Anda di halaman 1dari 1

35 1 A

1
7 2 B
10,5 10,5

3 9
10
4
11
5
12

13

14

6 15

16

17 B
POTONGAN PANDANGAN
B-B DEPAN

A
ASSEMBLING
POTONGAN
A-A P . DEPAN
11
8 C 4
F
14 E G
3 3

57,23 POTONGAN
F-F P. POTONGAN
POTONGAN P . DEPAN DEPAN G-G P . DEPAN
E-E

C
15

POTONGAN P . DEPAN 13
C-C
56.5

16 15
6
9

5 P . DEPAN P . SAMPING P . DEPAN P . SAMPING


H
14

P . SAMPING
15
4.8
P . DEPAN
H
17 6 Baut AISI 1010
POTONGAN
P.DEPAN 12 16 8 Paku Keling SC 30
H-H
P . ATAS 17 I Pegas Matahari
14 15 1 SUP 4
14 1 Naaf S55C-D JIS G 4501
13 1 Poros S55C-D JIS G 4501
7
P . DEPAN P . SAMPING 12 1 Bantalan Aksial SUP 4
16
11 1 Plat Pembawah S55C-D JIS G 4501
I 10 4 Pegas SOS 302
POTONGAN Paku Keling
9 16 AISI 1010
P . ATAS 3 I-I P.DEPAN
8 1 Plat Pembebas S55C-D JIS G 4501
7 6 Baut AISI 1050
16
6 6 Paku Keling AISI 1010
J J 5 1 Bantalan Radial SUP 4
P . ATAS 9
8 13,5 4 1 Plat Pembawah S55C-D JIS G 4501
P . DEPAN P . SAMPING 6
P . ATAS 7
3 6 Baut AISI 1010
P . DEPAN P . SAMPING
10 2 1 Plat Gesek Asbes
D
POTONGAN 1 1 Flywhell S55C-D JIS G 4501
POTONGAN J-J
P . DEPAN
D-D 6
P . DEPAN P . SAMPING NO JUMLAH NAMA BAHAN NORMALISASI KETERANGAN
SKALA : 1:2 DI GAMBAR : Gunawan Prasetiyo P : 107 Ps
SATUAN : mm NPM : 19013002
P . DEPAN N : 6000 Rpm
TANGGAL : 08-04-2021 DILIHAT : T. Jukdin S. M,eng
STUDIO GAMBAR MESIN
FAKULTAS TEKNIK KOPLING A3

Anda mungkin juga menyukai