NIM : D111201062
TUGAS BESAR 1
= 3.728.600 ton
= 45.950.200 bcm
Fasilitas untuk mengatasi batubara = 5 + (0,01 × 2) = USD 5.020.000 (USD 5.02 milion)
= 372.860 ton/tahun
= 4.595.020 bcm/tahun
= USD 10.480.535,31
Penerimaan dari ICI1 = 372.860 × 5% = 18.643
= USD 1.500.388,64
= USD 3.832.255,08
= USD 2.081.304,52
= USD 227.021,41
= USD 1.885.180,16
----------------------------------------------------------------------------------------------------