Anda di halaman 1dari 9

HAK CIPTA

Dilarang meniru atau memproduksi gambar


ini baik dalam bentuk apapun kecuali dengan
persetujuan tertulis dari developer

COPYRIGHT
No part of this document may by reproduced
transmitted or recorded in any form or
otherwise without the prior written permission
of the developers

No. Catatan & Revisi


Nb. Notes & Revisions

Proyek
DAPUR DAPUR DAPUR DAPUR DAPUR DAPUR Project

+0.25 +0.25 +0.25 +0.25 +0.25 +0.25


KM / WC KM / WC KM / WC KM / WC KM / WC KM / WC
+0.20 +0.20 +0.20 +0.20 +0.20 +0.20

Lokasi Proyek
Project Location
KAMAR TIDUR KAMAR TIDUR KAMAR TIDUR KAMAR TIDUR KAMAR TIDUR KAMAR TIDUR
+0.25 +0.25 +0.25 +0.25 +0.25 +0.25

Judul gambar
Drawing Title
KAMAR TAMU KAMAR TAMU KAMAR TAMU KAMAR TAMU KAMAR TAMU KAMAR TAMU
+0.25 +0.25 +0.25 +0.25 +0.25 +0.25

Digambar Tanggal Skala


: DS Scale
Drawn Date

22/04/20
Diperiksa Tanggal
Checked Date

Disetujui Tanggal
: PS
Approved Date

DENAH CONSTRUCTION
Utara
North

SKALA 1: 100 Lembar

DRAWING Sheet

No. Gambar
Drawing Number
HAK CIPTA
Dilarang meniru atau memproduksi gambar
ini baik dalam bentuk apapun kecuali dengan
persetujuan tertulis dari developer

COPYRIGHT
No part of this document may by reproduced
transmitted or recorded in any form or
otherwise without the prior written permission
of the developers

No. Catatan & Revisi


Ring Balok 5/10 Ring Balok 5/10 Ring Balok 5/10 Ring Balok 5/10 Ring Balok 5/10 Ring Balok 5/10 Nb. Notes & Revisions
KOLOM 10/10

KOLOM 10/10

KOLOM 10/10

KOLOM 10/10

KOLOM 10/10

KOLOM 10/10

KOLOM 10/10
BALOK 5/10 BALOK 5/10 BALOK 5/10 BALOK 5/10 BALOK 5/10 BALOK 5/10
SLOOF 15X25 SLOOF 15X25 SLOOF 15X25 SLOOF 15X25 SLOOF 15X25

POTONGAN A - A
SKALA 1: 80

Proyek
Project

Lokasi Proyek
Project Location
TAMPAK DEPAN
SKALA 1: 80

Judul gambar
Drawing Title

Digambar Tanggal Skala


: DS Scale
Drawn Date

22/04/20
Diperiksa Tanggal
Checked Date

Disetujui Tanggal
: PS
Approved Date Utara
TAMPAK BELAKANG North

SKALA 1: 80
CONSTRUCTION Lembar

DRAWING Sheet

No. Gambar
Drawing Number
D
A
HAK CIPTA
Dilarang meniru atau memproduksi gambar
ini baik dalam bentuk apapun kecuali dengan
E F B persetujuan tertulis dari developer

c COPYRIGHT
No part of this document may by reproduced
transmitted or recorded in any form or
otherwise without the prior written permission
of the developers

KOLOM 10/10

KOLOM 10/10

KOLOM 10/10
KOLOM 10/10
No. Catatan & Revisi
Nb. Notes & Revisions

G BALOK 5/10 BALOK 5/10


SLOOF 15X25

POTONGAN B - B
SKALA 1: 80
Proyek
Project

Lokasi Proyek
Project Location

Judul gambar
Drawing Title

Digambar Tanggal Skala


: DS Scale
Drawn Date

22/04/20
Diperiksa Tanggal
Checked Date

Disetujui Tanggal
: PS
Approved Date Utara
North

CONSTRUCTION
TAMPAK SAMPING KANAN Lembar

SKALA 1: 80
DRAWING Sheet

No. Gambar
Drawing Number
SLOOF 15 X 25 SLOOF 15 X 25 SLOOF 15 X 25 SLOOF 15 X 25 SLOOF 15 X 25 SLOOF 15 X 25
HAK CIPTA

