PEMBANGUNAN MESJID
I PEK. PERSIAPAN
1 Pengukuran ls 1,00 500.000 500.000,00
2 Pembuangan Puing m3 35,19 50.000
4 Perataan tanah + pemadatan m3 15,84 35.750 566.119,13
SUB TOTAL 1.066.119,13
MEKANIKAL
13 Tang tegak PVC 4 in + asesories M1 96,00 90.962 8.732.352,00
14 Pipa air bersih PVC 1. 1/2 in M1 45,00 69.430 3.124.350,00
15 Pipa air bersih PVC 1/2 in M1 45,00 21.500 967.500,00
16 kran Wudlu type kotak BH 12,00 125.000 1.500.000,00
17 kran biasa BH 4,00 78.470 313.880,00
18 PVC 3 in pipa air kotor M1 20,00 63.020 1.260.400,00
19 PVC 4 in pipa air kotor ke septik tank M1 16,00 82.370 1.317.920,00
20 Septik tank + sumur resapan UNIT 1,00 5.500.000 5.500.000,00
21 Tangki air bersih 2000 ltr UNIT 1,00 3.200.000 3.200.000,00
22 Pompa Jetpump 350 watt UNIT 1,00 7.629.210 7.629.210,00
23 Pompa trnsfer 100 watt UNIT 1,00 1.540.000 1.540.000,00
35.085.612,00
XII PEK. LUAR BANGUNAN
1 Saluran keliling Uk. 30x40 cm, m1 48,00 191.970 9.214.560,00
2 Cor Bibir saluran m1 22,00 85.750 1.886.500,00
3 Bak kontrol 30x30 + Tutup bh 6,00 617.380 3.704.280,00
14.805.340,00
XIII PEK. TAMAN
1 Pasang Rumput di area masjid M2 75,00 12.500 937.500,00
2 Pohon + bunga M2 15,00 15.000 225.000,00
3 Palm T= 5 m M2 14,00 250.000 3.500.000,00
4 Steping injakan M1 45,00 75.500 3.397.500,00
5 Kansteen pembatas / botolan M1 37,13 181.790 6.748.953,75
14.808.953,75
TOTAL ( Rp ) 1.099.262.010,64
TOTAL (Rp) 1.099.262.010,64
Dibulatkan (Rp) 1.099.262.000,00
Sistem Pembayaran untuk Pekerjaan Pengecatan Kantor ini, Menjadi 3 Tahapan Sebagai Berikut :
1. Down Payment (DP) Progres 0%-30% 329.778.600,00
2. Termin I (progress 30-60% 439.704.800,00
3. Termin II (progress 60-100% 329.778.600,00
* Apabila didapati perubahan ukuran, gambar/spesifikasi bahan bangunan yang ada di lapangan
tidak sesuai dengan rencana kami, maka dilakukan penawaran ulang.
Demikian penawaran yang kami ajukan, atas perhatian dan kerja samanya, kami ucapkan terima
kasih
Hormat Kami,
RASIDI