Anda di halaman 1dari 1

SENGKANG PLAT 40 x 4 mm

NOK 8/12 RENG 2/3 KUDA-KUDA 8/12 PEMERINTAH DAERAH PROVINSI SULAWESI TENGAH
GENTENG BAJA HAK ANGIN 2 x 5/10 DINAS CIPTA KARYA DAN SUMBER DAYA AIR
GORDING 6/12 Jl. Prof. Yamin No. 33 Telp. (0451) 421141 - 426455 Fax. (0451) 421141 Palu - 94112

+ 5.60 + 5.60
GAPIT 2 x 5/10
Kegiatan :
+ 4.70 PENGELOLAAN DAN PENGEMBANGAN
KUDA-KUDA 8/12 SISTEM PENYEDIAAN AIR MINUM (SPAM)
LINTAS KABUPATEN/KOTA

Lokasi :
+ 3.20 Lisplank 2 x 2/20
+ 3.20
KOTA PALU
PLAFOND + 3.00 PLAFOND + 3.00

Pekerjaan :
PERENCANAAN DED SPAM
HUNTAP PETOBO
KEC. PALU SELATAN KOTA PALU
SLO0F 15/20
SAL. AIR HUJAN SAL. AIR HUJAN Mengetahui :
KEPALA BIDANG
- 0.30 - 0.30 AIR MINUM PENYEHATAN LINGKUNGAN
( AMPL )

1.00 3.00 3.00 1.00 10 50 10 25


6.00 1.50 5.50 1.00 SURYA FIBRIANTI ST, MM
NIP. 19770206 200604 2 005
Menyetujui :

POTONGAN A - A POTONGAN B - B KEPALA SEKSI


PERENCANAAN TEKNIS AIR MINUM DAN
SKALA 1 : 100 SKALA 1 : 100 PENYEHATAN LINGKUNGAN PERMUKIMAN

7.00 JOENI RETNOWATI, ST.,


NIP. 19720001 200212 2 005
1.00 1.50 2.50 3.00 1.00
Diperiksa :
PEJABAT PELAKSANA TEKNIS KEGIATAN

Ir. TEGUH HARYONO, ST, MM


NIP. 19710327 199703 1 005
SENGKANG PLAT40 x 4 mm
NOK 8/12 RENG 2/3 Konsultan Perencana :
GENTENG BAJA PT. BINA KARYA TIYASA
GORDING 6/12 ENTERNIT
+ 4.00
100 x 100 Cm
+ 3.20 Lisplank 2 x 2/20

8.15
ANDI ISMANTO, A.Md
PLAFOND + 3.00 Direktur
KASO
5/7 - 50 Cm Budiartho Saada , ST, MT
Team Leader
KASO Ir. Ali Abdullah, MT
5/7 - 100 Cm Ahli Teknik Sumber Daya Air
SAL. AIR HUJAN
Estiworo Kusumaningtyas, ST
- 0.30 Ahli Teknik Lingkungan
Suyono Suratman, ST
Ahli K3 Konstruksi
Nama Gambar Skala
1.00 2.00 1.00 1.00 3.00 3.00 1.00
BANGUNAN
6.00 RUMAH JAGA
TAMPAK 1 : 100
POTONGAN C - C DENAH RENCANA PLAFOND
SKALA 1 : 100 SKALA 1 : 100 Kode Lbr. No. Lbr. Jumlah Lbr.

RJ 02 04

Anda mungkin juga menyukai