SLOOF 15 X 25

SLOOF 15 X 25

SLOOF 15 X 25

SLOOF 15 X 25

SLOOF 15 X 25

SLOOF 15 X 25

SLOOF 15 X 25

SLOOF 15 X 25

SLOOF 15 X 25

SLOOF 15 X 25

SLOOF 15 X 25

SLOOF 15 X 25

SLOOF 15 X 25
Dilarang meniru atau memproduksi gambar
ini baik dalam bentuk apapun kecuali dengan
persetujuan tertulis dari developer

COPYRIGHT
No part of this document may by reproduced
SLOOF 15 X 25 SLOOF 15 X 25 SLOOF 15 X 25 SLOOF 15 X 25 SLOOF 15 X 25 SLOOF 15 X 25 transmitted or recorded in any form or
otherwise without the prior written permission
SLOOF 15 X 25

SLOOF 15 X 25

SLOOF 15 X 25

SLOOF 15 X 25

SLOOF 15 X 25

SLOOF 15 X 25

SLOOF 15 X 25
of the developers

No. Catatan & Revisi


Nb. Notes & Revisions

SLOOF 15 X 25 SLOOF 15 X 25 SLOOF 15 X 25 SLOOF 15 X 25 SLOOF 15 X 25 SLOOF 15 X 25


SLOOF 15 X 25

SLOOF 15 X 25

SLOOF 15 X 25

SLOOF 15 X 25

SLOOF 15 X 25

SLOOF 15 X 25

SLOOF 15 X 25
SLOOF 15 X 25 SLOOF 15 X 25 SLOOF 15 X 25 SLOOF 15 X 25 SLOOF 15 X 25 SLOOF 15 X 25

DENAH PONDASI
SKALA 1: 100

Proyek
Project

Lokasi Proyek
Project Location

Judul gambar
Drawing Title

Digambar Tanggal Skala


: DS Scale
Drawn Date

22/04/20
Diperiksa Tanggal
Checked Date

Disetujui Tanggal
: PS
Approved Date Utara
North

DENAH ATAP CONSTRUCTION Lembar


Sheet
SKALA 1: 100
DRAWING No. Gambar
Drawing Number
LANTAI LANTAI LANTAI LANTAI LANTAI LANTAI
RABAT RABAT RABAT RABAT RABAT RABAT HAK CIPTA
LANTAI RABAT LANTAI RABAT LANTAI RABAT LANTAI RABAT LANTAI RABAT LANTAI RABAT
BETON BETON BETON BETON BETON BETON Dilarang meniru atau memproduksi gambar
BETON TEBAL 7 CM BETON TEBAL 7 CM BETON TEBAL 7 CM BETON TEBAL 7 CM BETON TEBAL 7 CM BETON TEBAL 7 CM ini baik dalam bentuk apapun kecuali dengan
TEBAL 7 CM TEBAL 7 CM TEBAL 7 CM TEBAL 7 CM TEBAL 7 CM TEBAL 7 CM
persetujuan tertulis dari developer

COPYRIGHT
No part of this document may by reproduced
transmitted or recorded in any form or
LANTAI RABAT LANTAI RABAT LANTAI RABAT LANTAI RABAT LANTAI RABAT LANTAI RABAT otherwise without the prior written permission
BETON TEBAL 7 CM BETON TEBAL 7 CM BETON TEBAL 7 CM BETON TEBAL 7 CM BETON TEBAL 7 CM BETON TEBAL 7 CM of the developers

