Bubungan
Nok 8/12
Papan Reuter 2/20
Tiang Kuda-Kuda 8/12
Plat Strip
Balok Sokong
Gapit 8/12
Gording 8/12
Tupai-Tupai +5.62
30°
Balok Tarik 8/12
Beugel
Kaki Kuda-Kuda
Ring Balk 15/15 Sudut Atap +4.45
Murplat 8/12
Usuk 5/7
Rangka Atap
Reng 3/4 +3.50
Lipslank 2/20
PLAFOND PLAFOND
+2.80
KALSIBOARD GYPSUM
PLAFOND PLAFOND
9 mm 9 mm PLAFOND GYPSUM
GYPSUM GYPSUM
+2.80 +3.00 9 mm
9 mm 9 mm
+2.80 +2.80
+2.80
+2.06
Sloof 15/20
+1.51
2.24
pas. Tembok
Tanah Urug
TERAS RUANG TAMU K. MANDI
HALAMAN DEPAN
-0.15
-0.03 ±0.00 -0.05
HALAMAN BELAKANG
-0.15
pas. Trasram
Sloof 15/20
±0.00
MUKA TANAH -0.30
Rollag Batu Kali
Anstampang
-1.20
0.30
0.70
0.90
1 2 3 5 6 8 9
SKALA 1 : 100