Anda di halaman 1dari 1

7.

70

0.40 0.40
3.45 3.46

Sheet Pile Beton


3.00 2.40 2.40 2.40

2.95

2.58
3.50
Tiang Pancang

2.57
Elv. +2,70

2.10 2.10

2.50
Tiang Pancang
Elv. 7.60

Jln. Jalaludin Tantu


2.75

2.75
X + 0,92m

2.50
Tiang Pancang Y + 18,72m

21.90
Elv. +3,70

+9.672
X - 10,31m
Y + 13,95m Sheet pile
X - 7,70m , Y + 13,60m

3.50
10.31

3.50
4.15 3.50
13.95

Tiang Pancang

4.00

4.00
KUBIKEL PLN
3.45

Elv. 3.40
Tiang Pancang
8.10

X - 0,40m
Sheet pile Elv. 7.60
Y + 3,35m
X + 0,35m X + 4,20m
Y + 2,95m Y + 3,50m
Y+
3.57

Titik B Jalan Existing


Jalan Existing
0.40
X- X+
4.20
X Dind
ing L 5 Batas Luar Jalan
uar S .00 m
alura
n+
0.40 Batas Luar Jalan
Y-

Shee 0.80 2.00 3.45 3.45


Dinding Dalam t Pile

Saluran Existing Titik A


Center Sheetpile

X - 15.16

Jumlah Lembar
PEMERINTAH PROVINSI GORONTALO BIDANG SUMBER DAYA AIR PPTK:
No. Lembar
FARID DANI, ST
DINAS PEKERJAAN UMUM & PENATAAN RUANG PEMBANGUNAN STASIUN Skala
PEKERJAAN
BIDANG SUMBER DAYA AIR POMPA BANJIR TANGGIDAA No. Kontrak
Jl. Prof. Dr. Aloei Saboe No.92 kel. Wongkaditi KPA:
KOTA GORONTALO, PROVINSI Tgl. Kontrak
Telp. 0435 (821806) LOKASI ROMEN S. LANTU, ST.MT
GORONTALO Tahun Anggaran