No. Catatan & Revisi


Nb. Notes & Revisions

LANTAI RABAT LANTAI RABAT LANTAI RABAT LANTAI RABAT LANTAI RABAT LANTAI RABAT
BETON TEBAL 7 CM BETON TEBAL 7 CM BETON TEBAL 7 CM BETON TEBAL 7 CM BETON TEBAL 7 CM BETON TEBAL 7 CM

DENAH LANTAI
SKALA 1: 100

Proyek
Project
PLAFON PLAFON PLAFON PLAFON PLAFON PLAFON
CALCIBOARD PLAFON PLAFON CALCIBOARD CALCIBOARD PLAFON PLAFON CALCIBOARD CALCIBOARD PLAFON PLAFON CALCIBOARD
4 MM, CALCIBOARD 4 MM, CALCIBOARD 4 MM, 4 MM, 4 MM, CALCIBOARD 4 MM, CALCIBOARD 4 MM, 4 MM, 4 MM, CALCIBOARD 4 MM, CALCIBOARD 4 MM, 4 MM,
RANGKA RANGKA KAYU RANGKA KAYU RANGKA RANGKA RANGKA KAYU RANGKA KAYU RANGKA RANGKA RANGKA KAYU RANGKA KAYU RANGKA
KAYU KAYU KAYU KAYU KAYU KAYU
Lokasi Proyek
Project Location

PLAFON PLAFON PLAFON PLAFON PLAFON PLAFON


CALCIBOARD 4 MM, CALCIBOARD 4 MM, CALCIBOARD 4 MM, CALCIBOARD 4 MM, CALCIBOARD 4 MM, CALCIBOARD 4 MM,
RANGKA KAYU RANGKA KAYU RANGKA KAYU RANGKA KAYU RANGKA KAYU RANGKA KAYU

Judul gambar
Drawing Title

PLAFON PLAFON PLAFON PLAFON PLAFON PLAFON


CALCIBOARD 4 MM, CALCIBOARD 4 MM, CALCIBOARD 4 MM, CALCIBOARD 4 MM, CALCIBOARD 4 MM, CALCIBOARD 4 MM,
RANGKA KAYU RANGKA KAYU RANGKA KAYU RANGKA KAYU RANGKA KAYU RANGKA KAYU
Digambar Tanggal Skala
: DS Scale
Drawn Date

22/04/20
Diperiksa Tanggal
Checked Date

Disetujui Tanggal
: PS
Approved Date Utara

DENAH PLAFON CONSTRUCTION


North

SKALA 1: 100 Lembar

DRAWING Sheet

No. Gambar
Drawing Number
BV P1 J2 J2 P1 BV BV P1 J2 J2 P1 BV BV P1 J2 J2 P1 BV

DAPUR DAPUR DAPUR DAPUR DAPUR DAPUR


HAK CIPTA
+0.25 +0.25 +0.25 +0.25 +0.25 +0.25 Dilarang meniru atau memproduksi gambar
KM / WC P2 P2 KM / WC KM / WC P2 P2 KM / WC KM / WC P2 P2 KM / WC ini baik dalam bentuk apapun kecuali dengan
persetujuan tertulis dari developer
+0.20 +0.20 +0.20 +0.20 +0.20 +0.20
COPYRIGHT
No part of this document may by reproduced
transmitted or recorded in any form or
otherwise without the prior written permission
KAMAR TIDUR KAMAR TIDUR KAMAR TIDUR KAMAR TIDUR KAMAR TIDUR KAMAR TIDUR of the developers
J1 +0.25 +0.25 +0.25 +0.25 +0.25 +0.25 J1
No. Catatan & Revisi
Nb. Notes & Revisions

KAMAR TAMU KAMAR TAMU KAMAR TAMU KAMAR TAMU KAMAR TAMU KAMAR TAMU
+0.25 +0.25 +0.25 +0.25 +0.25 +0.25

J1 P1 P1 J1 J1 P1 P1 J1 J1 P1 P1 J1

DENAH KUSEN
SKALA 1: 100

11W 11W 11W


Proyek
Project
DAPUR DAPUR DAPUR DAPUR DAPUR
11W 11W 11W 11W
KM / WC 11W 11W KM / WC KM / WC 11W 11W KM / WC KM / WC 11W 11W KM / WC

