Rab Sederhana Pembangunan Irigasi
Rab Sederhana Pembangunan Irigasi
Volume
Jumlah
Jumlah Total
No URAIAN Satuan Harga Satuan
Total Swadaya Pokir (Rp.)
Dari
Dari Pokir
Swadaya
I Bahan
1 Semen 50 Kg SNI 700 - 700 Zak Rp 63,000 - 44,100,000 44,100,000
2 Pasir 140 - 140 M³ Rp 130,000 - 18,200,000 18,200,000
3 Batu Kali 281 - 281 M³ Rp 160,000 - 44,960,000 44,960,000
4 Kerikil 30 - 30 Batang Rp 35,000 - 1,050,000 1,050,000
5 Batako 1 - 1 M³ Rp 1,650,000 - 1,650,000 1,650,000
6 Plastik 30 - 30 M Rp 5,000 - 150,000 150,000
7 Benang 2 - 2 Gulung Rp 5,000 - 10,000 10,000
SAFRI, STh.I