PROJECT : CORE TEAM PERENCANAAN DAN PENGAWASAN PROVINSI ACEH (PAKET -11/2022) PROVINSI ACEH
LOCATION : STA 26+940 N.043 BATAS BIREUN/BENER MERIAH - BATAS BENER MERIAH/ACEH TENGAH
PROVINSI : ACEH
DOCUMENTATIONS
PROJECT : CORE TEAM PERENCANAAN DAN PENGAWASAN PROVINSI ACEH (PAKET -11/2022) PROVINSI ACEH
LOCATION : STA 26+940 N.043 BATAS BIREUN/BENER MERIAH - BATAS BENER MERIAH/ACEH TENGAH
PROVINSI : ACEH
DOCUMENTATIONS
PROJECT : CORE TEAM PERENCANAAN DAN PENGAWASAN PROVINSI ACEH (PAKET -11/2022) PROVINSI ACEH
LOCATION : STA 10+900 N.037.2 KOTA SUBULUSSALAM - BATAS PROVINSI SUMUT
PROVINSI : ACEH
DOCUMENTATIONS
PROJECT : CORE TEAM PERENCANAAN DAN PENGAWASAN PROVINSI ACEH (PAKET -11/2022) PROVINSI ACEH
LOCATION : STA 10+900 N.037.2 KOTA SUBULUSSALAM - BATAS PROVINSI SUMUT
PROVINSI : ACEH
DOCUMENTATIONS
PROJECT : CORE TEAM PERENCANAAN DAN PENGAWASAN PROVINSI ACEH (PAKET -11/2022) PROVINSI ACEH
LOCATION : STA 10+900 N.037.2 KOTA SUBULUSSALAM - BATAS PROVINSI SUMUT
PROVINSI : ACEH
DOCUMENTATIONS
PROJECT : CORE TEAM PERENCANAAN DAN PENGAWASAN PROVINSI ACEH (PAKET -11/2022) PROVINSI ACEH
LOCATION : STA 15+050 N.044 GENTING GERBANG - CEULALA. BATAS ACEH TENGAH/NAGAN RAYA
PROVINSI : ACEH
DOCUMENTATIONS
PROJECT : CORE TEAM PERENCANAAN DAN PENGAWASAN PROVINSI ACEH (PAKET -11/2022) PROVINSI ACEH
LOCATION : STA 15+050 N.044 GENTING GERBANG - CEULALA. BATAS ACEH TENGAH/NAGAN RAYA
PROVINSI : ACEH
DOCUMENTATIONS
PROJECT : CORE TEAM PERENCANAAN DAN PENGAWASAN PROVINSI ACEH (PAKET -11/2022) PROVINSI ACEH
LOCATION : STA 15+050 N.044 GENTING GERBANG - CEULALA. BATAS ACEH TENGAH/NAGAN RAYA
PROVINSI : ACEH
DOCUMENTATIONS
PROJECT : CORE TEAM PERENCANAAN DAN PENGAWASAN PROVINSI ACEH (PAKET -11/2022) PROVINSI ACEH
LOCATION : STA 50+460 N.022 BATAS ACEH TENGAH/GAYO LUES - BLANGKEJEREN
PROVINSI : ACEH
DOCUMENTATIONS
PROJECT : CORE TEAM PERENCANAAN DAN PENGAWASAN PROVINSI ACEH (PAKET -11/2022) PROVINSI ACEH
LOCATION : STA 50+460 N.022 BATAS ACEH TENGAH/GAYO LUES - BLANGKEJEREN
PROVINSI : ACEH
DOCUMENTATIONS
PROJECT : CORE TEAM PERENCANAAN DAN PENGAWASAN PROVINSI ACEH (PAKET -11/2022) PROVINSI ACEH
LOCATION : STA 50+460 N.022 BATAS ACEH TENGAH/GAYO LUES - BLANGKEJEREN
PROVINSI : ACEH
DOCUMENTATIONS
PROJECT : CORE TEAM PERENCANAAN DAN PENGAWASAN PROVINSI ACEH (PAKET -11/2022) PROVINSI ACEH
