Anda di halaman 1dari 1

SALURAN SEKUNDER E : SALURAN SEKUNDER D :

A 700 ha E A 850 ha
700 ha Q
Q
V V
Vd +17.33
Vd
K 40 +18.50 D K 40
+26.00 850
m 1,0 +18.50 ha m 1,0
b 1,058 m +26.00 Kolam
b 1,239 m
h 0,666 m Olakan h 0,714 m
+20.50
w 0,50 m +20.50 w 0,50 m
n 1,59 +20.50 n 1,74

+23.23

+24.26

+25.60
+25.60 +23.19

+24.24 SALURAN SEKUNDER C :

A 900 ha
Q
+26.00 V 0.451/dtk
Vd
K 40
m 1,0
b 1,299 m
+24.24
+26.00 h 0,728 m
+25.60 +25.60
w 0,50 m
n 1,79

10
C
50
+21.00
SALURAN PRIMER A :

ha
+19.77
Kolam
A 1100 ha Olakan +21.00
+26.00
Q
V +24.25
+24.24
Vd
K 40
m 1,5 +26.00
b 1,492 m +25.60
+25.60
h 0,759 m
w 0,60 m
n 1,97 +21.60

1050 ha
+24.24
SALURAN SEKUNDER B :

B
Kolam +20.28
+24.25 Olakan
+26.00
25°
+21.60 A 1050 ha
+26.00
41° Q
1100 ha

18°
+24.24 +25.60 V
A

Vd
+26.00 +26.00 K 40
+26.00
m 1,5
b 1,338 m
h 0,714 m
w 0,60 m
n 1,87

DISETUJUI OLEH : DIGAMBAR OLEH : NAMA GAMBAR SKALA


TUGAS :
UNIVERSITAS DAYANU IKHSANUDDIN
DOSEN / ASISTEN
IRIGASI &
FAKULTAS TEKNIK BANGUNAN AIR 1 CATATAN / REVISI No. Gambar
PROGRAM STUDI TEKNIK SIPIL HILDA SULAIMAN NUR, S.T.,M.T. LA ODE RACHMAD MILLEN
Jml. Gambar
NIDN. 09 1607 6602 19 630 021
Kode Gambar

Anda mungkin juga menyukai