Lokasi Proyek
Project Location
KAMAR TIDUR KAMAR TIDUR KAMAR TIDUR KAMAR TIDUR KAMAR TIDUR KAMAR TIDUR
+0.25 +0.25 +0.25 +0.25 +0.25 +0.25
11W 11W 11W 11W 11W 11W

Judul gambar
KAMAR TAMU KAMAR TAMU KAMAR TAMU KAMAR TAMU KAMAR TAMU KAMAR TAMU Drawing Title

+0.25 +0.25 +0.25 +0.25 +0.25 +0.25

11W 11W 11W 11W 11W 11W

Digambar Tanggal Skala


: DS Scale
Drawn Date
MCB 11W MCB MCB 11W MCB MCB 11W MCB 22/04/20
Diperiksa Tanggal
Checked Date

Disetujui Tanggal
: PS
Approved Date Utara
North

DENAH INSTALASI LISTRIK CONSTRUCTION Lembar


Sheet

SKALA 1: 100 DRAWING No. Gambar


Drawing Number
HAK CIPTA
Dilarang meniru atau memproduksi gambar
ini baik dalam bentuk apapun kecuali dengan
persetujuan tertulis dari developer

COPYRIGHT
No part of this document may by reproduced
transmitted or recorded in any form or
otherwise without the prior written permission
of the developers

No. Catatan & Revisi


Nb. Notes & Revisions

DETAIL J1 DETAIL J2
SKALA 1: 40 SKALA 1: 40

DETAIL P1
SKALA 1: 40
Proyek
Project

Lokasi Proyek
Project Location

Judul gambar
Drawing Title

Digambar Tanggal Skala


: DS Scale
Drawn Date

22/04/20
Diperiksa Tanggal
DETAIL BV CONSTRUCTION Checked Date
DETAIL P2
SKALA 1: 40
SKALA 1: 40 DRAWING Disetujui
: PS
Tanggal
Approved Date Utara
North

Lembar
Sheet

No. Gambar
Drawing Number
HAK CIPTA
Dilarang meniru atau memproduksi gambar
ini baik dalam bentuk apapun kecuali dengan
persetujuan tertulis dari developer

COPYRIGHT
No part of this document may by reproduced
transmitted or recorded in any form or
otherwise without the prior written permission
of the developers

No. Catatan & Revisi


Nb. Notes & Revisions

DAPUR DAPUR DAPUR DAPUR DAPUR

KM / WC KM / WC KM / WC KM / WC KM / WC KM / WC

Proyek
Project

Lokasi Proyek
Project Location

Judul gambar
Drawing Title

Digambar Tanggal Skala


: DS Scale
Drawn Date

DENAH INSTALASI PIPA AIR Diperiksa


22/04/20
Tanggal
SKALA 1: 100 Checked Date

CONSTRUCTION Disetujui
: PS
Tanggal
Approved
DRAWING Date Utara
North

Lembar
Sheet

No. Gambar
Drawing Number
HAK CIPTA
Dilarang meniru atau memproduksi gambar
ini baik dalam bentuk apapun kecuali dengan
persetujuan tertulis dari developer

DETAIL SLOOF COPYRIGHT


No part of this document may by reproduced
transmitted or recorded in any form or
otherwise without the prior written permission
of the developers

No. Catatan & Revisi


Nb. Notes & Revisions

DETAIL A DETAIL B

DETAIL G Proyek
Project

DETAIL C

Lokasi Proyek
Project Location

Judul gambar
Drawing Title

DETAIL D
Digambar Tanggal Skala
: DS Scale
Drawn Date

22/04/20
DETAIL E Diperiksa Tanggal
Checked Date
DETAIL F
Disetujui Tanggal
: PS
Approved Date Utara

CONSTRUCTION North

DRAWING Lembar
Sheet

No. Gambar
Drawing Number