SUB JUMLAH I
II BAHAN/MATERIAL
1. Multiplek tebal 1,8 cm lbr 0.128 336,600.00
2. Kayu usuk/kaso klas 3 m3 0.005 3,115,800.00
3. Paku Biasa 5 cm - 7 cm kg 0.240 23,400.00
4. Minyak bekisting ltr 0.200 17,000.00
SUB JUMLAH II
III PERALATAN
SUB JUMLAH IV
JUMLAH HARGA = I + II + III + IV
HARGA SATUAN PEKERJAAN (DIBULATKAN)
JUMLAH
HARGA
(Rp.)
19,104.00
13,020.00
1,302.00
2,762.40
115,100.00
43,084.80
15,579.00
5,616.00
3,400.00
67,679.80
0.00
182,779.80
1,827.80
16,450.18
18,277.98
201,057.78
201,050.00