REKAPITULASI ANGGARAN BIAYA

PEKERJAAN : PEMBANGUNAN SPORT HALL TAHAP II FAKULTAS TEKNIK UNIVERSITAS HASANUDDIN


SATUAN KERJA : UNIVERSITAS HASANUDDIN
LOKASI : FAKULTAS TEKNIK UNHAS (KAB. GOWA)
TAHUN : 2022
PERUSAHAAN : CV. AM2O

NO JENIS PEKERJAAN TOTAL HARGA (Rp.)

I PEKERJAAN PERSIAPAN Rp. 92,850,000.00

II PEKERJAAN STRUKTUR ATAP Rp. 9,640,299,747.25

III PEKERJAAN ARSITEKTUR Rp. 1,926,054,798.95

IV PEKERJAAN MEP Rp. 1,150,840,758.79

Total Cost Rp. 12,810,045,304.99


PPN 11% Rp. 1,409,104,983.55
Dibulatkan Rp. 14,219,150,288.54
Terbilang

pajak ppn 11% = 1,564,106,531.74


pajak pph 2.65% = 376,807,482.65
sisa bersih di kurangi pajak 11%+2.65% = 12,278,236,274.15

komitmen 13% = 1,596,170,715.64


13%
3% = 368,347,088.22
4% = 491,129,450.97
6% = 736,694,176.45