P.1 P.2
P.0 P.3
P.4
P.5
P.6
P.7
P.8 P.9
P.10
P.11
SAL. PRIMER PE
TERONGAN
SITUASI
0 50 100 150 200 m
SKALA 1 : 2000
Bidang persamaan
+ 43.00
PATOK HEKTOMETER
NOMO PROFIL P.0 P.1 P.2 P.3 P.4 P.5 P.6 P.7 P.8 P.9 P.10 P.11
JARAK PROFIL
JARAK LANGSUNG
ELEVASI TANGGUL KIRI
YANG ADA
ELEVASI TANGGUL
ELEVASI MUKA AIR RENCANA
RENCANA
TRACE SALURAN
TIPE BANGUNAN
DIMENSI SALURAN Q b h
v i k Q = 4.186 m3 / dt. b = 4.50 m h = 1.400 m/dt v = 0.666 m/dt i = 0.000110 k = 70 m=0 w = 1.00 m Q = 4.157 m3 / dt. b = 4.50 m h = 1.400 m v = 0.659 m/dt i = 0.000108 k = 70 m=0 w = 1.00 m
DAN DATA TAMBAHAN m w
POTONGAN MEMANJANG
LEGENDA :
P.1
3
0
P.2
SA
L. P
P.1
4
RIM
ER 9
PE
TE P.1
RO
NG P.1
AN 5
8
P.1
P.1
6
P.17
SITUASI
0 50 100 150 200 m
SKALA 1 : 2000
Bidang persamaan
+ 42.00
PATOK HEKTOMETER
NOMO PROFIL P.11 P.12 P.13 P.14 P.15 P.16 P.17 P.18 P.19 P.20 P.21 P.22
JARAK PROFIL
JARAK LANGSUNG
ELEVASI TANGGUL KIRI
YANG ADA
ELEVASI TANGGUL
ELEVASI MUKA AIR RENCANA
RENCANA
TRACE SALURAN
TIPE BANGUNAN
DIMENSI SALURAN Q = 3.064 m 3 / dt. b = 4.50 m h = 1.300 m v = 0.526 m/dt Q = 2.832 m3 / dt. b = 4.50 m h = 1.100 m v = 0.572 m/dt i = 0.000100 k = 70 m=0 w = 1.00 m
DAN DATA TAMBAHAN i = 0.000073 k = 70 m=0 w = 1.00 m
POTONGAN MEMANJANG
LEGENDA :
6 P.2
U P.2 SA
L. P 8
RIM
E RP
ET P.2
ER 9
5 ON
GA
P.2 N
P.
4 30
P.2
P.
3 31
P.2
SITUASI P.3
2 2
P.2 0 50 100 150 200 m
SKALA 1 : 2000
P.3
3
Bidang persamaan
+ 42.00
PATOK HEKTOMETER
NOMO PROFIL P.22 P.23 P.24 P.25 P.26 P.27 P.28 P.29 P.30 P.31 P.32 P.33
JARAK PROFIL
JARAK LANGSUNG
ELEVASI TANGGUL KIRI
YANG ADA
ELEVASI TANGGUL
ELEVASI MUKA AIR RENCANA
RENCANA
TRACE SALURAN
TIPE BANGUNAN
POTONGAN MEMANJANG
LEGENDA :
P.33 P.34 P.35 P.36 P.37 P.38 P.39 P.40 P.41 P.42 P.43
P.44
SAL. PRIMER PETERONGAN
SITUASI
0 50 100 150 200 m
SKALA 1 : 2000
Bidang persamaan
+ 41.00
PATOK HEKTOMETER
NOMO PROFIL P.33 P.34 P.35 P.36 P.37 P.38 P.39 P.40 P.41 P.42 P.43 P.44
JARAK PROFIL
JARAK LANGSUNG
ELEVASI TANGGUL KIRI
YANG ADA
ELEVASI TANGGUL
ELEVASI MUKA AIR RENCANA
RENCANA
TRACE SALURAN
TIPE BANGUNAN
DIMENSI SALURAN
Q = 2.680 m3 / dt. b = 3.50 m h = 1.250 m v = 0.613 m/dt i = 0.000117 k = 70 m=0 w = 1.00 m Q = 2.472 m3 / dt. b = 3.50 m h = 1.250 m v = 0.564 m/dt i = 0.000994 k = 70 m=0 w = 1.00 m
DAN DATA TAMBAHAN
Q = 2.536 m3 / dt.
