Tangga
Tangga
PERENCANAAN
UNIVERSITAS KRISTEN PETRA
BAGIAN STRUKTUR: NRP: B11190077
TANGGA B11190085
PERHITUNGAN
BAB IV
TANGGA
A
sin α = 25 → A = 25 sin (38.38°) = 15.52 cm
A 15.52
Tebal plat rata-rata = 12 + 2 = 12 + = 19.76 cm
2
Syarat tangga:
2O+A= 61-63 cm
2O+A= 36 + 25 = 61 cm (OK)
Beban Mati
a. Plat miring
1
Berat sendiri plat = cos α x 0.1976 x 2400 = 604.97 kg/m2
Gambar 4.2 Output Momen Bordes dan Plat Miring Tangga Arah 1-1 pada SAP2000
Gambar 4.3 Output Momen Bordes dan Plat Miring Tangga Arah 2-2 pada SAP2000
FAKULTAS TEKNIK SIPIL DAN TUGAS STRUKTUR BETON Halaman: 19
PERENCANAAN
UNIVERSITAS KRISTEN PETRA
BAGIAN STRUKTUR: NRP: B11190077
TANGGA B11190085
PERHITUNGAN
Gambar 4.4 Letak Momen Positif dan Negatif Terbesar Arah 1-1 dan Arah 2-2
d = 120 – 20 – 0.5 x 10 = 95 mm
Mu max = 10.33 kNm
C=T
0.85 x fc’ x a x b = As x 240
0.85 x 30 x a x 1000 = As x 240
a = 0.0094 As
Mu = ∅Mn
10.33 x 106 = 0.9 x As x fy x (dx – 0.5a)
10.33 x 106 = 0.9 x As x 240 x (95 – 0.5 x 0.0094 As)
As = 516.62 mm2
Asmin = 0.25% x b x d = 0.25% x 1000 x 95 = 237.5 mm2
As > Asmin, maka digunakan As = 516.62 mm2
516.62
Jumlah tulangan perlu : n = = 6.58
0.25 𝑥 𝜋 𝑥 102
FAKULTAS TEKNIK SIPIL DAN TUGAS STRUKTUR BETON Halaman: 20
PERENCANAAN
UNIVERSITAS KRISTEN PETRA
BAGIAN STRUKTUR: NRP: B11190077
TANGGA B11190085
PERHITUNGAN
1000
Jarak tulangan : s = = 152.03 mm ≈ 100 mm
6.58
Syarat : smax ≤ min (2h atau 450 mm) (SNI 2847 : 2019 ps 8.7.2.2)
≤ 240 mm (OK)
Tulangan terpasang = Ø10 – 100
Tulangan pembagi = 20% x As = 103.32 mm2 (Ø10-760) > smax, maka s = smax
Tulangan pembagi terpasang = Ø10 – 240
Gambar 4.6 Output momen arah 3-3 balok bordes pada SAP 2000
Gambar 4.7 Output gaya geser arah 2-2 balok bordes pada SAP 2000
Penulangan geser
Vu = 16.14 kN
1
∅Vc = 0.75 x x √fc′ x b x d
6
1
= 0.75 x x √30 x 200 x 242 x 10-3
6