Anda di halaman 1dari 1

Plat beton 12 cm

+4.00

0.12
Support setiap jarak 1.50 m

0.50
Balok B2A-250x500

0.38
Cable tray 200x40

0.10
+3.40 0.20 0.20
Plafond

0.25
0.40

DETAIL KABEL TRAY 1:20

-0.25
81.06 0.93
F 6.06 6.00 6.00 6.00 6.00 5.00 6.00 6.00 6.00 5.00 6.00 6.00 6.00 2.32 2.68
3.12 2.94
2.00

1.02
E
1.24

RG. ABK
3.94

3.94
RG. ABK RG. ABK KSKP SPEEDBOAT
SPEEDBOAT SPEEDBOAT RG. DISHUB RG. KSOP
2.70

AREA SHELTER DAN DERMAGA AREA SHELTER DAN DERMAGA


4.00

KEBERANGKATAN (SISI SELATAN) KEBERANGKATAN (SISI SELATAN)


±0.00 ±0.00
14.34

14.34
8.00
C
TOILET 77.00
3.20

DIFABLE
KABEL TRAY 200X40, SUPPORT SETIAP JARAK 1500 mm SUB PANEL DISTRIBUSI 3 PHASE
4.00

TOILET WANITA
RG.
TUNGGULANSIA /
LAKTASI
0.80

B TOILET
DIFABLE
2.40

2.40
TOILET PRIA

A
0.74
0.85

1.11
1.15

1.39

1.50
0.81
0.81

0.81
0.80

0.85

0.85
2.05
2.11

6.06 6.00 6.00 6.00 6.00 5.00 6.00 6.00 6.00 5.00 6.00 6.00 6.00 5.00

2.16
2.11
81.06

2.09
-0.80 -0.80

2.36
-0.80
0.81
0.81

0.81

0.81

0.82

0.81
1 2 3 6 7 10 11 14 15 16
GARIS AS TANGGA

GARIS AS TANGGA

GARIS AS TANGGA
DENAH PERLETAKAN PANEL & KABEL TRAY 1:250

PAKET PEKERJAAN : DI SETUJUI OLEH : DI PERIKSA OLEH : DI BUAT OLEH : NOTE : SHOP DRAWING
PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN MANAJEMEN KONSTRUKSI KONTRAKTOR PELAKSANA
DINAS PERHUBUNGAN PROVINSI PT.SWEEB PLAN TRIALINDO BERDIKARI PRATAMA, KSO
PEMBANGUNAN PELABUHAN TENGKAYU KALIMANTAN UTARA JUDUL GAMBAR
TAHAP IV DENAH PERLETAKAN PANEL &
KABEL TRAY, DETAIL KABEL
TRAY
KONTRAKTOR PELAKSANA :
KODE GAMBAR SKALA
PEMERINTAH PROVINSI KALIMANTAN UTARA
DINAS PERHUBUNGAN, KOMUNIKASI DAN INFORMTIKA
1:250, 1:20
Jl. Durian RT.95 RW. 35 Telp. (0552) 21848
dishubkominfo_kaltara@yahoo.co.id, NO LEMBAR JML. LEMBAR
Tanjung Selor 77212 FREDY PATANTAN, ST. ARMAN, ST., MT. BUDI SETIAWAN, ST., MT.
NIP. 198008 072009 1 001 TEAM LEADER PROJECT MANAGER 107 107