POTONGAN MEMANJANG b = 3.50 m
LEGENDA : h = 1.250 m
v = 0.580 m/dt
i = 0.000105
Bangunan Sadap Saluran Primer
k = 70
Penguras Saluran Tersier m=0 SITUASI DAN POTONGAN MEMANJANG
w = 1.00 m SALURAN PRIMER PETERONGAN
Talang Saluran Pembuang P.33 S/D P.44
:
Bangunan Siphon Kampung / Desa
:
P.0 P.4
GALIAN = - m2 GALIAN = 1.63 m2
TIMBUNAN = - m2 TIMBUNAN = 27.06 m 2
P.1 P.5
GALIAN = 4.74 m2 GALIAN = - m2
TIMBUNAN = 18.74 m 2 TIMBUNAN = - m2
P.2 P.6
GALIAN = 1.00 m2 GALIAN = 3.68 m2
TIMBUNAN = 29.18 m 2 TIMBUNAN = 21.36 m 2
P.3 P.7
POTONGAN MELINTANG
SALURAN PRIMER PETERONGAN
P.0 S/D P.7
:
:
V
0 2.0 4.0 6.0 8.0 10.0 m PPK PERENCANAAN DAN PROGRAM PENGARAH DIREKSI
H SKALA
GALIAN = - m2 GALIAN = 4.47 m2
TIMBUNAN = - m2 TIMBUNAN = 19.45 m 2
P.8 P.13
P.9 P.14
P.10 P.15
P.12 P.16
POTONGAN MELINTANG
SALURAN PRIMER PETERONGAN
P.8 S/D P.16
:
:
V
0 2.0 4.0 6.0 8.0 10.0 m PPK PERENCANAAN DAN PROGRAM PENGARAH DIREKSI
H SKALA
GALIAN = 1.66 m2 GALIAN = 3.40 m2
TIMBUNAN = 25.90 m 2 TIMBUNAN = 21.87 m 2
P.17 P.21
GALIAN = - m2 GALIAN = - m2
TIMBUNAN = 39.23 m 2 TIMBUNAN = - m2
P.18 P.22
P.19 P.23
P.20 P.24
POTONGAN MELINTANG
SALURAN PRIMER PETERONGAN
P.17 S/D P.24
:
:
V
0 2.0 4.0 6.0 8.0 10.0 m PPK PERENCANAAN DAN PROGRAM PENGARAH DIREKSI
H SKALA
GALIAN = - m2 GALIAN = - m2
TIMBUNAN = - m2 TIMBUNAN = 29.72 m 2
P.25 P.29
P.26 P.30
P.27 P.31
P.28 P.32
POTONGAN MELINTANG
SALURAN PRIMER PETERONGAN
P.25 S/D P.32
:
:
V
0 2.0 4.0 6.0 8.0 10.0 m PPK PERENCANAAN DAN PROGRAM PENGARAH DIREKSI
H SKALA
GALIAN = 1.05 m2 GALIAN = - m2
TIMBUNAN = 24.13 m 2 TIMBUNAN = 30.96 m 2
P.33 P.37
GALIAN = - m2 GALIAN = - m2
TIMBUNAN = 27.75 m 2 TIMBUNAN = 30.65 m 2
P.34 P.38
GALIAN = - m2 GALIAN = - m2
TIMBUNAN = 27.33 m 2 TIMBUNAN = 37.05 m 2
P.35 P.39
P.36 P.40
POTONGAN MELINTANG
SALURAN PRIMER PETERONGAN
P.33 S/D P.40
:
:
V
0 2.0 4.0 6.0 8.0 10.0 m PPK PERENCANAAN DAN PROGRAM PENGARAH DIREKSI
H SKALA
GALIAN = 0.86 m2 GALIAN = - m2
TIMBUNAN = 25.70 m 2 TIMBUNAN = 34.38 m 2
P.41 P.45
P.42 P.46
P.43 P.47
P.44 P.48
POTONGAN MELINTANG
SALURAN PRIMER PETERONGAN
P.41 S/D P.48
:
:
V
0 2.0 4.0 6.0 8.0 10.0 m PPK PERENCANAAN DAN PROGRAM PENGARAH DIREKSI
H SKALA