LOCATION : STA 26+940 N.043 BATAS BIREUN/BENER MERIAH - BATAS BENER MERIAH/ACEH TENGAH
PROVINSI : ACEH
DOCUMENTATIONS
PROJECT : CORE TEAM PERENCANAAN DAN PENGAWASAN PROVINSI ACEH (PAKET -11/2022) PROVINSI ACEH
LOCATION : STA 26+940 N.043 BATAS BIREUN/BENER MERIAH - BATAS BENER MERIAH/ACEH TENGAH
PROVINSI : ACEH
DOCUMENTATIONS
PROJECT : CORE TEAM PERENCANAAN DAN PENGAWASAN PROVINSI ACEH (PAKET -11/2022) PROVINSI ACEH
LOCATION : STA 26+940 N.043 BATAS BIREUN/BENER MERIAH - BATAS BENER MERIAH/ACEH TENGAH
PROVINSI : ACEH
DOCUMENTATIONS
PROJECT : CORE TEAM PERENCANAAN DAN PENGAWASAN PROVINSI ACEH (PAKET -11/2022) PROVINSI ACEH
LOCATION : STA 10+900 N.037.2 KOTA SUBULUSSALAM - BATAS PROVINSI SUMUT
PROVINSI : ACEH
DOCUMENTATIONS
PROJECT : CORE TEAM PERENCANAAN DAN PENGAWASAN PROVINSI ACEH (PAKET -11/2022) PROVINSI ACEH
LOCATION : STA 10+900 N.037.2 KOTA SUBULUSSALAM - BATAS PROVINSI SUMUT
PROVINSI : ACEH
DOCUMENTATIONS
PROJECT : CORE TEAM PERENCANAAN DAN PENGAWASAN PROVINSI ACEH (PAKET -11/2022) PROVINSI ACEH
LOCATION : STA 10+900 N.037.2 KOTA SUBULUSSALAM - BATAS PROVINSI SUMUT
PROVINSI : ACEH
DOCUMENTATIONS
PROJECT : CORE TEAM PERENCANAAN DAN PENGAWASAN PROVINSI ACEH (PAKET -11/2022) PROVINSI ACEH
LOCATION : STA 15+050 N.044 GENTING GERBANG - CEULALA. BATAS ACEH TENGAH/NAGAN RAYA
PROVINSI : ACEH
DOCUMENTATIONS
PROJECT : CORE TEAM PERENCANAAN DAN PENGAWASAN PROVINSI ACEH (PAKET -11/2022) PROVINSI ACEH
LOCATION : STA 15+050 N.044 GENTING GERBANG - CEULALA. BATAS ACEH TENGAH/NAGAN RAYA
PROVINSI : ACEH
DOCUMENTATIONS
PROJECT : CORE TEAM PERENCANAAN DAN PENGAWASAN PROVINSI ACEH (PAKET -11/2022) PROVINSI ACEH
LOCATION : STA 15+050 N.044 GENTING GERBANG - CEULALA. BATAS ACEH TENGAH/NAGAN RAYA
PROVINSI : ACEH
DOCUMENTATIONS
PROJECT : CORE TEAM PERENCANAAN DAN PENGAWASAN PROVINSI ACEH (PAKET -11/2022) PROVINSI ACEH
LOCATION : STA 50+460 N.022 BATAS ACEH TENGAH/GAYO LUES - BLANGKEJEREN
PROVINSI : ACEH
DOCUMENTATIONS
PROJECT : CORE TEAM PERENCANAAN DAN PENGAWASAN PROVINSI ACEH (PAKET -11/2022) PROVINSI ACEH
LOCATION : STA 50+460 N.022 BATAS ACEH TENGAH/GAYO LUES - BLANGKEJEREN
PROVINSI : ACEH
DOCUMENTATIONS
PROJECT : CORE TEAM PERENCANAAN DAN PENGAWASAN PROVINSI ACEH (PAKET -11/2022) PROVINSI ACEH