Anda di halaman 1dari 1

1.50 1.

50

1.50
D:\2022\BAK AIR BRAWIJAYA\cdaa35ccfd6935127e3efa0e2db5d995.png
0.30
0.60

0.20

1.50
0.30

3.75
.38
.50 PEMERINTAH PROVINSI PAPUA BARAT

.75
ATAP SENG SPANDEK
2.44 x 1.10 m.

.75
2.45 .65
KETERANGAN :
BESI KANAL C
.15

.10

.70
.60
.15 .15
Pembangunan Lapangan Olah Raga

1.00
.25

BESI HOLLOW 4X8X6

.47
70°
Serba Guna Untuk Warga
20°
Masyarakat dan Pemuda-Pemudi

.30
.18
.13
110°
110°
BESI HOLLOW 4X8X6
DETAIL Kompleks Reremi

.36
0
1.5

..35
50°
BESI HOLLOW 4X8X6
LOKASI
.20 .20 .45 .20 .20
40°
DETAIL Kabupaten Manokwari
DIUSULKAN OLEH :
0.70

Wire Mesh Ø
0.03 3/8" @ 0.25
0.62
Ketua RW Kompleks Reremi
0.10

Wire Mesh Ø
3/8" @ 0.25
Asphalt Joint 1"
.45

.10 .65
.45

Wire Mesh Ø
1.25

3/8" @ 0.25
PAGAR PEMBATAS PASIR URUG/SIRTU .10 .65
Wire Mesh Ø
3/8" @ 0.25
Wire Mesh Ø
3/8" @ 0.20
.10
.45

.10
.35

Asphalt Joint Asphalt Joint PLATFORM


.02 .02 +0.10
=0.00

.10
PASIR URUG CONCRETE CONCRETE
.28

FRANS WEREY
.40

.20
.30 FOOTING PASIR URUG/SIRTU PASIR URUG/SIRTU

.55
.02

.35
FOOTING
PASIR URUG
KETUA RW 11

.20
PASIR URUG
Wire Mesh Ø
.30 1.50
3/8" @ 0.10
.60

TAMPAK 1-1
.50 ZONA TRIBUN DI BUAT OLEH:
KONSULTAN PERENCANA
CV.JARGARIA PAPUA
JUDUL GAMBAR SKALA
TAMPAK DEPAN
ZONA TRIBUN
KODE NO. LBR JLH. LBR

Anda mungkin juga menyukai